MIL:l;LA_NI FILL SITE NO. 2 PRELIMINARY SOI~ R~PORT
· WAIPIO, EWA, OAHU, HAHAII TAX MAP KEY: 9-5-0~: POR. 1
FOR REFERENCE · not to be taken from ihis room
To: SAM 0. HIROTA, INC.
WALTER LUM AS~~CIATES, INC~ ¢1VIL, STRUCTURAL, SOILS ENGINEERS I
NOVEMBER 7, 1973
. ;! . . MUNICIPAL ~. EFER.ENC. ~ECORDS CEN.TER
Crty & County oholulu City HaH Annex, 5 .. ·. King Street · ,
. Honolulu. ~ii 90013 . .
WALTER LUM ASSOCIATES, INC. CIVIL, STRUCTURAL, SOILS ENGINEERS
SAM 0. HIROTA, INC. Suite 707, Amfac Building 700 Bishop Street Honolulu, Hawaii 96813
Gentlemen:
• WALTER LUM
I · EDWARD WATANABi
· EZRA KOIKE . . WALLACE WAKAHIRO 3030 WAIALAE AVE., HONOLULU, HAWAII 96_816 •. TEL. 737·7931
November 7, 1973
Subject: :Mililani. Fill Site No. 2 J>reli'minau.Soil R~port (for site ·grading purposes) Waipio, Ew~, Oabu, H~waii
Tra11smitted.herewith is our preliminary soil report for site grading purposes for the proposed M_i:J,.:i,.lani Fill Site No. 2 in Waipio, Ewa, Oahu, Hawaii.
The proposed plan is to fill a gully or drainageway up to gpout 25 ft.
The soil§ at the s·ite may generally be described as· stiff clayey silt (MH soils) to about 40 ft, the depths drilled.
Before filling the drainageway, trenches should be cut in a herringbone pattern and subdrains placed in the trenches to prov:i,.de drainage paths.
The fill slope at the low end of the proposed fill site should be constructed at average overall slope ratios of about 3 horizontal to 1 vertical or flatte-r or. constructed with granular materiaL
The earthwork should be done in accordance with therequireme:r1ts of the · Revised Ordinances of Honolulu, 1969 As Amended and the .recommendations contained herein.
This report includes a Boring Location Sketch, boring logs, laboratory test results; recommenda,tions for !'dte grading and limitations.·
Respectfully submitted,
WALTER LUM ASSOCIATES, INC.
CM/EK:rm£
SCOPE OF EXPLORATION
FIELD EXPLORATION ... . . LABORATORY TESTS •
GEOLOGIC AND SOIL DESCRIPTIONS BY OTHERS
SOIL CLASSIFICATION SYSTEM •
GENERAL SITE CONDITIONS
INTERPRETATION OF SOIL CONDITIONS
DISCUSSION AND RECOMMENDATIONS • •
PROPOSED SPECIFICATION FOR EARTHWORK
APPENDICES:
• •
. . . •· .
A. LOGS OF BORINGS - Boring Nos. 1 thru 3
B. SUMMARY OF LABORATORY TEST RESULTS - Table IA
C. PLASTICITY CHART
D. PROJECT LOCATION SKETCH
E. BORING LOCAT:):ON SKETCH
F. PROPOSED BOULDER FILL ~ Figure 1
G. LIMITATIONS
. . • •
Page
1
1
1
2
2
2
3
4
._ MILILANI FILL SITE NO. 2 PRELIMINARY SOIL REPORT
WAIPIO, EWA, OAHU, l:IAWAII .TAX MAP KEY: 9~5-02: POR. 1
SCOPE OF EXPLORATION
The purpose of this exploration was to evaluate general soil conditions
for site grading purposes for the proposed Miiila1;1i Fi_l._l Site No. 2 in
Waipio, Ewa, Oahu, Hawaii. ·
This report incluges field .e:Kplorations, laboratory tests, general·
recommendations for site grading considerations and limitations.
FIELD_EXPLORATION
Tlu:ee borings were made at the site. The approximate locations of these
borings are shown on the Boring Location Sketch. DescriptiOil.S of the
soils encountered are shown on the boring logs.
