10.1 Introduction
Industrial development in Egypt is considered the essence of growth and
economic development. It reflects extent of economic progress to list its
products on world markets. Upgrade manufacturing & production sectors
reflect on exportation sector, as it is vital and essential motive for realizing
development in any country.
Industry occupies an advanced rank in its importance for the Egyptian National
economy; as it stands on the top of the economic sectors in terms of its
contribution to GDP, its strong interrelation with many productive and service
sectors and its role in developing foreign trade and improving payments
balance.
MSEA implements many funding programs to achieve environmental
compliance, through providing soft packages to finance pollution abatement
and cleaner production projects. The importance of cleaner production projects
is reflected in being the most important method to achieve sustainable
development and reduce pollutants in the industrial sector from the source; as
well as coping with global industrial policies, spread of cleaner production
trends, and appearance of new global concepts based on principles of total
quality to achieve its product quality.
3
10.2 Current Projects and Programs
10.2.1 Egyptian Pollution Abatement Projects –Second Phase
(2007-2012) The project provides soft financial package to support industrial pollution
abatement projects in industrial facilities with financial package (80 % loan,
20% grant). EPAP II concentrates on hot spot polluted areas in Greater Cairo &
Alexandria governorates, combining large industries emitting great amounts of
air and wastewater pollutants loads such as cement, iron and steel, chemical
industries and tanneries. Funding package of this phase estimated with 185
million dollars (one billion Egyptian pounds). Provided support include the
following:
10.2.1.1 Financial Component: Provide soft loans for industrial facilities, re-loaned by National Bank of
Egypt (80% loan, 20% non-refundable grant). The following illustrates
budget of that component:
1. 20 Million US$ World Bank for Construction and
Development.
2. Equivalent to 40 Million US$ Japan Bank for International
Cooperation (JBIC).
3. 40 Million € European Investment Bank (EIB).
4. 40 Million € French Development Agency (AFD).
10.2.1.2 Technical Support Component: Provide technical support to industrial facilities which will be financed by
the financial component (non-refundable grants) through:
1. European Investment Bank (EIB) 2.8 Million €.
2. Government of Finland 0.88 Million €.
10.2.1.3 Current status (2011):
49 projects are currently listed in the project, 30 major companies and 200
brick factories (Arab Abou Saed ) with total cost estimated with 204,058
Million US$.
4
Table (10-1 ) Projects in EPAP II pipe line
Projects Number of Projects Cost (Million dollar)
Projects under
implementation
20 44,117
Projects under bidding and
installation procedures
15+200 brick factories 101,205
Projects approved during
2011
13 48,736
Projects under preparation 1 10
Total 49+200 brick factories 204,058
Table (10-2) Implemented and operated projects through EPAP II During 2011
Current
status
Loan
(million
Dollar)
Project Company NO
Implemented 15 New Filters Torah Cement 1
Implemented 15
Rehabilitation of
phosphoric acid units,
fertilizer units and its
mills
(10 Projects)
Abou Zabaal
Fertilizer
2
Implemented 0,21 Installing waste water
treatment plant Harvest Food
3
Implemented 6 In process modification Ameria for Cement 4
36,21 Total
Table (10-3) Projects under tendering , procurement and installation procedures
Current
status
Loan
(million Dollar) Project Company No
Bid opening 20 New tissue filters for dry
lines 3 and 4 National Cement 1
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
5
Table (10-4) Approved projects during 2011
Current status Loan
(million Dollar)
Project Company No
Under bidding 2 Waste water pollution
abatement by treatment
Egyptian
etrochemicalP 1
Implemented 0,448
Buy cleaner unit and dust
vacuum unit 2
Under
installation 11,142
Modify production lines –
in process
Egyptian Starch &
Glucose Co. 3
Under
installation 1,945
Replacement of furnaces
‘door El Nasr for Coke 4
Bid Issued 15
Replacement of phenol
