Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use...

101
Board of Education Study Session August 22, 2019 Strong Schools Bond Program Measure A and Measure Z 1 *A correction was made to slide 72.

Transcript of Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use...

Page 1: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Board of EducationStudy Session

August 22, 2019

Strong Schools Bond ProgramMeasure A and Measure Z

1

*A correction was made to slide 72.

Page 2: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Agenda

1. Overview of Major Measure A Completed Bond Projects 

2. Measure A Bond Projects in Progress

3. Overview of Master Plan Activities 

4. School by School Master Plans for 20 Years

5. Measure Z Preliminary Project List

6. Current Measure Z Progress

7. Board Oversight of Measure A & Measure Z Programs

8. Some Current Issues

2

Page 3: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Overview of Major Completed Measure A Bond Projects

3

Page 4: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A Project List

• Ohlone Elementary School ‐ New Classroom Building and Modernization

• Fairmeadow Elementary School – New Classroom Building and Modernization

• Duveneck Elementary School – New Classroom Buildings and Modernization

• Greene Middle School – Classrooms, Cafetorium and Modernization

• J.L. Stanford Middle School – New Classroom Wing and Site Improvements

• Fletcher Middle School – New Administration/Library Wing and Modernization

• Gunn High School – New Aquatic Center

• Gunn High School – Industrial Arts Renovation

• Gunn High School – New Titan Gym

• Gunn High School – New Classroom Building and World Languages Building

• Gunn High School – Air Conditioning of Existing Buildings

• Gunn High School – Existing Gymnasium Modernization

• Gunn High School – E and K (L31 and MS) Buildings Renovation

• Gunn High School – Drop off and Parking off Miranda Dr.

• Gunn High School – Central Building Project

• Palo Alto High School – Multi‐use Field & El Camino Field Improvements

• Palo Alto High School – Athletic Stadium Improvements

• Palo Alto High School – Haymarket and Tower Building Exterior Improvements

• Palo Alto High School – New Classroom Building for Math/Social Sciences

• Palo Alto High School – New Media Arts Center

• Palo Alto High School – New Performing Arts Center

• Palo Alto High School – New Athletic Center

• Palo Alto High School – Renovation of Library

4

Page 5: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Elementary Schools

5

Ohlone Elementary School ‐ New Classroom Wing and Modernization

Roof Garden and New Classroom Wing

Completed December 2011

Page 6: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Elementary Schools

6

Fairmeadow Elementary School ‐ New Classroom Wing, Kinder Classrooms and Library Expansion

New Classroom Wing

Day Care Play Area

Completed July 2013

Page 7: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Elementary Schools

7

Duveneck Elementary School ‐ New Classroom Wing, Kinder Classrooms and New Library

New Classroom Wing

New Kinder Classrooms

Completed July 2014

Page 8: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Middle Schools

8

Greene Middle School ‐ New Classroom Wing & Cafetorium, Modernization and Expansion of Music and Art Classrooms, Two new Science Labs and Gym Improvements

New Classroom Wing

Hugh Center Court

Completed July 2013

Page 9: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Middle Schools

9

JLS Middle SchoolSite Improvements between classroom wings

New Classroom Wing

Updated Hardcourt Space

Completed July 2013

Page 10: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Middle Schools

10

Fletcher Middle School ‐ New Administration and Library WingNew Drama Classroom and Gym Improvements

New School Entry

Library Expansion

Completed October 2013

Page 11: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

11

Gunn High School ‐ New Aquatic Center

New 35M Pool

Completed June 2009

Page 12: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

12

Gunn High School ‐ Industrial Arts Addition and Renovation

Addition to Building L

New Science Labs

Completed December 2009

Page 13: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

13

Gunn High School ‐ New Titan Gym, including Gym, Weight Room, Team Rooms and Fitness Room

Titan Gym Interior Titan Gym Entry

Completed June 2013

Page 14: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

14

Gunn High School ‐ New Classroom Buildings for Math/English and World Languages

Math and English Classroom WingWorld Languages Classroom Wing

Completed July 2013

Page 15: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Strong Schools Bond Program – High Schools

15

Gunn High School ‐ Drop off area off Miranda Dr.

New Drop Off Lanes

New Signal at Miranda

Completed August 2014

Page 16: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

16

Gunn High School – Central Building Project Expanded lobby for Spangenberg Theater, New Music Classrooms, New Wellness Center and Student Activities Center. New Flex Classrooms

View of Performance Arts Center Entry

Completed April 2019

Page 17: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

17

Palo Alto High School – Multi‐Use Field, Churchill Parking Lot and El Camino Soccer/Lacrosse field

Baseball Field

Soccer / Lacrosse Field

Completed February 2011

Page 18: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

18

Palo Alto High School – Football Stadium Improvements, including new Bleachers and Concessions Building

Stadium Entrance

New Home Bleachers

Completed August 2013

Page 19: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

19

Palo Alto High School – Exterior improvements to Tower Building

Tower Building From Quad Tower Building – North Entrance

Completed August 2013

Page 20: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

20

Palo Alto High School – New Classroom Buildings for Math/Social Sciences

Math and Social Science Building

Classroom Building Entry

Completed August 2014

Page 21: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

21

Palo Alto High School – New Media Arts Center

Media Arts Center Entry

Media Arts Center Forum

Completed August 2014

Page 22: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

22

Palo Alto High School – New Performing Arts Center

Performing Arts Center Lobby

New Drop Off Area

Completed April 2016

Page 23: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

23

Palo Alto High School – New Athletic Center

Main Gymnasium at Perry Family Center

Perry Family Center Entry

Completed August 2017

Page 24: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

24

Palo Alto High School – Renovation of Library Building

Reading Area

Library Reading Area

Completed February 2019

Page 25: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A Bond Projects in Progress

25

Page 26: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Timeline for Current Measure A Projects

