DISTRIBUTION

Controlled copy to be distributed to:

SISJV project directors, project managers, site manager, construction managers, technical office manager, admin manager, logistics manager

SISJV subcontractors lead project manager, package managers

ALDAR

JACOBS

KEO

all interested parties involved in the CCAD project1

REFERENCES:

“Health & Safety Codes of Practice for Construction Projects”, Site Standards & Guidelines for Consultants & Contractors. (issued by the Emirate of Abu Dhabi Municipalities & Agricultural Dept.).

“Regulatory framework – EHS policy” (issued by the AD EHSMS)

This HSE plan will also comply with ALDAR Health Safety Security and Environmental Management System Doc No AC/HSSE/M/001 and AC/HSSE/M/002.

REVISION STATUS

Rev Date Revision Purpose Writer

Rev 0.0 Submitted 21 Mar 2010 For Review and Approval L. Davies

Rev 0.1 Submitted 25 Apr 2010 For Review and Approval L. Davies

Rev 0.2 Submitted 18 June 2010 For Review and Approval E. Chantraine

Rev 0.3 Submitted 8 August 2010 For Review and Approval E. Chantraine

1 This HSE Plan does apply to all parties having activities on site. This means to be even strictly applied and followed by any

contractor including any company directly appointed by the client or the consultants.

Page 3: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 3

Table of contents

1 INTRODUCTION ............................................................................................................................................. 6

1.1 DEFINITION AND INTERPRETATION ......................................................................................................................... 7 1.2 SCOPE ..................................................................................................................................................................... 7

1.2.1 SUBJECT OF THE CONTRACT ........................................................................................................................................8 1.2.2 CONCERNED PARTIES ..................................................................................................................................................8 1.2.3 IDENTIFICATION OF SUB-CONTRACTORS ....................................................................................................................9 1.2.4 IDENTIFICATION OF HSE PARTIES ................................................................................................................................9

1.3 HSE POLICY STATEMENT .......................................................................................................................................... 9 1.4 OBJECTIVE ............................................................................................................................................................. 10 1.5 HSE PLANNING ...................................................................................................................................................... 10

1.5.1 PHASE ONE: ENGINEERING .......................................................................................................................................10 1.5.2 PHASE TWO: ADMINISTRATION ................................................................................................................................11 1.5.3 PHASE THREE: PERFORMANCE MEASUREMENT & MONITORING ............................................................................11 1.5.4 PHASE FOUR: IMPROVEMENT ...................................................................................................................................11 1.5.5 PLANNING FLOW DIAGRAM FOR CONTINUAL IMPROVEMENT ................................................................................12

2 AUTHORITY AND RESPONSIBILITIES IN HSE ORGANISATION .........................................................................13

2.1 INTRODUCTION ..................................................................................................................................................... 14 2.2 PROJECT DIRECTOR AND DEPUTY PROJECT DIRECTOR ........................................................................................... 14 2.3 PROJECT / CONSTRUCTION MANAGERS ................................................................................................................ 15 2.4 TECHNICAL OFFICE ENGINEER ................................................................................................................................ 15 2.5 SITE MANAGER - LOGISTICS MANAGER ................................................................................................................. 16 2.6 SUPERVISORS ........................................................................................................................................................ 17 2.7 PERSONNEL DEPARTMENT IN-CHARGE .................................................................................................................. 17 2.8 HSE MANAGER / DEPUTY MANAGER ..................................................................................................................... 18 2.9 SAFETY OFFICERS .................................................................................................................................................. 18 2.10 FIRST AID .............................................................................................................................................................. 19

2.10.1 FIRST AID FACILITY ................................................................................................................................................19 2.10.2 MALE NURSE/FIRST AIDER ....................................................................................................................................19 2.10.3 SITE DOCTOR .........................................................................................................................................................20

3 ADMINISTRATIVE PROCEDURES ...................................................................................................................21

3.1 HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK REDUCTION PLANNING ................................................... 22 3.2 HSE AWARENESS ................................................................................................................................................... 22 3.3 HSE INCIDENTS AND ACCIDENTS ........................................................................................................................... 23

3.3.1 TREATING INJURIES AND INVESTIGATION .................................................................................................................23 3.4 HSE MEETINGS ...................................................................................................................................................... 25

3.4.1 INDUCTION MEETING ................................................................................................................................................25 3.4.2 TOOLBOX TALK ..........................................................................................................................................................26 3.4.3 TOOLBOX MEETING ...................................................................................................................................................26 3.4.4 HSE CONSULTATION AND COMMUNICATION METHODS .........................................................................................27 3.4.5 HSE PUBLICITY AND MOTIVATION.............................................................................................................................27 3.4.6 SAFETY MOTIVATION, INCENTIVES, AND RECOGNITION ...........................................................................................27

3.5 SAFETY COMMITTEE .............................................................................................................................................. 27 3.6 HSE INSPECTIONS AND AUDITS ............................................................................................................................. 28 3.7 SECURITY .............................................................................................................................................................. 29

3.7.1 GENERAL ...................................................................................................................................................................29 3.7.2 REMOVING MATERIALS OFF THE SITE .......................................................................................................................29

4 SITE PRACTICES & PROCEDURES ...................................................................................................................30

4.1 LIFTING OPERATIONS ............................................................................................................................................ 31 4.1.1 SAFE LIFTING PRACTICE .............................................................................................................................................31

Page 4: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 4

4.1.2 CRANE AND RIGGING SAFETY ....................................................................................................................................33 4.1.3 LOAD HANDLING .......................................................................................................................................................34 4.1.4 MOBILE CRANES ........................................................................................................................................................34 4.1.5 RIGGING REQUIREMENTS..........................................................................................................................................34

4.2 STORAGE ............................................................................................................................................................... 35 4.3 HAZARDOUS MATERIALS ....................................................................................................................................... 36 4.4 ENERGY SUPPLY – ELECTRICAL PLAN. .................................................................................................................... 37 4.5 SCAFFOLDING........................................................................................................................................................ 37

4.5.1 TECHNICAL SPECIFICATIONS FOR SCAFFOLDS. ..........................................................................................................38 4.5.2 THE CONSTRUCTION OF SCAFFOLDS .........................................................................................................................38 4.5.3 SCAFFOLD SAFE SYSTEM OF WORK. ..........................................................................................................................39 4.5.4 METHOD WORK.........................................................................................................................................................40

4.6 EXCAVATIONS ....................................................................................................................................................... 40 4.7 EQUIPMENT – HAND TOOLS .................................................................................................................................. 41 4.8 NUISANCE CONTROL (NOISE – DUST) .................................................................................................................... 41 4.9 GARBAGE – WASTE REMOVAL ............................................................................................................................... 42 4.10 LIGHTING .............................................................................................................................................................. 43 4.11 TRAFFIC SAFETY .................................................................................................................................................... 43 4.12 DRUGS AND ALCOHOL POLICY. .............................................................................................................................. 43 4.13 WELFARE FACILITIES. ............................................................................................................................................. 43

4.13.1 PURPOSE ...............................................................................................................................................................44 4.13.2 RESPONSIBILITIES ..................................................................................................................................................44 4.13.3 CANTEENS (SERVICED OR UN-SERVICED) ..............................................................................................................44 4.13.4 DRINKING WATER .................................................................................................................................................44 4.13.5 TOILET FACILITIES ..................................................................................................................................................45 4.13.6 REST AREAS ...........................................................................................................................................................45 4.13.7 WELFARE HEALTH & HYGIENE ..............................................................................................................................45

5 PERSONAL PROTECTIVE EQUIPMENT ............................................................................................................46

5.1 GENERAL ............................................................................................................................................................... 47 5.2 MAIN PPE ITEMS AND THEIR USES ........................................................................................................................ 47 5.3 MAIN PPE ITEMS AND THEIR USES ........................................................................................................................ 48

5.3.1 HEAD PROTECTION ....................................................................................................................................................48 5.3.2 EYE AND FACE PROTECTION ......................................................................................................................................48 5.3.3 HAND PROTECTION ...................................................................................................................................................48 5.3.4 FOOT PROTECTION ....................................................................................................................................................48 5.3.5 SAFETY HARNESS .......................................................................................................................................................49 5.3.6 RESPIRATORY PROTECTION .......................................................................................................................................49

6 FIRE PROTECTION AND PREVENTION ............................................................................................................50

6.1 GENERAL ............................................................................................................................................................... 51 6.2 BASIC RULES .......................................................................................................................................................... 51 6.3 TYPES OF FIRES...................................................................................................................................................... 51 6.4 TYPES OF EXTINGUISHERS TO BE USED .................................................................................................................. 52 6.5 DISTRIBUTION AND LOCATION OF FIRE FIGHTING EXTINGUISHERS ....................................................................... 52 6.6 FIRE PREVENTION ................................................................................................................................................. 53

6.6.1 HOUSE KEEPING RULES .............................................................................................................................................53 6.6.2 ORGANIZATION .........................................................................................................................................................53 6.6.3 RULES AND REGULATIONS ........................................................................................................................................54

7 EMERGENCY PLANNING AND PROCEDURES .................................................................................................55

7.1 JOB SITE EMERGENCY PROCEDURES ...................................................................................................................... 56 7.2 EMERGENCY PLANNING ........................................................................................................................................ 57

7.2.1 GUIDELINE IN CASE OF EMERGENCY .........................................................................................................................57 7.3 FIRE EMERGENCY PROCEDURE .............................................................................................................................. 57

Page 5: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 5

7.3.1 FIRE EMERGENCY RESPONSES ...................................................................................................................................58 7.4 EMERGENCY PRECAUTIONS................................................................................................................................... 58

7.4.1 ALARMS .....................................................................................................................................................................58 7.4.2 EVACUATION PLAN ....................................................................................................................................................58 7.4.3 FIRE PRECAUTIONS ....................................................................................................................................................58

8 HSE PERFORMANCE MEASUREMENT AND IMPROVEMENT ..........................................................................60

8.1 HSE PERFORMANCE MEASUREMENT ..................................................................................................................... 61 8.2 HSE PERFORMANCE IMPROVEMENT ..................................................................................................................... 61

9 HSE MONITORING ARRANGEMENTS AND TOOLS. ........................................................................................62

9.1 PURPOSE ............................................................................................................................................................... 63 9.2 SAFETY INSPECTION SYSTEM. ................................................................................................................................ 63 9.3 PRE TASK BRIEFING ............................................................................................................................................... 63 9.4 PERMIT TO WORK SYSTEM .................................................................................................................................... 63

9.4.1 PURPOSE ...................................................................................................................................................................63 9.4.2 RESPONSIBILITIES ......................................................................................................................................................64 9.4.3 PERMIT TO WORK PROCESS ......................................................................................................................................64 9.4.4 RECORDS ...................................................................................................................................................................65

9.5 TOOLS AND EQUIPMENT INSPECTION. .................................................................................................................. 65 9.6 SAFETY MONITORING FOR SPECIFIC SAFETY TOPICS. ............................................................................................. 66 9.7 APPOINTED SAFETY PERSONS AND SPECIFIC TRAINING. ........................................................................................ 66

9.7.1 PURPOSE ...................................................................................................................................................................66 9.7.2 RESPONSIBILITIES ......................................................................................................................................................67 9.7.3 PROCEDURE/PROCESS ...............................................................................................................................................67 9.7.4 FORMS / RECORDS ....................................................................................................................................................68

9.8 SAFETY MOTIVATION, INCENTIVES, AND RECOGNITION ........................................................................................ 68

10 APPENDIX .................................................................................................................................................69

APPENDIX A. HSE POLICY APPENDIX B. ORGANIZATION CHARTS APPENDIX C. SAMPLE – MONTHLY HSE PROGRAM APPENDIX D. RISK ASSESSMENT APPENDIX E. INCIDENT PROCEDURE APPENDIX F. LIFTING OPERATION APPENDIX G. SCAFFOLDING APPENDIX H. HELMET COLOUR CODE APPENDIX J. SAFETY BRIEFING TO WORK FORCE AND PERMIT TO WORK APPENDIX K. TRAINING MATRIX AND REGISTER

11 REFERENCES

Page 6: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 6

1 INTRODUCTION

Page 7: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 7

1. INTRODUCTION

This HSE Plan is the plan for the CLEVELAND CLINIC (CCAD) construction project applicable to all work areas that forms part of the project and is based on the applicable laws of the UAE and more specifically, the Emirate of Abu Dhabi.

All subcontractors shall comply with this plan. They will not operate separate plans and they shall provide their own safety personnel who meet the competency requirements set out below.

This plan covers the requirements of the accident prevention rules and safety program to be applied to the activities of SISJV that will be performed for the CCAD construction project Company.

The primary purpose of this plan is to provide a guideline for preventing any accidents which may injure Employees or damage properties at the construction site.

SISJV and his subcontractors shall abide by all safety rules and other regulations imposed at the site by the Laws of the country and the provisions of applicable laws, rules and regulations, including rules and procedures from the client (ALDAR) and the consultant (JACOBS).

1.1 Definition and Interpretation

In this document, the following words and expressions should have the following meaning and should be adapted to the words of each contract.

“Client” = ALDAR

“Consultant” = JACOBS

“SISJV” = SIX CONSTRUCT - SAMSUNG JOINT VENTURE (JV)

“CCAD” = CLEVELAND CLINIC ABU DHABI

“HSE Manager” = Senior Health Safety and Environmental Manager on site

“Safety Officer” = HSE Officer/ Engineer on Site

“HSE Plan” = Site specific safety plan

1.2 Scope

The purpose of this HSE Plan is to describe the Health & Safety provisions that will be employed in the Construction of the Works as per the Contract requirements and those required by the Authorities.

The HSE Plan represents the plan for conducting safe work, preserving personnel, property, and equipment.

