Bharuch Water Project

40
Working on Text content & selection photos for approval PRESENTATION on Drinking Water Management in BHARUCH District By Dr. Rajender Kumar (IAS) District Development Officer Bharuch District PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT Page | 0

description

A project report on water management activities in Bharuch district of Gujarat.

Transcript of Bharuch Water Project

Page 1: Bharuch Water Project

Working on Text content & selection photos for approval

PRESENTATION on Drinking Water Management

in

BHARUCH District

By

Dr. Rajender Kumar (IAS)District Development OfficerBharuch District

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 0

Page 2: Bharuch Water Project

PRESENTATION ON DRINKING WATER MANAGEMENT

in

BHARUCH DISTRICT

An ANALYSES & OBSERVATION OF WORKINGS BY

Dr. Rajender Kumar (IAS)

The District Development Officer

Bharuch District

A Report & Observation in Three Parts

A) Preface to Six Sigma after Acknowledgement & Synopsis

B) History - A Successful execution

C) The Present & the Future – Works in progress & planning ahead of time

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 1

Page 3: Bharuch Water Project

D) SWOT Analyses – A point wise workings on replication of the same for any Rural Water Supply Project throughout INDIA

TABLE OF CONTENT

Acknowledgement

SYNOPSIS

A) HISTORY - A Successful execution :: (Contents)

Bharuch Topography – + – water TDS level

Brief-History – Drinking Water scenario / Hydrogeological Survey (Water Table / Water Schemes by State & Central Government & related water sources)

Project Conceptualisation / Assessment (Source / Infra / Quality / Quantity )

Solution / Synchronization of Fund-Management & various water sources for Infrastructural requirements / Diagram of Fund utilisation Before & After intervention & co-ordination of DDO office / Cost effective solution

Hansot Taluka Report & impact Assessment (Including Excel & Chart data – not covering more than 7 pages)

Letter of Thanks & Gratitude (from Hansot Taluka – implemented project)

Silent efforts of DDOffice since 2008 is fruitful – & success makes way for ‘PHASE-2’

Photos & Content :: Major usage from VEDA booklet photos

HISTORY section - coverage within 25 to 30 Pages max

=================================

B) The Present & the Future :: (Contents)

Assessment (Source / Infra / Quality / Quantity ) - Source / Storage / Distribution = TDS level of current project – Valia Taluka highlighted

Infrastructural Gaps in water supply – where Swajaldhara / GWSSB & other schemes are combined to have a unison in planning of funds /

Nikora based supply in 18 villages near Bharuch to be highlighted

GNFC & ONGC involvement & assistance thus synch with other Project Funds

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 2

Page 4: Bharuch Water Project

Nikora water supply success

R.O Plant – 73 unfit villages & related reports

PANEE SAMEETEE – (Water Committee) Maintenance & involvement making Rural development in water supply – self reliance a dream come true.

R.O Plant – cost factor & working in villages (Need/Usage/Economic aspect/Installation)

=================================

C ) Swot Analyses & workings on how to replicate the same for any Rural Water Supply Project anywhere in INDIA

Swajaldhara & Panee Sameete – & responsibility

Committee members:: Hierarchy + job roles & responsibility

Training & awareness building programme & implementation

Management & maintenance of RO Plants

Committee Booklets & Forums

Every state has one WASMO – how to avail wellness

Annexure for Reference & Questionnaires & study criteria in English for reference to be implemented in local languages if the particular state governance wants to implement the same.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 3

Page 5: Bharuch Water Project

ACKNOWLEDGEMENT

We would like to thank the concerned officials at the GWSSB Bharuch, _______, the officials at

We would like to thank GWSSB / WASMO / VEDA / and other private organisations such as the GNFC & Smt. Sudha Anchlia (IAS), then CMD, GNFC for her persuasion, constant support and guidance, Shri. Guruprasad Mohapatra (IAS), MD GNFC for his constant guidance and support. for their involvement. The Gram Panchayat and Pani Samiti (for & by) the people of the Bharuch rural community, who made these projects a success in awareness & action upon the initiative taken by the District Development Office. We also thank concerned health officers at the block level and also other staff members at District Panchayat Office, Bharuch for providing us with information for the observation and analyses.