26

Page 27: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – High Schools

27

Palo Alto High School – Science Addition with four new Science Labs

New Science Lab Addition

Status: In Construction

Page 28: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure A – Elementary Schools

28

Hoover Elementary School  ‐ New Classroom Wing, Library, Administration, Multi‐Purpose and Flex Rooms and Renovation of Existing Classroom Wings

View of School Entry

View of Multi‐Purpose Room Entry

Status: In DSA, Bidding Anticipated in January 2020

Page 29: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Strong Schools Bond Program – Elementary Schools

29

El Carmelo Elementary School ‐ New Multi‐Purpose Building

View of New Multi‐Purpose Room From Field

Status: In Design Development

Page 30: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Strong Schools Bond Program – Elementary Schools

30

Escondido Elementary School – New Multi‐Purpose Building

New Multi‐Purpose BuildingStatus: To be redesigned, combining Measure A & Z scope and funds

Page 31: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

REMAINING MEASURE A AND OTHER BOND FUNDS

ITEM AMOUNT

Gunn High School Remaining Measure A Funds $6,467,000

Middle School Remaining Measure A Funds $   305,000

Elementary School Measure A Reserve $3,392,000

Measure  A General Reserve $7,394,000

Building Projects Fund – Capital Reserve Fund $3,547,000

31

Page 32: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Overview of Master Plan Activities

32

Page 33: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Status

• Educational Specifications• Elementary and Secondary Advisory Committees reviewed and updated 

standards for future facilities. Finalized in February 2019, so recent issues and information such as the security report needs to be incorporated.

• Site Plans for Campuses• Site Committees for each campus worked with GPA and HED on long‐term 

plans for improvements to each individual campus.

• Development of Projects• fs3H worked with GPA and HED on grouping improvements into logical 

breakdowns of work to develop individual projects that could be separate or combined with others. Preliminary project lists are complete for both the $1.18 Billion master plan and the $460 Million preliminary bond project list. The high school project lists have been updated to reflect the site steering committee discusses this past Spring.

33

Page 34: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Status

• Project Budgets• Project budgets have been developed for the $1.18 Billion scope for the 

master plan and are reflected in the Preliminary Bond Project List.

• Master Plan Narratives• These narratives have been created and are in the final edit stage.

34

Page 35: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

School by SchoolMaster Plans for 20 Years

35

Page 36: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

ADMIN

MULTI-USE

K

K

K

1

1

1 2 4 4

3 3 3 5

4

5 5FLEX

AKC

LIBRARY

LC

FLEX

RC

Lincoln Avenue

Addison Avenue

Mid

dlefield R

oad

Webster Street

2

2

FLEX

AKC

BIK

ES

BIK

ES

PLAY

PROJECTS

CONSTRUCT NEW WING WITH LEARNING CENTER, RESOURCE CENTER AND ENRICHMENT LAB. CONVERT TWO EXISTING CLASSROOMS TO ENRICHMENT LABS.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

1

2

3

1

Addison Elementary School

36

Page 37: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 CONSTRUCT NEW WING WITH LEARNING CENTER, RESOURCE CENTER AND ENRICHMENT LAB. CONVERT TWO EXISTING CLASSROOMS TO ENRICHMENT LABS. 

$           5,055,116 

2 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           6,123,105 

3 ADD SOLAR (PV) SYSTEM TO CAMPUS $               935,011 

$           12,113,232 

Note: New Accessible Playground funded by Measure A / County

Addison Elementary School

37

Page 38: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

RC 1 1 1 K K K

FLEX

LC

FLEX

2

2

2

3

3

3

4

44

55

5

MULTI-USE

ADMIN

LIBRARY

FLEX

KC KC KC

Barron A

venue

Exist ing cond it ions w ith build ings t o be re-m oved shaded dark gray.

BIKES

BIKES

PLAYPLAY

PROJECTS

DEMOLISH EXISTING ADMIN AND MULTI-PURPOSE. CONSTRUCT NEW WING WITH ADMIN, LEARNING CENTER, MP AND ENRICHMENT LAB.

DEMOLISH KINDER WING AND ADD THREE NEW CLASSROOMS WITH NEW PLAY STRUCTURE AND COVERED EATING AREA.

REMOVE PORTABLES AND CONSTRUCT NEW WING WITH CLASSROOM AND TWO ENRICHMENT LABS.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

14

6

5

2

3

Barron Park Elementary School

38

Page 39: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 DEMOLISH EXISTING ADMIN AND MULTI‐PURPOSE. CONSTRUCT NEW WING WITH ADMIN, LEARNING CENTER, MP AND ENRICHMENT LAB.

$        10,387,356 

2 DEMOLISH KINDER WING AND ADD THREE NEW CLASSROOMS WITH NEW PLAY STRUCTURE AND COVERED EATING AREA.

$           6,163,237 

3 REMOVE PORTABLES AND CONSTRUCT NEW WING WITH CLASSROOM AND TWO ENRICHMENT LABS.

$           2,818,938 

4 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES. CONVERT TWO EXISTING CLASSROOMS INTO ENRICHMENT LABS.

$           5,988,230 

5 NEW SOLAR (PV) SYSTEM. $              935,011 

6 NEW ACCESSIBLE PLAYGROUND. $           1,084,448 

$          27,377,218 

Barron Park Elementary School

39

Page 40: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

ADMIN

MULTI-USE

FLEX

FLEX

K

K

K

1

1

1

2

2

2

3 3 3 4 4 4 555LC

LIBRARY OHCENTERFLEX

KC

Maybell A

venueOrm e Street

RC

BIKESBIKES

PLAYPLAY

1

PROJECTS

DEMOLISH EXISTING ADMIN AND MULTI-PURPOSE. CONSTRUCT NEW ADMIN, MULIPURPOSE WITH ENRICHMENT LAB ATTACHED.