The ultimate goal is to eliminate at the very source all danger to the health, safety and physical integrity of anyone.

Each employee on the Project is responsible for his own health & safety and for the people around him. It is therefore of paramount importance that each employee on this project fully understands all project HSE rules and standards; and those HSE rules and standards specifically concerned with the work they perform.

Page 8: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 8

This HSE Plan is intended to be complimentary to the general code of practice and to the existing statutory regulations of Local Authorities, inclusive Labour Legislation with regard to medical, first aid, safety, and training requirements.

SISJV is responsible for managing and coordinating all activities of construction, subcontractors, suppliers, and any contractor working in the same area.

All sub-contractors shall adhere to this HSE Plan and propose their HSE Officer or so acting for approval prior to commencement of the work on Site.

This HSE Plan will be adapted and complemented from time to time by the HSE Manager or his deputy as and when required (i.e.: Change of Scope of Works – detected dangers not known at the time when this plan was prepared).

This HSE Plan shall also apply to subcontractors.

This HSE plan covers all activities of SISJV as well located on Sowaah Island as on the Yas Island area.

Every 3 months this plan will be evaluated in coordination with the consultant HSE manager and reviewed as needed.

1.2.1 Subject of the Contract

The Cleveland Clinic Abu Dhabi will be constructed in 36 months, total projected work force at peak time could be up to 9 to10 thousand employees. Total man-hours will be calculated at work force x 240hrs per month.

1.2.2 Concerned Parties

Client ALDAR

Address PO BOX 51133 – ABU DHABI

Tel 026964444

Fax 026417501

Consultant JACOBS International Holdings INC

Address PO Box 3135

Tel 026745150

Fax 026745155

General Contractor SIX CONSTRUCT-SAMSUNG JV

Address PO Box 226

Tel 02 671.54.00

Fax 02 676.85.29

Page 9: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 9

1.2.3 Identification of Sub-contractors

The details pertaining to the Sub- Contractors will be submitted in due course, as soon as they will be approved under the Contract.

1.2.4 Identification of HSE Parties

Please also refer to Chapter 7 – Emergency Planning and Procedures

Relevant Authorities Contact Tel n° Contact person (if applicable)

Ambulance 998

999 Civil Defence/ Fire 997

Police 999

Municipality Emergency Office 993

Water Department 991

Hospital (Khalifa) 02- 6102000

Carewell center 02- 6728966

Client’s representative Jacobs HSE Manager

050-3178830 Mr. Mohd Alghanam

SISJV Project director 050-4819689 Mr. Didier Bosredon

SISJV HSE Manager 050-4826505 Mr Lyndon Davies

SISJV deputy HSE Manager 050-6283810 Mr Eric Chantraine

Civil Aviation 02-5757500

Environmental Protection 02-6980349

Electricity Department 02-4464677

Sewerage Department 02-6711244

Coast Guard 02-6731900

Etisalat 8005500

Adnoc 02-6023177

1.3 HSE Policy statement

See appendix A the latest version and the translation in different languages used on site

of the site HSE policy signed by the project directors.

This HSE policy will posted on signage boards at numerous locations on site (e.g. signage boards next to rest areas).

Page 10: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 10

1.4 Objective

The objective of this HSE Plan is to ensure that all construction activities relating to the CCAD project are carried out in accordance with the relevant legislative and contractual requirements and that no injury to personnel or damage to property is caused. Therefore, the SISJV will ensure that all persons on the project are aware of their HSE responsibilities.

Short term program may be set on a monthly basis in order to achieve needed safety outcomes, based on trend analysis, incidents or other requirements.

See in appendix B a sample of HSE monthly program.

Each individual on the jobsite must do his best to ensure that all sources of danger are reduced to manageable levels, not only to protect his own life, health and material possessions, but, as importantly, to prevent harm from occurring to colleagues. Every person has a right to have his life and health respected and his property protected.

1.5 HSE Planning

In order to ensure all hazards and risks are adequately addressed during the construction phase, HSE planning within SISJV is a pro-active process consisting of four phases: Engineering, Administration, Performance Monitoring and Improvement as part of the safety management process.

The four-phase HSE planning forms a continual loop following administration so that the system is continually improved by incorporating lessons learnt, new techniques and any revisions to the scope of work.

HSE planning is a continual process with inputs from policy, regulations, and objectives, scope of work, method statements, HSE inspections, audit results and feedback from performance measurement that will be used to improve the plan.

HSE planning inputs are analyzed by process owners and the HSE Manager is to prepare safety and environmental improvement methods for incorporation into operational procedures.

1.5.1 Phase One: Engineering

Phase 1 is the phase where work place activities and their associated hazards are identified, assessed and classified. Priorities and objectives are assigned and an HSE plan is prepared. HSE planning inputs include information from workers, accident and incident records, local regulations, scope of work, existing building best practices, material specifications and recommendations for using materials and machines safely.

HSE planning inputs are analyzed by process owners and the Safety Officer prepares HSE improvement methods for incorporation into operational procedures and method statements. Method statements will include safety work procedures for each operation. HSE planning outputs include risk classification registers, HSE plans/ programmes, safety checklists, permit-to-work procedures and job method statements

Page 11: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 11

1.5.2 Phase Two: Administration

Phase 2 is the phase of the HSE planning including communicating the results of phase one, explaining the plan to the work force and other interested parties and providing the resources needed to achieve the HSE objectives.

Resources include the provision of: HSE awareness training on safe working practices; Site rules, applicable regulations and procedures; Facilities for handling materials; Safe plant and machinery; Signage to warn people of potential hazards; Personal Protective Equipment to cover residual risks; Emergency mitigation facilities such as:

Emergency and evacuation plans; First Aid facilities and trained First Aid personnel; Spill containment and clean up materials.

1.5.3 Phase Three: Performance Measurement & Monitoring

Phase 2 is the phase of the HSE planning including communicating the results of phase one, explaining the plan to the work force and other interested parties and providing the resources needed to achieve the HSE objectives.

Phase three is the phase where HSE performance data are obtained from the results of plan implementation. Data includes HSE inspections, audit results, HSE incidents or accidents, non-conformances and corrective actions taken, HSE violations and disciplinary actions taken. The performance data is analyzed and the resulting information is output to the phase four. The recognition should, on the other hand, be given to workers following the rules to reinforce good behaviour. An incentive procedure is available within the IMS system and is to followed

1.5.4 Phase Four: Improvement

Phase four is the phase consisting of a management review where decisions are taken to implement recommended HSE improvement actions resulting from the information obtained from phase three. During management review, decisions will be made on priorities and resources needed to improve the effectiveness of the HSE management system.

New work place activities are subjected to hazard identification and risk assessment; and the results are used to update the revised safety plan from phase 4 and the cycle is repeated from phase 1.

Page 12: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 12

1.5.5 Planning flow diagram for continual improvement

Start

Safety programme Safety administration Safety training Material management Safe machinery Safety signage Safety procedures Method statements Permit-to-work Personnel protective equipment Safety inspections Emergency planning

Process hazard ID

Risk assessment & classification

Implementation

Performance monitoring

Audit

Management review &

performance analysis

New process

Safety programme

Phase 1

Phase 2

Phase 3

Phase 4

Method statements

HSE policy & objectives

Improvement decisions,

assignments & resources

Page 13: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 13

2 AUTHORITY AND RESPONSIBILITIES IN HSE

ORGANISATION

Page 14: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 14

2. AUTHORITY AND RESPONSIBILITIES IN HSE ORGANISATION.

2.1 INTRODUCTION

Health and safety is a shared responsibility.

Everyone has a duty to take reasonable care of themselves and those around them through zero tolerance of unsafe acts or conditions. We must therefore all work together to prevent accidents and ill health and the hardships that follow.

The management of health and safety is a shared responsibility of all line and service department managers throughout the SISJV. Therefore, managers at all levels are responsible for the health and safety at work of persons under their control and for ensuring that health and safety issues are properly considered.

The management recognise their role in engaging the active participation of all workers in improving health and safety.

Health and Safety staff is responsible for providing advice, assistance and support to managers at all levels of the organisation and to all employees.

Further details of departmental and individual responsibilities for health and safety, are detailed below.

Where duties and appointments are not delegated or made by the responsible manager, then by default, they will rest with that manager.

An organization chart of SISJV key personnel is submitted to the consultant under a separate cover.

See in appendix B for the current organization chart and a specific organisational chart for the HSE department for CCAD

2.2 PROJECT DIRECTOR AND DEPUTY PROJECT DIRECTOR

The Directors must note the overall responsibilities as defined in the introduction and in addition direct and ensure the following have been acted upon:-

a. Promote Health and Safety in the project.

b. Ensure Health & Safety is always an agenda action point of all operational Meetings and ensure the

reporting line and responsibilities of line management are clearly defined.

c. Attend as necessary or chair appropriate Safety meetings.

d. Support HSE Department and ensure resources are available to maintain an effective HSE

performance including suitably trained and competent staff.

e. Require monthly reports on the project’s safety performance.

f. Carry out safety site visits, be aware of the principles of current safety legislation and

developments and ensure their staff area aware of their accountability for Health, Safety &

Environment.

Page 15: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 15

2.3 PROJECT / CONSTRUCTION MANAGERS

All Senior Managers must set a personal example.

Project Managers/Construction Managers must:- a. Promote health and safety within their specific areas/ sections of the project.

b. Be aware of the requirements of relevant Health and Safety legislation, particularly the, Codes of

Practice, Technical guidelines and other applicable documentation.

c. Ensure effective Health and Safety implementation.

d. Ensure that during tendering, planning, construction and production, maintenance and repair,

sufficient allowance is made for adequate welfare facilities, safe systems of work, supervision and

safety equipment.

e. Ensure that training needs for their personnel are identified by the Personnel Department and

must release staff for attendance at training courses when required.

f. Liaise with the HSE Department on requirements for safety support.

g. Ensure this safety plan is communicated to sub- contractors as appropriate.

h. Arrange the Site Safety kick off meetings for their sub contractors working within their sections.

i. Check that both overall and specific risk assessments are done, appropriate method statements

and task sheets produced and communicated to those carrying out work.

j. Review any safety appointment and ensure safety management from the sub contractors on site.

k. Ensure work is carried out as planned, relevant legislation is complied with, and high standards of

professionalism, site tidiness and access are maintained at all times.

l. Conduct a monthly safety inspection within their specific areas/ sections of the project.

m. Ensure the legal requirements relating to involvement of the workforce are implemented to

promote safety within the workforce.

n. Require reporting and investigation of all accidents and dangerous occurrences in conjunction

with the Safety Department and ensure that appropriate corrective and preventative measures

are taken to prevent recurrences.

o. Attend Safety meetings as required.

2.4 TECHNICAL OFFICE ENGINEER

Technical office engineers must: a. Promote health and safety within their specific sections of the project.

b. Be aware of the requirements of relevant Health and Safety legislation, particularly the,

Codes of Practice, Technical guidelines and other applicable documentation.

c. Liaise with the HSE Department on requirements for safety support.

d. Prepare specific risk assessments with their method statements. Therefore, they need to

liaise as well with the HSE department as with the construction team.

e. Submit in due time the risk assessment and method statement to the HSE department

before submittal to the consultant.

Page 16: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 16

f. Organize risk assessment meeting if needed.

g. In particular, the technical office manager will provide and update to the HSE department a

“3-months look ahead” program in order for the HSE department to collect sufficient

information for the preparation of the activities.

2.5 SITE MANAGER - LOGISTICS MANAGER

All Senior Managers must set a personal example.

Site Manager/ Logistics Manager must:- a. Promote health and safety within their specific areas/ sections of the project.

b. Be aware of the requirements of relevant Health and Safety legislation, particularly the,

Codes of Practice, Technical guidelines and other applicable documentation.

c. Ensure effective Health and Safety implementation.

d. Ensure that during tendering, planning, construction and production, maintenance and

repair, sufficient allowance is made for adequate welfare facilities, safe systems of work,

supervision and safety equipment.

e. Ensure that training needs for their personnel are identified by the Personnel Department

and must release staff for attendance at training courses when required.

f. Liaise with the HSE Department on requirements for safety support.

g. Ensure this safety plan is communicated to sub- contractors as appropriate.

h. Arrange the Site Safety kick off meetings for their sub contractors working within their

sections.

i. Review any safety appointment and ensure safety management from the sub contractors on

site.

j. Ensure work is carried out as planned, relevant legislation is complied with, and high

standards of professionalism, site tidiness and access are maintained at all times.

k. Conduct a monthly safety inspection within their specific areas/ sections of the project.

l. Ensure the legal requirements relating to involvement of the workforce are implemented to

promote safety within the workforce.

m. Require reporting and investigation of all accidents and dangerous occurrences in

conjunction with the Safety Department and ensure that appropriate corrective and

preventative measures are taken to prevent recurrences.

n. Attend Safety meetings as required.

o. Provide welfare facilities accordingly relevant Health and Safety legislation, particularly the,

Codes of Practice, Technical guidelines and other applicable documentation.

p. Organize and maintain circulation’s roads on site in order to promote a safe work

environment.

q. Purchase on due time the equipment requested for the good practices of safety.

Page 17: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 17

2.6 SUPERVISORS

All Supervisors must set a personal example.