Dr. Rajender Kumar (IAS) DDO – Bharuch

SYNOPSIS

• Fresh water availability per annum, per person, in India is 2000 cubic meters.

• While in Gujarat State it is 1137 cubic meters.

BHARUCH

Area (Km2) : 5353 · 8 Talukas

Density (/Km2) : 210 · 662 Villages

Population: 1,370,104 · 4 Nagarpalikas Photo : A1

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 4

Page 6: Bharuch Water Project

This Book is a Report & Observation in Three Parts of the Drinking water provisions in the areas of Bharuch district, located in the southern part of Gujarat, near the Gulf of Khambhat in Arabian Sea.

Because of high concentration of industries (such as chemical, petrochemical, engineering, ports and shop building) as well as due to nearness to the coastline, drinking water is one of the major problems in the district. The District Administration had an innovative programme of installing Reverse Osmosis (RO) plants besides other provisional projects for providing drinking water in all the villages of Bharuch district.

A2 – A14

The selection of R.O intervention as a major stakes performer was a part of a multi-tier systematic strategy, developed after an extensive survey by the district officials, led by DDO, Bharuch, and intensive interactions with the beneficiaries for the whole of Bharuch district. Since there was no such scheme for R.O. water intervention and therefore no ready funds, it was the committed efforts of DDO that there was convergence of different existing schemes wherein untapped fund from all the different water and sanitation projects (Government / Private / Social welfare) were mobilized to ensure the innovative idea sees the light of day and make it a success.

Thus at the project conception stage, a multi-stage planning-process was designed wherein Hansot Taluka was selected as a priority. Buoyed by the positive response of the intervention in Hansot Taluka, the district administration successfully proceeded with the implementation of the second and third stages.

The 1st Phase of the programme devised by DDO, Bharuch, Dr Rajender Kumar, IAS wherein the villages of Hansot taluka were provided with RO Plants. The quality of water in the taluka varied from highly saline to moderate saline. The TDS varying from 896 ppm to 4675 ppm in the entire taluka with an average of 2280 ppm indicating that the available water is not fit for drinking purposes except in some villages. To begin with an Equi-TDS map is drawn to study the quality of water in details in the area Hansot area, results indicating that the provisional drinking water in the whole Hansot taluka is not fit for human consumption.

Photo V-1. From Veda / IAS Presentation

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 5

Page 7: Bharuch Water Project

The water samples analysed by the study team after the monsoon indicated high degree of mixing of saltwater with fresh water and the reduction of TDS considerably in the area. This event is very short and cannot be depended on long term basis for the provision of drinking water. However, this indicates that people would not use much of RO plant during the monsoon period. This time can be utilized for maintaining and repairs of the same.

A detailed study was conducted by ‘Rajeev Gandhi National Drinking Water Mission’ (Comment Unaudible), which found 100 villages/habitation having inadequate facility of water supply and 146 villages/habitation having acute water quality problem in 2003, which was systematically addressed over this time, however there were gaps even after these efforts. To address this situation, a systematic survey and source mapping was done in 2008 by the district team on adequacy of drinking water supply and quality of water. The major parameter studies were per-capita water availability from various sources in the village / habitat on qualitative aspects, TDS, Nitrate and

Thus assessing the problem and looking at the then current Drinking water scenario source mapping was done : wherein

A) Adequacy of the water supply to given villagesB) Overall quality of the water availableC) TDS, Nitrate & Fluoride levelsD) Infrastructure mapping to assess (Availability & infra gaps in the supply

were checked)

The best practical solution was sought for. The task included not just multiple fund diversions and management to a singular resource focus but also synergising of different water supply sources and changing the then position of drinking water to an edible and drinkable source.