REMOVE EXISTING PORTABLE, RENOVATE EXISTING KINDER CLASSROOMS AND ADD ADDITIONAL SQUARE FOOTAGE TO EXISTING KINDER CLASS.

AT REAR OF CAMPUS, REMOVE TWO EXISTING PORTABLES AND CONSTRUCT TWO NEW ENRICHMENT LABS. RENOVATE AND CONVERT EXISTING SPACE TO NEW CLASSROOMS, A LEARNING CENTER AND RESOURCE CENTER.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

6

5

2

3

Briones Elementary School

40

Page 41: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 DEMOLISH EXISTING ADMIN AND MULTI‐PURPOSE. CONSTRUCT NEW ADMIN, MULTIPURPOSE WITH ENRICHMENT LAB ATTACHED.

$           7,642,536 

2 REMOVE EXISTING PORTABLE, RENOVATE EXISTING KINDER CLASSROOMS AND ADD ADDITIONAL SQUARE FOOTAGE TO EXISTING KINDER CLASS.

$           3,105,941 

3 AT REAR OF CAMPUS, REMOVE TWO EXISTING PORTABLES AND CONSTRUCT TWO  NEW ENRICHMENT LABS. RENOVATE AND CONVERT EXISTING SPACE TO NEW CLASSROOMS, A LEARNING CENTER AND RESOURCE CENTER.

$           4,997,175 

4 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           4,638,860 

5 NEW SOLAR (PV) SYSTEM. $               935,011 

6 NEW ACCESSIBLE PLAYGROUND. $           1,084,448 

$          22,403,971 

Briones Elementary School

41

Page 42: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

4-5

1

11

KK

K

K

1

2

2

2

2

LC

RC

ADMINMULTI-USE

LIBRARY

33

FLEX

DKC DKC

Ales

ter A

venu

e

Channing Avenue

BIKES

BIKES

33

FLEX

FLEX

PLAY

PLAY

1

PROJECTS

DEMOLISH TWO CLASSROOMS AND FLEX ROOM. BUILD NEW MULTI PURPOSE ROOM WITH ENRICHMENT LAB ATTACHED. CONVERT EXISTING MP INTO TWO NEW ENRICHMENT LABS.

DEMOLISH EXISTING ADMIN AND REPLACE WITH NEW ADMIN BUILDING WITH ADDITIONAL RESOURCE SUPPORT SPACES AND GANG RESTROOMS.

CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5 2

Duveneck Elementary School

42

Page 43: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 DEMOLISH TWO CLASSROOMS AND FLEX ROOM. BUILD NEW MULTI PURPOSE ROOM WITH ENRICHMENT LAB ATTACHED. CONVERT EXISTING MP INTO TWO NEW ENRICHMENT LABS.

$        12,937,975 

2 DEMOLISH EXISTING ADMIN AND REPLACE WITH NEW ADMIN BUILDING WITH ADDITIONAL RESOURCE SUPPORT SPACES AND GANG RESTROOMS.

$           2,673,633 

3 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           3,534,820 

4 NEW SOLAR (PV) SYSTEM. $           1,850,581 

5 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$          22,427,907 

Duveneck Elementary School

43

Page 44: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

FLEX FLEX

FLEX

LCRC

2 2 2 1 1 1

K

K K

3

3

3

4 4 4 5 5 5 MULTI-USELIBRARY

KC

KC

El Carm

elo Avenue

Loma Verd

e Avenue

Bryant St reet

Ram ona St reet

ADMIN

BIKES

BIKES

PLAY

2

PROJECTS

STRONG SCHOOL BOND: CONSTRUCT NEW MP & ENRICHMENT LAB. CONVERT EXISTING MP TO TWO ENRICHMENT LABS.

CONSTRUCT NEW KINDER CLASSROOM & RENOVATE EXISTING.

DEMOLISH EXISTING MODULAR CLASSROOMS AND BUILD THREE NEW CLASSROOMS.

DEMOLISH EXISTING ADMIN AND REPLACE WITH NEW ADMIN BUILDING AND RESOURCE CENTER.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

6

7

4

3

1

El Carmelo Elementary School

44

Page 45: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 STRONG SCHOOLS BOND PROJECT:  CONSTRUCT NEW MP &  ENRICHMENT LAB. CONVERT EXISTING MP TO TWO ENRICHMENT LABS.

S.S.B

2 CONSTRUCT NEW KINDER CLASSROOM & RENOVATE EXISTING. $           1,617,717 

3 DEMOLISH EXISTING MODULAR CLASSROOMS AND BUILD THREE NEW CLASSROOMS.

$           4,321,694 

4 DEMOLISH EXISTING ADMIN AND REPLACE WITH NEW ADMIN BUILDING AND RESOURCE CENTER.

$           4,813,303

5 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           5,146,226 

6 NEW SOLAR (PV) SYSTEM. $           1,430,898 

$         16,705,776

Note: New Accessible Playground funded by Measure A / County

El Carmelo Elementary School

45

Page 46: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

FLEX

FLEX

MULTI-USEK

K

K

K

1

1

1

1

5

5

5 4/5 4 4 4

LC

3 3

4 3

2/3

3

5

2

2

22

RC

FLEX

LIBR

ADMIN

K/1

EKC

EKC

Escond ido Road

Stanford A

venue

BIKES

BIKES

PLAY

PLAY

PROJECTS

STRONG SCHOOL BOND: CONSTRUCT NEW MP & ENRICHMENT LABS. CONVERT EXISTING MP TO TWO CLASSROOMS. CONSTRUCT ADDITIONAL KINDER CLASS.

DEMOLISH EXISTING ADMIN AND MP. CONSTRUCT NEW ADMIN, LIBRARY, ENRICHMENT LAB AND RESOURCE CENTER.

