Steam Piping by The Boiler Components Manufacturing Company New Delhi
Boiler MANUFACTURING STEPS
-
Upload
asjad-abbasi -
Category
Engineering
-
view
94 -
download
8
Transcript of Boiler MANUFACTURING STEPS
CONTENTS
Two parts of presentation
Basic view
Introduction
History
Types
Working of boiler
Manufacturing
BOILER MANUFACTURING
INTRODUCTION Boiler defination:
A boiler is a closed vessel in which water or other fluids are heated and steam generated.
A kettle, steam locomotive, etc are all examples for boilers
MANUFATURING Boilers standard (ASME Boiler & Pressure
Vessel Code (BPVC)
History behind creation of standards
Steps (design, fabrication ,inspection)
MANUFACTURING STAGES 4th step:
Then tube plate are mcahined by computer controlled
vertical milling machine for precise hole tube alligment
Then hand welding is carried out by appropriately coded welders.
MANUFACTURING STAGES 5th step Then all weld subject to pressure are test by non
destructive testing (NDT)
MANUFACTURING STEPS 6th step:
furnace,combustion chamber and front tube plate are fitted to the boiler shell
MANUFACTURING STEPS 7th step: Then all parts are fitted adjacent to each other
On completion of tubing boiler shell is subjected to hydraulic test and inspection
MANUFACTURING STEPS
Then stop and safety valves are fitted for steam exportation and to relieve excess pressure
MANUFACTURING STEPS
Then hydraulic or water level controlled and pressure gauges are fitted to boiler .
A blow down valve is also fitted to empty boiler or to remove unwanted solids from bottom
MANUFATURING STEP
Then all external electrical components are ore wired to a side mounted control panel