This is when the Bharuch District Development Office made combination of efforts & resources possible by combining programs like Swajaldhara / GWSSB & other schemes available to the state in planning for project funds and workings.

The success of the 1st Phase in Hansot initiated the 2nd phase of workings in the District, wherein RO Plants and Nikora based water supplies where kicked off under the supervision of DDO Bharuch. The involvement and support of major

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 6

Page 8: Bharuch Water Project

industries in the area, such as GNFC & ONGC was also attained for relieving the cost factor which comes with such a infrastructural execution.

The benefits of RO Plant installation are clearly visible, since surveys done after the 1st phase in the villages where RO Plant installation showed that instances like stone in gall-bladder, stomach pain and skin-disease had reduced. As per observation of Community Health Care Centre, Hansot, the instances of waterborne diseases have reduced by 30-35%. Besides these R.O water is highly helpful in proper & fast cooking of food.

Besides these, a fixed convenient timing for water supply has led in better planning of day-schedule for womenfolk for engaging in livelihood or any village or recreational activity, since distribution of water at convenient timings these particular villagers. Also social causes and increased level of social commitment like Free supply of RO water to schools & anganwadi going children, the time cost particularly of the girl child for fetching water has reduced.

Photo C3.

Looking at the benefits it was clearly identified as an asset and recommended for being maintained and sustained for longer time. Thus Six sigma / SWOT analyses was done to boost not just the installation but also the maintenance factors of these RO Plants. Thus after further analyses it is proposed that the use of R.O. be increased to about 70% of households, the maintenance of the RO Plants is recovered. Subsequently, the use of R.O water can be further increased so that in the longer run cost of the RO plants is also recovered. The Benefit cost Ratio (BCR) works out to be about 1.04 and the Internal Rate of Return (IRR) is about 21 % indicating the installation of R.P plants is technically feasible as well as economically viable provided at least 73 % of the Households use the same.

Points worked upon on a Lean Six Sigma level of delivery to the end users wherein all factors natural and otherwise were measured and incorporated in the planning. Such as:

• Scientific drainage system for disposal of R.O. wastage water should be established.• It should be ensured that water filtration plant room and surrounding is hygienic.• There should be differential rate of water charges for economically backward (especially BPL category) sections of the society to encourage them under the ambit of RO water scheme.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 7

Page 9: Bharuch Water Project

• Based on Panchayat rules and regulation, bank account of Pani Samiti should be separated and it should be ensured that the finance is utilized only on maintenance and management of R.O. Plant.• At least one women member should be there in the Bank account as authorized signatories.• There should be a practice of rotation of members of Pani Samiti periodically, as per panchayat rules.• Registers and other essential inventory should be maintained and managed properly by the Pani Samiti.• Extensive Training to the operators for RO system maintenance, TDS setting and filter change etc. of R.O. Plant• The motivational training should be provided to all Pani Samiti Members to sensitize them about their role and responsibilities; and encourage and ensure their active participation in rural water supply system• The scientific rain water harvesting system should be promoted as alternative source of enhancing drinking water security in the villages• The electricity connection to the R.O. Plants be supplied at differential rates (lower rates) rather than commercial charges• The enlightened village youth should be trained and encouraged as Mechanic, in a cluster of 8-10 villages for providing regular technical support and facilitating community-based maintenance and management system• The damaged water tank should be reconstructed and villages lacking water tank facility should get these tanks constructed.• The water pipe line with valve system should be put, according to the geographical condition of village. Also the booster system sucking extra water through motor pump should be banned so that water can be supplied equally and forcefully.• During summer water, there is need to ensure that canal water reaches ponds in remote villages to ensure the perennial source of water for R.O. system.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 8

This section can be briefly described and points taken in extensive / detailed description of “Execution / Methodology” section

This section can be briefly described and points taken in extensive / detailed description of “Execution / Methodology” section

Page 10: Bharuch Water Project

SIX SIGMA

A Quality improvement system with a great deal of emphasis on accountability & bottom-line results – Many companies use Six Sigma management to improve efficiency and eliminate defects. It also helps in reducing costs

Six Sigma comes from the managerial approach designed to create processes that result in no more than 3.4 defects per million. One of the important characteristics of Six Sigma is a clear focus on achieving bottom-line results in a relatively short period. Initially, only a few companies adopted Six Sigma in their organizations. However, after seeing the success at these companies, other companies worldwide have instituted Six Sigma management programs.