DEMOLISH LIBRARY AND PORTABLES. CONSTRUCT NEW CLASSROOM WING WITH LEARNING CENTER. CONSTRUCT TWO ADDITIONAL NEW CLASSROOMS AND ADD SPACE TO CREATE NEW KINDER CLASS.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

6

2

3

1

Escondido Elementary School

46

Page 47: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 STRONG SCHOOL BOND:  CONSTRUCT NEW MP &  ENRICHMENT LAB. CONVERT EXISTING MP TO TWO CLASSROOMS. CONSTRUCT ADDITIONAL KINDER CLASS.

S.S.B.

2 DEMOLISH EXISTING ADMIN AND MP. CONSTRUCT NEW ADMIN, LIBRARY, ENRICHMENT LAB AND RESOURCE CENTER.

$        11,006,691 

3 DEMOLISH LIBRARY AND PORTABLES. CONSTRUCT NEW CLASSROOM WING WITH LEARNING CENTER. CONSTRUCT TWO ADDITIONAL NEW CLASSROOMS AND ADD SPACE TO CREATE NEW KINDER CLASS.

$        19,434,567 

4 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           7,481,034 

5 NEW SOLAR (PV) SYSTEM. $           2,056,201 

6 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$          41,409,391 

Escondido Elementary School

47

Page 48: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

RC

ADMIN

MULTI-USE

LIBRARY

FLEX

SERV

4-5

LC

1

11

1

2

2

2

2

3

3

3

3

KK

KK

FLEX

East

Mea

dow

Driv

e

KC

KC

BIKES

BIKES

PLAY

PLAY

FLEX

1

PROJECTS

DEMOLISH JACKSON CENTER. CONSTRUCT NEW MP BUILDING WITH TWO NEW ENRICHMENT LABS AND LEARNING CENTER. CONVERT EXISTING MP INTO TWO CLASSROOMS AND IMPROVE FIRST GRADE COURTYARD. CONSTRUCT NEW ENRICHMENT LAB NEAR LIBRARY TO REPLACE EXISTING PORTABLE.

DEMOLISH EXISTING ADMIN. CONSTRUCT NEW ADMINISTRATION BUILDING WITH RESOURCE CENTER. RECONFIGURE DROP OFF AND STAFF PARKING.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

1

1

2

Fairmeadow Elementary School

48

Page 49: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 DEMOLISH CLASSROOM WING (JHC). CONSTRUCT NEW MP BUILDING WITH TWO NEW ENRICHMENT LABS AND LEARNING CENTER. CONVERT EXISTING MP INTO TWO CLASSROOMS AND IMPROVE FIRST GRADE COURTYARD. CONSTRUCT NEW ENRICHMENT LAB NEAR LIBRARY TO REPLACE EXISTING PORTABLE. 

$        15,406,759 

2 DEMOLISH EXISTING ADMIN. CONSTRUCT NEW ADMINISTRATION BUILDING WITH RESOURCE CENTER. RECONFIGURE DROP OFF AND STAFF PARKING.

$           4,020,705 

3 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           5,804,916 

4 NEW SOLAR (PV) SYSTEM. $           1,850,581 

5 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$          28,513,859 

Fairmeadow Elementary School

49

Page 50: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

RC FLEXK

K

K

1

1

1

2

2

2

33 3

4

4

4

5

5

5

FLEX

LCFLEX

MULTI-USE

ADMIN

LIBRARY

East Charleston R

oadBIKES

BIKES

PLAY

PLAY

1

PROJECTS

CONVERT ENRICHMENT LAB NEAR ADMIN TO LEARNING CENTER. ADDITION OF TWO ENRICHMENT LABS TO RESOURCE/KINDER WING.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

1

Hoover Elementary School

50

Page 51: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 CONVERT ENRICHMENT LAB NEAR ADMIN TO LEARNING CENTER. ADDITION OF TWO ENRICHMENT LABS TO RESOURCE/KINDER WING.

$           3,580,672 

2 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           5,853,090 

3 NEW SOLAR (PV) SYSTEM. $           1,233,721 

4 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$         12,098,380 

Hoover Elementary School

51

Page 52: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

1

PROJECTS

NEW KINDER CLASSROOM WING WITH PLAY AREA. CONVERT EXISTING KINDER INTO THREE ENRICHMENT CLASSROOMS.

CONSTRUCT FIVE NEW CLASSROOMS, LEARNING CENTER AND RESOURCE CENTER. DEMOLISH PORTABLES. LIFE SAFETY AND ADA UPGRADES REQUIRED.

RENOVATE INTERIOR OF MULTIPURPOSE ROOM AND CONVERT FLEX AREA INTO SERVERY.

UPGRADE EXISTING HVAC AND RE-ROOF ALL BUILDINGS.

SITE UPGRADES TO INCLUDE ACCESSIBLE RAMP DOWN TO PLAYGROUND AND PROVIDE COVERED EATING AREA.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

6

7

2

3

Nixon Elementary School

52

Page 53: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost1 NEW KINDER CLASSROOM WING WITH PLAY AREA. CONVERT 

EXISTING KINDER INTO THREE ENRICHMENT CLASSROOMS. $        11,843,787 

2 CONSTRUCT FIVE NEW CLASSROOMS, LEARNING CENTER AND RESOURCE CENTER. DEMOLISH PORTABLES. LIFE SAFETY AND ADA UPGRADES REQUIRED.

$        14,787,540 

3 RENOVATE INTERIOR OF MULTIPURPOSE ROOM AND CONVERT FLEX AREA INTO SERVERY. 

$           2,455,201 

4 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           3,329,300 

5 SITE UPGRADES TO INCLUDE ACCESSIBLE RAMP DOWN TO PLAYGROUND AND PROVIDE COVERED EATING AREA.

$               167,227 

6 NEW SOLAR (PV) SYSTEM. $           1,233,721 

7 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$         35,247,674

Nixon Elementary School

53

Page 54: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Am

arill

o A

ve.