Foremen / Supervisors / gangers must note the overall responsibilities outlined in the introduction and in addition generally assist management in the execution of their duties as listed previously and in particular:-

a. Incorporate safety and health instructions in routine orders and see that they are carried out.

b. Suitably brief workers under their control so that work is carried out without excessive risk or in

an uncontrolled manner. Give pre task briefing and toolbox talks and the attendance sheets

documented.

c. Ensure as far as is reasonably practicable, that all operatives are trained and competent for work

in which they are engaged.

d. Ensure new employees are inducted and made aware of possible hazards and controls in their

workplace.

e. Ensure non-employees, including the general public, are protected from the work under their

control.

f. Ensure that plant & equipment, including power and hand tools are maintained in good condition

and ensure defective items are taken out of use.

g. Ensure instruction is given in the use of hazardous materials.

h. Ensure that all operatives are provided with, and use, suitable and appropriate personal

protective equipment.

i. Maintain a tidy, organised and safe work area.

j. Ensure welfare facilities are maintained in a clean and safe condition with adequate supplies.

k. Prevent “horseplay” and discipline those who consistently fail to consider their own well being

and that of others around them or fail to report incidents or accidents.

2.7 PERSONNEL DEPARTMENT IN-CHARGE

Personnel department in-charge must: a. Prepare weekly and monthly statistics data for the HSE reporting regarding manpower and

manhours on site as well for the SSJV employees and the supplied people as for the

subcontractors.

b. Hold list of the employees present on site in order to be able to hold the headcount in case of

evacuation

c. Promote safety for the required safety trainings on site.

Page 18: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 18

2.8 HSE MANAGER / DEPUTY MANAGER

Provide advice support and assistance to senior project management on matters pertaining to Health and Safety as well as any legislative requirements. a. To provide advice to the management on all matters pertaining to HSE with the aim to ensure

adequate systems and procedures are developed to mitigate any risks to an acceptable level.

b. Co-ordinate and supervise all operational HSE officers, engineers under their control.

c. To receive information on the Health and Safety performance in order to conduct trend analysis,

develop, implement corrective and preventative actions.

d. To review all relevant HSE documentation as required.

e. To review the risk assessment prepared by the technical office engineers before submittal to the

consultant.

f. To ensure Legislative compliance for all aspects of the project relative to Health and Safety.

g. To provide appropriate input into the procurement process for setting health and safety standards,

PPE specifications.

h. Conduct incident investigations

i. Conduct site inspections and audits as required.

j. Implement and conduct Site safety committees.

k. Assess and implement the project training needs.

l. In particular, advise and assist such that :-

HSE risk assessments are reviewed, before submittal of method statement, after incidents or

as circumstances alter.

Trained first aid provision is provided

m. Liaise with external authorities with regards to Health and Safety related issues.

n. Attend all client Health and Safety meetings.

2.9 SAFETY OFFICERS

The main functions of the safety officers are to provide advice and active assistance to their area of project in effective implementation of the HSE Plan.

a. Advice and assistance is to be provided to site teams such that:-

Safety inspections and monitoring are carried out.

Appropriate fire precautions are taken.

Lifting operations are carried out safely.

Accident reporting and investigation is carried out.

The general public are not exposed to risks from the project.

Reporting and investigating incidents.

b. Promote provision of adequate resources and competencies to achieve the required health & safety performance, including assistance in promotion, development, organisation and delivery of health & safety training and instruction.

Page 19: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 19

c. Maintain an up to date knowledge of all health and safety matters relevant to the project and liaising with appropriate safety organisations and trade associations.

d. Ensure that all accident and incident investigation is properly carried out to identify both immediate and underlying causes.

e. Provide reports on health & safety performance of projects to relevant managers. f. Maintain close working relationships with appropriate Operations Managers, Project Managers

and their site management.

2.10 FIRST AID

2.10.1 First Aid facility

A First Aid Room will be provided on Site and will be sufficient for initial treatment in the event of an incident. Arrangements will be made with a local clinic – hospital for the treatment of more serious accidents or injuries. The provision of first aid facilities shall meet the requirements specified in the Federal Law No 8 Year 1980.

The Project Management, the HSE manager and the Male Nurse will be responsible for deploying the required first aid and rescue equipment, including training and awareness programs related to the use of such equipment.

At all times, Site Supervisors shall ensure that access routes for eventual evacuation to the First Aid Room shall be kept clear from any obstructions.

The telephone number of the Clinic or Hospital selected for the treatment of more serious accidents or injuries shall be displayed prominently on Notice Boards and at the secretary office.

2.10.2 Male Nurse/First Aider

Male Nurse will ensure the full control of all medication and/ or drugs in stock.

Full time male nurses and first aiders shall report to the site doctor for carrying out their assigned duties and shall provide basic first aid treatment for non-serious injuries or illnesses. They evaluate the severity of injuries and determine the need for the patient to be referred to the site doctor.

They will conduct regular documented inspection relevant to health and hygiene on site (e.g. hygienic condition in the welfare and sanitary facilities, heat stress at the work spot).

They shall maintain a register of all demands for treatment or medical intervention. This register must indicate as a minimum:

The date and time of the demand; The name of the person; and his Company Number (HO. No); The nature of the illness or injury; The nature of the treatment.

Statistics will be produced and analyzed on a monthly basis and a weekly report will be submitted to the consultant.

Male Nurse will ensure the full control of all medication and/ or drugs in stock.

Page 20: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 20

2.10.3 Site Doctor

The site doctor shall ensure the full control of all medication and / or drugs in stock.

The site doctor shall, on referral from the nurse evaluate the severity of injuries and determine the need for the patient to be referred to the hospital or not.

The site doctor shall conduct regular documented inspection of medical needs for the site clinic (e.g. medications required, instruments and equipment required) monitor and review the register of all demands for treatment or medical intervention. This register must indicate as a minimum:

The date and time of the demand. The name of the person; and his Company Number (HO. No). The nature of the illness or injury. The nature of the treatment.

Statistics will be produced and analyzed on a monthly basis to identify trends with regard to medical issues of workers.

Page 21: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 21

3 ADMINISTRATIVE PROCEDURES

Page 22: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 22

3. ADMINISTRATIVE PROCEDURES

3.1 Hazard identification, risk assessment and risk reduction planning

This project will be subject to the normal hazards encountered during general construction activity plus an additional set of hazards due to the nature of the Project.

See in appendix D for “risk register” for the list of pre-assessed risks and related control measures.

Risk assessments shall be detailed in method statements to identify hazards that would otherwise be hidden and to implement adequate preventive measures. Hazards are to be prioritised when completing the risk assessment; the highest residual risk will be listed first and so on.

Before commencing the job, the risk assessment results shall be clearly explained to the work force.

Risk analyses of all major fire risks and the method of protection shall be carried out.

3.2 HSE Awareness

HSE awareness and safe practices shall be promoted during HSE induction training and additional awareness sessions including “tool-box” meetings prior to starting work. HSE awareness will be maintained by notices being placed in strategic locations around the site and through regular HSE meetings audits and inspections. All employees will be informed of the various HSE procedures that must be followed.

Safety notices distributed around the site in strategic locations shall include but not be limited to:

"No smoking"

"Hard Hat Area"

"Danger – Construction site – Do not Enter"

"Authorised Personnel Only"

"Goods Lift Only"

"Caution – Inflammable Material"

Other standard HSE at work type visual posters aimed at minimising language difficulties/ communication.

SISJV shall impose sanctions on any employee (including those of Sub-Contractors) who fails to follow the prescribed HSE program requirements.

Safety awareness is implemented at 2 different levels. Workforce and direct supervision will be reached trough toolboxes arrangements and staff personnel will be made aware through periodical awareness topic posted by e-mail or on the safety board in offices.

Page 23: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 23

3.3 HSE Incidents and accidents

See appendix E incident procedure separately submitted.

All accidents/ incidents/ near misses must be reported immediately to the Safety Officer for further investigation.

Initial reporting will be completed within 24 hours of the incidents giving details of the occurrence, assessing responsibility and action for prevention in the future.

A copy of the report will be forwarded to the Project Manager, Construction manager and consultant.

A monthly summary will presented during safety meetings and provided to the project director.

For additional information, see Chapter 7 - Emergency planning and procedures

3.3.1 Treating injuries and investigation

If serious injury is apparent or suspected, utilise the pre-established Emergency hospital ambulance service. For small cuts, scratches, etc. First Aid treatment will be rendered on site.

Over and above the legal requirements for reporting accidents to Local Authorities, SISJV is required to report immediately to the Client’s Representative all disabling injuries and serious accidents resulting in work interruption. This incident/accident, the area must be barricaded until investigation is carried out by Jacobs and SISJV investigation team.

Incidents investigations will be performed by the site management including, Superintendent, Foreman, Male Nurse and the Safety Officer. The Accident Report shall be in accordance with Article (28) of Ministerial Decision No. (32) of 1982. Additional data and recommendations for preventative actions will be added by the Safety Officer on a separate report as required.

The occurrence of a fatal accident requires thorough investigation and a detailed report shall be prepared by the Safety Officer for review by the Project Manager and forwarded to the Client’s Representative. The Project Manager is responsible for the thorough investigation of each such accident to determine the causes

Accident reports will be analysed by the HSE manager to determine unsafe conditions and unsafe acts in order to improve preventive procedures as deemed necessary.

Page 24: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 24

Determine the category of incident

Minor Significant High Potential Major

Determine if emergency services are required or not

No

Yes

No Yes

Call 999

Notify HSE Manager

HSE Manager notifies, Project Director, Client’s HSE Manager

24 hour notification completed and submitted to the Engineer

Full investigation to be completed and submitted within 72 hrs to the Engineer

Call 999

Notify HSE Manager

HSE Manager notifies, Project Director, Client’s HSE Manager

HSE Manager notifies Emergency authority

Senior manager on site sets up emergency and liaise directly with Emergency authority

Incident Occurs

Determine if the incident is significant or not

INCIDENT NOTIFICATION AND REPORTING PROCESS

Page 25: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 25

3.4 HSE Meetings

HSE meetings on a construction project are an essential tool in continued development of a mutual understanding of HSE objectives and program. They provide an environment in which individual commitment, effort, and ideas can be continuously correlated toward improvement in HSE programs and achievements. Records of Safety Meetings shall be filed; site HSE meetings will take place monthly.

3.4.1 Induction Meeting

Before starting working at site, any new employee will be informed about the HSE site rules in force. The induction meeting will be provided by the Project HSE Officer and be recorded on the Induction Training Record.

This procedure is mandatory and applies to all construction activities. This is to be carried out prior to the start of any work activities. This procedure does not replace any statutory training requirements.

Minimum site-specific sections of the induction:

Site Management Organisation Structure

Duties & Responsibilities

Emergency Arrangements i.e. First Aid, Fire and Security etc.

Health & Welfare Facilities

Site Specific Health & Safety Procedures / Rules

Access & Egress to the site including Traffic & Pedestrian Routes

Permits to Work

Accident / Incident Reporting Procedure

Method Statements / Risk Assessments (for supervisors).

Control of Substance Hazardous to Health (COSHH)

Personal Protective Equipment

Contract / Client requirements

Emergency call out (for supervisors)

Notification of New Starters to Site

The Project/Construction Managers shall make suitable arrangements for the purpose of notification of new starters either employees, or subcontractors. This will ensure that all new starters are aware of the requirement to attend an induction course at the start of their first day of work.

Delivery of Course

A member of the HSE department shall deliver the induction course.

Levels of Induction

HSE Induction This is the induction course that is mandatory for all persons working on CCAD, including subcontractors, consultants and client.

Emergency induction and visitors HSE Brief All visitors shall be required to report to the main Security and sign in and shall be given a site-

Page 26: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 26

specific visitor brief which is valid for 48 hrs. The individual shall be escorted by a person from the team concerned for this visit who has completed the full site induction at all times when on site

Objectives

On completion of the site H&S induction course participants should be aware of:

General hazards relevant to a construction workplace

Understand their HSE obligations

Be aware of good site practices in HSE

The importance of Incident / Accident Reporting

The safety procedures used within CCAD

The site specific HSE rules

The CCAD Project Safety Disciplinary Procedure

Language / Reading / Writing Difficulties

SISJV recognises that situations may arise where individuals have difficulties with language, reading or writing abilities and will make arrangements to identify any person/s who may require assistance and the necessary provisions implemented.

RECORDS

Every person who attends induction must be issued with an identification sticker to appose on the helmet

All records / documentation relating to these procedures shall be maintained at the site office and will be made available for auditing purpose at all times.

3.4.2 Toolbox Talk

Regular toolbox talks will be conducted for each crew (i.e. carpenters, welders, electricians, etc). The talk will be short, approximately 10 minutes at the start of each day. All unsafe conditions or unsafe work practices noted on the Project that may affect the workers will be brought to their attention. The proposed methods for eliminating these practices or conditions will be discussed.

3.4.3 Toolbox meeting

Regular toolbox meetings will be conducted two times a week for the workforce.

The meeting will be documented with specific topics according to the monthly safety program.

Site staffs are to take part of weekly safety meeting where the toolbox meeting topic will be exposed as well as unsafe conditions or unsafe work practices noted on the Project that may affect the workers will be brought to their attention. The proposed methods for eliminating these practices or conditions will be discussed.

Page 27: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 27

Employees will be encouraged to make HSE suggestions at these meetings. When hazardous materials or conditions are about to be encountered or when crews appear to be careless about HSE matters, additional toolbox meeting will be scheduled.

3.4.4 HSE Consultation and communication methods

The effectiveness of the HSE plan requires open communication within the work forces.

The Health & Safety Employee’s Representatives are consulted regularly. A prime purpose of the project HSE Plan will be to open communication channels for HSE dialogue between all parties concerned with HSES. The indoctrination [briefing] for all personnel will emphasize that two-way communication is essential for HSE success and will advise recipients how they may initiate such dialogue and their right to raise HSE issues for discussion with their supervisors. Site rules and safety noticed are to be placed on the notice boards for dissemination to the employees.