Borings were made with 4-in. diameter augers using finger-type bits.
Soil samples were recovered with a 2-in. standard split spoon sampler
drivenwith a 140-lb hammer falling 30 inches.
LbBORArPRX TESTS
LaborCl.tory tests included: natural ~vater content and density, Atterberg
liJ:nit and unconfined compression.· A summary of the laboratory test results
is given in Table IA.
GEOLOGiC Al\T]) SOIL DESCRIPTIONS ~y OTHERS
Stearns, H. T. and U. S. Geologic Survey, "Geologic and Topographic Map
of the Island of Oahu," 1938:
Jointed dense to very vescular, hollocrystalline and micro
crystalline, aphanitic and porphyritic permeable effusive
basalts (TKb).
U. S. Soil Conservation Service, "Soil Survey of the Islands of Kauai,
Oahu, Maui, Molokai, and Lanai, State of Hawaii," AtJ.gu~t 1972:
Helemano silty clay, 30 to 90 percent slopes (HLMG)
Unified Soil Classification - MH
SOIL CLASSl!!'ICATION SYSTEM
Soil samples were visually observed and subjected to appropriate tests
in the laboratory. Based on visual observations and laboratory tests,
the soil desc~iptions given on the boring logs are generally made in
accordance with the "Unified Soil.Classificat:ion System."
GENEMJ., SITE CO:t\IDI'J:'IONS
Location
The proposed fill area is located behind Waipio Acres
Subdivision about 5,000 ft northeast of the ip.tersection
of Kamehameha Highway and Kuahelani Avenue in Waipio,
Ewa, Oahu, Hawaii.
- 2 -
Annual Rainfall
The averB:ge annual rginfall varies from about 40 to 50
inches.
Topr;>graphy
The proposed fill site is a natural drainag~way that.slopes
downward in a southwestern direction at about a 5% gradient .•
The depth of the gully varies fro!ll about 5 to 25 ft. The .
side slop~s vary from about 20 to 50% and steeper in localized
areas.
The site is covered with trees and.brush.
The ~levation varies from about 700 to 730 ft •.
INTERPRETATION_O~ _SOIL COijpiTIONS
From the field explo~.!:J.tion and laboratory test results, the soils
enc~mntered in the borings may be generally described as follows: ·
Stiff clayey silts (MH soils) to· 21 to 41 ft, the
depths drilled.
Water was not noticed in the borings at the time of the field explorations.
Variations to the above soil conditions are to be expected iri localized
areas. For more detailed descriptions of soils encountered in the drill
holes, refer to theboring logs.
- 3 -
- DISCUSSION A.Nb RECO:MMENDATIONS
In general, the present plan is to clear and fill the natural drainage'tvay.
The portion. of the drainageway to be filled is approximately 710 ft long
and 160 to 225 ft wide. Fills of about 5 to 25 ft are planned. The
higher fills would generally occur at the lower (southwest) end of the
site.
It is our understanding that the fill would be constructed and the site
left idle. This would al],ow the fills and surrounditJ.g ground to adjust
to the ne:w fill loads.
If development of the site is contemplated in the future, soil explorations
may be made at that time for the intended use.
Before fills are placed in the drainageway, trenches should be cut ip. a
herringl;>ane pattern along the bottom and sides and subdrains placed in the
trenches to provide drainage paths.
For the fill slope at the lower end of the drainageway, average overall
slope ratios of apoU:t 3 horizontal to 1 vertical or flatter are recommended.
·sit~ Grading
Grading work should be done in accordance with the requirements
of the Revised Ordirian¢es of Honolulu, 1969 As Amended; and as
recommended b~~ow:
1. The area should be cleared and grubbed.
Surface vegetation and mis~ellaneous
- 4 -
debris should be cleared and removed
prior to site filling.
2. Loose surface soils should be stripped to
stiff natural ground before the placement
of fills.
3. Subdrains should be placed along the bottom
of the n.~tural drainageway with laterals in
a herringbone pattern. along the sides.
