3/8/16 Page 1Can Your LDAR Database Survive An EPA Audit?

Can Your LDAR Database Survive an EPA Audit??

Chen Zhu

David Ranum

3/8/16 Page 2Can Your LDAR Database Survive An EPA Audit?

Three Reasons Why EPA is Interested in Your LDAR Database

3/8/16 Page 3Can Your LDAR Database Survive An EPA Audit?

#1 Easy to Ask for:• Database can provide information on the compliance status of

most regulations.

• Records are all conveniently in one place.

• Electronic format therefore easily reproduced.

• Meets the definition of “reasonable request” under the Clean Air Act

3/8/16 Page 4Can Your LDAR Database Survive An EPA Audit?

#2 Easier Enforcement• Little argument over compliance issues – you’ve documented

them!

• Clearer penalty calculations

3/8/16 Page 5Can Your LDAR Database Survive An EPA Audit?

#3 Bigger Return for the Inspection Dollar

• Equipment

• Personnel

• Travel

3/8/16 Page 6Can Your LDAR Database Survive An EPA Audit?

The Section 114 Request

• Purpose – Determine if facility is in compliance with CAA.

• Requested information to be provided within 30 days.

3/8/16 Page 7Can Your LDAR Database Survive An EPA Audit?

The Section 114 Request - Organization• Enclosure 1 Information Request

• I. Instructions

• II. Definitions

• III. Questions

• Enclosure 2 List of Output Fields for LDAR Compliance Queries

3/8/16 Page 8Can Your LDAR Database Survive An EPA Audit?

Enclosure 1: The Information Request• Trade secrets or confidential business information are not

exempted.

• Signed authorization that all information is true and complete\under penalty of law.

• Provided information can be used in an administrative, civil or criminal action.

3/8/16 Page 9Can Your LDAR Database Survive An EPA Audit?

I. Instructions• Separate response for each question.

• Identify each person responding to any question.

• For each question, identify document consulted, examined or referenced.

3/8/16 Page 10Can Your LDAR Database Survive An EPA Audit?

II. Definitions• Document

• Person, You, Yours

• Masculine words shall also apply to the femine version, singular words shall be construed in the plural and vice-versa.

3/8/16 Page 11Can Your LDAR Database Survive An EPA Audit?

III. Questions• Back up file in electronic format of the fugitive emissions monitoring

records database for the past 5 years.

• Name of the LDAR Contractor

• Component information for all components in the LDAR program

3/8/16 Page 12Can Your LDAR Database Survive An EPA Audit?

III. QuestionsFor the same records, provide the results of queries designed to show compliance with the following regulatory requirements:

Final Repair Attempts

2-Month Re-Monitoring

1st Repair Attempt

DTM Monitoring

3/8/16 Page 13Can Your LDAR Database Survive An EPA Audit?

Enclosure 2 List of Query Output Fields

Final Repair within 15 Days:

DTM Monitoring:

3/8/16 Page 14Can Your LDAR Database Survive An EPA Audit?

What Do You Need to Prepare for A Database Audit?

• How does EPA conduct a database audit? What are they looking for?

• What do you need to prepare for a database audit?

3/8/16 Page 15Can Your LDAR Database Survive An EPA Audit?

How Does EPA Conduct A Database Audit?• Request a backup of your database (i.e. bak. file) (5 years)

• Request a master table of component information

• EPA will import the bak. file into their audit software (i.e. Access, SQL)

• EPA will request your facility to run specific queries (Access preferred)

3/8/16 Page 16Can Your LDAR Database Survive An EPA Audit?

1. A database *.bak file is created using SQL.

2. Unless you know SQL you will have to have your IT dept. do this for you.

3. Because this will be a large file (maybe 1 G-byte or more) you will probably have to send this on a flash drive or via a FTP (File Transfer Protocol) site.

4. Note: EPA expects to receive your *.bak file 10-30 days after request.

Create A *.bak File

3/8/16 Page 17Can Your LDAR Database Survive An EPA Audit?

What Is A Component Master Table? • Unit Name (e.g. Alky)

• Type of Component (e.g. pumps, valves, etc.)

• Class of Service (i.e., GV, LL, HL)

• Number of each type of component (e.g. 23,500 valves)

• Regulatory applicability (e.g. VV, VVa, HON, etc.)

• Current monitoring method (e.g. M21, AVO, etc.)

• Current leak definition for each component type (e.g. 500 ppm, 2000 ppm etc.)

• Current monitoring frequency for each component type (e.g. Quarterly, Monthly etc.)

3/8/16 Page 18Can Your LDAR Database Survive An EPA Audit?

Preparing For A Database Audit

3/8/16 Page 19Can Your LDAR Database Survive An EPA Audit?

How Do You Prepare For A Database Audit?

Export Database

into Access

Select Tables (e.g.

Component, Inspection

History)

Join Selected Tables in Access

Select the Fields

Apply the Criteria Using

Database Terms Only

Save and Run the Query

3/8/16 Page 20Can Your LDAR Database Survive An EPA Audit?

