Concept Report DRAFT February 2012 MOA Project No. 09-004 Prepared for: Municipality of Anchorage, Public Works Department, Project Management & Engineering Division, 4700 Elmore Road, Anchorage, Alaska 99507 Prepared by: CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, Alaska 99503 www.crweng.com A C A D E M Y / V A N G U A R D T r a f f i c C i r c u l a t i o n I m p r o v e m e n t s ACADEMY DRIVE / VANGUARD DRIVE AREA TRAFFIC CIRCULATION IMPROVEMENTS BRAYTON DRIVE TO ABBOTT ROAD

Transcript of BRAYTON DRIVE TO ABBOTT ROAD

Page 1: BRAYTON DRIVE TO ABBOTT ROAD

Concept Report DRAFT

February 2012MOA Project No. 09-004

Prepared for: Municipality of Anchorage, Public Works Department, Project Management & Engineering Division, 4700 Elmore Road, Anchorage, Alaska 99507

Prepared by: CRW Engineering Group, LLC3940 Arctic Blvd. Suite 300 Anchorage, Alaska 99503 www.crweng.com

ACADEMY/VANGUARD

Traffic Circulation Improvement

s

ACADEMY DRIVE / VANGUARD DRIVE AREA TRAFFIC CIRCULATION IMPROVEMENTS BRAYTON DRIVE TO ABBOTT ROAD

Page 2: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport MOAProject#09‐004 

ProjectTeam

Municipality of Anchorage, Project Management & Engineering 

Steve Gillette, P.E. – Project Manager 

Duane Maney – Project Administrator 

 

CRW Engineering Group, LLC (Consultant) 

 

Context Sensitive Solutions IS: 

A result of collaborative processes, broad‐based consultation, and compromise between 

community needs and individual interests. 

The way to achieve a safe facility that is in harmony with the community and its scenic, 

historic, and environmental values. 

An efficient use of time, budget, and community resources. 

The creation of a public facility that adds lasting value to the community. 

A way for the community’s affected interests, as a whole, including immediate residents 

to contribute the definition of a project scope. 

A balance of competing desires. 

A Strategy for Developing Context Sensitive Transportation Projects, MOA Adopted October 2008. 

 

Page 3: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport MOAProject#09‐004 

TableofContents

Project Information/Nomination Form......................................................................................................... 1 

Introduction .................................................................................................................................................. 4 

Background ............................................................................................................................................... 4 

Problems to Be Solved ................................................................................................................................ 10 

Roadway .................................................................................................................................................. 10 

Traffic Circulation .................................................................................................................................... 11 

Speeding .................................................................................................................................................. 11 

Abbott Road Intersection ........................................................................................................................ 11 

Drainage .................................................................................................................................................. 11 

Non‐Motorized Facilities ......................................................................................................................... 11 

Lighting .................................................................................................................................................... 11 

Existing Right‐of‐Way .............................................................................................................................. 11 

Utilities .................................................................................................................................................... 12 

Coordination with ADOT ............................................................................................................................. 12 

Stakeholder Coordination ........................................................................................................................... 12 

Summary of General Stakeholder Discussions ........................................................................................... 14 

Summary of Business Stakeholder Comments ........................................................................................... 15 

Summary of Agency Stakeholder Comments ............................................................................................. 19 

Summary ..................................................................................................................................................... 20 

ListofAppendices

Appendix A  Public Involvement Announcements and Displays 

Appendix B  Meeting Records and Comments 

Appendix C  Design Criteria Table 

 

 

Page 4: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page1MOAProject#09‐004 

ProjectInformation/NominationForm

Academy Drive / Vanguard Drive Area Traffic Circulation Improvements  Brayton Drive to Abbott Road 

Municipality of Anchorage 

Project #:      09‐004Project Manager:  Steve Gillette, P.E. (MOA PM&E)        Project Administrator:  Duane Maney  (MOA PM&E)        Consultant:    CRW Engineering Group, LLC 

Nominated by  MOA 

Problems to Be Solved 

When the 92nd Avenue underpass at the Seward Highway is constructed by the State with a connection to Old Seward Highway, traffic on the connection between the Seward Highway and Abbott Road will increase. This new connection will enhance traffic circulation in the Abbott/Dimond area. The existing roadway is not built to handle the expected traffic volumes with the addition of the 92nd Avenue underpass of the Seward Highway. 

Known Issues  Increased traffic to area residents and businesses 

Speeding along Academy Drive 

Parking issues along Academy Drive during soccer season 

Congestion and queuing at Vanguard Drive and Abbott Road intersection 

Lack of pedestrian and bike pathways 

Intersection realignment 

Poor neighborhood connectivity 

One‐way roads in and out of residential areas creates out of direction travel 

Community Councils  Abbott Loop Community Council

House District 29  Chris Tuck 

Senate District  O    Kevin Meyer 

Assembly District         4 & 6 

Elvi Gray‐Jackson and Dick Traini (Section 4); Jennifer Johnston and Chris Birch (Section 6)

Schools  Service High, Hanshew Middle, Abbott Loop Elementary, Spring Hill Elementary  

Parks  None 

MOA Grid  SW2332, SW2333, SW2432, SW2433

Zoning  R2M, R2A, 1‐1SL, R‐3SL, B3‐SL

Utilities  Gas, electric, cable, water, sewer

Roadway Right‐of‐Way Width (ROW) 

Vanguard and Academy Drives: 60 feet 

Abbott Road: 100 feet 

Lanes/Speed Academy Drive 

2 Lanes  Posted Speed25 MPH 

85th Percentile Speed Academy Drive 

None Available

Lanes/Speed Vanguard Drive 

2 Lanes  Posted Speed25 MPH 

85th Percentile SpeedVanguard Drive 

    None Available

Average Daily Traffic (ADT) 

Academy Drive 2011 ADT: 1,500.  2035 Projected ADT with  92nd Ave Connector: 9,492 Vanguard Drive 2011 ADT: 2,000 2035 Projected ADT with  92nd Ave Connector: 7,015 

Page 5: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page2MOAProject#09‐004 

Average Daily Traffic (ADT, continued) 

Existing Vanguard Drive / Abbott Road intersection:eastbound traffic from Vanguard Drive onto Abbott Road Level of Service (LOS): LOS D at AM Peak  LOS F at PM Peak 

Crash Data  From 2006 – 2010, there were 123 crashes at Abbott/Vanguard, 3 crashes at Vanguard/Hartzell, and 21 crashes at Vanguard/Academy. Crash rates will be determined during the Design Study Phase.  