4. Localized soft pockets encountered dur4J.g the
site preparation should .be excavated and
replaced with compacted seleat material.
5. Fills should be constructed in approximately
level layers starting at the lower end and
working upward. Where fills are made on
sloping areas steeper them about 5 horizontal
to 1 vertical, the ground at the toe of the
fill should be benched to a generally l-evel
condition. As the fill is brought up, it
should continually be keyed into stiff natural
ground by cutting steps into these slopes
and compacting the fill into these steps.
,... 5 -
6. In general, fills should be laid in 6-in.
compacted layers to 90% of the maximum
density determined by the AASHO T-180-57
test method.
7. Provisions should l;>e induded to drain the
site during and after fill operations.
8. If bould.ers are proposed to be used in the
construction of fills, they should be generally
placed along the toe sections of fill slopes.
Before placing any boulders, the subgrade
s~ould be stripped to stiff natural grou~d and
shaped to drain. A layer of select material
or low grade concrete should be placed on the
subgrade and the boulders placed on the s~lect
material or low grade concrete. 'l;he void spaces
between boulders should be filled with smaller
granular materiaL A blanket of filter material
s~ould be placed against the boulders l;>efore
any earth fills a:re placed against the boulders.
See attached sketch, Figure 1.
- 6 -
Slopes
The. fill slope at the lower en,d of the drainageway should
be constructed at average overall slope ratios of 3
horizontal to l ·vertical or flatter or constructed wi.th
granular material.
For localized low slopes constructed with silty or sandy soils,
cut and fill slopes of 2 horizontal to 1 vertical or flatter
may be considered.
Where clay "CH" soils are encountered, flatter slopes should be
considered, otherwise removal of clay pockets and replacement
with select soils be considered.
To minimize erosion, the runoff from rainstorms $hould be
diverted away from slopes by berms o:r ditches wherever
practicable.
The surface of fill slopes should.be compacted by cat-tracking
or with a sheepsfoot roller.
Slope.planting is recommended on fill slopes to minimize
erosion.
Slope adjustments or other precautions may be necessary if
seepage zones, expansive clay pockets or soft spots are
encountered in localized areas.
Utilities
Utilities should be placed after the fills are COJ'l.Structed.
Utility lines should be designed with fle~ible joints,
pa:tticu1arly where lines are connected to structures.
UnJ:o:teseen Conditions.
Because of the variability of soil deposits, site
improvements, designs aiJ,d c;onstruction techniques,
conditions may be encountered that cannot be foreseen
with even the most exhaustive studies of site and project
conditions. These unforeseen conditions should be recog
nized when encountered and then evaluated so that the
designs or the construction methods may be modified
accordingly, if necessary.
UIJ.foreseen or undetected conditions such as soft spots,
existing utility trenches, structure foundations, voids
or cavities, boulders, expansive soil pockets or seepage
water, etc., may occur in localized areas and will have
to be adjusted and corrected in the field as they are
detected.
- 8 -
PROPOSED SPECIFICATION :FQR EARl'HWORK
M;ILILANI FILL SITE NO. 2
G~n.~t:"!'ll Description
This item shall consist of clearing a.nd grubbing, preparing of land
to be filled, excavating and filling of the land, spreading, compacting e1nd
testing of the fiil, and subsid:iary work for grading the site.
Clearing, Grll.b.Qing ~nq Prepar:J,p.g A:1;:-~as to be Filled
Vegetation, rubbish and miscellaneous material shall be removed and
disposed of, leaving the disturbed area with a neat, _debris-free appearance.
T0psoil and stockpiled soils shall be stripped to stiff natural ground
before the placement of fills. Loose surface soils encountered Cl.t finish
grade shall be·scarified and recompacted.
The bottom and sides of natural drai.i:ia~eways shall be stripped down
to stiff natural ground before the placement of fills.
Subdrains shall be placed along the bottom and sides of natural
drainageways before the placement of fills.
Materials
· Fill material shall consist of selected on-site soils or approved
borrow soils. The soils shall contain no more than a trace of organic
and deleterious matte.r.