Why you need to do Six Sigma?          Six Sigma can cut waste and save money. Consider how much money could be saved by eliminating potential defects and the resulting scrap and warranty returns. Time and money may be wasted in corrective actions and delays. Also consider the image those results from product failures for the customer. In order to determine the waste, you need to understand what adds value to your product and what does not.

         One way to know how good you are doing is to compare your operation to similar ones elsewhere, as a benchmark. If there are similar operations in your organization, then bench marking will be easier.

 

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 9

Page 11: Bharuch Water Project

Six Sigma Costs and SavingsOne can't expect to significantly reduce costs and increase sales using Six Sigma without investing in training, organizational infrastructure and culture evolution. Sure you can reduce costs and increase sales in a localized area of a business using the

Six Sigma quality methodology. For Example,

* Motorola adopted Six Sigma in1987. In 1988, Motorola won its first Baldridge Award.  

"Companies of all types and sizes are in the midst of a quality revolution. GE saved $12 billion over five years and added $1 to its earnings per share. Honeywell (AlliedSignal) recorded more than $800 million in savings."

"GE produces annual benefits of over $2.5 billion across the organization from Six Sigma."

"Motorola reduced manufacturing costs by $1.4 billion from 1987-1994."

"Six Sigma reportedly saved Motorola $15 billion over the last 11 years."

Criteria for selecting a Six Sigma project (by Suresh J)

(Extract from : http://forum.benchmarksixsigma.com/discussion/topic/show/141151)

1. Strategic Importance : A project that solves critical problems for the company will not only benefit the company but also ensure that company management will support the project and provide resources to ensure its success.

2. Root Cause Solution Unknown : It is important to pick a problem that does not already have a known root cause or solution. If the solution is known, just go ahead and implement it. Don't waste Six Sigma resources to identify the root cause and come up with the same solution.

3. Chronic Issue : Select a problem that is a chronic issue (happens often). If you pick a problem that only occurs once and will not repeat, there is no point in spending time to develop a solution if it never happens again. Also, it would be difficult to collect past data to analyze the causes because the problem occurred only once in the past.

4. Well Managed Scope : Select a project that can be completed in a reasonable period of time. The

project that you pick should be in your control. You should be able to make the recommended changes

in order to improve the process. If things are not in your control, then it would be difficult to deploy your

project recommendations and hence complete the project.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 10

Page 12: Bharuch Water Project

HISTORY & SUCCESSFUL EXECUTION

Impact of Drinking Water Schemes Implemented by Government of Gujarat

Fresh water availability per annum, per person average in India is 2000 cubic meters. While in Gujarat it is 1137 cubic meters. District Bharuch, having 8 talukas and 1.3 million population, although situated on the banks of river Narmada, is a typical alluvial coastal area with TDS level, varying from 896 ppm -to- 4675 ppm, making it unfit for drinking water purposes

<Awaiting Photo of TDS reading above 4000 if possible> Below an Analog TDS/pH - (Source autotoolsequipment.com)

Image of Pocket TDS/Ec Meter (Source from HiTech website) (Technicality of both to be checked with Mr. Dharmesh Mehta- Hi Tech)

Sample

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 11

Page 13: Bharuch Water Project

The Population Factor : The population of Hansot taluka of Bharuch district is in the order of 68782 as ofyear 2001, which would increase to about 102006 by the year 2021 with a growthrate of 2 %. The water requirement of the taluka would be in the order of 1.49 mcm/year @ of 40 LPCD. As the total area falls in the saline area, at least pure drinkingwater @ of 5 lpcd has to be provided for drinking purposes. This would be in theorder of 0.187 mcm/year.

