Case Study: Using BIM 360 on an Industrial Construction Project
Connie McLaughlin
Operations Manager, U.S. Construction
Cody Austin
Technical Solutions Executive
![Page 2: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/2.jpg)
Connie McLaughlin, Operations Manager U.S. Construction
Connie has 35 years of experience in engineering and construction in the chemical,
oil and gas sector with emphasis on project execution. She has held various
positions in project controls, technical services, information management with most
recently being the Operations Manager for U.S. Construction. System development
and deployment has been a common theme throughout her career at KBR.
Cody Austin, Technical Solutions Executive
Cody is a member of Autodesk’s Technical Solutions Team focused on connecting
Autodesk’s solution portfolio with Customer’s challenges, goals and strategic
initiatives . He brings with him over 13 years of Industrial Construction experience
including 4 Texas Gulf Coast projects with Zachry Group, laser scanning with Hi-
CAD/LFM, plant design and engineering with AVEVA and now 6 years in his current
role with Autodesk. Cody is also a member of CII RT 344 focused on improving
supply chain visibility.
![Page 3: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/3.jpg)
Video
![Page 4: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/4.jpg)
KBR is a global provider of differentiated professional services and technologies across the asset and
program lifecycle within the Government Services and Hydrocarbons sectors. KBR employs approximately
34,000 people worldwide (including our joint ventures), with customers in more than 75 countries, and
operations in 40 countries, across three synergistic global businesses:
Government Services, serving government customers globally, including capabilities that cover the
full lifecycle of defense, space, aviation and other government programs and missions from
research and development, through systems engineering, test and evaluation, program
management, to operations, maintenance, and field logistics
Technology, including proprietary technology focused on the monetization of hydrocarbons
(especially natural gas and natural gas liquids) in ethylene and petrochemicals; ammonia, nitric acid
and fertilizers; oil refining and gasification
Hydrocarbons Services, including onshore oil and gas; LNG (liquefaction and regasification)/GTL; oil
refining; petrochemicals; chemicals; fertilizers; differentiated EPC; maintenance services (Brown &
Root Industrial Services); offshore oil and gas (shallow-water, deep-water, subsea); floating
solutions (FPU, FPSO, FLNG & FSRU); program management and consulting services
KBR is proud to work with its customers across the globe to provide technology, value-added services,
integrated EPC delivery and long term operations and maintenance services to ensure consistent delivery
with predictable results. At KBR, We Deliver.
![Page 5: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/5.jpg)
BIM 360 Case Study
▪ EPC - $500MM
▪ Texas Gulf Coast
▪ 2-Year Construction
▪ 1M Earnable Hours
▪ 1.5M Safe Work Hours
▪ 1000 Employees
▪ 2000 Tons of Steel
▪ 4000 Piping Isometrics
▪ 500 Piping IWPs
▪ 150 Process Systems
▪ PDMS, CADWorx, Tekla
Project Approximations
![Page 6: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/6.jpg)
Project Timeline9/5/2016 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering (Detailed)
Procurement
Construction
9/16 – 11/17
1/17 – 4/18
12/16 – 10/18
![Page 7: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/7.jpg)
Why Change?
▪ Infancy stage of using WorkFacePlanning on all projects
▪ Improve productivity to remain competitive
▪ Paper-based work processes embedded in construction execution
▪ Timely delivery of information to the field
▪ Visual management
Digitization of Project Execution
![Page 8: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/8.jpg)
Why Autodesk BIM 360?
▪ Compatibility with engineering design tools (PDS, PDMS, S3D, etc.)
▪ Extends Autodesk Navisworks to Field Managers
▪ Affordable & scalable
▪ Easy to configure and implement
▪ Non-disruptive to current work processes
Digitization of Project Execution
![Page 9: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/9.jpg)
Project TeamProject
Superintendent
Craft Superintendent
General Foreman
Foreman
Crew
Craft Planners
Craft Superintendent
General Foreman
Foreman
Crew
Craft Planners
Craft Superintendent
General Foreman
Foreman
Crew
Craft Planners
Craft Superintendent
General Foreman
Foreman
Crew
Craft PlannersWorkFacePlanning Manager
Who was involved?