Borrow soils shall be select so:Lls generally less than 6-in. wa~i:o:ilirn
size, with more than 30% fines and a plasticity index generally less than
20.
:PS-1
Fill material placed in the top 2 ft of fills sh<ill contCI.in ::J..ess
than 30% gravel.
Pl.:id .. ng, Spreading and Gompactiru;; f_i],.l Mat~'t;i..:il
The selected fill material shall be placed in level layers which,
when compacted., shall not eX,ceed 6 inches. Each layer shall be spread
evenly and blade-mixed during the spreading to attain uniformity of
materiCI.l a_11d water content within each layer.
Rocks or cobbles shall not be allowed to nest and voids between
rocks shall be filled and compacted with small stones or earth.
When the water content of the fill material is well below the
optimum for compacting purposes, water shall be added until the water
content is near the optimum.
When the water content of the material is well above the optim'-!m
for compacting purpos~s, the fill material shall be aerated by blading
ot by other satisfactory methods until the water content is near the
optimum.
After each layer has been placed, mixed and spread even::J..y, it shall be
. compactecl to 90% of maximum density in accordance with AASHO Test No._ T-180-51
or other comparable density tests. Compaction shall be with sheepsfoot
rollers, multiple-whe~l pneumatic-tired rollers or other acceptable rollers
whi.ch shall be able to compact the fill to the specified density. Rolling
shal.l be accomplished while the fill material is at the specified W(lter
con.tent. The rolling of each layer shall be continuous over the area and
tb.e roller shall make sufficient passes to obtain the desired density.
PS-'2
Field density tests shall be made to get an ind.ication of the
compaction of the fill. Whe:te sheepsfoot rollers are used, the soil
may be disturbed to a depth of several inches. Density readings shall
be taken as often as necessary in the compacted material below the
disturbed surface. When these readings indicate that the density of
a layer of fill or portion thereof is below the required density, that
layer or portion shall be reworked until the required density has been
obtained.
The fill operation shall be conti.I).ued in 6-in. compacted layers,
as specified above, until the fill has been brought to the .finished
slopes and grades as shown on the accepted plans.
Bo.ulder Fills
If boulders are used for the construction of fills, th.ey shall be
generally placed along the toe section of slopes. The subgrade shall
be stripped to stiff IJ.atural ground, shaped to drain and a layer of
select material or low grade concrete shall be placed on it. Voids
shall be filled with smaller granular soils. A blanket of filter
material shall be placed against the boulder fill .before construction
of fills against it.
Excavation
Suitable material from e~ca:vation shall be used in the fill and
unsui.table material from excavation shall be disposed of.
PS-3
Unforeseen Co11ditions
If unforeseen or undetected co11ditions such as soft spots, existing
utility trenches, structure foundations, voids or cavities, boulders,
expansive soiJ_ pockets or seepage water, etc., are encountered, corrective
measures shall be made in the field as they are detected.
Rainy Weather
Fill material shall not be placed, spread or rolled Q.uring
unfavorable weather conditions.· When the work is interrupted by heavy
rain, fill operations shall not be resumed until field tests indicate
that the water content and density are as previously specified.
PS-4
BORING LOGS
The stratification lines ~hoWI1 on each of the boring logs represent . the approximate boundary between soil types and the tran~ition may be gradual.
SYtnbols
Symbol.~ used generally are in accordance with the Unified Soil. Classification System.
Where a parenthesis "(MH)" is used, the soil sample was classified by visual observation of the sample recoveted.
Where no parenthesis "MH" is used, the soil sample was classified ·from either the Atterberg limit or sieve analysis test results•
\ ...
