1 CARE 06, Frascati, 17.11.05
HIPPI in 2006HIPPI in 2006
- HIPPI Objectives- 2006 Activities- ESAC Report- Planning and
deliverables
Maurizio Vretenar, CERN
2 CARE 06, Frascati, 17.11.05
HIPPI:HIPPI: High Intensity Pulsed High Intensity Pulsed Proton Injectors Proton Injectors
Main objective:
Research and development of the technology for high intensity pulsed proton linear accelerators up to an energy of 200 MeV.
Applications of the HIPPI results:Upgrade of the linac injectors for GSI, CERN and RAL.
10 participating laboratories:RAL, CEA, CERN, FZJ, GSI, IAP-FU, INFN-MI, (INFN-NA), LPSC, IPNO
Expected budget:14.7 M€ (FC-equivalent), EU contribution 3.6 M€
3 CARE 06, Frascati, 17.11.05
HIPPI WorkplanHIPPI Workplan
Chopper B
Models for RF properties, drift tubes, alignment
Prototype for power tests, beam dynamics analysis
Model for RF properties
Prototype for power tests
Prototype, hardware test
Drift Tube Linac
H-mode Linac
Side Coupled Linac
Cell Coupled DT Linac
Design of the GSI Injector
Design of the CERN Injector
Design of the RAL Injector
Following Phase
Comparative assessment of beam optics
layouts, simulations, experiments
Work
Package 2
Work
Package 3
Elliptical Cavities Prototypes for pulsed power test
Spoke Cavities Prototypes for power test
CH Resonator Tuning system construction and test
Experiments at CERN (3 MeV) and GSI (UNILAC)
Work
Package 5
Code development
Preparation of codes and specific routines
Code benchmarking
Comparison of beam dynamics codes
Diagnostics Prototypes
Beam experiments
HIPPI Joint Research Activity
Work
Package 4
Chopper A Prototype, hardware test
Chopper Line Assembling, testing with beam
Comparative assessment of NC structures
Comparison NC / SC
Comparative assessment of chopper and chopper line performance
Comparative assessment of SC structures
2007-08: -comparative assessments
- Linac designs being finalised
4 CARE 06, Frascati, 17.11.05
HIPPI Technical GoalsHIPPI Technical Goals
HIPPI Technical Goals from HIPPI Proposal (Annex 1), reviewed at the HIPPI06 Meeting:
WP2: High shunt impedance normal conducting WP2: High shunt impedance normal conducting cavitiescavities
ZT2 > 40 M/m, 3 … 100 MeV, low cost
WP3: Low beta superconducting cavitiesWP3: Low beta superconducting cavities
Eacc > 7 MV/m, Q > 1010, 5 … 200 MeV
WP4: Lossless injection in a ringWP4: Lossless injection in a ring
chopper rise time < 2 ns, minimum emittance growth
WP5: Control of the haloWP5: Control of the halo
validation of codes, design for loss < 1 W/m up to 1 GeV
5 CARE 06, Frascati, 17.11.05
Jan Feb March Apr May Jun Jul Aug Sep Oct Nov Dec CARE & HIPPI
CSC Meeting 11
Paris 13-14 CERN
WP2 Meeting 18-19
Grenoble
WP3 Meeting 27-28
Juelich
WP4 Meeting 4-5
CERN
WP5 Meeting 27-28
Juelich
HIPPI Annual Meeting 27-29 Juelich
CARE Meeting 15-17
Frascati Collaboration meetings
IPHI-SPL meetings 15-16 Saclay
ISTC meetings 27-30
Novossib. 5-7
CERN Conferences, workshops
HB 2006 Workshop 29.5-2.6 Tsukuba
EPAC 2006 26-30
Edinbourgh
LINAC 2006 20-25
Knoxville
RuPAC 2006 10-14
Novosib.
2006 Meetings2006 Meetings
6 CARE 06, Frascati, 17.11.05
2006 Annual Meeting2006 Annual Meeting
IKP, Forschungszentrum Jülich, Jülich (Germany)
- 37 participants from 14 Laboratories (10 HIPPI, 1 external, 3 members of External Scientific Advisory Committee - ESAC)
- 28 technical presentations: 4 on general (inter-WP) topics, 24 on WP specialist topics + 4 presentations on organizational or administrative matters.
- 25% of time devoted to questions and discussion.
