IntroductionRichard Lane• Project Management• Consulting• Change Management• Education & Training• Technology

What is BIM?Building a consistent, collaborative industry, with clear and open communication

Information of high‐quality is procured  to support business outcomes

Modelling the design increases efficiency,  enabling simulation & analysis

bsiCIC

What is BIM?Core Level 2 BIM Components

BIM Protocol

PAS 1192‐2:2013

PAS 1192‐3:2014

BS 1192‐4:2014

GovernmentSoft LandingsSoft

Landings

TSBDigital Plan Of Works

dPOW

ClassificationSystem

Classification BS 1192‐4

PAS 1192-2

PAS 1192-2Fundamental principles for Level 2 information modelling

PAS 1192-2

cpic.org.uk

Pre-Contract• Are EIRs achievable?• Approach• Capability• Capacity• Competence• Whole Supply Chain

Pre-Contract• Project Implementation Plan

• Goals for collaboration & Information Modelling

• Major Project Milestones• Project Information Model (PIM) Deliverable Strategy

Post Contract• Facilitate Delivery Management including contractual information exchange requirements set out in the BIM Protocol

Post ContractEIR Response, pre‐contract content, plus:• Roles & Responsibilities• Survey Strategy & Existing 

Data Use• Approval Process• Task Information Delivery 

Plan• Master Information 

Delivery Plan• Standard Method & 

Procedure• IT Solutions

Post Contract

• If an EIR is not supplied, look for opportunities to collaborate with the client to clarify needs or state clear assumptions when developing the BEP

• Clients may specify a BEP template at Framework or Project Level

• Ensure the BEP is a true response to the EIR and reflective of the project. Not just corporate boilerplate

Key Lessons