·WALTER LUM ASSOCIATES, INC. 303.0 WAIAL_AE AVENUE • HONOLULU. HAWAII 96816 • PHONE 737-7931
Boring Log PROJ ECT.,.-. _ _.:.::t1:..:I:.::L:.::t=LA1=N~I=--=F~I=L:.::L;_::::.S.:::..IT.:.;E=--.:I.:...:10.:...:.__;_2 ___ _
LOCATJON ___ w.;;;.· a;..._iP:.:.·-_i_o..:.,_E_w __ a~,"--,...o_a_h_u--.;.,' ..... H_a....,.w ___ .... a.,...i,...i ___ -~-..,_ Tax Hap Key: 9-5-01: Por. 1
HAMMER:
BO_RING NO. ~ l --- -:~--- Sheet N_o_. of ----
Driii•;W. L.LlM A??OC.- 1 1 NC., _ Datil OC.T. 'ZG f 'Z.Gi, I 'lT?
Field Party-_ ASATO, ci-low ., dMo R I -ALIGf;F-..("~r..?A \ 4" Type of Boring · 171'-.1\..\... I Diem._-_ __..:.. ____ _
1oo'±.-*. Elev. _;___:...;..:::_.:::.,,..,...---- Datum ---"'"-'----.,... Drill Bit .. l• G_, DRA'i!
~eight,·_ -~1_4_o~~-------------------- ---~~~-~--~---~----~~----~0 '' Wete:r _Lev•'-..:: NN:.::,~'-I.ri~''G:..::E:;~r::>+--~-1----1"----+---Drop !2" <;- '2'1 o.D. IHIK! WA.L-'- Tu!H::· - Tim•---~~---+---+---r----
SAMPLER: ''Z"5S· Z'' <5TANI7ARI7 Sf!.-lT ~rool'l-- ---- D•tel.:.:O:....·;.::,·-z..:;.;-~1..::.?-'---;......L--......;.-'-----l----
PENETRATION DATA
~ Standard 2'' Q, t?. Ti-l r/J .
DESCRIPTION
=: Pen·etr~tion Test ·· WAL..t... 1\.L.f'f: ~ ~ . SAMrL-e~ .. . Iii o.. N (Blows per foot) , > o 10 20 30 40 r?I..OW?/o.~
STIFF, E:>R.OWN.·. -MH CL.A7E::"t. :Sll-i-
,..,-.
- ?TIFf- -- ..... MO'f'ft;...ep--c,RA.y-:-P.,fi:.OWN . CL./>."'/f;,/ ~I k:T
s-r1 !"r _ Ri;:t7 F->~oWN - G! tV:-1-
. ct..Atet -;,~.-::c.
?nr-r-.. ---------l"vio-rr'-e\7- c,~'1 r.,r,owt-1 G!..A1f:.'/ .'711.-:T..
E:Ht:7.oP pORING.' IO · -z.r.. • 1:,
.... ??cLEVA.TtcH-l.C'.STtMA.TE:D :· F':KoN·. Topo MP.,P, __ ~
1- t?
1- e 4-'2.
\-f'
l·H \OS
1·1
I·S
... 87
.PL. -:..So
(000
"'1 'Z.I'l.O IOISO
\~ L..tV.t L-11 .. -'1 l
1--+--1--+--f---J .s& .
!i; . G; . 'J, • /0, e; /I), 5 _ lo.~
WALTER LUM ASSOCIATES, INC. ~~ 303.0 WAIALAE AVENUE • HONOLU.LU, HAWAII 96816 • PHONE 737-7931
Boring Log BORING NO. .. 7. - - Sheet No. of
PROJECT ___ M_;_I_L_I_LA_N_I ........... F ..... I_L_L_S_I_T_E_N_O_. _2 _____ Driller ·w. LIJM ~770C., 1 INc.;·· D~te Oc.T. 'ZS ·1 '1 1?
L CATION Waipio, Ewa, Oahu, Hawaii Field Party- A?ATO, · c,rlow .. - ---O _ __:.:..==L=.=-z....-=..:.:.=..z..___:::..:=:..>...,.==~--- . AuG. ~tt-;(!eRi1A -\- ....... '- --·- -.4 .. .