This is the report of From a TDS (Total Dissolved Solids) level soaring from ____ to ____ , the District of Bharuch is

The funds were independently available

To put an RO plant up is one thing and to sustain it with maintainance is another

--

A detailed study was conducted in about 10 villages to know present scenario of drinking water situation in the villages of Hansot taluka of Bharuch district. About 200 people were contacted and the detailed discussions were held and the information was collected regarding the present position of drinking water supply vis-a-vis their requirement as well other social aspects of the villages. The data has been analysed with Statistical package SPSS and the results are broadly as under.

• The sources of water supply include, hand pumps, wells, tap tanks, canals etc. Wherein — The majority of the villages are not fitted with Hand pumps and even where they are installed, they are not properly working.— The majority of the villages have more than three wells for drinking water supply but only about 2 wells work on an average.

• 78 % of the villages get water supply every day. In the remaining villages, there is no fixed schedule of getting drinking water. In about 10 % of the cases, people get twice in a day.

• The water is supplied mainly in the morning while in some places; the water is supplied both in morning and evening.

• 52 % of the time, the water is supplied about less than one hour while 36 % of the time the water is supplied about 1 to 2 hours.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 12

Page 14: Bharuch Water Project

• About 70 % of respondents opined that they are getting adequate water for drinking purposes.A few suggestions for its successful implementation RO plants as well as general drinking water schemes in the villages are given below:

The recommendations based on the field experience for improving the effectiveness of implementation of RO plants as well as general drinking water schemes in the villages are summarized below.

• Sustainability of R.O. intervention: It is proposed that if the use of R.O. is increased to about 70% of households, the maintenance of the RO Plants is recovered. Subsequently, the use of R.O water can be further increased so that the cost of the RO plants is also recovered. The Benefit cost Ratio (BCR) works out to be about 1.04 and the Internal Rate of Return (IRR) is about 21 % indicating the installation of R.P plants is technically feasible as well as economically viable provided at least 73 % of the Households use the same.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 13

Page 15: Bharuch Water Project

The Drinking Water Scenario

• Fresh water availability per annum, per person, in India is 2000 cubic meters.

• While in Gujarat State it is 1137 cubic meters.

• District Bharuch, having 8 talukas and 1.3 million population, although situated on the banks of Narmada river, is a typical alluvial coastal area with TDS level, varying from 896 ppm -to- 4675 ppm, making it unfit for drinking water purposes.

• Shallow water tables in the area, has severe drinking water problem, particularly in coastal Hansot Taluka, consisting of 46 villages. All of which were found having TDS level average 2280 ppm, indicating that the available water is not fit for drinking.

• The survey conducted by ‘Rajeev Gandhi National Drinking Water Mission’ found 100 villages /habitation having inadequate facility of water supply & 146 villages/habitation having acute water quality problem.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 14

Page 16: Bharuch Water Project

A) HISTORY & Successful execution :: (Contents)

Bharuch Topography – + – water TDS level

Brief-History – Drinking water scenerio / Hydrogeological survey (Water Table / Water Schemes by Guj Government & related water sources)

Project Conceptualisation / Assessment (Source / Infra / Quality / Quantity )

Solution / Synchronization of Fund-Management & various water sources for Infrastructural requirements / Diagram of Fund utilisation Before & After interventio & co-ordination of DDO office / Cost effective solution

Hansot Taluka Report & impact Assessment (Including Excel & Chart data – not covering more then 7 pages)

Letter of Thanks & Gratitude (from Hansot Taluka – implimented project)

Silent efforts of DDOffice since 2008 is fruitful – & success makes way for the phase 2