K-1K-1K-1K-1K-1

K-1

K-1

K-1

K-1

2-3

2-3 2-3 2-3 2-3 2-3 2-3 2-3 2-3ADMIN

MULTI-USE

LIBRARY

4-5

4-5

4-5 4-5 4-5

RC

FLEX

4-5 4-5 4-5

ROOF GARDEN

FLEX

FARM

OKC OKC

4-5

2nd Floor

SERV

BIKES

FLEX

LC

1

PROJECTS

DEMOLISH EXISTING LIBRARY & MP. CONSTRUCT NEW MULTIPURPOSE ROOM, LIBRARY, ENRICHMENT LAB AND FARM OFFICE MEETING AREA. EXPAND AND RECONFIGURE PARKING.

CONSTRUCT NEW ENRICHMENT LAB AND LEARNING CENTER.

DEMOLISH EXISTING ADMIN. CONSTRUCT NEW ADMIN BUILDING WITH ANCILLARY SPACE.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

6

2

3

1

Ohlone Elementary School

54

Page 55: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost 

1 NEW KINDER CLASSROOM WING WITH PLAY AREA. CONVERT EXISTING KINDER INTO THREE ENRICHMENT CLASSROOMS.

$        11,843,787 

2 CONSTRUCT FIVE NEW CLASSROOMS, LEARNING CENTER AND RESOURCE CENTER. DEMOLISH PORTABLES. LIFE SAFETY AND ADA UPGRADES REQUIRED.

$        14,787,540 

3 RENOVATE INTERIOR OF MULTIPURPOSE ROOM AND CONVERT FLEX AREA INTO SERVERY. 

$           2,455,201 

4 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           3,329,300 

5 SITE UPGRADES TO INCLUDE ACCESSIBLE RAMP DOWN TO PLAYGROUND AND PROVIDE COVERED EATING AREA.

$               167,227 

6 NEW SOLAR (PV) SYSTEM. $           1,233,721 

7 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$         35,247,674 

Ohlone Elementary School

55

Page 56: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

ADMIN

MULTI-USE

LIBRARY RC FLEX

FLEX

FLEX

LC

KK

K

111222

3

3

3

4

4 4 5 5

5

KC KC

Louis Road

Rorke W

ay

BIKES

PLAY

PLAY

1

PROJECTS

DEMOLISH EXISTING MP AND FRONT CLASSROOM WING. CONSTRUCT NEW MULTIPURPOSE ROOM, NINE CLASSROOMS, ENRICHMENT LAB AND LEARNING CENTER

DEMOLISH ADMIN. CONSTRUCT NEW ADMIN BUILDING. RECONFIGURE DROP OFF AND PARKING AREA.

NEW KINDER CLASSROOM AND YARD EXTENSION.

REMOVE EXISTING PORTABLES. CONSTRUCT NEW ENRICHMENT LABS. RELOCATE KIDS CLUB TO ALIGN WITH LIBRARY ENRICHMENT WING.

EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

6

7

2

3

4

Palo Verde Elementary School

56

Page 57: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost 

1 DEMOLISH EXISTING MP AND FRONT CLASSROOM WING. CONSTRUCT NEW MULTIPURPOSE ROOM, NINE CLASSROOMS, ENRICHMENT LAB AND LEARNING CENTER.

$        22,050,429 

2 DEMOLISH ADMIN. CONSTRUCT NEW ADMIN BUILDING. RECONFIGURE DROP OFF AND PARKING AREA.

$           3,495,150 

3 NEW KINDER CLASSROOM AND YARD EXTENSION. $           1,669,983 

4 REMOVE EXISTING PORTABLES. CONSTRUCT NEW ENRICHMENT LABS. RELOCATE KIDS CLUB TO ALIGN WITH LIBRARY ENRICHMENT WING.

$           2,969,720 

5 EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

$           4,040,559 

6 NEW SOLAR (PV) SYSTEM. $           1,233,721 

7 NEW ACCESSIBLE PLAYGROUND. $           1,430,898   

$         36,890,460 

Palo Verde Elementary School

57

Page 58: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

K

K

K K

1

11

1

2

2

2

2

3

3

3

3

44 4

4

5

5

5

5LC

RC

FLEX

FLEX

FLEX

ADMIN

MULTI-USE

LIBRARY

KC KC

Em barcadero Road

Midd lefield Road

BIKES

BIKES

PLAY

PLAY

1

PROJECTS

CONSTRUCT NEW MULTIPURPOSE ROOM WITH TWO ENRICHMENT LABS. CONVERT EXISTING MP TO KIDS CLUB. CONSTRUCT TWO NEW KINDER CLASSROOMS. RENOVATE EXISTING KINDER CLASSROOMS. EXTEND PARKING.

NEW CLASSROOM WING.

MAJOR RENOVATION OF THE MAIN BUILDING TO INCLUDE RECONFIGURATION OF ADMIN, CLASSROOMS AND LIBRARY. INCLUDE LEARNING CENTER AND ENRICHMENT LABS. EXISTING CLASSROOM UPGRADE THROUGHOUT WITH A/C AND ENVELOPE UPGRADES.

NEW SOLAR (PV) SYSTEM.

NEW ACCESSIBLE PLAYGROUND.

1

2

3

4

5

2

3

Walter Hays Elementary School

58

Page 59: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost

1 CONSTRUCT NEW MULTIPURPOSE ROOM WITH TWO ENRICHMENT LABS. CONVERT EXISTING MP TO KIDS CLUB. CONSTRUCT TWO NEW KINDER CLASSROOMS. RENOVATE EXISTING KINDER CLASSROOMS. EXTEND PARKING AND DROP OFF.