Technical Services Manager
Operations
Craft Superintendent
General Foreman
Foreman
Owner
![Page 10: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/10.jpg)
Autodesk Navisworks & iConstructModel Conditioning, Work Package Planning & Status Visualization
![Page 11: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/11.jpg)
BIM 360 Implementation Timeline6/7/2017 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering
Procurement
Construction
Subscribed to BIM 360
![Page 12: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/12.jpg)
HardwareApple iPad Pro Wi-Fi 12.9” 256GB w/ OtterBox Defender
![Page 13: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/13.jpg)
BIM 360 Implementation Timeline6/7/2017 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering
Procurement
Construction
Subscribed to BIM 360
Published 3D Model & Documents
![Page 14: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/14.jpg)
BIM 360 Case StudyInformation Access at the Work Front
▪ Complete 3D Model
▪ Work Packages & Test Packages
▪ P&IDs
▪ Piping Isometrics
▪ Detail Drawings
▪ Instrumentation Data
▪ Cable Schedule
▪ 4-Week Lookahead & Plot Plan
![Page 15: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/15.jpg)
BIM 360 Implementation Timeline6/7/2017 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering
Procurement
Construction
Subscribed to BIM 360
Published 3D Model & Documents
BIM 360 Training & RFI Config.
![Page 16: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/16.jpg)
BIM 360 Case StudyRFI Initiation at the Work Front
▪ General Foreman implementation
▪ Description
▪ Photographic evidence
▪ Supporting documents
▪ Responsible contractor
▪ Reduced response time
▪ Simple user interface
![Page 17: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/17.jpg)
BIM 360 Implementation Timeline6/7/2017 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering
Procurement
Construction
System Turnover Config.
Subscribed to BIM 360
Published 3D Model & Documents
BIM 360 Training & RFI Config.
![Page 18: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/18.jpg)
BIM 360 Case StudyPaperless System Walkdowns
▪ Paperless system walkdowns
▪ Punch, sync, done
▪ Greater context and visibility
▪ Faster and smoother system turnover
▪ Walkdowns in the rain
▪ Automated reporting and dashboards
![Page 19: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/19.jpg)
BIM 360 Case StudyReal-Time Visibility & Automation
![Page 20: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/20.jpg)
BIM 360 Implementation Timeline6/7/2017 – 10/15/2018
|Sep |Dec |Mar |Jun |Sep |Dec |Mar |Jun |Sep2016 2018
Engineering
Procurement
Construction
System Turnover Config.
Interviews
Subscribed to BIM 360
Published 3D Model & Documents
BIM 360 Training & RFI Config.
Interviews
Interviews
![Page 21: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/21.jpg)
BIM 360 Case Study
▪ Cultural change
▪ 5D mobilization confirmation
▪ Increased productivity
▪ Reduced rework
▪ Reduction of indirect roles
▪ Easy RFI = $$$
▪ Paperless system walkdowns
▪ Increased construction visibility
▪ Automated reporting
Impact of Digitization
1 Federated 3D Model
12,769 Drawings
20,270 Tags
433 RFIs
808 MC Punchlist
2,281 Photos
10+ Gigabytes
AS OF 9/28/18
![Page 22: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/22.jpg)
Best Practices
▪ Start small and grow from there
▪ Identify a Champion
▪ Invest in model conditioning & automation tools
▪ Leverage AWP to increase model maturity
▪ Continuous training / education
▪ Establish baselines and KPIs
▪ Regular cadence (virtual and onsite)
What are some lessons we learned?
![Page 23: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/23.jpg)
Going Forward
▪ Extend to subcontractors
▪ Extend RFI workflows
▪ Digitize ITRs (Checklists)
▪ Real-time construction progressing
▪ Work package management
▪ Digital timesheets
▪ Custom real-time dashboards
▪ Weld and flange management
What’s next?
![Page 24: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/24.jpg)
![Page 25: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/25.jpg)
![Page 26: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/26.jpg)
In Summary
▪ BIM 360 provides an affordable and scalable solution for digitizing field execution
▪ BIM 360 can coexist and compliment existing WorkFace Planning tools and processes
▪ Low-hanging fruit, can increase construction productivity and reduce rework
▪ Many paper-based construction processes can be easily digitized
Call to Action!
![Page 27: Case Study: Using BIM 360 on an Industrial Construction ...](https://reader031.fdocuments.in/reader031/viewer/2022012508/6184677b6cadab78006e9a83/html5/thumbnails/27.jpg)
Autodesk and the Autodesk logo are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document.
© 2018 Autodesk. All rights reserved.