Step 1: Get Your Data into Access

3/8/16 Page 21Can Your LDAR Database Survive An EPA Audit?

Step 2: Select Tables Select Tables (e.g. Component,

Inspection History)

3/8/16 Page 22Can Your LDAR Database Survive An EPA Audit?

Step 3: Join The Tables Join Selected Tables in Access

3/8/16 Page 23Can Your LDAR Database Survive An EPA Audit?

Step 4: Select The Fields Select the Fields

3/8/16 Page 24Can Your LDAR Database Survive An EPA Audit?

Step 5: Apply The Criteria Apply the Criteria Using

Database Terms Only

3/8/16 Page 25Can Your LDAR Database Survive An EPA Audit?

Step 6: Save and Run Save and Run the Query

3/8/16 Page 26Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to Run• Component Monitoring Analysis

• NTM• DTM

• Two Month Valve Monitoring Analysis• Repairs

• First Attempt• Final Attempt• DOR• Follow-Up Inspections

• 3% DTM Rule• Technician Monitoring Efficiency• LDAR Inventory Accuracy

3/8/16 Page 27Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunNTM Components Monitoring Analysis :

• Valves

• Pumps and Agitators

• Connectors

• PRVs

• AVOs

3/8/16 Page 28Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunDTM Monitoring Analysis:

• Equipment Category

• Date Placed Into Service

• Date Of Initial Monitoring

• Annual Monitoring Records

3/8/16 Page 29Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunTwo Month Initial Valve Monitoring Analysis:

• Valves in LL/GV hydrocarbon service must be monitored for 2 consecutive months after being placed into service.

3/8/16 Page 30Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunRepairs Within Required Timeframe:

• First Attempt Repair• Equipment Type

• Subject Regulation

• Monitoring Date

• Inspection Reading

• Date Of First Attempt At Repair

3/8/16 Page 31Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunRepairs Within Required Timeframe:

• Final Repair or DOR Assignment• Equipment Type

• Subject Regulation

• Monitoring Date

• Inspection Reading

• Date Of First Attempt At Repair

• Final Repair Date/DOR Assignment Date

3/8/16 Page 32Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunRepairs Within Required Timeframe:

• DOR Repair At Shutdown• Date Put On DOR

• Unit Shutdown History

• DOR Repair Date

3/8/16 Page 33Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunFollow-up inspections:

• Tag Number

• Monitoring Date and Reading

• First Attempt Date and Reading

• Final Repair Date and Reading

• First Month Remonitoring Date and Reading

• Second Month Remonitoing Date and Reading

3/8/16 Page 34Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunNSPS/HON 3% DTM Classification

• DTM percentage in newly constructed units (built after 1981) can not exceed 3%. This does not apply to units brought into VV, VVa or HON through reconstruction or modification. 0

1

2

3

4

5

Unit A Unit B Unit C Unit D

DTM Valves / All Valves

Unit A Unit B Unit C Unit D

1950 1985

1985

1950

3/8/16 Page 35Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunTechnician Productivity and Method 21 Implementation Analysis:

• Monitoring Efficiency

• Time Between Monitoring Event

3/8/16 Page 36Can Your LDAR Database Survive An EPA Audit?

Typical Queries EPA Will Ask You to RunLDAR Inventory Accuracy:

• LDAR Inventory Changes

• Orphan Tags

• Instrument Use

3/8/16 Page 37Can Your LDAR Database Survive An EPA Audit?

3/8/16 Page 38Can Your LDAR Database Survive An EPA Audit?

Post-Processing Of Course……..Post Processing:

• Out Of Service

• Unit Shutdown

• Outside the Evaluation Period

3/8/16 Page 39Can Your LDAR Database Survive An EPA Audit?

Responding to An Database Audit Request

3/8/16 Page 40Can Your LDAR Database Survive An EPA Audit?

Responding to an Database Audit Request

Don’t Panic & Don’t Procrastinate

• Responding quickly, honestly and in a cooperative manner will benefit you in the long run.

• Remember – full disclosure of relevant information is required.

3/8/16 Page 41Can Your LDAR Database Survive An EPA Audit?

Responding to an Database Audit Request

Bring in legal consul and have them involved in every step of the response process.

3/8/16 Page 42Can Your LDAR Database Survive An EPA Audit?

Responding to an Database Audit RequestDevelop an Action Plan and Timeline

3/8/16 Page 43Can Your LDAR Database Survive An EPA Audit?

Responding to an Database Audit RequestImmediately open discussions with the Agency

3/8/16 Page 44Can Your LDAR Database Survive An EPA Audit?

Responding to an Database Audit Request

Begin investigation of potential compliance issues immediately

Include legal consul in on the investigations to protect the results under attorney client privilege & attorney work product doctrine.

Begin investigation of potential compliance issues immediately

3/8/16 Page 45Can Your LDAR Database Survive An EPA Audit?

The End……

Questions…..