$        19,492,796 

2 NEW CLASSROOM WING WITH EIGHT CLASSROOMS AND RESOURCE CENTER.

$        12,282,609 

3 MAJOR RENOVATION OF THE MAIN BUILDING TO INCLUDE RECONFIGURATION OF ADMIN, CLASSROOMS AND LIBRARY. INCLUDE LEARNING CENTER AND ENRICHMENT LABS. ALSO INCLUDES AC AND ENVELOPE UPGRADES

$        16,204,385 

4 NEW SOLAR (PV) SYSTEM. $           1,542,151 

5 NEW ACCESSIBLE PLAYGROUND. $           1,430,898 

$          50,952,840 

Walter Hays Elementary School

59

Page 60: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Frank S. Greene Middle School

60

Page 61: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost 

1 DEMO BUILDING H AND BUILD NEW CTE CLASSROOMS AND KITCHEN $                  13,032,012 

2 DEMO BUILDING E AND BUILD NEW 2‐STORY CLASSROOMS $                    8,427,999 

3 RENOVATE BUILDING L AND ADDITION FOR DRAMA CLASSROOM $                    6,032,240 

4 DEMO BUILDING F & LIBRARY, AND BUILD NEW 2‐STORY CLASSROOMS AND LIBRARY

$                  25,592,095 

5 RENOVATE BUILDING A/B TO ENLARGE CLASSROOMS AND NEW ADMIN, ADD AC

$                  20,732,783 

6 RENOVATE BUILDINGS C, N AND M AND ADD AC $                    5,804,116 

7 RENOVATE GYM, LOCKER ROOMS/SHOWERS AND RESTROOMS $                  13,118,563 

8 ADD PV SYSTEM $                    2,337,527 

$                  95,077,335 

Frank S. Greene Middle School

61

Page 62: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

J.L. Stanford Middle School

62

Page 63: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost 1 DEMO MUSIC CLASSROOMS AND BUILD NEW CENTRAL KITCHEN, FOODS 

AND FUTURES CLASSROOM$                  6,483,097 

2 DEMO CAFETORIUM AND BUILD NEW CAFETORIUM AND MUSIC CLASSROOMS

$                12,277,574 

3 DEMO LIBRARY AND BUILD NEW 2‐STORY LIBRARY AND ADMIN EXPANSION

$                13,189,549 

4 MINOR RENOVATION OF BUILDINGS 100 ‐ 500 AND ADD AC TO CLASSROOMS

$                  9,435,684 

5 MINOR RENOVATION OF BUILDINGS 600 ‐ 800 AND ADD AC TO CLASSROOMS

$                12,350,774 

6 MINOR RENOVATION TO GYM, AND MAJOR RENOVATION TO LOCKERS/SHOWER/RESTROOMS

$                11,880,124 

$                 65,616,803 

J.L. Stanford Middle School

63

Page 64: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Ellen Fletcher Middle School

64

Page 65: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Element Description Project Cost 

1 BUILD NEW CTE CLASSROOM WING AND RENOVATE QUAD AND AMPHITHEATER

$                  6,046,076 

2 RENOVATE ADMINISTRATION AND ADD AC TO CR'S, ADDITION FOR STAFF WORKROOM

$                  1,438,950 

3 RENOVATE CAFETORIUM BUILDING AND ADD AC $                  6,339,588 

4 MINOR RENOVATION TO MUSIC AND DRAMA CLASSROOMS AND ADD AC

$                  2,147,206 

5 RENOVATE GYM, LOCKER ROOMS/SHOWERS AND RESTROOMS $                12,749,826 

6 MINOR RENOVATION TO BUILDINGS E ‐ K AND ADD AC $                13,430,613 

7 FIRE ALARM SYSTEM, CAMPUS UPGRADE $                  1,527,090 

$                43,679,349 

Ellen Fletcher Middle School

65

Page 66: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Henry M. Gunn High School

66

Page 67: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

67

Element Description Project Cost 1 MAJOR MODERNIZATION OF BUILDINGS A & B FOR ADMIN AND 

FOOD SERVICES$                13,711,277 

2 DEMO BUILDING M AND BUILD NEW MEDIA ARTS / ARTS BUILDING $                21,825,883 

3 BUILD ADDITION TO TITAN GYM, ADD AC TO GYM AND NEW CONCESSIONS BY STADIUM

$                11,097,639 

4 MAJOR MODERNIZATION OF BOW GYM, WITH NEW LOCKER/SHOWER/RESTROOM AREA

$                13,270,440 

5 MAJOR MODERNIZATION OF SPANGENBERG THEATER $                20,449,097 

6 RE‐PROGRAM SCIENCE OFFICE AREA INTO TWO NEW LABS AND BUILD ADDITION FOR OFFICES

$                11,315,758 

7 MAJOR MODERNIZATION AND ADDITION FOR BUILDING L FOR CTE LABS

$                14,115,908 

8 MINOR MODERNIZATION OF BUILDINGS C, D, E, F & G $                11,032,979 

9 FOOTBALL STADIUM IMPROVEMENTS $                  6,297,206 

10 SOCCER AND BASEBALL STADIUM IMPROVEMENTS, INCLUDING LIGHTING AND NEW SOCCER FIELD TURF

$                  4,552,511 

11 NEW PARKING LOT CONFIGURATION AND SOLAR (PV) PANELS $                  9,090,508 

$              136,759,206

Henry M. Gunn High School

Page 68: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

LEGEND

LIBRARY

MULTI-PURPOSE ROOM

CLASSROOM

ADMIN

LEARNING CENTER

ENRICHMENT LAB

Palo Alto High School

68

Page 69: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

69

Element Description Project Cost 1 MAJOR MODERNIZATION OF TOWER AND HAYMARKET THEATER 