3.4.5 HSE Publicity and motivation

Since HSE success is of paramount importance among the project deliverables, it implies that HSE must remain in the forefront of each project participant’s attention. Dissemination of HSE information through an established publicity program generates interest among project personnel and provides a format for continuing circulation of HSE information, such information should be posted on site notice boards:

1. An advice method regarding modifications to the existing HSE program in addition to the established communication through HSE and supervisory staff.

2. Information regarding project execution activities from a HSE viewpoint. 3. Recognition of HSE accomplishments on the Project. 4. General HSE industry information that could serve to maintain and increase the HSE awareness and

attention of the project’s work force.

3.4.6 Safety Motivation, Incentives, and Recognition

A Key motivation in HSE success is the development of continuing pride by all the work force, group or personnel, in the achieved target. The HSE Plan will include a program of recognition and awards to individuals and/or groups who have reached defined, significant HSE milestones or who have made outstanding contributions to the project HSE program. All individuals, groups, and firms in the project organisation will be eligible for participation in the program.

Awards will be presented and celebrated at award congregations and the details of the achievements will be published on project notice boards. Participation at award congregations will also include, when appropriate, not only management staff members but also the Client/ Engineer’s Representative.

3.5 Safety committee

SISJV shall organize a safety committee consisting of Project Manager, HSE Manager, Subcontractor’s Project Manager and Safety Officer. Meeting will be held on a regular base.

Page 28: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 28

Purpose of the Safety Committee: To have safety coordination between contractor and all sub-contractors for situations not

mentioned in the order letter.

To decide arrangements for cooperation between all sub-contractors

To make arrangements for coordinating preventative and control measures where more than

one contractor may be exposed to the same risk

To have regular exchange of HSE information between all those working on site

Safety Committee shall: Monitor and ensure the operations in a proper safety manner.

Direct, coordinate and orient the safety activities.

Look for, detect, and identify risky conditions.

Review investigation of all accidents and the recommendations to avoid any repetition.

A safety committee meeting shall be held on a monthly basis and chaired by the SISJV HSE Manager and attended by all Safety Committee members.

All Safety Committee members prior to holding a meeting shall conduct a joint site safety inspection and the inspection results shall be discussed at the meeting.

3.6 HSE Inspections and audits

In the sense that a prime HSE objective is to instil continuous HSE awareness to all project personnel on the worksite, every person on the worksite should pay attention to HSE at all times and this is an important element of HSE monitoring.

As part of the HSE monitoring process, periodic site safety inspections shall be carried out to identify and evaluate the workplace hazards and implement corrective measures where required.

The safety officer is to carry out daily site inspections. Site supervision will accompany the safety officer on HSE inspections in their area of responsibility at least one per week. The project manager is to carry out at least one monthly site safety inspection.

Regular HSE inspections and audits will be conducted by Contractor Staff who is not engaged on the Project.

The frequency of HSE inspections and audits will be determined by the following: Any frequency prescribed by regulation or request from the consultant,

The introduction of new processes, procedures or equipment that has a potential of

introducing new hazards to the workplace, or reassigning permanent or intermittent workers

The occurrence of incidents or accidents or occupational diseases,

When workplace conditions warrant an inspection.

As a minimum standard, monthly safety inspections shall be conducted on sections of the project that shall consist of the project management, HSE Managers and invited members of the consultant and client should they wish to attend.

Page 29: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 29

Monthly inspections are carried out by the Construction Managers and their findings recorded and deviations prioritised for close –out based on severity and potential risk.

Daily and weekly inspections are carried out by site HSE staff for any unsafe acts or unsafe conditions. Safety observation logbook are completed and submitted to site staff or if case of no suitable action taken to the construction manager on a weekly basis. Deviations will be prioritised for close –out based on severity and potential risk. Copies of the inspection reports will be kept in the site safety files for record purposes and follow up. These reports will be analysed in order to determine trends and in so doing preventative measures can be taken in order to change negative trends. It is the site staff or if requested the Construction Managers responsibility to follow up and ensure deviations have been closed out.

3.7 Security

3.7.1 General

See specific Security plan to be separately submitted.

Only personnel with a professional relation to the site shall be allowed on the site. A watch guard shall be organised at each entrance to verify that the persons entering the site have the required authorization from the site Management.

Visitors must report to the site Management at all time.

Before equipment and material can access the site, all safety document must be filed by the equipment supervision team. The listing of the equipment and materials shall be submitted at the HSE department. This applies to all equipment and materials.

3.7.2 Removing materials off the site

Before equipment and material can be removed from the site area, a Material Gate Pass with a listing of the equipment and materials shall be submitted at the gate. This applies to all equipment and materials.

SISJV’s authorised key personnel shall sign the Material Gate Pass. The driver shall deliver a copy of the signed Material Gate Pass to the Guard at the Site Gate. The other copy will be filed at the Site Gate.

No vehicle shall be allowed to transport equipment or materials out of the gate without a Material Gate Pass.

Page 30: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 30

4 SITE PRACTICES & PROCEDURES

Page 31: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 31

4 SITE PRACTICES & PROCEDURES

4.1 Lifting Operations

See specific lifting plan to be separately submitted.

No lifting operations shall be permitted over any areas where personnel are working.

Where lifting over personnel is impossible to avoid; suitable and sufficient control shall be established to minimise the risk to personnel from the lifting operations.

Clearly designated exclusion zones shall be established for all lifting operations; the only person allowed inside this zone will be the designated banks man. The banks man shall at all time wear a high visibility vest. A clash detection system will be in operation and communication with the crane operator will be by radio.

Note: Any crane attempting to enter the site without valid certificates shall be refused admission. Load charts are to be carried in the cab

All safety and override devices to be operational

Operator to be certified for the particular type of machine

The crane shall be inspected by a competent person prior to use.

All lifting equipment (incl. Crane, rigging hoisting and slings) for the project shall be supplied with the required legal certificates. This is the responsibility of the plant division site management.

All certificates together with the central register of all lifting equipment or devices on the work site shall be held available on site by the plant division site management. A register copy will be submitted to the HSE department.

All tools and equipment are required to be maintained in good working condition.

The plant division shall inspect all tools and equipment periodically.

Heavy equipment will be inspected every day prior to beginning activities. A deeper weekly inspection will be documented. See appendix for the inspection templates.

4.1.1 Safe lifting practice

See in appendix F for a sample of inspection register for lifting inspection

Thorough Examination and Inspection

A thorough examination may include visual examination, a strip down of the equipment and functional tests. Advice should be sought from manufacturer’s instructions and a competent person for guidance on what a thorough examination should include for each piece of equipment. Additional inspections will be identified by the user of the equipment. Factors that must be taken into account by the user include the work being carried out, any specific risks on site that may affect the condition of the equipment and the intensity of the equipment.

Page 32: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 32

The level of competence will depend upon the type of equipment and the level of thorough examination or inspection required.

A thorough examination must be carried out:

a. When the equipment is put into service for the first time unless:

It is new equipment that has not been used before and a declaration of conformity made not

more than 12 months before lifting equipment is put into service has been received.

The equipment was obtained from another undertaking, and it is accompanied by a copy of

the previous report of a thorough examination.

b. Where safety depends upon the installation conditions to ensure that it has been installed correctly

and is safe to operate:

After installation and before being put into service for the first time.

After assembly and before being put into service at a new site or in a new location.

c. Lifting equipment for lifting persons must be thoroughly examined at least every 6 months.

d. Accessories for lifting (lifting gear) must be thoroughly examined at least every 6 months.

e. All other equipment must be thoroughly examined at least every 12 months.

f. After exceptional circumstances liable to affect the safety of the lifting equipment.

Inspection

An inspection may also be required at suitable intervals for certain types of lifting equipment. Unless indicated by the manufacturer it will be appropriate to continue inspecting lifting equipment at weekly intervals.

For the majority of lifting equipment the driver should be competent to carry out the regular inspection.

Reports

The persons carrying out the thorough examination must make out a report as soon as possible and the report must be in writing. The report can be contained in a register, attached to the equipment itself, or stored electronically (in a tamper proof form); it must be signed by the person carrying out the thorough examination (or someone on his behalf).

For each thorough examination, the person making out the report must provide the report to the user, and, to the person from whom the equipment has been hired or leased.

For each inspection, a report must be made in writing and provided to the user.

Any defects noted during the thorough examination or inspection which could become a danger to persons must be notified to the user and the equipment must be used until the defect is rectified.

In the event of a defect being identified during a thorough examination involving an existing or imminent risk of serious injury, a copy of the report must be sent as soon as possible to the HSE Manager.

Reports of thorough examinations and inspections should be kept available for inspection at the place where the lifting equipment is being used, if this is not possible the information should be readily accessible. Reports must be readily available to The HSE Manager if required.

Page 33: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 33

No lifting equipment should leave any undertaking unless accompanied by physical evidence that the last thorough examination has been carried out.

Reports of thorough examinations must be kept:

In the case of a thorough examination for equipment first put into use by the user – until he no

longer uses the lifting equipment. (except for a lifting accessory)

In the case of a thorough examination for lifting accessories, first put into use by the user – for

two years after the report is made.

In the case of all other thorough examination for equipment dependent upon the installation

conditions – until the user no longer uses the lifting equipment at that place.

In the case of all other thorough examinations – until the next report is made or for two years

whichever is the longer (if you are following the intervals laid down in the regulations all

thorough examination reports will need to be kept for two years from the date that the last

report was made.

Reports of inspections must be kept available until the next report is made.

Some Examples of Plant &Lifting Equipment

Tower Cranes+Lifting Gear/Equipment

Mobile Cranes+Lifting Gear/Equipment

Passenger/Material Hoist’s

MEWP’S-Cherry Picker’s, Scissor Lift’s,Tele-Boom’s

Excavators

Dumper Truck’s

Lifting Chain Blocks

Forklift Trucks/Tele- Handlers

4.1.2 Crane and rigging safety

Crane set-up / ground stability

One of the critical factors of proper crane setup is a firm-supporting surface.

For maximum capacity, the crane shall be level. However, to maintain a level condition, the ground surface shall be adequate to support the dynamic loads of a working crane.

Basic elements are to be considered Total imposed load

Supported surface area

Cribbing to be used

Ground stability

Wind velocity

Storm and lightening strikes

Page 34: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 34

Crane overlapping

The installation of anti-collision system between tower cranes will be implemented.

Regarding overlapping with mobile crane, every crane operator –tower crane operator and mobile crane operator– will be instructed of the position of the surrounding cranes prior to the raising of the boom of a new mobile crane.

4.1.3 Load handling

Load weight: No crane shall be loaded beyond its rated capacity

Attaching the load. No open hooks shall be used for lifts higher than 1m. Hooks used for lifts

in excess of 1m shall have hook safety latches or shall be self-closing hooks

Moving the load: the operator shall determine that the crane is level to within 1° degree and,

where necessary, is properly cribbed and blocked

The operator shall position the hook over the load in such a way and manner as to prevent

load swing

4.1.4 Mobile cranes

The operators shall be responsible for: Proper placement of the crane in relation to the load to be handled and the landing area to

obtain rated lift capacity

Levelling the crane to within 1 degree of level and rechecking the level a minimum of three

times, during the 8 hours working shift

The proper placement and use of outriggers, where provided, for all its lifts except where the

manufacturer permits otherwise for assembly of the boom only

The determination of stable or unstable ground or footing. Additional floats, cribbing, timbers

or other structural requirements shall be fitted

The applicable UAE Legislation is contained in the Ministerial Order No. (32) Year 1982 – Article (20).

Guidance is given in H&SaWM Section 7 “Cranes & Hoists”

4.1.5 Rigging requirements

General

All rigging equipment shall be inspected prior to each shift and as necessary during the shift to ensure safety. Damaged or defective slings shall be removed from service. Persons must not pass under suspended loads. The SISJV reserves the right to remove from service and or destroy any damaged or defective rigging equipment.

The applicable UAE Legislation is contained in the Ministerial Order No (32) Year 1982 – Article (20).

Guidance is given in H&SaWM Section 8 “Lifting Gear”

Page 35: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 35

Condition of lifting equipment

All rigging devices including slings shall have permanently marked identification stating size, grade, rated capacity, and manufacturer.

Rigging equipment not in use shall be removed from the immediate work area when not in use and correctly stored.

Shop made grabs, hooks, clamps or other lifting devices shall not be used unless proof-tested to 125% of their rated load by an approved testing agency. Approved devices shall have the rated capacity identified and permanently affixed.

Slings shall never be left lying on the ground or otherwise exposed to dirt.

Eyes in wire rope bridles, slings, or bull wires shall not be-formed by wire clips or knots.

Protruding ends of strands in splices on slings or bridles shall be covered or blunted.

Safe operating practices

Slings in use shall not be shortened by knots, bolts, or other makeshift devices.

Wire ropes slings shall be padded or softeners shall be used for protection from damage due to sharp corners;

Slings used in a basket hitch shall have the loads balanced to prevent slippage.

Loads handled by slings shall be landed on cribbing or dunnage to avoid damaging the slings by pulling under or being crushed by the load.

Slings subjected to shock loading shall be immediately removed from use and destroyed.

When U-bolt wire clips are used, the manufacturer’s instructions shall be used to determine number and spacing of clips.

4.2 Storage

Storage shall be carried out in good time and in designated places on the site.

A storage plan shall be prepared with materials and products sorted and grouped as per the material type and / or quality of the product.

Storage areas shall be organised and maintained by the Storekeepers. They shall ensure that materials are stored in conditions that will avoid deterioration and enable efficient issue for authorized use.

Storage of materials in the works structures shall be minimised.

Storage of hazardous materials in the works structures is strictly forbidden except in special storage areas approved by the Safety Officer.

The storage of hazardous materials on the site shall be kept to the lowest practical levels.

Hazardous materials shall be stored at ground level, in prepared facilities with the required ventilation, lighting, signage and security against impact or falling.

