Pipe Exposed on Overbank, Large Sand Splay in Farmers Field (top right)
Looking Downstream - April 2003 Pipe is Vulnerable to Impact from the Next Large Floating Tree. Bank is a mess
(technical term)
September 5th, 2003 Portable Cofferdams used to Dewater the site for Pipeline Recoating; The Green Portion of the Pipeline is New, Pipe was Cut, and New Section Installed at a Lower Elevation
Pre-tested Pipe
Hickahala Creek Conceptual Drawings - Total Mats (182)
Looking Upstream into Tributary
Widening Channel to Accommodate LPSTP
The Key Trench is a Thing of Beauty!
From Key Looking Downstream in Tributary Toward Hickahala Creek - September 17th, 2003 - Fresh LPSTP
Looking Upstream into Tributary
Longitudinal Peaked Stone Toe Protection (LPSTP)
LPSTP Under Construction
Looking Downstream - September 17th, 2003
September 17th, 2003
Mat Installation
September 17th, 2003Installing Mat
Looking Across and Upstream - September 22nd, 2003High Water Event During Construction
High Water Event During Construction
September 22nd, 2003
September 26th, 2003
*Note* Bank Paving (left), LPSTP (5 tons/ft; middle), Key (right)
September 26th, 2003
*Note* Bank Paving (left), & LPSPT (right)
September 27th, 2003 - Mat Installation Complete
Looking Upstream - September 30th 2003
Installation Complete
Project Completed
Looking Upstream - November 24th, 2003Floodwaters Crested 1 Foot Below Top of Levee