Brief Synopsis of ProjectHickahala Creek
•Hickahala Creek Pipeline Protection Project at milepost 347.64 Tate County, Senatobia, MS
Designed by Submar, Inc and River Research and Design, Inc.Installed, & Monitored by:
Submar Incorporated 805 Dunn St., Houma, LA
www.R2D-ENG.com | www.Submar.com
Hickahala Creek Pipeline Protection Project at milepost 347.64 Tate County, Senatobia, MS (Looking across and downstream in this view)
Looking Downstream - March 2003 - Pipeline Exposed 50 FeetMain stream force & thalweg of stream aimed underneath exposed pipe; note other pipeline exposed.
Looking Upstream - March 2003 - Long Straight ReachThornton Creek (tributary stream; bottom left) feeding into Hickahala Creek (top right)
July 2003 After May Flood (overbank, picture looking away from stream) Floodwaters Carry Sand 1000 Feet into Farmer's Field
August 2003 - Aerial Photos - *Note* Upstream Straight Stretch (bottom right)
Pipe Exposed on Overbank, Large Sand Splay in Farmers Field (top right)
Looking Downstream - April 2003 Pipe is Vulnerable to Impact from the Next Large Floating Tree. Bank is a mess
(technical term)
September 5th, 2003 Portable Cofferdams used to Dewater the site for Pipeline Recoating; The Green Portion of the Pipeline is New, Pipe was Cut, and New Section Installed at a Lower Elevation
From Key Looking Downstream in Tributary Toward Hickahala Creek - September 17th, 2003 - Fresh LPSTP