Transit Service Routes  Route #1 Starts at Dimond Center Transit Center and travels along Abbott Road to Lake Otis Parkway.  Route #2 starts at the Dimond Center Transit Center and travels along the Old Seward Highway to O’Malley Road, Independence Drive to Abbott Road then along Lake Otis Parkway towards Midtown terminating in Downtown.   

ASD Walking Routes  The residential area served by Academy Drive and Vanguard Drive does not include a designated Safe Routes to School. 

ASD Bus Service  School aged children are bussed to Spring Hill Elementary, Hanshew Middle School on Lake Otis Parkway and Service High School on Abbott Road. 

Funding and Schedule Funding Source  Current funding $500,000 for planning/design study phase – Local road bonds. Future 

funding will be a combination of State Grants and local bonds. 

Schedule  Phase  Approximate Dates Cost Estimate

Design Study  9/2011 to 6/2012 $500,000

Design (unfunded) 7/2012 to 7/2013

Right‐of  Way  (Unfunded) 12/2012 to 12/2013

Utilities (Unfunded) 7/2012 to 6/2013

Bid Phase  (Unfunded) 1/2014 to 3/2014

Construction  (Unfunded) 5/2014 to 6/2015 $8,800,000

Total Project Cost Estimate  $9,300,000

Guiding Plans 

Long Range Transportation Plan (LRTP) 

Street Typology:  Mixed‐Use. Located in areas characterized by a mix of high‐intensity commercial, retail and residential areas with substantial pedestrian activity as defined by the employment and redevelopment designation in Anchorage 2020.  Mixed‐use streets typically consist of two to four travel lanes.  

Recommended Road Improvement Projects in the Short Term (2006‐2015): Add new facility – extend 92nd Avenue from Brayton Drive to Abbott Road. Purpose: Circulation and access. Length of project: 0.45 miles. Length of new sidewalk: 0.45 miles. Length of new pathway: 0.45 miles. 

Official Streets & Highways Plan (OS&HP) 1996 (Amended in 2005) 

Functional Classification: Minor Arterial Designation with minimum of two lanes and 80 feet of right‐of‐way.   

Minor arterials function to move through traffic and also provide a land access function.  Access should be at block intervals whenever possible. They carry traffic parallel to or connecting with major arterials supplementing the flow on the major system. Minor arterials serve less concentrated traffic generation areas such as neighborhood shopping areas and schools.  Direct access is controlled to a lesser degree on minor arterials than on major arterials. 

Page 6: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page3MOAProject#09‐004 

Anchorage Bowl 2020 Comprehensive Plan 

Policy 37: “Design, construct and maintain roadways or rights‐of‐way to accommodate pedestrians, bicyclist, transit users, the disabled, automobiles and trucks where appropriate.” 

Policy 38: “Design, construct and maintain roadways or rights‐of‐way to promote and enhance physical connectivity within and between neighborhoods.” 

Policy 53: “Design, construct and maintain roads to retain or enhance scenic views and improve the general appearance of the road corridor.”  

Policy 54: “Design and construct neighborhood roads and walkways to ensure safe pedestrian movement and neighborhood connectivity and to discourage high‐speed, cut through traffic.” 

Abbott Town Center area.  

Composite Land Use Plan Map (Conceptually Adopted by PZC June 2006) 

Community Activity Area, Low/Medium Intensity Residential, Office – Low Intensity. 

2010 Anchorage Bicycle Plan 

Proposed on‐street bicycle lane 

Proposed separated multi‐use pathway 

Proposed paved shoulder bikeway  

2007 Pedestrian Plan   Priority 149 – Brayton Drive from Legacy Drive to Dimond Blvd. for missing sidewalk and lighting on a school bus stop route.  

Priority 284 – 88th/9nd Avenue and Academy Drive at Seward Highway for missing link walkway  

2006 Anchorage Bowl Park, Natural Resource and Recreational Facility Plan 

SE Park District. No municipally‐owned parks in the project area. Closest park is Ruth Arcand Park between Abbott Road and Lake Otis Parkway. Cook Inlet Soccer uses the grass fields at the Holly Spirit Association for the Unification of the World church property. 

Wetlands Management Plan 

No designated wetlands in the project area.

Page 7: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page4MOAProject#09‐004 

IntroductionThe Municipality of Anchorage (MOA) is studying 

alternatives to improve the traffic cirulation on 

Academy Drive and Vanguard Drive in the 

Abbott/Dimond area. The Seward Highway/92nd 

Avenue Grade Separation Project, which is 

designed to alleviate congestion in the Dimond 

Boulevard / Seward Highway area, is being 

managed by the Alaska Department of 

Transportation (ADOT). The existing Academy 

Drive and Vanguard Drive roadways were not 

designed to handle the expected traffic volumes 

resulting from the future extension of Academy Drive to the west beneath the Seward Highway to 

connect to 92nd Avenue. The MOA's Academy Drive / Vanguard Drive project will evaluate various 

transportation  network alternatives to find a logical and efficient link between Academy Drive to Abbott 

Road that will safely accommodate increased vehicular, pedestrian, and bicycle traffic generated by the 

ADOT's 92nd Avenue project. 

This  project  will  evaluate  alternatives  to  upgrade  the  roadways  to  current Municipal  standards  to 

improve  both  pedestrian  and  driver  safety.  Improvements  are  expected  to  include  a  new  road 

alignment,  improved circulation and connectivity, pedestrian/bicycle facilities, and street  lighting.   The 

project will also evaluate alternatives to improve the Vanguard Drive and Abbott Road intersection.   

The first phase of the project is the preparation of the Concept Report using the MOA Context Sensitive 

Solutions  Strategy  (CSS) Policy.   The CSS policy provides guidelines  to  involve project  stakeholders  in 

defining the problems to be solved.   This report documents the public process,  issues  identified by the 

stakeholders, and conceptual alternatives to carry forward to the Design Phase.    