Page 36: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 36

4.3 Hazardous Materials

The following requirements shall be implemented as and when required:

The applicable UAE Legislation is the Ministerial Order No (32) Year 1982 – Article 6 and 18.

The control of substances hazardous to health is a critical element of the HSE program, and shall be achieved through a combination of communication, establishment of safe work systems and controlled handling and disposal of such hazardous substances.

Hazardous materials are substances that may cause adverse health affects to people through ingestion, inhalation, injection, or absorption in to the human body, in short or long term, or cause environmental damage if discharged to air, ground or water.

The use of hazardous materials shall be reduced to the practical minimum limit.

Flammable and other hazardous materials shall be stored in a systematic controlled way. Their

use and storage location shall be authorised by the Safety Officer.

The quantities of flammable and hazardous materials in storage shall be registered and

communicated by the storekeeper to the Logistic manager and the HSE manager.

The storage of hazardous products shall be in accordance with relevant Code of Practice and will

include, when required, the provision of the required fire extinguishers, ventilation, spill

mitigation and clean up facilities and the like.

Handling, use and manipulation of hazardous goods shall be done according the MSDS

(Materials Safety Data Sheets) and with the outmost care and precaution.

All spillages shall be cleaned up immediately to prevent contamination of the soil, the air and or water aquifers.

Every employer shall implement safe work systems and provide all relevant personal protective equipment to ensure that the risks associated with the use, handling and-disposal of such substances are manageable. In case of failure to provide the relevant PPE, the activity will be stopped until adequate PPE will be provided. If the SISJV provides to the subcontractor the required PPE the cost will be charged to the subcontractor.

SISJV shall ensure that any person handling such hazardous substances has received instructions, regarding the hazard, the work system to be adopted and the actions required in the event of spillage.

Work that for any reason becomes, or threatens to become hazardous, unsafe, unhealthy or hazardous to the environment shall be stopped immediately until necessary corrections have been taken.

A specific risk assessment in accordance with the COSHH regulations or regulations that controls hazardous substances shall be carried out for all work involving the use of hazardous substances.

In all cases, the assessment shall consider options for minimising any risk to people or the environment by implementing suitable and sufficient controls.

The hierarchy of controls to be used in all cases is; 1. Eliminate the need for hazardous materials as much as possible;

2. Substitute the hazardous material by a less hazardous material.

Page 37: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 37

3. Reduce the exposure by changing the work process, or exposure time or nature of the

material.

4. Physically isolate the hazardous material from people and the environment.

5. Control exposure through engineering means such as the use of exhaust ventilation etc.

6. Hazardous materials shall be stored in places that can be locked, to avoid unforeseen

contact.

7. Use of PPE to eliminate the residual personal risks

All hazardous materials purchased for the project shall be supplied with the MSDS (Materials Safety Data Sheets). This is the responsibility of the purchase and procurement site management.

All MSDS together with the central register of all hazardous substances on the work site shall be held available on site by the storekeeper. A register copy will be submitted to the HSE department.

4.4 Energy Supply – Electrical plan.

Electrical plan to be separately submitted.

The applicable law in the Emirate of Abu Dhabi is issued by the Government of Abu Dhabi, Water & Electricity Department (ADWEA) – Regulations for Electrical Installation Works (1980).

All electrical equipment shall be tagged, tested, and inspected.

All electrical installations shall be equipped with fuses and ELCB’s.

All distribution boards shall be equipped with fuses and 30mA ELCB’s.

All plugs and sockets shall be of a reasonable minimum standard IP44.

All installations shall have adequate insulations.

A team of electricians shall be permanently on the site to secure and guarantee electrical installations.

The register of the electricians at work on site will be held available by the line supervisor. A register copy will be submitted to the HSE department.

4.5 Scaffolding

Risk assessment shall be carried out by the superintendent in charge of the area where the scaffolds are erected in collaboration with the Safety Officer prior to using the scaffold.

The SCAFFTAG system shall be implemented.

Specific attention will be paid to prevent falling materials, and adequate measures shall be taken for working on scaffolds on extreme heights e.g. netting, fastening, doubled safety for hanging scaffolds (safety rope and rope for moving up/down), perimeter control,…

The applicable Law is defined in the “Ministerial Order No. (32) Year 1982; Article (19-b).

Guidance is given in the H&SaWM, Section two and is given from paragraph 2.1 to 2.9, both inclusive (pages 2 to 12 of 22)

Page 38: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 38

4.5.1 Technical specifications for scaffolds.

Planning:

Only authorised personnel will erect, modify or dismantle scaffolding towers. Towers should not be specified for use in the vicinity of overhead power lines. Specification for use of tower scaffolds will take into account the site ground conditions expected, height restrictions and obstructions. Work will be tendered for taking into account relevant standards.

Physical:

Towers will be erected by trained personnel in accordance with relevant standards and manufacturer's instructions. Ladder access should be internal and fixed to the narrowest side. Maximum height to base ratios will not be exceeded: 3.5:1 inside use and 3:1 external use without ties. Ties will be used in exposed or windy conditions. All tower platforms will be fully boarded and fitted with toe-boards and guardrails. Wheels will be braked or locked when the tower is in use. Personnel and materials will be removed before a tower is moved. Manufacturer's advice on maximum loadings will be adhered to.

Managerial/Supervisory:

All scaffolding will be inspected on handover to or from other contractors. After alteration or adverse weather conditions scaffolds must be inspected by management. Towers over 2m in height must be inspected every seven days and the results recorded. All scaffold inspections will be carried out by a competent person.

Scaffolds will be checked regularly to ensure their correct use and that unauthorised modifications have not been made.

Training:

Persons erecting scaffolding must be adequately trained. Training may be provided by manufacturers or hirers, but some proof should be obtained.

Inspections of scaffolding will be carried out only by those trained and competent to do so.

4.5.2 The construction of scaffolds

Construction of scaffolds is to allow people to execute their works at height in a safe way. Therefore, all scaffolding constructions will comply at least with current industry best practices, standards, and this procedure. Special attention will be paid to a number of minimal technical specifications, which are specified below.

All scaffolds shall be tagged at each access point (ladder), indicating whether it can be accessed or not. The red tag will indicate that the scaffold is unsafe for use until the scaffold has been inspected, corrected, and re-inspected until it passed for safe use.

When the scaffold is safe and inspected, a green tag card will be inserted, indicating the date, name and signature of the authorised and competent scaffold inspector.

All scaffolds that will remain in use longer than a week will be inspected weekly by a competent scaffold inspector.

Page 39: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 39

If no green scafftag is connected to a scaffold, or if the interval since the inspection exceeds one week the scaffold is unsafe to use. The scaffold will be used again only after proper inspection and adequate tagging.

In addition, all scaffolds shall be re-inspected and confirmed as safe to use after bad weather or other incident that could affect its safety, e.g. high winds.

All scaffolds shall be built on a stable base. If necessary, special measures will be used, such as spread beams under the supports.

All scaffolds platforms will be able to carry a minimum required load to allow safe working. If scaffolds are to be used to lift heavy materials, a calculation note, proving the construction strength will be prepared. After the approval, the scafftag can be inserted, indicating safe access.

All work floors will have railings and toe-boards. This means a plinth of a height of minimum 15cm, a knee rail at the height of 0.765 m and a handrail at 1.15 m shall be installed.

All accesses to platforms will be by means of ladders or stairs (inside or outside the scaffold). No access is allowed by climbing over railings.

When raising or lowering materials, scaffolders must be clipped on at all times, or working on a safe handling platform with a double guarded-rail provided.

Neither equipment nor material shall be thrown up or down “bombing”.

4.5.3 Scaffold safe system of work.

All scaffolds are required to be maintained in good working condition.

The scaffold inspector in the different construction teams shall inspect scaffold weekly.

Scaffolds will be visually checked every day prior to beginning activities by the foreman. See appendix G for the inspection templates.

Preparation

The work should be assessed to ensure that all health and safety risks are identified and suitably controlled. Supervision should aim to organise, plan and manage their work to minimise any risk, with a goal of zero accidents / incidents.

Scaffolders should be selected who have appropriate attitude, aptitude, fitness, training, and experience for the particular task to be completed, and have received appropriate and recorded training.

Supervision should be provided that is appropriate to the work situation and the number and skills of the work team.

All scaffolders must wear and use the minimum fall arrest equipment, which has been inspected prior to use.

Page 40: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 40

4.5.4 Method work

Erection

Scaffolding should be completed progressively with scaffolders installing a single guardrail on all lifts to provide protection whilst at work; Scaffolders must be clipped on when installing components outside of guardrail. Traversing along scaffolding elevations outside of the single guardrail must be limited to the maximum length of materials used.

Alteration to scaffolds

The single guardrail must remain to ensure that scaffolders are protected when carrying out alteration works. Scaffolders should be working from a minimum three-board platform or more for wider structures when carrying out these operations.

Dismantling

All dismantling activities should be carried out progressively, reversing the erection process. Therefore, guardrails should be included as early as possible in to the erection process and removed as late as possible during dismantling, reducing the need for scaffolders to climb the scaffold structures.

Decking

Scaffolders should use as a minimum 600mm wide platforms placed centrally (e.g. 3 x 195mm scaffold boards)

Boards used for decking should always be adequately supported by transoms and bearers i.e. every 1.5 m or 1.2 m as appropriate.

4.6 Excavations

This procedure covers all activities that will involve works at least 50cm below ground level.

All excavations deeper than 1.2m shall require shoring, stepping, sloping or benching as identified by a competent person in collaboration of the Construction Manager. In all such cases, the Safety Officer shall agree the method of prevention of collapse.

On-site, it must be assumed that all excavations may encounter subterranean services or other hazards, such as contaminated soil. In all cases, preparatory checks are required. These may include reviews of drawings, and trial pits excavations.

Excavations are normally subject to excavation permits, but this is not always necessary.

Excavations may be carried out manually or by mechanically means. Manual excavation involves the use of ‘blunt” digging implements such as a shovel, and is to be implemented in all cases where there is a reason to believe that buried services are present that could be damaged by more aggressive digging. In manual excavation tools may not be struck or their effectiveness otherwise enhanced by mechanical means.

In areas that are suitable for mechanical excavation, all hand operated and mechanical tools may be used.

Page 41: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 41

In all cases where groundwater may be encountered, adequate measures must be implemented to remove any water ingress into the excavation. Depending on the nature of the water and the presence of any contamination, the water may require sedimentation and/ or filtering before disposal.

The applicable UAE Legislation is contained in the Ministerial Order No. (32) Year 1982 – Article (15), (19) and (20)

Guidance is provided in H&SaWM, Section 4 complete

4.7 Equipment – Hand Tools

All hand tools, portable power tools, and equipment shall be maintained in a safe and proper working condition. No home made or modified tools shall be used.

The applicable UAE Legislation is the Ministerial Decision No (32) Year 1982 – Articles (10) & (13). The Federal law No (8) Year 19890 – Article (96) applies too.

Tools designed with guards, handles and electrical trip switches including dead man switches

shall be quipped with such devices at all times. These shall not be removed or by-passed.

Employees shall be trained/ instructed in the proper use of tools.

All defective tools shall immediately be removed from service for repair.

Tools shall be inspected for damage or defects daily and prior to use.

Extension cords and air hoses shall be protected from damage and shall be routed through the

job in such a way that they do not form a tripping hazard and are not subject to damage or are

damaged by any activity.

The site store man is to set up a register of all small stores on site. A monthly check is to be

carried out on all small stores for serviceability. Equipment that is found to be faulty or in a poor

condition is to be removed from site.

Extension cords and air hoses shall never be placed on stairs; walkways, grate floor, ground, or floors where these can create a hazard or suffer damage.

Cords and air hoses shall, as far as is practically possible, never be placed on the ground or walkways, on surfaces or emergency exits.

Air hoses shall be fitted with whip checks at each coupling joint.

In close cooperation, the store and plant divisions will inspect all tools and equipment periodically.

Hand and small powered tools will be inspected every day prior to beginning activities. A deeper 3-monthly inspection will be documented and will apply a colour coding.

4.8 Nuisance Control (noise – dust)

Measurements, monitoring, and evaluation are key elements of noise and dust pollution management.

This process is intended to ensure that all activities are being conducted in accordance with the local laws, established policies, and procedures.

Page 42: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 42

Control measures such as noise barriers shall be utilized where practical to prevent the spreading and increase of noise.

If it is possible to isolate or insulate the sound, reduction devices shall be considered when practical.

Noise measurements shall be carried out where noise is produced and at other work places where operatives may be subject to higher level than their work generates.

Dust created by on-site traffic will be controlled by spreading water by truck.

The applicable UAE legislation is the Ministerial Order No (32) Year 1982 – Article (1), Article (5) d, and Article (15)

4.9 Garbage – Waste removal

See environmental plan (CEMP) to be separately submitted.

Non hazardous waste

Wastes that may be delivered to an official waste handling site without special requirement are classified as “Non-hazardous” wastes.

Waste shall be segregated according the sub-classes of: A. Organic waste

B. Plastic

C. Wood

D. Iron

E. Chemical (paint, diesel, fuel)

F. Old oil

G. Concrete – bricks

Batteries, oil filters, and other equipment that contains traces of substances classified as hazardous waste shall be treated as hazardous waste and disposed off accordingly.

Sub-contractors are responsible for sorting their waste, placing it in special containers, and for reporting to SISJV if the containers are full and are not being emptied. These containers are restricted for “safe” ordinary waste.

Hazardous waste shall be handled as detailed below.

Hazardous waste

Each sub-contractor is responsible for managing his own hazardous waste. This also covers hazardous wastes belonging to his sub-contractor(s).