BUILDINGS$                26,648,750 

2 DEMO 600 BUILDING AND BUILD NEW STUDENT CENTER, FOODS AND WELLNESS CENTER

$                  6,678,390 

3 DEMO 900 AND 1000 BUILDINGS AND BUILD NEW STEM / CTE LAB BUILDING, AND QUAD

$                19,816,473 

4 MAJOR MODERNIZATION OF BUILDINGS 100‐300, MAC UPGRADES AND REPLACE 300A/B

$                25,831,235 

5 MODERNIZATION OF BUILDINGS 400 AND 700 $                  9,079,516 

6 NEW TURF FIELDS FOR FOOTBALL STADIUM AND MULTI‐USE FIELD, NEW TRACK SURFACING

$                11,473,456 

7 REPLACE HW/CW DISTRIBUTION PIPING AND REPLACE COURTYARDS AROUND LIBRARY

$                  8,182,157 

$               107,709,977 

Palo Alto High School

Page 70: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Summary of Cost – 20 Year Plan

70

Cost Breakdown of Project List

• Elementary Schools $   355,000,000 • Middle Schools $   216,000,000• High Schools $   258,000,000 • Possible long term Improvements at non‐School

Sites and Central Facilities $   184,000,000• Other Costs

• Planned Maintenance ($3M/Yr), Technology Fund ($3M/Yr), Program Management (5%) $    170,000,000

Total Cost of Draft Plan $1,183,000,000 

Page 71: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure ZPreliminary Bond Project List

71

Page 72: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

• The Property Committee met 4 times between March 14th and May 29th, 2019 2018. • The total amount of the 20 – year project list was $1.18 Billion.

• A major subject of the meetings was the development of a preliminary bond project list. The target amount was approximately $ 460 Million.

• The distribution of funds by grade level was the following:• Elementary School – 41%• Middle – 25%• High School – 34% 

• This percentage distribution is approximately the same as the percentage distribution of number of students.

72

Preliminary Bond Project List 

Page 73: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List – Elementary Schools

73

Addison                              $229,000• Furniture Only

Barron Park                  $10,555,656• Demolish Administration and Multi‐Purpose, and replace with new Administration, Multi‐Purpose, Learning Center and Music Classroom

Briones                         $12,808,011• Demolish Administration and Multi‐Purpose, and replace with new Administration, Multi‐Purpose, Learning Center and Music Classroom

• Build two new Enrichment Labs and renovate classroom wing by OH Building

Duveneck $13,158,975• Demolish two classrooms and flex room, and build new Multi‐Purpose with Enrichment Lab

Page 74: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List – Elementary Schools

74

El Carmelo                      $168,300 • Furniture Only

Escondido                  $11,227,691• Demolish Administration and build new Library, Administration and Learning Center

Fairmeadow $15,601,409• Demolish classroom wing (JHC). Construct new Multi‐Purpose with two new Enrichment Labs and Learning Center

• Convert existing Multi‐Purpose into two Classrooms

Hoover                            $221,000• Furniture Only

Page 75: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List– Elementary Schools

75

Nixon                              $ 14,634,515 • New Kinder Classroom wing with play area. Convert existing Kinder into three Enrichment Classrooms

• Renovate interior of Multi‐Purpose room and convert flex area into Servery

• Site upgrades to include accessible ramp down to playground and provide covered eating area

Ohlone                           $ 14,010,678• Demolish Library and build new Multi‐Purpose and Library• Demolish Multi‐Purpose and expand parking lot• Construct new flex room and Learning Center

Palo Verde                     $ 25,232,649• Demolish and build new Multi‐Purpose, Classrooms and Learning Center• Build new flex rooms and relocate after‐school care

Page 76: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List– Elementary Schools

76

Hays              $19,661,096• Build new Multi‐Purpose and flex room• Renovate Multi‐Purpose to after‐school care, (2) new Kinder Classrooms

• Renovate Kinder wing

All Elementary Sites $14,849,802• New Accessible Playgrounds

Page 77: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List– Middle Schools

77

Greene                        $ 39,027,857• Demolish Building H and building new Career and Technical Education (CTE) Classroom and Kitchen

• Demolish Building F & Library and build new 2‐story classroom and Library

J.L. Stanford                 $32,353,970• Demolish Music Classrooms and build new central kitchen, Foods and future classrooms

• Demolish Cafetorium and build new Cafetorium and Music Classrooms• Demolish Library and build new 2‐Story Library and Administration expansion

Fletcher                        $19,434,146• Build new CTE Classroom wing and renovate Quad and Amphitheater• Renovate Administration and addition for Staff Workroom

Page 78: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Measure Z Preliminary Bond Project List – Henry Gunn High School

78

Gunn                          $70,085,447 • Major modernization of Buildings A & B for Administration and Food Services

• Demolish Building M and build new Media Arts / Arts Building

• Renovate locker rooms, Showers and restroom area• Major modernization of Spangenberg Theater

Page 79: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

79

Palo Alto                   $ 53,972,363• Major modernization of Tower and Haymarket Theater Buildings

• Demolish 600 Building and build new Student Center, Foods and Wellness Center

• Demolish 900 and 1000 Buildings and build new CTE Lab Building, and Quad

Measure Z Preliminary Bond Project List – Palo Alto High School

Page 80: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

80

Measure Z Preliminary Bond Project List

Developed with Property Committee in May 2018. Presented at Board Meeting of June 5 and June 19, 2019.

Page 81: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

81

Measure Z Preliminary Bond Project List

Available August ‐ November 2018

Page 82: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

82

Measure Z Adopted Budget

Adopted by the Board, May 28, 2019

Page 83: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Preliminary Bond Project List ‐ Subject to Change

• This list was not intended to be a permanent distribution• In the previous bond, there were many changes over the course of 

time to stay current with changes in District need• Examples:

• The District transferred $8,500,000 to purchase 525 San Antonio when it became available. 