with NMP
Ameria Petroleum
Refining 5
Under
Implementation 25 Fuel switching Arab Abou Saad
brick factories 6
Under
supplying 2,8 De dusting system
Alexandria
Sodium Carbonate 7
Under
supplying 2,4 Cement mills Filters Helwan cement 8
Under
supplying 7,8
Installation of new bag
filter
Amereyah Cimpor
Cement 9
Under
supplying
and
installation
1,26
13 filter replaced in the
area of packaging and
clinker handling line 1,2
Ameria for
Cement 10
Under
supplying 0.75
Installing waste water
treatment plant
El Nile Soft Drinks
Company “Crush” 11
Under
supplying 1
Installing industrial waste
water treatment plant Kiriazi 12
Under
supplying 7
Filter replacement in line
2
Amreria for
Cement 13
Bid under
evaluation 0,36 Solvent Recovery unit Pachien 14
Bids under
evaluation 4 Solvent Recovery unit Porta Egypt 15
Bids under
evaluation 0,3
Installing Waste water
Treatment plant Great Food 16
101,205 Total
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
6
from pollution source
Under bidding 4 Installation of Reverse
Osmosis unit
Abou Qier
Fertilizer 2
Under bidding 4,4 dust collection Upgrading
system in furnace area
Delta for steel
3
Under bidding 1,64 Using Alternative fuel Amiria
Cement 4
Under bidding 1
industrial ation ofInstall
aste water treatment w
plant
Misr for
micals Che
ndustryI
5
Application
form and credit
worthiness
submitted
21 Fuel switching for Brick
Factories in Saaf area Maya Gas 6
pplication A
submitted form 4 Solvent recovery unit Rotografy 7
Under bidding 4
Using Alternative fuel
(agricultural waste and
sludge)
Helwan
cement 8
Under bidding 0,09 ventilation Installation of
unit
Universal
9
Under bidding 0,106
industrial Installation of
aste water treatment w
plant
10
Application
form submitted 3,5
Recycling rice straw to
produce compost Hayawe 11
Application
form submitted 1 Fuel switching lamSek 12
Under bidding 2
Using Alternative fuel
(agricultural waste and
sludge)
Suez
Cement(Qata
mya Factory)
13
48,736 Total
Table(10-5) Projects under study
Current status
Loan
(million
Dollar)
Project Company No
Application 10 Fuel switching
for Brick Town gas 1
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
7
form submitted Factories in Grza
area
10 Total
Examples for financed projects:
1. Abou Zabaal for Fertilizers and Chemicals:
EPAP project financed in process modification by adding new units to
reduce dust emissions with total cost 16.69 million $, EPAP II provided 15
million $ (80% loan, 20% grant).
2. Ameria Cement:
Before Implmentation After Implmentation
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
8
Adding tissue filter after the electrostatic precipitators for raw mills in
production line number (1); total cost of the project 7.8 million $. EPAP II
provided 6.1 million $ (80% loan, 20% grant) and the rest self-financing by
the company.
10.2.2 Private and Public Sector industry project (PPSI) 2008 -
2012
10.2.2.1 Background:
The Private Public Sector Industry Project (PPSI) aims at supporting
Egyptian industry (small – medium – large industries) to comply with
environmental laws and regulations; as well as improve its environmental
performance .It is a joint project between German government
(represented by KFW) and Egyptian government (represented by Central
Bank of Egypt) and Egyptian Environmental Affairs Agency as the
implementing agency.
10.2.2.2 PPSI's Objectives:
1. Support industrial pollution abatement projects in industrial enterprises
in both private and public sectors.
2. Develop sustainable financial, technical and institutional mechanisms
for pollution abatement and decrease pollution loads in the selected hot-
spots areas particularly in Delta and Upper Egypt governorates to
improve local environmental conditions.
3. Activate legislative procedures, improve inspection efficiency; develop
technical capacity of environmental institutions and competent banks;
raise public awareness relating to industrial environment in Egypt,
particularly within Delta and Upper Egypt governorates.
10.2.2.3 Current Status ( Dec, 2011):
Before Implmentation After Implmentation
9
1. Total grant (7.26 Million Euro) with total investment about 31 million
Euro) 6.55 million Euro directed to industrial enterprises and the
remaining for technical support component.