- The ESAC participated actively to the discussions (+ 5 hours for reviewing)
HIPPI06
Programme, copy of slides, list of participants: http://www.fz-juelich.de/ikp/hippi/autumn2006/
7 CARE 06, Frascati, 17.11.05
2006 Publications2006 Publications
Good number and quality of HIPPI Publications in 2006:
CARE-CONF : 18CARE-NOTES : 9CARE/HIPPIdoc : 1
For a total of 28 papers in 2006
(until end of October, average of 2.8/month)
8 CARE 06, Frascati, 17.11.05
WP2: Normal-conducting structuresWP2: Normal-conducting structures
Lab. Structure Name HIPPI Power Gaps Frequency
(MHz) Energy (MeV)
profile
CERN DTL ISTC Tank1
No (components)
cold/hot 28 352 3 – 10 Variable
IAP CH Model Yes cold 8 352 5 Fixed
IAP CH Prototype hot
CERN CCDTL Proto 1 Yes hot 4 352 50 Fixed
CERN CCDTL Proto 2 (ISTC)
Yes hot 8 352 50 Variable
LPSC SCL Model Yes cold 11 1000 90 Fixed
Overview of the 6 models (cold) and prototypes (hot) developed, built and analysed inside HIPPI:
9 CARE 06, Frascati, 17.11.05
WP 2 – Progress with CH-DTL WP 2 – Progress with CH-DTL for the GSI linacfor the GSI linac
Some convergence (or cross-fertilization): coupling cells have been added to the CH-DTL structure, as in CCDTL and SCL.
New (top) and old design (bottom) of the intertank connection of the CH-DTL developed at IAP-Frankfurt for the FAIR project at GSI
The CH-DTL model built at IAP-Frankfurt.
Decision by GSI to move from 352 MHz to 324 MHz:easier CH-DTL and compatible with UNILAC upgrade(324=3*108), but no more standardisation offrequencies at the European level.
10 CARE 06, Frascati, 17.11.05
WP2 – Prototyping at CERN for WP2 – Prototyping at CERN for Linac4Linac4
Concern: delays (1 yr CCDTL1, 6 months CCDTL2) and bad quality of work due to priority given to LHC (CERN mechanical workshops, CERN vacuum team, even Novossibirsk workshops!)
CCDTL pre-prototype built at CERN during high-power tests (left). Prototype built in Russia by ISTC (right) being completed (delivery at CERN in Jan. 07)
11 CARE 06, Frascati, 17.11.05
WP2 – Drift Tube Linac StudiesWP2 – Drift Tube Linac Studies
Studies of DTL post-coupler stabilisation at CERN
478
Mechanical design of ISTC DTL prototype
12 CARE 06, Frascati, 17.11.05
WP2 – Side Coupled at LPSCWP2 – Side Coupled at LPSC
Side Coupled model and RF coupler for DTL being made at LPSC (participation to Linac4 R&D).
13 CARE 06, Frascati, 17.11.05
WP3 (Superconducting) – WP3 (Superconducting) – review of prototypesreview of prototypes
Lab. Type Name HIPPI Beta
design Gaps
Frequency (MHz)
CEA Elliptical Cavity B Yes 0.47 5 704
INFN Elliptical Cavity A Only tests 0.47 5 704
IAP CH Prototype No (only tuning)
0.1 19 352
FZJ Spoke 3-spoke Only tests 0.2 760
FZJ Spoke 3-spoke Yes 0.48 4 352
IPNO Spoke 1-spoke Only tests 0.35 2 352
IPNO Spoke 1-spoke Yes 0.15 2 352
7 prototypes in HIPPI: 3 built and tested, 3 only tested in pulsed mode, 1 only for the tuning system:
14 CARE 06, Frascati, 17.11.05
WP3 – HighlightsWP3 – Highlights
15 CARE 06, Frascati, 17.11.05
WP3 – HIPPI test area at CEA SaclayWP3 – HIPPI test area at CEA Saclay
16 CARE 06, Frascati, 17.11.05
WP3 – RF for 700 MHz test WP3 – RF for 700 MHz test standstand
17 CARE 06, Frascati, 17.11.05
HIPPI Prototypes - ChoppersHIPPI Prototypes - Choppers
Chopper A (CERN) Chopper B (RAL)
Fast Fast Slow†
Rise/fall time < 2 nsec ≤ 2 nsec ≤ 15 ns
Max. rep rate 50 MHz 2.6 MHz 1.3 MHz
Max. voltage/target 250 V/500V 1400V / 2200V
≤ 6kV
Reliability TBD TBD TBD
Flexibility Min 8 nsec (3 bunches) 7 – 15 ns
200 ns – 100 us
Chopping effectiveness
(calculated)
99.7% 99.0 %
Emittance growth of the un-chopped
beam
8% 8% (New 3 MeV MEBT design)‡
18 CARE 06, Frascati, 17.11.05
WP4 Progress – CERN-chopper WP4 Progress – CERN-chopper structurestructure
September 05September 06
electrical measurements and
vacuum tests are done : OK
19 CARE 06, Frascati, 17.11.05
WP4 Progress – CERN dumpWP4 Progress – CERN dump
READY
20 CARE 06, Frascati, 17.11.05
Fast and slowchoppermodules
Chopper 1 (fast transition)
Chopper 2 / Beam dump(slower transition)
BEAM
1.5 m
WP4 Progress -RALWP4 Progress -RAL
DESIGN HAS CHANGED RECENTLY.