Photos & Content :: Major usage from VEDA booklet photos

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 15

Page 17: Bharuch Water Project

SELECTED PHOTOS

The photos selected herein will be placed in order of activities and reports

Custom Made

A1

A2

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 16

Page 18: Bharuch Water Project

A3. Bholav Village resourvers

A4. Bholav Village resourvers

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 17

Page 19: Bharuch Water Project

A5. Bholav Village resourvers provisions

A6. Bholav Village resourvers

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 18

Page 20: Bharuch Water Project

A7. Mothiya Village plant setup

A8. Well at RAYMA Village : Other Water Resources being brought in the RO scheme

A9. Ponds at Shera : Other sources brought into RO provisionPRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 19

Page 21: Bharuch Water Project

A10. Village Water & Hygiene Orientation drive attendance at Chandravan village : initiated by Wasmo & the Village water committee under Swajaldhara Program (a Self-reliance of water program)

A11.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 20

Page 22: Bharuch Water Project

A12

A13

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 21

Page 23: Bharuch Water Project

A14. R-1200 series from HiTech site (Will get clear photo from HiTech)

A15. RO10000 – 50000 (Capacity 10000 Ltrs per hour)

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 22

Page 24: Bharuch Water Project

New - Charts to be represented in order

C1

C2. To be placed with charts of other water source types

C3.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 23

Page 25: Bharuch Water Project

C4. C5.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 24

Page 26: Bharuch Water Project

Photo extract from www.GWSSB.org

To be applied in relevant water source & finished project literature

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 25

Page 27: Bharuch Water Project

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 26

Page 28: Bharuch Water Project

From Veda / IAS Presentation

V1. To be placed near Hansot related literature

V2.

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 27

Page 29: Bharuch Water Project

V3. Assessment Charts - placed in the Analyses related literature

V4

V5

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 28

Page 30: Bharuch Water Project

V6

V7

V8. To be used for TDS level assessment

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 29

Page 31: Bharuch Water Project

V9

All inauguration Photos to be used for completion literature

.V10

.V11

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 30

Page 32: Bharuch Water Project

.V12

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 31

Page 33: Bharuch Water Project

List of AbbreviationsOption 1 : End pages of the Book / Option 2 : Below each page containing the Abbreviation or

1.) TDS: Total Dissolved Solids are the total amount of mobile charged ions, including minerals, salts or metals dissolved in a given volume of water, expressed in units of mg per unit volume of water (mg/L), also referred to as parts per million (ppm). TDS is directly related to the purity of water and the quality of water purification systems and affects everything that consumes, lives in, or uses water, whether organic or inorganic, whether for better or for worse.

2.) PPM: Parts Per Million is the weight-to-weight ratio of any ion to water.

3.) RO: Reverse Osmosis works by forcing water under great pressure against a semi-permeable membrane that allows water molecules to pass through while excluding most contaminants. RO is the most thorough method of large-scale water purification available.

3.) DDO: District Development Office works for the development of the District & its Talukas with a perspective of ______

4.) GNFC : option of giving website details as well for such corporates

5.) ONGC

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 32

Page 34: Bharuch Water Project

Left – to – Right: Names of dignitaries to be put in

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 33

Page 35: Bharuch Water Project

ROUGH - DRAFT - INSERTIONSThe Road Ahead - & - Behind Us (At the end of this book)

Behind us ◦ What we have seen so far is the amount of work done with clear analyses

and joint initiative from various departments coming together for a common good, and succeeding in-spite of the red tapes & beaurocracy

◦ If education is the right of every child citizen between age 6 to 14, then Pure Drinking Water is the right of every Citizen regardless of religion, caste or creed, sex or age, the right to good health and a healthy future

Ahead ◦ The future is what we should aim to foresee and beyond, what we

have achieved should only motivate us to accomplish even more◦ What we want to achieve is perfect Health (the Wealth of the

Country is only determined by the health of its individuals)

Compiled by

PRESENTATION ON DRINKING WATER MANAGEMENT IN BHARUCH DISTRICT P a g e | 34