2. Approved industrial projects are with total investment (31 million
Euros) including 7.2 million Euro grant.
3. Number of industrial enterprises in the project is 50 (22 large, 28
SMEs), including 13 public sector enterprises and 37 private sector
enterprises.
Table (10-6) enterprisers in the project and their geographical distribution
No. Company Project
Qena and Sohag governorates
(Qena – Nagaa Hemady – Qous – Gerga - Armant)
1 Qena for Paper
Prevent direct discharge of waste water
into River Nile; convert it to sanitation
network for treatment and use in irrigating
timber forest (contracted with Drinking
Water and Sanitation Authority for
conducting engineering studies) .
2 Misr Aluminum Rehabilitation of the old tar melting unit
(operating )
3
Al- Ahram Company
for Plastic Bags
Production
Recycling line to reuse generated solid
waste (operating )
Install new printing unit (operating )
4 El-Romani for Plastic
Bags Production
Recycling line to reuse generated solid
waste (operating )
5 Bebobird Factory for
Leather Industries
Recycling line to reuse generated solid
waste (operating )
6 Al-Kawther Company
for Food Production
Install new boiler with its connection
utilities (operating )
7 Al- Kawther Factory for
Animal Fodder
Install air filters and 2 silos at the feeding
area (operating )
8
Sohag for Plastic
Install 2 crushers, 2 injection units , 1
mixer, 2 forming units (operating )
9 El-Motahda for plastic Replace old crusher, injection unit , mixer
& forming units with new (operating )
10
El-Barka for chicken
fodder production
Replacement of old boiler with new
natural gas one (operating )
Install 2 capsule machine, 2 grinding
machine & mixer (operating )
10
11
Abou Eldahb for plastic
pipe production
Replacement of old crusher, injection,
mixer & forming units with new one
(operating )
12 Egyptian Ferro Alloys
(Ferrosilicon ) Gases treatment (operating )
13 El-Nasr for Mining Co.
First project : Installation of filters for
crusher of raw mining material (start-up
test )
14 Misr Edfu for Pulp and
Paper
Pulp washing & recycling systems (start-
up test )
15
Sugar and Integrated
Industries Company –
Abu-Qurqas factory
Switching fuel to natural gas (start-up )
16 El-Redi for extracting
oils and Poultry Fodder
Rehabilitation of fodder line production
(operating )
Rehabilitation of boiler (operating )
Install natural gas boiler (operating )
17 El-Yasmin for Pasta
Production
Install natural gas boiler (operating )
Conveyor belts and ventilation system
(operating )
Industrial wastewater treatment plant
(WWTP) (operating )
18 El-Mokhtar for Food
Industries
Replace packing unit by an automatic one
(operating )
19 El-Zaeem for fodder
Production
Line filter ventilation, four silos in the
storage area with mixing and automatic
lift (operating )
20 El-Saba for wood
production
Replace old wood production line by new
technology (operating )
New painting line (operating )
21 El-Forsan for Food
production
Replace 10 sugar cookers, mills & de-
dusting system (operating )
22 Delta Fertilizer
(environmental studies)
Install nitrogen emission reduction (Nox)
unit
23 Mansoura Resins
(environmental studies) Switching fuel to natural gas
24 Dakhlia textile Switching fuel to natural gas, (operating )
25 Misr oil and soap
(Sandoub Factory) Switching fuel to natural gas, (operating )
26 Ashmawy Brick factory Switching fuel to natural gas, (operating )
11
27 Abd El-Hay Brick
Factory Switching fuel to natural gas, (operating )
28 Mansoura Bio-Fibers Solid waste treatment ( preparation of
technical studies )
Sharkia Governorate
(Zagazig, Tenth of Ramdan)
29 Misr oil and soap
(Zaqaziq Factory) Switching fuel to natural gas, (operating )
30 CAN for gases filling Installation of units to reduce industrial
waste pollution (operating )
31 Sharkia Rice Mills Switching fuel to natural gas, ( preparation
of technical studies )
32 El-Shoubagy Wastewater treatment plant (technical
studies prepared)
33 Gest for Metal Co. Install new sanding machine( installed and
operated)
34 El-Rowad for Poultry
(ROFI)
Industrial wastewater treatment plant,
(operateing).
