Article how-clear-communications-benefit-dredging-projects-143-3
Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects...
Transcript of Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects...
![Page 1: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/1.jpg)
11th and 12th February 2020, Antananarivo, Madagascar
Beyond C-RISe future projectsAmani Becker
National Oceanography Centre
![Page 2: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/2.jpg)
Introduction
• Projects already underway• Projects with funding• Current proposals• Future plans
![Page 3: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/3.jpg)
CRISCCoastal Resilience to flooding Impact through relocatable Storm surge forecasting Capability for developing nations (C-RISC)
https://surgedemo.z16.web.core.windows.net/
![Page 4: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/4.jpg)
EO4SD
![Page 5: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/5.jpg)
Innovate UK - Mozambique(Nzualo et al., 2018)Deploying novel remote sensing
solutions to increase the efficiency of dredging operations and coastal management at the port of Beira, Mozambique
![Page 6: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/6.jpg)
X-Band Radar
• Monitoring storms and recovery
• Assessing resilience of the offshore bank
• Raw radar data show waves coming from the south east and the east during storm events in January 2018
• Data are processed to derive bathymetry and surface currents
![Page 7: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/7.jpg)
Near-shore monitoring
Raw Data Wave inversion derived Bathymetry
Surface Currents
![Page 8: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/8.jpg)
Sediment movement• Continuous observation during storm events.
• A survey is generated leading up to a storm and another following the storm.
• Image shows the residuals between surveys generated before and after storm Doris 23rd
February 2017.
• ~30 cm elevation changes in various regions of the beach and around the Alt river training bank to the north of the radar location.
![Page 9: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/9.jpg)
Relocatable tide gauge
Proposed design Asymmetry of tidal duration (a) and velocity (b), Nzualo et al., 2018
![Page 10: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/10.jpg)
C-RISe AlertEuropean Space Agency (ESA) Environmental Crimes Call
Requirement to Stimulate Development of Applications to directly prevent environmental crimes
• Illegal fishing, marine pollution and smuggling of illegal products
• Support agencies working to protect the marine environment
![Page 11: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/11.jpg)
C-RISe AlertOur Proposal:
Near Real Time Information service on marine conditions –web delivery and potential for text service1. Understand user requirements 2. Create demonstration service 3. Final Specification and Business Case.
If successful – starts April/May 2020 runs for 6 months
![Page 12: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/12.jpg)
C-RISe AlertOur Proposal:
• Near Real Time Information service on marine conditions – web delivery and potential for text service
• User Requirements – Demonstration Service – Final Specification and Business Case.
• If successful – starts April /May runs for 6 monthsInterested?
Let us know!
![Page 13: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/13.jpg)
Training/Capacity Building• Broadening the C-RISe user base and extending capability of existing partners• Development of training materials and open source code to support
programming for data analysis (particularly where using) different types of datasets from multiple sources• Better enable partner organisations to deliver outputs to decision makers
(strengthen in-country capacity)
![Page 14: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/14.jpg)
Training/Capacity BuildingThree visits:1. Two-day training design workshop – involving our partners, presenting and
refining our ideas.2. A seven-day course, split in to two parts -• the first two days involves decision-makers from government ministries and
technical staff • followed by five days for technical training• During this visit we could also collect local content for an online course.
3. At week long train-the-trainer workshop (following the design of the online course)
![Page 15: Beyond C-RISe future projects€¦ · National Oceanography Centre. Introduction •Projects already underway •Projects with funding •Current proposals ... dredging operations](https://reader033.fdocuments.in/reader033/viewer/2022050104/5f42e075625a2212213d4396/html5/thumbnails/15.jpg)
What else?