Background

Academy Drive and Vanguard Drive are minor arterial roadways in the Dimond/Abbott area that serves 

several adjacent  residential neighborhoods,  commercial office, medical offices,  state‐assisted housing 

and commercial  retail near  the Abbott Town Center as designated  in  the Anchorage Bowl Anchorage 

2020 Comprehensive Plan.  See FIGURE 1 for an overview of the project area.  

Academy Drive is an 80‐foot wide roadway with two 11‐foot wide, paved lanes with curbs on both sides 

and street lighting. The posted speed is 25 mph.  There are no pedestrian/non‐motorized facilities along 

Academy Drive.   

Vanguard Drive  is a minor arterial  from Academy Drive to Abbott Road within the project area.  It has 

two, paved 11‐foot wide lanes with curbs on both sides and street lighting. The posted speed limit is 25 

MPH.    There  are  no  pedestrian/non‐motorized  facilities  along  Vanguard  Drive  within  the  project 

corridor. The public right‐of‐way for Vanguard Drive is 60 feet.  

Page 8: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page5MOAProject#09‐004 

This  project  is  a  priority  for  the  Abbott  Loop  Community  Council  and  a  high  priority  for  the  Traffic 

Department, and the surrounding businesses and the adjacent residential neighborhoods. The goals of 

this project are to:  

Provide an efficient and  logical  link  to accommodate additional  traffic  from  the proposed 

92nd Avenue Connector Project; 

Upgrade Academy Drive and Vanguard Drive to current MOA minor arterial road standards; 

Improve safety by providing pedestrian facilities to separate pedestrians and bicycles from 

vehicle traffic; and 

Improve the circulation and congestion for the residential neighborhoods and businesses in 

the area. 

Currently,  the project has been  funded with a $500,000 State grant  for  the planning/concept and 

design  study  phase. Additional  bond  funding  and  State  grants will  be  necessary  for  design,  pre‐

construction  tasks  including  any  right‐of‐way  acquisitions  and  utility  relocations.  The  preliminary 

estimated construction cost is approximately $8.8 million.  The earliest construction could occur is in 

2014 if funding becomes available. 

Page 9: BRAYTON DRIVE TO ABBOTT ROAD

Sewa

rd

Abbo

tt

Dimond

Sewa

rd

79th

Tolof

f

Hartz

ell

Bray

ton

Sprin

g

Erin

Home

r

Elim

80th

Vang

uard

Independence

Arlon

81st

Unna

med

78th

88th

82nd

Sand

lewoo

d

Golov

in

Corb

in

94th

Academy

Peter

sbur

g

Azurite

Dimond

Colony

Abbott

84th

75th

Cedrus

Lumb

is

Briar

wood

Long

Helge

lien

Donnie

Shor

tGr

ange

Brigadier

Moss Creek

Adobe

Relia

nce

Poke

y

Gamb

ell Courage

Golden Berry

Henr

y

Wanig

an

Ranc

ho

Johnson

Otis Came

ron

Atkin

s

Marsh

a

Barn

ey

Cinn

abar

Nigh

Bell

Surrey

Hacie

nda

Dimo

nd H

ook

85th

Morn

ingsid

e

86th

87th

Gree

nwoo

d

Thimble Berry

Valley

Park

Tartan

Alpin

e View

Stac

y

Little

Ben

d

Yorktown

Unnamed

88th

Dimond

Unnamed

80th

84th

79th

Unnamed

Bray

ton

84th

Unna

med

82nd

Unnamed

0 2,0001,000

Feet

Figure 1Area Context

LegendWetlands

Parks

Trails

Roads

Streams

Project Area

Pa

th:

J:\J

ob

sda

ta\1

012

2.0

0 A

cade

my-

Va

ng

uard

Imp

rove

me

nts\

00

CA

DD

\02

Fig

ure

s\0

6 C

on

cep

t F

ig's

\10

12

2.0

0 F

ig1

- A

rea

Co

nte

xt.m

xd

Page 10: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page7MOAProject#09‐004 

Academy Drive looking west towards Brayton Drive.  

Area Context 

The  Academy  Drive  –  Vanguard  Drive  corridors 

transect  a  diverse  mix  of  land  uses  that  include 

commercial  offices,  commercial  retail,  light 

industrial,  single  family  homes  including  the 

Southwood Manor Mobile Home Park, multi‐family 

dwellings and  state‐assisted disabled housing.   The 

only access  for several  residential neighborhoods  is 

via the Seward Highway one‐way  frontage roadway 

along Brayton Drive.  To  the  south of  the Academy 

Drive – Vanguard Drive corridor is the Independence 

Park residential neighborhood.  

There are no Municipally‐owned parks in the project 

area but there is a large park‐like area owned by the 

Holy  Spirit Association  for  the Unification of World 

Christianity  Church  widely  used  by  the  Cook  Inlet 

Soccer  Club  which  also  has  an  office  on  Academy 

Drive.  

Commercial  activities  include  medical  and  health 

services offices, a gas station, commercial retail such 

as  the Fred Meyers grocery chain,  restaurants  such 

as Chili’s and Qdoba, and banking and professional 

services  offices.  Light  industrial  land  uses  are  also 

scattered along Vanguard Drive and Hartzell Road.  

There  are  no  sidewalks  in  the  project  area  and 

pedestrians use the roadway to walk or bike.  There 

is  a  considerable  amount  of  foot  traffic  from  the 

residential  area  to  the  Fred  Meyer  store  on  the 

corner of Abbott Road and  Lake Otis Parkway. The 

closest transit service is Route #1 which starts at the 

Dimond  Center  Transit  Center  and  travels  along 

Abbott Road to Lake Otis Parkway. Students living in 

the  area  are  bussed  to  Spring  Hill  Elementary, 

Hanshew Middle School and Service High School.  

Vanguard Drive at Abbott Road  

Academy Drive and Vanguard Drive intersection.