21 CARE 06, Frascati, 17.11.05
Two turn load inductance~ 50 nH
Load capacitance ~ 30 pf
6 kV, 400 MHz ÷ 1000 probe
- 8 kV~ 5 μF LF cap.bank
+ 8 kV~ 5 μF LF cap.bank
- 8 kV~ 3 nF HF cap.bank
+ 8 kV~ 3 nF HF cap.bank
HVdampingresistor
8 kV push-pullMOSFETswitch
Trigger input
Auxiliary power supplies
Cooling fan
SPG pre-prototype ‘Breadboard’ system
WP4 Progress -RALWP4 Progress -RAL
22 CARE 06, Frascati, 17.11.05
WP4 Problem : DELAYS WP4 Problem : DELAYS
Delay in the CERN mechanical workshop Delay in the CERN mechanical workshop ((low-prioritylow-priority in front of LHC) in front of LHC)
Delay in vacuum testing ( Vacuum group Delay in vacuum testing ( Vacuum group overloadedoverloaded))
Delays in delivery of the IPHI-RFQ at CERN Delays in delivery of the IPHI-RFQ at CERN (key component of the 3 MeV test stand)(key component of the 3 MeV test stand)
Move of the lab area at RAL Move of the lab area at RAL
23 CARE 06, Frascati, 17.11.05
HIPPI@SaclayHIPPI@Saclay
QUAD
DUMPBSHM
Choppers
•No compromise on the HIPPI goals by going to Saclay w.r.t. tests originally foreseen at CERN.
•Agreement of the IPHI Steering Committee. Technical document in preparation, to be validated by the next IPHI Steering Committee in October.
24 CARE 06, Frascati, 17.11.05
HIPPI@Saclay-scheduleHIPPI@Saclay-schedule
25 CARE 06, Frascati, 17.11.05
WP 5 – Beam dynamicsWP 5 – Beam dynamics
Preparation of appropriate tools for the analysis of high-intensity linear accelerators: beam dynamics codes and detectors.
Benchmarking of 7 codes (some old, some new, some updated) finished, results are comparable, benchmarking in progress with measurements at GSI UNILAC: first measurement campaign successfully completed in (March and October 06).
Progress in the understanding of beam neutralization phenomena.
26 CARE 06, Frascati, 17.11.05
WP 5 – Simulations for CERN and WP 5 – Simulations for CERN and GSI Linac designsGSI Linac designs
Beam dynamics work focused on the requirements of 2 well defined linac projects: CERN Linac4 (tracking+error studies) and GSI FAIR linac (space charge routine for LORASR).
27 CARE 06, Frascati, 17.11.05
ESAC AssessmentESAC AssessmentAll 3 ESAC members present at HIPPI06 (J. Stovall, A. Pisent, Y.
Yamazaki), ESAC report received (although only yesterday…). 13 page document, quite complete analysis of all HIPPI activities, will
be annexed to the HIPPI Annual Report.
In general the committee found all of the presentations to be of professional quality. In some cases the work represents important contributions to the art as described below. In some cases the presentations demonstrate the professional development of young scientists under the excellent tutelage of senior scientists. All of the presentations presented represent work at the “international standard.”
With the focus on specific upgrade designs, and while no less important, it will be more challenging for the work-package managers to maintain the close collaborations among the HIPPI institutions that we have seen in the first 3 years. The committee is pleased to observe no reluctance among the participants to collaborate with their colleagues and in some cases to note strong inter-lab collaborations.
Concerns of the ESAC: delays in chopper beam tests – delays in DTL tank prototype -
28 CARE 06, Frascati, 17.11.05
Deliverables 2006Deliverables 2006
8 deliverables8 deliverables originally scheduled for 2006 (3 for originally scheduled for 2006 (3 for the summer, 5 in December)the summer, 5 in December)
Reviewed list (HIPPI06, September) : Reviewed list (HIPPI06, September) : 1 has been delivered 3 are expected in December 06 1 merged with an achieved milestone (collimators dump) 3 rescheduled for 07 (late by 6 – 7 months)
0
2
4
6
8
10
12
14
16
18
2004 2005 2006 2007 2008
Deliverables
Milestones
Milestones Deliverables Total2004 1 0 12005 16 1 172006 4 8 122007 5 9 142008 1 13 14
58
29 CARE 06, Frascati, 17.11.05
Milestones 06 Milestones 06
3 milestones for 06 + 10 carried over from 3 milestones for 06 + 10 carried over from 05 : 05 : 16 milestones in 200616 milestones in 2006
Status today : Status today : 9 milestones completed, 4 to be completed by dec06, 3 rescheduled for 07