Hazardous waste shall be kept in containers clearly marked with contents, and only 1 type of hazardous waste shall be kept in each container.

Hazardous waste shall be stored in approved areas only, locked up in a fireproof store.

SISJV shall approve type and volume of the waste for outgoing transport.

Page 43: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 43

SISJV shall manage the removal and disposal to authorised sites.

4.10 Lighting

Sufficient and adequate lighting shall be provided throughout the site.

The site will be equipped with the following lighting systems:

Safety lighting:

Safety lighting shall be installed on all places where lighting is strictly needed to carry out or control safe operations

Safety lighting shall be installed in confined spaces.

Emergency lighting:

It is important for rescue operations to have significant lighting.

All places with major key functions during evacuations and or emergencies shall be equipped with emergency lighting.

Emergency lighting may be powered by an independent electrical source,

4.11 Traffic Safety

See specific traffic plan to be separately submitted.

Speed limit: The on-site speed limit shall be 20 Km/h and shall be rigidly enforced.

Reversing: Site construction vehicles shall be fitted with an audible reversing warning

Drivers of other vehicles shall wait until the reversing process has stopped before resuming their journey. On no account should a driver attempt to squeeze past another vehicle that is engaged in manoeuvring.

4.12 Drugs and alcohol policy.

Usage or being under influence of drugs and alcohol is prohibited on site. Employees under specific medication are to advice of this status the male nurse.

The HSE department has the authority to stop any personnel suspected of having used prohibited substances or inappropriate material.

4.13 Welfare facilities.

See specific site installation plan to be separately submitted.

Page 44: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 44

4.13.1 PURPOSE

Help the site management team establish the welfare facilities in compliance with local legislation good practice and company standards.

This is mandatory and applies to all construction and general site offices located on CCAD. The following process shall be followed when setting up welfare facilities.

4.13.2 RESPONSIBILITIES

Logistics Manager

The Logistics Manager shall ensure that all welfare facilities are established and inspected prior to start of work. The establishment of facilities for subcontractors shall be defined at the tender stage and reviewed at pre start meetings and advice taken from the HSE Manager. The Logistics Manager shall also ensure that a system of monitoring is established to maintain the standards of compliance with statutory and company requirements.

HSE Manager

The HSE Manager shall advise the Site Manager on the requirements for establishing site offices and welfare facilities and shall monitor the compliance of the site management team on a regular basis.

4.13.3 Canteens (Serviced or Un-serviced)

Where canteen facilities are provided the following criteria shall be followed: A. Adequate and suitable accommodation shall be provided with sufficient tables and

chairs to accommodate, at any one time the number of people likely to use the facilities.

B. All tables, preparation areas, etc. should be covered with a smooth impervious surface,

for hygiene purposes. See local regulations for latest legal requirements.

C. If equipment provided for boiling water, cooking or heating food and for washing up

utensils, all equipment provided to be kept clean and maintained in safe working order.

Food preparation areas on site are only permitted if consent is given from HSE Manager.

D. Suitable arrangements shall be made for ventilation of canteen.

E. If provided, any kitchen areas shall be provided with a fire blanket, and either a dry

powder or CO2 Fire extinguisher. In kitchens where food is prepared for or by

employees, double sinks one for food preparation and one for working utensils, are

required. A separate sink for hand washing shall also be required.

F. Food waste bins will be empted after each meal and removed from site daily

G. Gas cylinders shall be positioned outside the building.

4.13.4 Drinking Water

A. Chilled drinking water shall be provided to all workers throughout the day.

B. No man should have to walk more than five minutes to access fresh drinking water.

Page 45: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 45

C. Signage shall be provided to indicate, ‘drinking water’, ‘toilets’, ‘eating area’, ‘rest area’,

prayer area’. Standard pictorial signs can be used.

4.13.5 Toilet Facilities

A. A sufficient number of toilet facilities (as per ADM code of practice, separate lockable

facilities needed for females) shall be provided. The facilities are to be cleaned at least

twice daily and toilet paper and towels provided and replaced as necessary. Hot and

cold running water for washing hands etc. shall be provided in the immediate vicinity of

the toilets.

B. Toilet facilities shall be positioned at a reasonable distance away from kitchens and

canteens and at not too great a distance from the workplace. All men must have easy

access to toilet facilities. It must take no longer than five minutes for a man to reach the

nearest toilet facility

C. Septic tanks must never be positioned so that odours can reach the eating area or be a

nuisance to offices. A management system should be adopted to ensure that they are

emptied regularly to prevent overflowing. They shall be designed to ensure that if they

overflow that a bunded area can contain the spill. Standard pictorial signs can be used.

4.13.6 Rest Areas

A. Shaded rest areas away from the working environment must be provided and must

include benches and tables for sitting and eating.

B. Where practical an area shall be provided for men to lie during lunch breaks. This shall

not be permitted to be in an area of work.

4.13.7 Welfare Health & Hygiene

A. Adequate waste bins must be provided for disposal of food waste. These shall be of

metal construction and have a lid. They shall be emptied at least twice a day and

cleaned using disinfectant.

B. All welfare facilities shall be cleaned at least twice a day. A register of this shall be kept

and the cleaning crew supervisor shall sign to say it has been carried out

C. The spill from fresh water dispensing units must be channelled away so that it does not

stagnate or enter the rest or eating area.

D. Lighting shall be provided during hours of twilight or darkness.

E. Air conditioning or fans shall be provided as per regulation.

Page 46: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 46

5 PERSONAL PROTECTIVE EQUIPMENT

Page 47: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 47

5 PERSONAL PROTECTIVE EQUIPMENT

5.1 General

Personal Protection Equipment (PPE) comprises devices for individual use, intended for protecting the worker’s physical integrity against the normal aggressions of his work.

Each employer is totally responsible for providing personal protective equipment for the protection of their employees as needs or requested.

SISJV and all Sub-Contractors will supply all the PPE necessary for the proper and safe carrying out of the Works. The equipment must always be in good working condition and suitable for the activity in question.

The use of the PPE by employees is compulsory in activities where it is prescribed. The refusal to use this equipment in such a situation can result for the employee in question being dismissed or access to specific areas may be refused. The use of PPE supplied by the Employer is a Legal Requirement under the Federal Law No. 8, 1980; employees who do not adhere to this Legal Requirement will be sanctioned.

The PPE will be regularly inspected and maintained in good condition.

It is also the employer’s responsibility to ensure that his employees are well trained and use properly the personal safety equipment at all time in the Site and out of site while working.

The safety Officers will check that the specified protection equipment is available, is used and that the personnel using them are fully informed and instructed on the correct methods of use. The HSE Officer will report to the concerned Supervisor any operative not using his PPE correctly. He will also record the same on his report. A register is to be kept of all specialist PPE and a record kept of the training given to the employees on fitting and use as per the manufactures guidelines.

5.2 Main PPE Items and their uses

PPE shall be used in accordance with the Legal Regulation Ministerial Order No. (32) Year 1982 – Article (1), (6), (9), (22).

The choice of PPE will also be guided by H&SaW as follow:

Section 12 Paragraph 3 Head Protection page 3 of 19

Section 12 Paragraph 4 Eye Protection page 5 of 19

Section 12 Paragraph 5 Hearing Protection page 7 of 19

Section 12 Paragraph 6 Foot Protection page 9 of 19

Section 12 Paragraph 7 Hand Protection page 10 of 19

Section 12 Paragraph 8 Body Protection page 11 0f 19

Section 12 Paragraph 9 Respiratory Protective Equipment page 12 of 19

Section 12 Paragraph 10 Safety Harness and Belts page 16 of 19

Page 48: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 48

See in appendix H the colour coding for the different functions on site.

5.3 Main PPE Items and their uses

5.3.1 Head Protection

Safety hats or helmets are rigid headgear made of various materials and designed to protect the heat from impact, flying particles, electric shock, or any combination of the three. Each helmet has two parts, a shell and a suspension cradle.

Any modification of the safety helmet, especially punching holes in shell, is prohibited.

5.3.2 Eye and Face Protection

Protection of the eyes and face from physical or chemical agents are of prime importance in an industrial environment. And also, due to intensive sun exposure, uncontrolled dust and high humidity, locally used cotton Scarf should be issued to open area workers during construction period.

To select the type of protection will depend on the properties of possibly imposed hazard, but it should be borne in mind that all eye protection and most face protection devices must be considered as optical instruments. They must be selected, fitted, and used with regard to both the type of hazard and the optical condition of the user.

Industrial grade safety glasses (eventually with shield) required at all times during working hours in shop or in construction site.

A. Welding and cutting

B. Excavation

C. Driving nails

D. Grinding

E. Drilling

5.3.3 Hand protection

The kind of gloves used depends primarily upon the material or equipment being handled.

Gloves should not be used near rotating machinery as they can be caught and trap the hand.

Suitable gloves should be worn on most construction work.

5.3.4 Foot Protection

The safety shoe or boot is fitted with a metal toecap. The toecap is capable of withstanding both compression and impact loads.

Safety footwear for construction work must be able to withstand a compressive load of 1,100 kg and an impact load of 33 kg.

Foot guards must be worn when using jack hammers, tampers and similar equipment.

Page 49: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 49

5.3.5 Safety Harness

Lifelines and Lanyards should be worn while working elevation is 3 m high form ground or platform level and no guardrail could have been put in place prior to the activity.

Lifelines, safety belts, and lanyards shall be used only for worker safeguarding.

Lifelines shall be secured above the point of operation to an anchorage or structural member.

Safety lanyard shall be a minimum of 14mm nylon, or equivalent, with a proper length of falling distance.

5.3.6 Respiratory Protection

Where processes create atmospheric Contaminant, which may be hazardous to the health of employees, the first consideration always should be the application of engineering measures to control release of the contaminants.

In some cases, engineering control measures are not practical and the worker should therefore be supplied with personal respiratory protective equipment.

Ventilators, fans, air moves, dust mask or a combination of these should be used in dusty atmospheres. Users of dust masks, breathing air masks and respirators must be fit- tested and trained in their use.

Page 50: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 50

6 FIRE PROTECTION AND PREVENTION

Page 51: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 51

6. FIRE PREVENTION AND PROTECTION

See specific fire prevention plan to be separately submitted.

6.1 General

Flammable materials shall be stored at a safe distance away from the work areas.

Fuel storage tanks shall be grounded, vented located within bunded areas and provided with signage and foam type fire extinguishers mounted on posts at least 3m from the tanks.

Compressed gas cylinders shall be stored and transported as per supplier recommendations

In general, the main emphasis shall on fire prevention; but when a fire does occur the priority shall be the evacuation of personnel rather than fire fighting.

After evacuation, containment shall become the prime consideration until the alarm has been transmitted to the Fire Brigade/ Civil Defence and their arrival on Site.

6.2 Basic rules

All activities producing fire, extra-heat or sparks are submitted to hot work permit system.

All employees must know where fire extinguishers are and have attended a toolbox talk about how to use them.

Flammables shall be stored in properly labeled containers.

Accumulation of trash, oily rags, combustible materials and similar fire hazards of any nature will not be permitted.

All welding and cutting torches must be equipped with flame valve and standard operational gauges.

All alleyways, driveways, roads, stairway, ladder and transformers shall be kept clear of hazardous material and equipment.

Refuelling of petrol and diesel equipment shall be done only in prescribed areas and with approved equipment.

Employees shall take all measures to minimize spills and to clean up immediately and spills which may accidentally occur. Refueling equipment with the engine running is prohibited.

There must be a fire extinguisher, water hose or other fire control equipment easily accessible for each welding, cutting, burning or other such operation. The Subcontractor shall install and maintain fire extinguisher and fire fighting equipment to be available all times next to his activities.

6.3 Types of Fires

It is important to be able to identify the type of fire so that the correct type of fire fighting equipment can be selected for use. The Fire Protection Association classifies five categories of fire:

Page 52: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 52

Class “A” Fire : Fires in ordinary combustible materials such as cloth, wood, paper etc.

Class “B” Fire : Fires in flammable liquids, oils etc.

Class “C” Fire : Fires in gases such as Acetylene, LPG etc.

Class “D” Fire : Fires in metals such as magnesium, sodium etc.

Class “E” Fire : Fire in electrical equipment

6.4 Types of extinguishers to be used

Class “A” Fire : Foam, Dry Chemical Powder (all purpose type),

Class “B” Fire : Foam, Dry Chemical Powder (all-purpose type)

Class “C” Fire : CO2, Dry Chemical Powder (all-purpose type)

Class “D” Fire : Dry Chemical Powder, Foam, (all-purpose type)

Class “E” Fire : CO2, Dry Chemical Powder (all-purpose type)

6.5 Distribution and location of fire Fighting Extinguishers

The location, quantity and type of fire extinguishers will be shown on emergency plan drawings. The numbers of extinguishers and type will be based upon the fire risk level linked to the construction schedule.

Fire extinguishers are an important part of any fire protection program. For fire extinguishers to be effective, the following conditions must be met:

- The fire must be discovered while it is still a small fire. - The extinguisher must be easily accessible and in proper working condition. - The extinguisher must be of the proper type to extinguish the fire.

Site personnel will be trained to recognize types of fire and to make correct judgement on the type of equipment to be used for fire fighting.

The Safety Officer will organize training sessions to instruct selected personnel and keep records of the training sessions.

Fire fighting equipment.

The following shall rise with the building simultaneously and the need will be regularly evaluated:

Fixed fire extinguishing devices: - One fire water booster pumps will be installed next to the main power generator - Fire water availability: one 5000 gals tank to be installed and pumping system from sea water - Three fire water rise to be installed throughout stairs shaft - Three fire hose reels to be installed on ground level

Portable fire extinguisher: register, location and conditions of fire extinguishers to be in-house monthly inspected by the safety officers In addition to the portable extinguisher spread on site, every high fire risk activity will require the availability of specified and appointed fire extinguisher.