Page 11: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page8MOAProject#09‐004 

Guiding Plans – Academy Drive and Vanguard Drive   

Long Range Transportation Plan (LRTP) 

Street Typology:  Mixed‐Use. Located in areas characterized by a mix of high‐intensity commercial, retail and residential areas with substantial pedestrian activity as defined by the employment and redevelopment designation in Anchorage 2020.  Mixed‐use streets typically consist of two to four travel lanes.  Recommended Road Improvement Projects (#628) in the Short Term (2006‐2015): Add new facility – extend 92nd Avenue from Brayton Drive to Abbott Road. Purpose: Circulation and access. Length of project: 0.45 mile. Length of new sidewalk: 0.45 mile. Length of new pathway: 0.45 mile. 

Official Streets & Highways Plan (OS&HP) 1996 (Amended in 2005) 

Functional Classification: Minor Arterial Designation with minimum of two lanes and 80 feet of right‐of‐way.   

Minor arterials function to move through traffic and also provide a land access function.  Access should be at block intervals whenever possible. They carry traffic parallel to or connecting with major arterials supplementing the flow on the major system. Minor arterials serve less concentrated traffic generation areas such as neighborhood shopping areas and schools.  Direct access is controlled to a lesser degree on minor arterials than on major arterials. 

Anchorage Bowl 2020 Comprehensive Plan 

Policy 37: “Design, construct and maintain roadways or rights‐of‐way to accommodate pedestrians, bicyclist, transit users, the disabled, automobiles and trucks where appropriate.” 

Policy 38: “Design, construct and maintain roadways or rights‐of‐way to promote and enhance physical connectivity within and between neighborhoods.” 

Policy 53: “Design, construct and maintain roads to retain or enhance scenic views and improve the general appearance of the road corridor.”  

Policy 54: “Design and construct neighborhood roads and walkways to ensure safe pedestrian movement and neighborhood connectivity and to discourage high‐speed, cut through traffic.” 

Abbott Town Center 

Composite Land Use Plan Map (Conceptually Adopted by PZC June 2006) 

Community Activity Area, Low/Medium Intensity Residential, Office – Low Intensity. 

2010 Anchorage Bicycle Plan 

Proposed on‐street bicycle lane 

Proposed separated multi‐use pathway 

Proposed paved shoulder bikeway (from Golden View Middle School to Rabbit Creek Road intersection) 

2007 Pedestrian Plan   Priority 149 – Brayton Drive from Legacy Drive to Dimond Blvd. for missing sidewalk and lighting on a school bus stop route.  

Priority 284 – 88th/9nd Avenue and Academy Drive at Seward Highway for missing link walkway 

2006 Anchorage Bowl Park, Natural Resource & Recreational Facility Plan 

SE Park District. No municipally‐owned parks in the project area. Closest park is Ruth Arcand Park between Abbott Road and Lake Otis Parkway. Cook Inlet Soccer uses the grass fields at the Holly Spirit Association for the Unification of the World church property.  

Wetlands Management Plan 

No designated wetlands in the project area.

 