• The District transferred elementary funds to enrollment growth reserve.• The District subsequently transferred the remaining amount from 

enrollment growth to fund elementary Multi‐Purpose buildings.

83

Page 84: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Measure Z Progress

84

Page 85: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Architect Selection Process

• Twenty Architects responded to an RFP. 

• A short list of seven architects were selected for interview, one 

withdrew.

• A panel interviewed six architects.

• Two architects, LPA and SVA were the highest scoring. 

• References were contacted. 

• The Board of Education approved Master Agreement with LPA and SVA. 

85

Page 86: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Gunn High School

• Gunn Administration opted to continue their program with HED Architects. 

• There have been a number of facilities steering committee meetings.

• Project prioritization has taken place.

• The Board has approved HED currently working on conceptual designs of the following:

• Renovation of Building A and B to accommodate admin, food services, and Career Tech Ed and renovate Building K into two science labs

• Add air‐conditioning to the Titan Gym

86

Page 87: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Palo Alto High School

• Paly Administration opted to continue their program with HED Architects. 

• There have been a number of facilities steering committee meetings.

• Project prioritization has taken place.

• The Board has approved HED currently working on conceptual designs of the following:

• Renovation and restoration of the Tower Building

• Replace hot and cold water piping distribution to the campus.

87

Page 88: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Three Middle and Three Elementary Schools

• Principals interviewed LPA and SVA.

• LPA was selected to design for Greene, Escondido and Hays.

• SVA was selected to design for JLS, Fletcher and Palo Verde.

• Contract addendums for conceptual design at the three middle schools and the three elementary schools will be presented for discussion and action at subsequent meetings.

88

Page 89: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Other Measure Z Commitments to Date

• Paly Science Addition $4,485,000

• Bond Program Management 2019/2020 $1,149,000

• HED Conceptual Design for Gunn Projects $28,000

• HED Conceptual Design for Paly Projects $28,000

• Technical Refresh Program $1,690,000

89

Page 90: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Board Oversight of Measure A & Measure Z Programs

90

Page 91: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

CURRENT BOARD PROJECT REVIEW PROCESSMINIMUM OF 11 MEETINGS

Board Agenda Item # of Meetings

Approval of Project & Authorization to Develop Conceptual Design

2

Approval of Conceptual Design 2

Approval of Schematic Design 2

Approval of Final Design and Submittal to DSA 2

Authorization to Bid the Project 2

Award of Contract 1

91

Page 92: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

BOARD PROJECT REVIEWPaly Tower Building Renovation

Board Agenda Item Meetings

Approval of Project & Authorization to Develop Conceptual Design

5/28/19, 6/11/19

Approval of Conceptual Design TBD

Approval of Schematic Design TBD

Approval of Final Design and Submittal to DSA TBD

Authorization to Bid the Project TBD

Award of Contract TBD

92

Page 93: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

BOARD PROJECT REVIEWDuveneck Elementary School Project

Board Agenda Item Meetings

Approval of Project & Authorization to Develop Conceptual Design

04/27/10 – 05/11/10

Approval of Conceptual Design 12/14/10 – 01/11/11

Approval of Schematic Design 06/14/11 – 06/28/11

Approval of Final Design and Submittal to DSA 06/26/12

Authorization to Bid the Project 12/18/12 – 01/15/13

Award of Contract 03/12/2013

93

Page 94: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Proposed Additional Layer of Board Review

Quarterly Status Reports at Board Meetings(Could Be Bi‐Monthly or Monthly if Desired)

Proposed dates for 2019‐20 School Year

• November 19, 2019

• February 25, 2020

• May 26, 2020

94

Page 95: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Property Committee Oversite

95

• Property Committee worked extensively on preparation on the Measure Z Bond.

• The Property Committee will be meeting once a month, generally on the 3rd Monday of the month to review Measure A & Z progress and provide input.

Page 96: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Community Oversight of Bond Program

• A Citizens Oversight Committee (COC) for a 55% approval bond is required by the Education Code.

• The COC for Measure A was established in 2008.

• The COC was authorized by the Board of Education to also oversee the Measure Z bond program in 2019.

• The COC meets quarterly and reviews the program and audit results.  

• The COC makes an annual report to the community.

• Full information on the COC is available at https://www.pausd.org/bond‐citizens‐oversight‐committee 

96

Page 97: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Issues

97

Page 98: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Issue 1

Gender Neutral Restrooms

Potential Solutions:  Make the District technical spec floor to ceiling restroom partitions and no urinals.

A decision can then made by the District as to whether to make the new restrooms gender neutral or not. 

Make a decision regarding a retrofitting of all current restrooms.

98

Page 99: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Issue 2

Elementary School Food Service

• The elementary serveries are being designed to accommodate cooking capabilities in the future.

• If desired, these serveries can become cooking facilities. 

• The cost of logistics and operations of such a change will need to be determined and a decision made.

• Note this decision will impact the planned central kitchen project at JLS. If decided to have cooking facilities at elementary sites, the current plan to renovate the JLS kitchen is not needed.

99

Page 100: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Issue 3

Safety Measures and Consistency

• The District has received a comprehensive report from Emergency Preparedness Group, Inc.  

• This report will be used as a source for capital investments by the Bond. 

• This report also outlines safety procedures to be used by schools and other facilities. 

100

Page 101: Board of Education Study Session August 22, 2019 · 2019. 8. 22. · 2 2 2 2 lc rc admin multi-use library 3 3 flex dkc dkc a l e s t e r a v e n u e channing avenue bikes bikes 3

Current Issue 4

Shade – aka Sun Protection

• The sites have different needs for shade.

• For example, the L‐shape elementary schools have a great deal of “built‐in” shade. 

• A process will be developed to move forward on this issue.

101