Page 53: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 53

Fire alarms: will be installed on tower cranes inside the project boundaries at different level. The fire alarm system will be checked quarterly during emergency drills.

6.6 Fire Prevention

6.6.1 House keeping rules

Personnel must know the place of work, its fire hazards, and the location of fire fighting equipment.

Keep all fire fighting equipment clear of any obstruction. Provide easy access to fire fighting equipment in order to save time and minimize fire damage.

Keep the work place clean and tidy

Emergency exit paths shall be maintained free of any obstruction and clearly marked

The use of inflammable, flammable, and burnable items or items likely to pose a fire hazard shall be minimized.

Waste materials shall be collected into one central location and removed from site at regular intervals to reduce potential fire hazards. Highly flammable material shall be stored outside the building structure at suitable locations and as instructed by the Safety Officer.

Open flame work (welding, cutting, etc.) shall require the utmost caution. All combustible materials in the work area must be removed or covered as sparks may fly up to 10 meters.

6.6.2 Organization

Stacked combustible materials in yard storage shall not exceed a height of three (3.0) meters or four and a half (4.5) meters if handled by mechanical equipment. Stacks shall not be closer than five (5.0) meters to buildings or structures

Driveways will be at least five (05) meters wide and free of debris around combustible storage areas. These storage areas will not exceed fifteen (15) meters by fifteen (15) meters in plan.

Storage of flammable materials in tanks shall be bunded.

Staircases shall be erected at the same time as the floor slab to guarantee escape routes and access for fire fighting personnel.

Disposal of combustible waste material shall comply with the applicable fire and environmental Laws and Regulations.

Ventilation that is adequate to prevent the accumulation of flammable vapours to hazardous levels shall be provided in all areas where flammable and combustible liquids are handled or used.

All storage, handling, and use of flammable and combustible liquids shall be under the supervision of a qualified person.

Motors of all equipment shall be shut off during refuelling.

Paint scrapings and paint-saturated debris shall be removed from inside any structure on a daily basis.

Page 54: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 54

6.6.3 Rules and Regulations

Stacked combustible materials in yard storage shall not exceed a height of three (3.0) meters or four and a half (4.5) meters if handled by mechanical equipment. Stacks shall not be closer than five (5.0) meters to buildings or structures

Personnel will not be permitted to return to their work unless the “All Clear” has been authorized by a competent person or the Civil Defence Authorities.

The entire job site is declared a NO SMOKING AREA. Smoking will only be permitted in clearly identified areas equipped with ashtrays.

All sources of ignition shall be prohibited in areas where flammable and combustible liquids are stored, handled, and processed: suitable “NO SMOKING” and/ or “NO OPEN FLAME” signs shall be posted in all such areas.

The contact of oil, grease or paint with oxygen cylinders shall be avoided. There may be a risk of explosion due to oxidization

Compressed gas cylinders must be stored in separate areas.

Never check for LPG or acetylene gas leaks with a lighted match or cigarette lighter. Apply soapy water with a brush.

Never keep oil, acetone, or any flammable liquid in or near areas where grinding, welding, or any other sources of heat are generated.

Do not store unwanted materials in electrical cabins, AC plant rooms etc...

Switch off the main supply if electrical equipment is not in use.

Switch off all task lights, heaters or any kind of machine when not in use.

Never throw lighted cigarettes or burning materials into dustbins as they may ignite and create a fire when you have left the area.

Never leave open fires/ flames unattended. (Such as torches and the like).

Page 55: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 55

7 EMERGENCY PLANNING AND PROCEDURES

Page 56: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 56

7. EMERGENCY PLANNING AND PROCEDURES

7.1 Job Site Emergency Procedures

In case any accident occurs with death or injury resulting in work loss, fire, explosion, collapse of structure scaffolding or failure of a crane or other lifting appliances, on the Site, SISJV shall immediately notify the concerned Authorities as detailed below by telephone, followed by a written accident report.

In case of such major accident, the Safety Officer and the Construction Manager are the first to be notified in order to take immediate and proper actions to save lives and properties. They shall then ensure that the Project Management is kept aware of the situation. The Project Safety Officer or the designated HSE Officer will supervise the operations and inform all responsible people.

Relevant Authorities Contact Tel n° Contact person (if applicable)

Ambulance 998

999 Civil Defence/ Fire 997

Police 999

Municipality Emergency Office 993

Water Department 991

Hospital (Khalifa) 02- 6102000

Carewell center 02- 6728966

Client’s representative Jacobs HSE Manager

050-3178830 Mr. Mohd Alghanam

SISJV Project director 050-4819689 Mr. Didier Bosredon

SISJV HSE Manager 050-4826505 Mr Lyndon Davies

SISJV deputy HSE Manager 050-6283810 Mr Eric Chantraine

Civil Aviation 02-5757500

Environmental Protection 02-6980349

Electricity Department 02-4464677

Sewerage Department 02-6711244

Coast Guard 02-6731900

Etisalat 8005500

Adnoc 02-6023177

The SISJV shall maintain a register of accident details including the name of the injured person, date of accident, date of return to work, the number of days the injured person was away from work and a brief

Page 57: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 57

description of the accident. The information and shall be made available at the Site Office for inspection at any time.

7.2 Emergency Planning

In every case, the following will be implemented:

The various emergency plans shall be prepared in sufficient detail to meet the requirements of OHSAS 18001: 1999. Plans shall be based upon the construction schedule and the type of construction activities. Furthermore, the HSE Management will test the procedures and the results of the test shall be filed in accordance with the ISO – OHSAS Requirements

7.2.1 Guideline in case of Emergency

In the event of a large-scale emergency where the site must be evacuated, the following procedures shall be followed:

On hearing the continuous sound of the alarm, site personnel will be required to stop work, switch off their power tools and assemble at the Emergency Assembly Point(s).

The person responsible for administering the Site Diary shall simultaneously account for the visitors on site.

In this manner, a reasonably accurate forecast can be determined of the number of Site staff and visitors remaining in the building or missing.

The person or persons responsible for raising the alarm shall make himself/themselves known to the HSE Manager or the designated HSE Officer/ Construction Manager or in their absence, to a responsible member of the Site Management. He/they shall remain available to inform Legal Authorities of the exact location(s) of the emergency and to describe in brief the cause of any emergency.

A manually operated alarm system, comprising a loud siren and located on the Site Offices, shall be set up. This alarm will constitute the signal to evacuate the Site.

7.3 FIRE EMERGENCY PROCEDURE

1. Raise alarm and sound siren immediately when you see a fire.

2. Shout ‘FIRE’, ‘FIRE’, ‘FIRE’ at the top of your voice to alert the people.

3. Try to attract others’ attention as far as possible on your way and request that access be

prevented to the area of the fire.

4. The person who discovers any outbreak of fire must inform the HSE Manager, the designated

HSE Officer, or his Site Superintendent immediately. He will give full details of location, type of

fire etc.

5. Switch off all electrical equipment and fuel-powered engines. (except those which constitute a

means of escape and are not subject to immediate hazard).

6. Close all gas cylinders.

Page 58: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 58

7. Clear the passage and/ or road for easy access for the Fire Brigade.

8. In case of small fires, try to identify the type of fire and use a suitable fire extinguisher.

9. Escape through the shortest possible route.

10. Assemble at designated place(s).

11. All Supervisors shall count their workforce and ensure nobody is missing.

12. Timekeeper shall provide the list of persons on duty.

13. Carry out a roll call.

14. Nobody is allowed to return to his job site until the affected area is declared safe.

7.3.1 Fire Emergency Responses

Upon discovery of a fire, raise the alarm. Any outbreak of fire must be reported immediately to the HSE

Manager and the designated HSE Officer, The Construction Manager or any responsible person on Site.

The persons having discovered the outbreak of the fire will give details of location and nature of the fire.

Access to the site and the building must be cleared at once to allow unimpeded access by the Fire

Brigade / Civil Defence. On a priority basis, the affected parts of the building shall be evacuated. In the

event of major fire, the whole Site shall be evacuated, in accordance with the general evacuation

procedures.

Site personnel shall only tackle outbreaks of fire that can be easily contained. Fire shall only be tackled

under supervision of the HSE Manager or the designated HSE Officer or senior Supervisory staff.

7.4 Emergency Precautions

7.4.1 Alarms

SISJV and his Sub-Contractors must ensure that their employees are fully aware of and conversant with

the respective alarms associated with the emergency procedures on the Job Site, and with the measures

to be taken in the event of an alarm being sounded.

7.4.2 Evacuation Plan

The SISJV and his Sub-Contractors must ensure that their employees are fully aware of, and conversant

with the plan for evacuation of the Job Site should the occasion arise. Drills will be organized by the

Safety Officer to acquaint all staff/ workers with the procedure.

7.4.3 Fire Precautions

In the event of a fire, the Safety Officer shall ensure that the Civil Defence Authorities are alerted. He

will ensure that all site personnel and visitors have knowledge of the location of the fire to ensure that

no one attempts to enter affected parts of the site.

Page 59: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 59

Personnel shall only be directed to tackle outbreaks of fire that can be easily contained. Priority shall be

given to ensuring the evacuation of personnel and to informing the Civil Defence Authorities of any such

outbreaks.

The relevant Authorities telephone numbers shall be prominently displayed at the entrance of the

various offices on Site.

A system will be established to ensure that an accurate tally is kept of all persons on the job site at all

times.

All Site Facilities/Offices and working areas will be regularly inspected by the Safety.

No office, welfare facility, accommodation, store, lay down area or hutting of any kind will be erected or

moved without the prior approval of the HSE Manager or the Construction Manager, who may specify

minimum spacing between buildings, as per Local Regulations.

SISJV and his Sub-Contractors shall provide and maintain a sufficient number and types of suitable Fire

Extinguishers. SISJV and his Sub-Contractors shall ensure that these Fire Extinguishers are located in all

temporary and other buildings and elsewhere, particularly at works faces. Only trained personnel shall

use Fire Extinguishers.

Smoking is not allowed within the structures regardless of the state of completion.

No burning of rubbish or debris will be permitted on the Job Site.

“Danger” and “No Smoking” signs will be displayed at all applicable locations

Assembly Points shall be established and clearly identified at the assembly location, on the site plan and

the personnel shall be informed of their designated assembly area in cases of emergencies.

Until the arrival of the Civil Defence, the HSE Manager together with the Construction Manager and the

Safety Officer has full authority for fire fighting, evacuation and emergency procedures. Their

instructions and orders must be obeyed without question by the workforce and the site supervisors.

Page 60: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 60

8 HSE PERFORMANCE MEASUREMENT AND

IMPROVEMENT

Page 61: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 61

8. HSE performance measurement and improvement

8.1 HSE performance measurement

The results of HSE audits, inspections and investigations into accidents and incidents shall be analyzed

by the HSE Manager.

Other inputs will be taken from the work-force representatives and emerging best practice as well as

any changes to the regulations or codes of practice that apply to the project.

Performance measurements shall include:

Number of man-hours worked without a lost time injury

Number of nonconformities reported by HSE audit as a percentage of audits in the accounting

period

Number of reported HSE incidents in the accounting period

Number of emergency drills carried out as a percentage of planned drills

Number of hazardous material spillages in the accounting period…

The HSE performance statistics shall be compared to the HSE objectives and where there is a shortfall, it

shall be investigated to identify the reasons and plan remedial action for the next measurement period.

Other improvement suggestions shall be subjected to risk analysis prior to submittal to management for

review and authorization.

8.2 HSE performance improvement

Remedial and other improvement action recommendations resulting from performance analysis shall be

reviewed, selected, prioritized and the resources authorized by top management.

The HSE Manager shall update the HSE plan, prepare revised awareness sessions and training as

necessary to deploy the revised plan effectively

Page 62: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 62

9 HSE MONITORING ARRANGEMENTS AND

TOOLS.

Page 63: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 63

9. HSE MONITORING ARRANGEMENTS AND TOOLS.

9.1 Purpose

The purpose of this section is to provide a view of the monitoring system on site to ensure a close

follow-up of the safety regulations, rules and practices during the work activities.

9.2 Safety inspection system.

As the construction site is every day changing, every safety officer on site has the duty to check for the

safety arrangement on site and to keep daily up-to-date observations log book. Every month each safety

officer to receive a new observations log book.

The observations are compiled in a weekly activity report to be submitted during the safety weekly

meeting with the consultants and client’s representatives.

This weekly activity report is also explained during SISJV internal management meeting to highlight to

project management the trend of the safety observations.

In addition of the above mentioned safety inspections, project and construction managers are to

document a monthly safety inspection in their area/ scope of activities.

9.3 Pre task briefing

Site staff must incorporate safety instructions in routine orders and see that they are carried out.

They also have to suitably brief workers under their control so that work is carried out without excessive

risk or in an uncontrolled manner. Therefore, they will give pre task briefing and document the

attendance sheets based on a job safety analysis (JSA) made prior and close to the beginning of their

activities.

See appendix J for the proposed template to be used on CCAD.

9.4 Permit to work system

HSE department to implement work permit procedure for the following activities:

Hot work, confined space, lock out/tag out

9.4.1 PURPOSE

To establish the control requirements for the use of permit to work systems within the Project. This

procedure is mandatory and applies to all operations/activities on The Project.

Page 64: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 64

A permit-to-work system is a formal written system used to control certain types of work that are

potentially hazardous. A permit-to-work is a document, which specifies the work to be done, and the

precautions to be taken. Permits-to-work form an essential part of a safe system of work for many

construction activities. They allow work to start only after safe procedures have been defined and they

provide a clear record that all foreseeable hazards have been considered.