Page 12: BRAYTON DRIVE TO ABBOTT ROAD

HARTZELL RD

ABBOTT

RD

D

C

C

B

B

SEWARD HWY

OLD SEWARD HWY

AB

BO

TT

RD

TOLOFF STINDEPENDENCE DR

ERIN ST

VANGUARD DR

92N

D A

VE

UNNAMED RD

E 8

8T

H A

VE

AC

AD

EM

Y D

R

SPRING ST

CORBIN DR

BRAYTON DR

FLINTLOCK ST

DO

NN

A D

R

LONG ST

E D

IMO

ND

BLV

D

BRIARWOOD ST

GRANGE DR

COLO

NY LOO

P

PETERSBURG ST

SHORT ST

CE

DR

US

CT

SANDLEWOOD PL

OT

IS P

L

HELGELIEN LOOP

BR

IGA

DIE

R D

R

MO

SS

CR

EE

K A

VE

E 8

4T

H A

VE

E 8

2N

D A

VE

RELIANCE DR

E 8

4T

H C

T

WANIGAN ST

JOH

NS

ON

DR

CO

LO

NY

PL

DIMOND HOOK DR

CA

LA

MIT

Y C

T

BA

LF

OU

R D

R

HOMER DR

CO

NT

RA

RY

CT

SEWARD NB O

FF ABBO

TT RAMP

SE

NT

RY

DR

HARTZELL RD

FR

ED

CIR

SEWARD SB ON DIMOND RAMP

CA

NN

ON

EE

R C

IR

N H

EA

TH

ER

ME

AD

OW

S L

OO

P

S H

EA

TH

ER

ME

AD

OW

S L

OO

P

MORNINGSIDE LOOP

SEWARD SB OFF DIMOND RAMP

SU

RR

EY

CIR

STURBRIDG

E C

T

CINNABAR LOOP

GROSS CIR

CO

UR

AG

E D

R

REDCOAT PL

E D

IMO

ND

CI R

ALISSA CIR

SALIX CIR

NEWHAVEN LOOP

MUSKET BALL PL

E 8

5T

H C

T

GREENWOOD ST

E 8

6T

H C

T

CH

INA

BE

RR

Y C

IR

GOOSE BERRY PL

SU

ND

OW

N C

T

E 9

4T

H A

VE

CO

NG

RE

SS

CIR

E 9

2N

D A

VE

E 1

00T

H A

VE

STACY CIR

E 8

1S

T A

VE

HARTZELL ST

E 8

5TH

AV

E

ALANA CIR

CORNELLA LOOP

THIMBLE BERRY DR

JOD

Y C

IR

NANTUC

KET C

IR

LA

KE

WO

OD

CT

MUSKET B

ALL CIR

CE

DR

US

CIR

OL

SO

N C

IR

JACQUE CIR

CO

UR

AG

E C

IR

ST

UR

BR

IDG

E C

IR

SEWARD NB ON ABBOTT RAMP

ST

EP

HA

NIE

CIR

CA

TH

Y C

IR

ARBORVITAE DR

GO

LD

EN

DA

WN

CIR

JAMESTOW

N C

IR

ME

LIS

SA

CIR

WILLIAM JONES CIR

PO

WD

ER

HO

RN

CIR

UN

NA

ME

D R

D

UNNAMED RD

UN

NA

M

ED RD

UNNAMED RD

U

NNA MED RD

UN

NA

ME

D R

D

BRAYTON DR

UNNAMED RD

E D

IMO

ND

BLV

D

UN

NA

M

ED RD

UNNAMED RDUNNAM

ED RD

UNNAMED RD

UN

NA

ME

D R

D

UNNAMED RD

UN

NA

ME

D R

D

E 8

2N

D A

VE

Littl

e C

ampb

ell C

reek

Little Campbell Creek

Littl

e Ca

mpb

ell C

reek

Pat

h: J

:\Jo

bsd

ata

\101

22.0

0 A

cad

emy-

Va

ngu

ard

Impr

ovem

ent

s\0

0 C

AD

D\0

2 F

igu

res\

04 P

rese

nta

tion\

03

Pu

blic

Mee

ting

Jan

19_

201

2\10

122

.00

Va

ngu

ard

Map

DS

R F

ig.m

xd

Da

te S

aved

: 2/

14/

201

2 8

:57:

34 A

M

0 300 600 900 1,200150

Feet

ACADEMY / VANGUARD (PM&E 09-04)

Legend

MOA Streams

MOA Wetlands

2010 Ortho Image

ADOT Proposed InterChange(December 2011)

Parcels

Draft AlignmentsFor Discussion

FIGURE 2. AERIAL

Page 13: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page10MOAProject#09‐004 

ProblemstoBeSolved

Roadway

The existing Academy Drive and Vanguard Drive roadways were not built to handle the expected traffic 

volumes resulting from the future extension of Academy Drive to the west beneath the Seward Highway 

to connect to 92nd Avenue to the Old Seward Highway.   

Academy Drive also does not meet current MOA minor arterial roadway standards.  Existing traffic data 

was collected by Kittelson and Associates  for  this study.   Annual average daily  traffic  (AADT) was also 

projected f by ADOT&PF or the 92nd Avenue Grade Separation project.  

Existing Traffic Volumes (2011) 

Projected Traffic Volumes (2035) 

The Vanguard Drive / Abbott Road  intersection  is currently operating at a Level of Service  (LOS) D  for 

westbound  traffic  (from  the  business  driveway)  onto  Abbott  and  LOS  F  for  eastbound  traffic  from 

Vanguard Drive onto Abbot Road. The  left turn/through movements for both approaches operate at a 

LOS F during the PM Peak. The contributing factors for crashes include congestion, speeds, and visibility 

on Abbott Road due to the curves (especially during the winter).  

 

According  to  the  OS&HP,  Academy  Drive  and  Vanguard  Drive  are  designated  as  a  “Class  II Minor 

Arterial.” During  the Design Study Phase,  traffic data  including  capacity analysis,  turning movements, 

crash data, and speed studies etc. will be updated and analyzed  in greater detail  including projections 

for the design life of the facility.  

Academy Drive 

1,500  Brayton Drive to Vanguard Drive 

Vanguard Drive 

2,000  Academy Drive to Abbott Road 

Academy Drive 

9,492  Brayton Drive to Vanguard Drive 

Vanguard Drive 

7,015  Academy Drive to Abbott Road 

Page 14: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page11MOAProject#09‐004 

TrafficCirculation

Currently, one‐way in and out of neighborhoods has created out‐of‐direction travel for residents, 

increasing the vehicle miles driven by vehicles from these neighborhoods, and adding to traffic 

congestion and traffic volumes.  

Speeding

Speeding along Academy Drive has noise impacts on the adjacent Southwood Manor residents. The flat 

roadway has no built‐in traffic calming elements creating noise impacts from fast moving automobiles 

that have reportedly used the roadway for drag racing.  

AbbottRoadIntersection

The Vanguard Drive and Abbott Road intersection is not currently signalized. Traffic from the residential 

areas and commercial offices along Vanguard Drive queue up during peak traffic hours. Drivers turning 

from Vanguard Drive onto Abbot Road have a difficult time judging which lane a vehicle is in and 

determining an appropriate gap between vehicles to navigate their turn or straight movement because 

of the curves along Abbott Road and indistinguishable sight distance.  Left turn and through movements 

at this intersection can be very difficult for drivers to make during peak hours and extremely difficult for 

pedestrians. The closest signalized intersection is at Independence Drive and Abbott Road to the east.  

Drainage

Drainage is currently conveyed through a curb and gutter storm drain system along the roadway. 

However, drainage can pond where parking lot grades and roadway grades do not match.   

Non‐MotorizedFacilities

There are no bike paths or sidewalks on either Academy Drive or Vanguard Drive.  Fred Meyers and the 

adjacent retail and commercial businesses draw considerable foot traffic from this residential area. The 

lack of sidewalks or pathways makes it challenging for pedestrians and bicyclists who do not have other 

modal choices. It is also more difficult for drivers if pedestrians are in the roadway because there are no 

dedicated sidewalks or pathways.   

 

All students in the area attending the elementary, middle and high schools are bussed. The lack of 

sidewalks and pathways also precludes a separated area for students to wait at school bus stops.  

Lighting

Currently, both Academy Drive and Vanguard Drive have lighting along the roadway on one side.   

ExistingRight‐of‐Way

Academy Drive:   

80 feet between Brayton Drive and Vanguard Drive 

Page 15: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page12MOAProject#09‐004 

Vanguard Drive:  

60 Feet between Academy Drive and Abbott Road intersection  

Utilities

Existing utilities in the corridor include:  

Natural gas  

Sewer 

Water 

Electric 

Communications (ACS, GCI) 

CoordinationwithADOTCoordination with ADOT & PF on the Seward Highway/92nd Avenue Projects began in May 2011 and has 

been ongoing. Both ADOT’s Seward Highway/92nd Avenue Projects and the MOA’s Academy/Vanguard 

Area project were represented at the December 1, 2011 Open House.  The Agency Stakeholder meeting 

was coordinated to include ADOT’s representation of their Seward Highway/92nd Avenue projects also.  

Coordination will continue during the Design Study and Design Phase of this project to ensure that 

roadway improvements match. The ADOT 92nd Avenue connector project ends on Academy Drive just 

east of the Trailer Park where the MOA Academy/Vanguard Area project begins.   