Solid waste treatment unit, (operated)
35 El-Motahida for Metal
Foundries
Install de dusting filter system (preparing
technical studies )
36 Tiba Engineering
Industries
New electrostatic powder painting machine
(preparing technical studies )
37 Fortuna
Switching fuel to natural gas , automatic
printing machine ((preparing technical
studies )
38 Al-Amir for Ceramic
Company
Install de-dusting filters (preparing
technical studies )
39
10th of Ramadan for
Electrical Industries
(GAD)
Install an automatic electrostatic painting
unit (preparing technical studies )
Switching fuel to natural Gas , (preparing
technical studies )
40 Saiver Egypt Replace polyurethane foam injection
machine (preparing technical studies )
41 EIPCO
Industrial wastewater treatment plant
(preparing technical studies )
42 Elrabea Replace sesame and tahini Production line
(installation)
Behara Governorate
(kafr Eldwar,Hosh issa,Behara)
12
43
Misr for Spinning ,
Textile and Dyeing /
Kafr El-Dawar
Switching fuel to natural gas( operating)
44
Misr for spinning ,
textile and dyeing / Kafr
El -Dawar - (Bida
factory)
Switching fuel to natural gas( operating )
45 Behera Pack
Replace cutting and printing
machines(start-up test)
Install closed cooling water cycle (start-
up test)
46 Dody plast
Replace manual feeding with automatic
one (start-up test)
Install new extruder (start-up test)
Damiata Governorate
(Damiata)
47 Damietta Co for
containers Industrial wastewater treatment plant
Gharbia Governorate
(Mahalla)
48 SMC Electronics Industrial waste water treatment plant and
modify production process (operated).
49 Othman Brothers for
Textile
Industrial waste water treatment plant
(technical studies prepared)
Fayom Governarate
(Fayom)
50 Fayom For Sugar Switching fuel to natural gas
Examples for financed projects:
1. Abd El Hay Brick Factory:
Switching fuel used in the furnace from (mazot) to natural gas; extend
internal and external pipelines network and change current burners.
Total cost of the project 95 thousand Euro from the Private and Public
Sector Industry project (30% non-refundable grant -28 thousand Euros).
Source: Ministry of State for Environmental Affairs - Central Department for Industrial Environment
Protection and Improvement
13
Before
2. CAN for manufacturing and gases filling:
Install 2 CNC machines to adjust used inks in printing operations with total
cost 441,907.2 Euro; in addition to financing environmental studies with
88381.44 Euro (non-refundable grant) through the Private and Public
Sector Industry Project. Installation and operation of this project finalized
in January 2009.
10-3 Future vision:
1. Raise environmental awareness among civil society through applying
different systems such as assessment and classification of pollution
resulting from industrial projects (Program for Pollution Evaluation
Report, PROPER), through publishing results of such programs in
Egyptian newspapers to evaluate performance of companies.
Before Implmentation After Implmentation
Before Implmentation After Implmentation
14
2. Apply Environmental Impact Assessment (EIA) for all new projects to
comply with the requirements of co-financers (International Bank for
Reconstruction and Development, Japan International Cooperation
Agency, European Investment Bank, French Agency for Development),
including the most important requirement which is holding public
hearings and announce about these projects before their execution to
guarantee transparency and improvement of the environmental status.
3. Reduce pollution loads of cement companies in Greater Cairo and
Alexandria to the full compliance with permissible local standards and in
some companies to the international standards during next five years.
4. Transfer all polluting industries from residential areas to authorized
industrial zones such as Badr and El Akrasha.
5. Convert discharge of waste water from Nile River to public networks in
some large industrial companies which is considered the main source of
Nile pollution, after conducting projects for treating or recycling waste
water.
6. Reduce pollution loads in Greater Cairo hot spots areas (air quality) and
Alexandria (discharge into sea), after executing proposed projects in
industrial companies through MSEA’s financial packages.
7. Study the impact of issuing Executive Regulations of Law No. 9/ 2009
on the environmental performance of industries.