A permit is needed when work can only be carried out if normal safeguards are dropped or when new

hazards are introduced by the work.

9.4.2 RESPONSIBILITIES

Project Manager / Construction Manager

The Project Manager/Construction Manager shall ensure that any requirement for permit to work

systems are identified from the hazards identified and the results of the risk assessment or

tender/contract documents and is developed and put in place prior to start of any work.

HSE Manager

The HSE Manager shall advise and assist in the development of any permit to work systems to ensure

that they are suitable for use and comply with any statutory requirements or HSE guidance as may be

required.

Supervisors

The Supervisors are responsible for monitoring the compliance of any permit to work system, ensuring

that control measures are implemented and the permit used as per procedural requirements.

9.4.3 PERMIT TO WORK PROCESS

The implementation of any permit to work system shall be carefully planned, developed and

implemented taking in to consideration the following sections.

Description of the Work

The permit shall include a clear description of the work to be undertaken and any associated hazards.

The following should also be taken into consideration:

Can plans and diagrams be used to assist in the description of the work to be done its location

and limitations?

Is any plant adequately identified, e.g. by discrete number or tag to assist issuers and users in

correctly taking out and following a permit?

Does the work require a method statement? If so has one been prepared, reviewed and

accepted.

Page 65: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 65

Essentials of the Permit-to-Work

All good Health and safety Guidance confirms that a permit-to-work must help communication between

everyone involved. It should be designed by the company issuing the permit taking into account

individual site conditions and requirements. Separate permit forms may be required for different tasks,

such as hot work and entry into confined spaces, so that sufficient emphasis can be given to the

particular hazards present and precautions required. The essential elements of a permit-to-work form

are as follows:

A. Permit title

B. Permit number (reference to other relevant permits or isolation certificates)

C. Job location

D. Plant / Equipment identification

E. Description of the work to be done and its limitations.

F. Hazard identification including residual hazards, & hazards introduced by the work.

G. Precautions necessary – person who carries out precautions, e.g. isolations, should sign that

precautions have been taken.

H. Protective equipment including personal protective equipment.

I. Authorization – signature confirming that isolations have been made and precautions taken,

except where these can only be taken during the work; date and time duration of permit.

J. Acceptance – signature confirming understanding of work to be done, hazards involved and

precautions required. Also confirming permit information has been explained to all workers

involved.

K. Extension / shift handover procedures – signatures confirming checks made that plant remains

safe to be worked upon, and new acceptor / workers made fully aware of hazards / precautions.

New time expiry given.

L. Work Completed – signed by acceptor certifying work completed. Signed by issuer certifying

work completed and plant ready for testing and re-commissioning.

M. Cancellation – certifying work tested and plant satisfactorily re-commissioned.

9.4.4 RECORDS

All records / documentation relating to these procedures shall be maintained at the site and will be

made available for auditing purpose at all times.

9.5 Tools and equipment inspection.

Poor conditions of tools or equipment can result in accident with severe injuries.

Therefore, it is at all time needed to have tools and equipment in the best working setting.

In order to ensure such good conditions, a 3-monthly inspection system will be implemented on CCAD.

Page 66: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 66

Every 3 months the colour coding will be as follow:

January – February – march Green

Aril – may – june White

July – august – September Yellow

October – November – December Blue

Need repair Brown or no color

Out of order Red

Tools and equipment concerned and the responsible party to inspect:

Powered tools Store to organise and Plant division to provide a qualified electrician

Mobile plant equipment Third party as per regulations

Plant division for the other (if not regulated or between third party if

period longer than 3 months)

Ladder Store

Slings, chains, ... Store

Safety harnesses Store

The responsible site division to apply the colour coding, keep documented register and provide copy of

the register for the 15th of the month of inspection to the HSE department.

9.6 Safety monitoring for specific safety topics.

Monthly the safety management team has to set a look-ahead program to monitor specific safety topics.

See appendix B for a sample of monthly program for safety department special actions with sample

documents to be used for the safety check of items.

9.7 Appointed safety persons and specific training.

9.7.1 PURPOSE

To ensure that any requirement for appointed persons is identified and individuals appointed for

specific task are trained appropriately as may be required by legislation or client requirements on The

Project.

This procedure is mandatory and applies to all site operations/activities on The Project.

Page 67: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 67

The term appointed person for the purpose of this procedure applies to appointments made to comply

with statutory regulations/Client or Project H&S requirements.

9.7.2 RESPONSIBILITIES

Project / Construction Manager

The Project/Construction Manager shall ensure that appointed persons are identified and appointed in

writing to carry out statutory requirements, or any other duties as may be required in this management

system. This shall also apply to any designated company HSE duties that may require a formal

appointment.

HSE Manager

The HSE Manager shall identify all statutory and company appointments for the CCAD project and

monitor the on site implementation.

Supervisors

The Supervisors shall monitor any person appointed under this procedure to ensure that they fulfil their

duties as may be specified.

9.7.3 Procedure/Process

Identification of Appointed Persons

The requirement for any appointed persons shall be identified prior to the start of any work taken place

during the planning stages. The level / number of appointments shall reflect the work being undertaken

and based on hazards and risk. Typical appointments may include the following:

First Aiders

Fire Wardens / Marshals

Scaffold Inspectors

Slinger/Riggers / Banksman/Signaller

Special tool operators e.g. cartridge guns/benchsaw operator/welder/electrician

Appointing Individuals For The Role

All persons appointed to fulfil roles within CCAD as per this procedure shall be recorded on the

Appointed Persons Register. The individual shall only be appointed based on their competency to

carryout any task or function, as may be required by legislation, company or client requirements.

Page 68: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 68

Briefing / Training of Appointed Persons

The appointed person shall be fully briefed on their duties and responsibilities at the time of

appointment. All briefings shall be recorded on the toolbox attendance form sign by the responsible

manager and filed with the appointed persons register. A copy shall be provided to the HSE department.

Consultation of Appointed Persons

A key function of any appointed persons is to keep up to date on the HSE requirements related to their

appointment. The HSE Manager shall ensure that relevant information, changes to legislation etc., is

brought to the attention of any appointed persons to ensure they meet up to date standards.

9.7.4 FORMS / RECORDS

Every appointed person shall receive an individual authorisation for his duties signed by his responsible

line manager.

The following Project register and form are to be used for the purpose of this procedure. Copies of

competency certification must be checked for authenticity, relevance and copies attached to register.

The following documentation / records shall be used for the purpose of this procedure and shall be

maintained at the site offices for auditing / monitoring purposes.

See in Appendix K training matrix and the template register for Appointed Persons.

9.8 Safety Motivation, Incentives, and Recognition

A Key motivation in HSE success is the development of continuing pride by all the work force, group or personnel, in the achieved target. The HSE Plan will include a program of recognition and awards to individuals and/or groups who have reached defined, significant HSE milestones or who have made outstanding contributions to the project HSE program. All individuals, groups, and firms in the project organisation will be eligible for participation in the program.

Awards will be presented and celebrated at award congregations and the details of the achievements will be published on project notice boards. Participation at award congregations will also include, when appropriate, not only management staff members but also the Client/ Engineer’s Representative.

Page 69: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

Occupational Health, Safety & Environmental Plan Page 69

10 APPENDIX

Appendix I. HSE POLICY

Appendix J. Organization charts

Appendix K. Sample – Monthly HSE program

Appendix L. Risk assessment

Appendix M. Incident procedure

Appendix N. Lifting operation

Appendix O. Scaffolding

Appendix P. Helmet colour code

Appendix J. Safety briefing to work force and permit to work

Appendix K. Training matrix and register

Page 70: CCAD- Project HSE Plan

CLEVELAND CLINIC ABU DHABI

11 REFERENCES

DOCUMENT SEPARATELY SUBMITTED

Construction Environmental Plan (CEMP)

Electrical plan

Traffic plan

Lifting plan

Site installation

Fire prevention plan

Emergency procedure

Incident procedure

REFERENCES

“Health & Safety Codes of Practice for Construction Projects”, Site

Standards & Guidelines for Consultants & Contractors. (issued by the Emirate of Abu Dhabi Municipalities & Agricultural Dept.).

“Regulatory framework – EHS policy” (issued by the AD EHSMS)

ALDAR Health Safety Security and Environmental Management System Doc No AC/HSSE/M/001 and AC/HSSE/M/002.

Page 71: CCAD- Project HSE Plan
Page 72: CCAD- Project HSE Plan
Page 73: CCAD- Project HSE Plan
Page 74: CCAD- Project HSE Plan
Page 75: CCAD- Project HSE Plan
Page 76: CCAD- Project HSE Plan
Page 77: CCAD- Project HSE Plan
Page 78: CCAD- Project HSE Plan
Page 79: CCAD- Project HSE Plan
Page 80: CCAD- Project HSE Plan
Page 81: CCAD- Project HSE Plan
Page 82: CCAD- Project HSE Plan
Page 83: CCAD- Project HSE Plan
Page 84: CCAD- Project HSE Plan
Page 85: CCAD- Project HSE Plan
Page 86: CCAD- Project HSE Plan
Page 87: CCAD- Project HSE Plan
Page 88: CCAD- Project HSE Plan
Page 89: CCAD- Project HSE Plan
Page 90: CCAD- Project HSE Plan
Page 91: CCAD- Project HSE Plan
Page 92: CCAD- Project HSE Plan
Page 93: CCAD- Project HSE Plan
Page 94: CCAD- Project HSE Plan
Page 95: CCAD- Project HSE Plan
Page 96: CCAD- Project HSE Plan
Page 97: CCAD- Project HSE Plan
Page 98: CCAD- Project HSE Plan
Page 99: CCAD- Project HSE Plan
Page 100: CCAD- Project HSE Plan
Page 101: CCAD- Project HSE Plan
Page 102: CCAD- Project HSE Plan
Page 103: CCAD- Project HSE Plan
Page 104: CCAD- Project HSE Plan
Page 105: CCAD- Project HSE Plan
Page 106: CCAD- Project HSE Plan
Page 107: CCAD- Project HSE Plan
Page 108: CCAD- Project HSE Plan
Page 109: CCAD- Project HSE Plan
Page 110: CCAD- Project HSE Plan
Page 111: CCAD- Project HSE Plan
Page 112: CCAD- Project HSE Plan
Page 113: CCAD- Project HSE Plan
Page 114: CCAD- Project HSE Plan
Page 115: CCAD- Project HSE Plan
Page 116: CCAD- Project HSE Plan
Page 117: CCAD- Project HSE Plan
Page 118: CCAD- Project HSE Plan
Page 119: CCAD- Project HSE Plan
Page 120: CCAD- Project HSE Plan
Page 121: CCAD- Project HSE Plan
Page 122: CCAD- Project HSE Plan
Page 123: CCAD- Project HSE Plan
Page 124: CCAD- Project HSE Plan
Page 125: CCAD- Project HSE Plan
Page 126: CCAD- Project HSE Plan
Page 127: CCAD- Project HSE Plan
Page 128: CCAD- Project HSE Plan
Page 129: CCAD- Project HSE Plan
Page 130: CCAD- Project HSE Plan
Page 131: CCAD- Project HSE Plan
Page 132: CCAD- Project HSE Plan
Page 133: CCAD- Project HSE Plan
Page 134: CCAD- Project HSE Plan
Page 135: CCAD- Project HSE Plan
Page 136: CCAD- Project HSE Plan
Page 137: CCAD- Project HSE Plan
Page 138: CCAD- Project HSE Plan
Page 139: CCAD- Project HSE Plan
Page 140: CCAD- Project HSE Plan
Page 141: CCAD- Project HSE Plan
Page 142: CCAD- Project HSE Plan
Page 143: CCAD- Project HSE Plan
Page 144: CCAD- Project HSE Plan
Page 145: CCAD- Project HSE Plan
Page 146: CCAD- Project HSE Plan
Page 147: CCAD- Project HSE Plan
Page 148: CCAD- Project HSE Plan
Page 149: CCAD- Project HSE Plan
Page 150: CCAD- Project HSE Plan
Page 151: CCAD- Project HSE Plan
Page 152: CCAD- Project HSE Plan
Page 153: CCAD- Project HSE Plan
Page 154: CCAD- Project HSE Plan
Page 155: CCAD- Project HSE Plan
Page 156: CCAD- Project HSE Plan
Page 157: CCAD- Project HSE Plan
Page 158: CCAD- Project HSE Plan
Page 159: CCAD- Project HSE Plan
Page 160: CCAD- Project HSE Plan
Page 161: CCAD- Project HSE Plan
Page 162: CCAD- Project HSE Plan
Page 163: CCAD- Project HSE Plan
Page 164: CCAD- Project HSE Plan
Page 165: CCAD- Project HSE Plan
Page 166: CCAD- Project HSE Plan
Page 167: CCAD- Project HSE Plan
Page 168: CCAD- Project HSE Plan
Page 169: CCAD- Project HSE Plan
Page 170: CCAD- Project HSE Plan
Page 171: CCAD- Project HSE Plan
Page 172: CCAD- Project HSE Plan
Page 173: CCAD- Project HSE Plan
Page 174: CCAD- Project HSE Plan
Page 175: CCAD- Project HSE Plan
Page 176: CCAD- Project HSE Plan
Page 177: CCAD- Project HSE Plan
Page 178: CCAD- Project HSE Plan
Page 179: CCAD- Project HSE Plan
Page 180: CCAD- Project HSE Plan
Page 181: CCAD- Project HSE Plan
Page 182: CCAD- Project HSE Plan
Page 183: CCAD- Project HSE Plan
Page 184: CCAD- Project HSE Plan
Page 185: CCAD- Project HSE Plan
Page 186: CCAD- Project HSE Plan
Page 187: CCAD- Project HSE Plan