StakeholderCoordinationUsing the MOA CSS process as a guideline, the project team began the public and agency outreach  in 

October 2011 with the identification of over 2,000 project stakeholders.  The goal of the CSS process is 

to collaborate with all stakeholders to  improve the safety and mobility of the corridor, balance diverse 

interests, and to find areas of compromise that address budget and environmental concerns.   

Page 16: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page13MOAProject#09‐004 

List of Stakeholders 

MOA Agencies  Other Agency Stakeholders 

Project Management & Engineering  Adjacent property owners, businesses and residents 

Traffic Division  Abbott Loop Community Council 

Community Development and Planning 

ADOT&PF 

Watershed Management  Alaska Communication Systems (ACS) and GCI 

Non‐Motorized Transportation  Chugach Electric Association (CEA) 

Maintenance and Operations  ENSTAR Natural Gas Company 

Right‐of‐Way  AWWU 

Street Maintenance   Senator Kevin Meyer 

Geotechnical Services  House Representative Chris Tuck 

Anchorage Fire Department (AFD)  Anchorage Assembly Representatives Grey‐Jackson, Traini, Birch and Johnston  

Parks and Recreation    

Survey    

Anchorage Police Department   

Information  distributions  included  a  combination  of  traditional  newsletters  by  mail  and  electronic 

newsletter  updates.    Copies  of  announcements,  displays,  and  other  communications  are  included  in 

APPENDIX A.     From September 2011 to January 2012, the following activities have been undertaken to 

solicit feedback: 

Project Website (www.academyandvanguard.com)   September 2011 (Updated as necessary) 

Post Card & E‐Newsletter Invite to Open House  November 2011 

Abbott Loop Community Council Presentation   October 27, 2011 

Open House @ Spring Hill Elementary School  December 1, 2011 

E‐newsletter Update – Comment Summary  January 11, 2012 

Business Stakeholder Meeting  January 19, 2012 

Agency Presentation  January 24, 2012 

E‐newsletter‐ Update   As necessary  

Abbott Loop Community Council Update  February 23, 2012 

Individual Stakeholder Contact  Ongoing  

The CSS process will continue throughout the design phase with opportunities for stakeholders to obtain 

information  and  provide  feedback  through  the  web  page,  e‐newsletters,  open  houses,  community 

council presentations, and direct feedback through phone calls and e‐mail.  

Page 17: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page14MOAProject#09‐004 

SummaryofGeneralStakeholderDiscussionsComments  from  the  39  stakeholders  who  attended  the  Open  House,  and  the  additional  5  who 

submitted  written  comments,  and  comments  heard  at  the  Community  Council  meetings  are 

summarized below.     A complete  list of actual comments received to date and meeting records can be 

found in APPENDIX B.   

Sidewalks and Pathways  

There was consensus that pedestrian and bicycle facilities should be addressed on both Academy Drive and Vanguard Drive as part of this project.  

A multi‐use pathway is widely supported.    

Connections from one neighborhood to another as well as pedestrian connects to the commercial 

center at the Fred Meyer is highly supported. 

Traffic Congestion 

There was consensus that traffic congestion was already at a level nearing grid lock during peak travel times and should be addressed at the Vanguard Drive / Abbott Road intersection as part of this project.  Other comments included:   

Traffic problems/congestion will increase once the 92nd Avenue project is complete. 

Property acquisition will be likely for most new road alignments that are necessary to relieve 

congestion. 

Fixing the Academy Drive/92nd Avenue may cause more problems for Abbott Road traffic 

problems, especially at the intersection of Vanguard Drive and Abbott Road. 

Abbott Road Intersection  

Traffic problems/congestion are already problematic at this intersection 

Left turning movements are almost impossible with sight distance issues from the curve in 

Abbott Road. 

Through‐movements are already difficult. 

Consider putting in a signal here or on the other side of the gas station.  

Academy Drive 

Speeding and noise is an issue along the straight and wide Academy Drive.  

An alternate route out of the Southwood Mobile Homes Park and out of Moss Creek/Heather 

Meadows neighborhood is needed to provide emergency access and for increased connectivity 

to reduce out of direction travel.  

Parking on both sides of Academy Drive at Holy Spirit fields during soccer season impacts both 

residents and the drivability of the roadway because of the reduction in visibility.  

A future connection at 92nd Avenue may increase truck traffic on Academy Drive because of the 

more efficient route to access the Old Seward/Dimond Center commercial area.   

Page 18: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page15MOAProject#09‐004 

Vanguard Drive 

Cut through traffic on Vanguard Drive through the adjacent residential neighborhood is 

currently a problem as vehicles are avoiding the Abbott Road intersection. The 92nd 

Avenue/Academy Drive connection will bring more cars onto this roadway.  

Cut through traffic happens at Courage Circle as people are trying to get to the Fred Meyer 

commercial retail area by Independence Drive.  

This is a residential, recreation and commercial area without pathways for pedestrians or bike 

routes. Dedicated non‐motorized facilities would increase safety for automobiles also, especially 

around the curved roadways.  

Any design alternatives should consider minimizing curves as winter conditions and line of sight 

issues make it more difficult to navigate.  

Brayton Drive  

A two‐way frontage road like the ones they have in the Valley would help out residents with the 

one‐way Brayton Drive/frontage road as their only access.  

Residents living in Independence Park avoid Abbott Road intersection by taking Academy Drive 

to Brayton Drive to Dimond Blvd. 

The Brayton Drive frontage road is the only access for residents living in the Southwood Manor 

Mobile Home Park and the Heather Meadows residents.  

Property Acquisition for New Roadway Alignment 

Commercial and residential property acquisition is likely to be necessary for a new alignment 

that will solve the congestion and traffic circulation issues in the area and was generally 

supported by some property owners who may be impacted.   

The fact that several properties in the area are currently on the market, could provide 

opportunities for acquisitions early in the process should funding become available. 

SummaryofBusinessStakeholderCommentsThe  intent  of  the  Business  Stakeholder Meeting  held  on  January  19,  2012 was  to  inform,  to  solicit 

feedback and to brainstorm  ideas from area businesses and organizations  in the project area that use 

the roadways every day. Ten people attended, representing seven businesses/organizations.   

Q: What is the funding for the ADOT projects, current and future?  

The current project has $20 million which provides a new roadway (92nd Avenue) on the west side of the 

Seward Highway and new on‐and off‐ramps from the Seward Highway to access 92nd Ave. The future 

project, which includes the 92nd Ave underpass connector to Academy Drive, is approximately $17 

million. The current project (Ph.1) is estimated to begin construction in 2014‐2015. Construction for the 

future project (Ph.2) is estimated for 2020‐2021.  

 

Page 19: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page16MOAProject#09‐004 

Q. Does the traffic model account for the increased traffic on Abbott with the connection of Elmore 

and Martin Luther King Drive? Elmore to Abbott is now the quickest route to access this area from the 

Muldoon area. When Elmore Road was built to Abbott Road, traffic started to back up on Abbott all 

the way to Vanguard Drive because of the increased number of users traveling from the eastside to 

the Dimond Blvd. area or south Anchorage. The Traffic model should include "out‐of‐town" 

contributions (those coming in from Wasilla, etc. to purchase a soccer ball at Sports Authority).  

The traffic model is currently being updated and will include all new connections that are planned that 

could affect the traffic volume projections for this project.  The traffic model will also look at origins and 

destinations of travel trips to help understand where traffic is going.  

Comment: If another traffic light were to be put in at the Abbott/Vanguard intersection, that would 

be the third signal along the same corridor without much spacing between them which seems like a 

lot of signals. The traffic signals at Vanguard, 88th, and Independence would be coordinated and timed 

to allow traffic to progress smoothly and efficiently through this corridor.  

 

Comment: A signal at the intersection of Vanguard/Abbott to reduce the rate of crashes and access to 

businesses should be considered. It is difficult for vehicles to turn left from Abbott into the businesses 

on the east side. Also, motorists currently cut through the businesses on the west side to turn right 

onto Abbott Road because they become impatient waiting for people to turn left from Vanguard Drive 

onto Abbott Road. It is much easier to use Academy Drive to access the Seward Highway from R&M 

than to try to get onto Abbott with a left turn. The left turn movement does not perform satisfactory 

(has a failing level‐of‐service) today. This intersection will continue to “fail” when 92nd Avenue 

underpass is constructed if there are no improvements. Accident rates at the Abbott Road/ Vanguard 

Drive intersection are high (21 accidents in the past 5 years). The high traffic volumes at this intersection 

are bringing it close to a volume threshold that would warrant a signal. A signal warrant study will be 

coordinated with the Municipality's Traffic Department in determining if a signal will be installed.  

Comment: The study should address cut‐through traffic that is using R&M's parking lot.  

This study will look at all possible alternatives and alignments and that will provide a more connected 

transportation network so that cut‐through traffic is minimized. Cut‐through traffic at Courage Drive to 

Independence Drive and Fred Meyers was also reported by residents at the Open House.  

Q. Why is the red alignment unfavorable? Don't discount or throw out the red‐option (straight thru) 

too soon in the process. It seems like the direct connection from Abbott to the Seward Highway would 

be ideal? Another traffic design sub‐goal to consider, is getting the traffic going to 92nd Avenue, over 

to 92nd Avenue as fast as possible (eg, as the red‐option would do). The large property acquisitions 

associated with this alterative make it very expensive. Additionally, the angle of the intersection of the 

red alignment with Abbott would not be standard and could create hazards and confusion. However, this 

alternative will be fully analyzed at the Design Study phase.  

 

Page 20: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page17MOAProject#09‐004 

The Design Study Report will include this as an alternative that was considered along with all other 

alternatives. At the Open House, residents reported that speeding and drag racing along Academy Drive 

is already a problem because it is a wide and flat road. The red alignment would make Academy Drive 

straighter and faster and may exasperate the current problem with speeding. Drive‐ by bb gun shootings 

near the trailer with windows being shot out was reported at the Open House by residents. A business 

owner in attendance reported that his windows have been shot out. 

Comment: There was a section line easement at 92nd Ave (which is essentially Abbott Road if it were 

to continue straight) but it was vacated during the development process.   

 

Q. When will the Academy‐Vanguard project be built? 2014 is the earliest if all the funding is in place; 

in 2013 right‐of‐way acquisition will begin. The acquisition process will begin only after a preferred 

alternative has been chosen and the road is sufficiently advanced to determine what acquisitions are 

necessary. Moreover, the property acquisition process is a confidential matter between the property 

owners and the Municipality.  

Q. Family Church (Holy Spirit Association) commented that Cook Inlet Soccer Club (CISC) uses their 

fields without a fee on a yearly basis in exchange for maintaining it. CISC has had that agreement for 

the past 10 years. They are concerned about the increased traffic volumes on Academy Drive and the 

safety of children running onto the roadway after stray soccer balls. The high‐demand of parking on 

Academy from the soccer fields was reiterated. Could a fence be installed along Academy to prevent 

soccer balls from entering the roadway and from children running onto the road to fetch the ball, 

especially if the roadway will be higher speed with higher traffic volumes than it is currently?  

Landscaping, buffers, separation from the roadway, lighting, pedestrian facilities will all be addressed 

during the detail design phase of the project.  

Q. Have roundabouts been considered on Abbott Road?  

With signalized intersections at both 88th Ave and Independence Drive, a roundabout would not work at 

Vanguard/Abbott because the existing signals would back traffic up at the roundabouts during peak 

times. Roundabouts work best with other roundabouts or as a stand‐alone but are less effective when 

paired with signals.  

Q. What will the city do if full funding is secured this year? Will it construct even though the 92nd 

Avenue interchange is so far out? How soon before the 92nd project does the city need to construct 

the Academy‐Vanguard project? A business representative was appreciative of the Municipality’s 

continued coordination with ADOT on their 92nd Ave project. The Municipality may reassess the 

schedule if the 92nd Avenue project is 10‐20 years out. But it is not a question of “if” the 92nd Avenue 

interchange will happen; it’s a question of “when.”  The Municipality is cautiously planning this project in 

order to be proactive and prepared for ADOT’s 92nd Avenue connection. 

Q. Have any alternatives been considered that uses the existing alignment of Academy and Vanguard?  

Using the existing alignment is a good possibility with the lowest impact to adjacent properties but it 

may not solve the problem of moving projected increased traffic from 92nd to Abbott efficiently. The 

Page 21: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page18MOAProject#09‐004 

Design Study Report will include this as an alternative. The positives and negatives of each alternative 

will also be discussed in the Design Study Report.  

 

Q. What does the $7.8 million in the CIP request include?  

$7.8 million is the estimate for the right‐of‐way acquisition, pre‐construction costs and construction 

costs. The project currently has just over $1 million for the design study report and design. The project’s 

total estimated cost is $8.8 million.  

 

Q. Could the project be phased to accommodate the unknown schedule of the 92nd Avenue 

connection? Maybe don’t acquire property yet, but select an alternative and make 

Academy/Vanguard a 4‐way stop and install a signal at Vanguard/Abbott? This idea was noted and will 

be evaluated. The key is how to construct phased improvements now without having to remove those 

new improvements in 5+ years when 92nd Ave is constructed. Constructing a new road then removing it 

5 years later is typically not supported by the public.   

Comment: Consider "phasing" the project, in order not to have the full complement of Academy 

improvements "lead" the 92nd Avenue improvements, especially if we're talking 2020 for the 

construction of the full complement of 92nd Avenue improvements. In a nutshell, we can phase our Ph.1 

with the ADOT's Ph.1, and so on.  And while we cannot eliminate some elements of our Ph.1 from being 

sacrificial, we can minimize these by knowing what our Ph.2 is likely to look like even if we don't build 

it until a decade from now.  

 

Q. Does the funding request include acquisition of the R&M buildings for right‐of‐way?  

Analysis of alternative has only just begun, and no preferred alternative has been determined at this 

point.  Additional funding will be required for any substantial acquisition of parcels. 

 

Q. Is a roundabout possible at the intersection of Academy/Vanguard?  

A large amount of right‐of‐way is required for a roundabout, but this will be evaluated further during the 

Design Study Phase. Roundabouts work in many instances for improved traffic flow, but generally not 

close proximity to existing signals which would have a tendency to cause the roundabout to gridlock.   

 

Q.  Is the Mayor supportive of this project and will he promote this to the State legislature?  

This is a priority in the Mayor’s legislative request list to help solve the traffic congestion issues at the 

Dimond Blvd/Seward Highway interchange.  

 

Q. Will the Design Study Report include a recommended alternative?  

Yes, the Design Study Report will include the analysis of each alternative and a statement of the 

preferred alternative. It is scheduled to be completed by April/May 2012. 

 

Q. Cornerstone Clinic’s building on the northwest corner of Academy Drive/Vanguard Drive was 

previously moved. May be it can be moved again? Spinell Homes was asked if they have any involvement 

with Cornerstone Clinic and they answered that they developed the site but are not involved anymore. 

Page 22: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page19MOAProject#09‐004 

SummaryofAgencyStakeholderComments(Responses are italicized)  

The  purpose  of  the  Agency  Stakeholder  Meeting  was  to  inform  and  coordinate  with  the  various 

Municipal,  State  and  utility  stakeholder  on  the  scope  of  the  traffic  circulation  study  and  roadway 

upgrade project prior to drafting the Concept Report. Over 15 agency representatives attended.  

ADOT & PF Related 92nd Avenue Connector Project 

Q: Is the 92nd Avenue connector project proposed to connect under the Seward Highway or over? 

Under the Seward Highway is the preferred based on the cost analysis of both the over and under the 

Highway alternatives.  Ground water is shallow in this area with about 2 feet of water under the 

highway. Deep digging is not an option and raising the highway will be necessary.   

Q.  Where does the ADOT project stop on the east side of the Seward Highway?  

From Brayton Drive at the Seward Highway to just east of the trailer park along Academy Drive.  

Q. What size will the sidewalk be on the ADOT portion of Academy Drive?  

A 6 ‐foot sidewalk on one side, a 10‐ foot pathway on the other side and an on‐street bike path is 

anticipated.  

Comment: Hartzell Road is an example where the MOA put in an 8‐foot sidewalk in to connect the 

residential area to the commercial area.  

Comment: ADOT summarized the other state road projects in the Dimond/Seward Highway vicinity that 

will help with traffic circulation once completed including Sandalwood to Lore Road, Dimond to Dowling, 

and new ramps at Lore Road and 76th Avenue at the Seward Highway.     

Alignment Concepts 

Q: Will Independence Drive connect to Academy Drive (red alignment concept)?  

The decision on the preferred alignment will be based on how much right‐of‐way can be acquired and 

based on how much funding is provided.  

Traffic Circulation and Parking 

Q. Adequate parking for soccer is an issue now along Academy Drive – will parking be going away with 

the road upgrade?  

The road upgrade project is an opportunity to improve the parking situation and to improve the safety of 

the field use with landscaping treatments to prevent stray balls from reaching the road.   

Q: Is a gate as cut‐through traffic mitigation measure at Courage Drive a possibility? Residents there 

have asked for one to reduce the number of cut through traffic trips to access Independence Drive and 

the Fred Meyer store?  

Page 23: BRAYTON DRIVE TO ABBOTT ROAD

AcademyDrive/VanguardDriveAreaTrafficCirculationImprovements February2012

 

DraftConceptReport Page20MOAProject#09‐004 

The project will look at improving traffic circulation to the area so that cut‐through neighborhood traffic 

will be minimized as people are given more efficient travel choices with better connections.  

SummaryIn general,  the design  for Academy Drive and Vanguard Drive  from Brayton Drive  to Abbott Road as 

Minor Arterials will contain the following elements:  

Two travel lanes; 

Separated on –street bike lanes; 

Multi‐use pathway/sidewalk;  

Piped storm drain system; 

Lighting; 

Landscaping; and 

Marked pedestrian crossings.  

In addition, the following will be evaluated during the design phase:   

A new roadway alignment; 

Traffic analysis  to determine  traffic controls, need  for  turning  lanes, and connectivity options; 

and 

Intersection alternatives for Abbott Road.