Tax Map Key_:. 9-5-01: Por. 1 Type <>I Boring . "' -""1\.t.o ., - Diam.··· . .. ... ... . .... _ ___:___: _ ___:~.:....:.:=-~::;.!-~_.:::.._;..._.:::..:::..:.._~::...:--=--- . 1. a... , -t "'* .. . . -. -
Elev. ·· -· O<CJ - · · .c.·. ···Datum
HAMMER: 'lA-o :fl-_· Drill Bit -~T:t-.t?RAGi- -· :.:.· ___ : :~-------------~ .... -.. ----~-..:.--~--::.:-... _-__ -__ ~ ...... .
Weight--.-...,_~-0-:,-:-,_-_._-------------'--...-..,...,- Water LeveL ':to1;c-;t' : ... ·: __ - · Orop----~--~~----------------~------- ·-- --·--·-·-···· Tim·s: ......... .
SAMPLER: .,......,.. __ :?._'_' _s_T_A_N_t7_A_r<._L7_-._s_r_.t;_·c ...... r ·_:~s_·:.:....ro_o_ .. _N_ ... _ ... _:.~_.-· _-_:._ ---:~-:s~,~~~~-~-...,--~----~---T---Dot• : \0· ~ • -~
~ DESCRIPTION -= . ll.
e .:. e,'+ * -~ L..E;...,,- 10 .... ~- 9- --
----
..... S:Tt PF-1 MoTIL-e-P: ~MWIJ - S - - .c.!.:'A"fe·r?lt..:L · .. _ . _ - · :--
-----
\ :$TIF-f1-.TAIJ f>F'OWN. . . ~ (Mt-\) · ·:c.t.;..b-11::1 ~11.-:T W/lf.:AC.E:S or- · · ... ·
t7E:COMt'o-?f;C'· ROC.K ......_
.......
-,......
IS --
.• ?TIFF-, .IAt--1 I?>"OWN ~ ... -!.'i.:A"ft;·;I:'!>IL--L: : -
--
.~
-_.,..
-.$\Iff';. -- - - ··"_s . MoHt.-e-P 1'\ES'O-f?~Y~N- C!qRA-{ -Ct-A/E;,'i $1 1..-j . . . _
eN.P Of. !?ORIN~- e ~~- ~ !0·?.;;-1?
*-eLc.vt-:poN E;S'f!MATcP . . PRO~ ."(Of'O MAP
-:....
-30 -
-·-
~
"' Q. E .. "'
: ~
0 ..: ... " z 0
~ . " 0
" .,.,; u
Q. ~~ OJ~
" ou E 7;~ >oL .. ?; ?; 0 "'
- ?Go -
..... '?7 -- LL- :. 6'2.
!'L- -:.-4-<f,
- ~-4- -
'Z q -
4S -
··:: NOji'; ...
.. L-t..~L-!Qt.!tt7
. :. rl.-'0- fL--AS(IU
0. E
~ 0 .. u " ...:u.: .r: • g~
yl": G.J~-
~-4. <:C.. .. :::> >
A-~10 -
- -
-. ·~ . - --
l-IMIT ..
t:-IMIT ..
PENETRATION DATA
I Standard Penetration Test
l'j (Blows per foot) 0 10 20 30 40 ---
41
J
J4+. 11---t---t--+--+---'
WALTER LUM ASSOCIATES, INC. 3030 WAI.ALAE AVENUE • HONOLUtU, HAWAII 96816 • PHONE 737-7_931
Boring Log BORING NO. - ~ Sheet No. of
PROJECT ___ M_I_L_I_LA~N_I_F_I_L_L__.;;...S...;IT-'E_,_N-,.'-0,.....;-. _2 ......... ____ Driller \N. LU!V\ A ~?q<;,;.; 1 N G. 0~~~ _oc. T. 'Z 4, 1 9 1 ~ Waipio, Ewa, Oahu, Hawaii Field Party- A.~ATO-, C.HOW: .. ~--=~-:~--~~:-::·:=:-~::- :·· ---
LOCATION_..... ____ .!.-_:_-......:. __ _:_______ --AuG tv'tfl...'>A )· 4" Tax Map Key: 9-5-01_: _ PQJ;'. 1 Type of Boring '~f:f{..\. ~1\11-1.- Diam: __ _:_ ____ _
--~------~--=--....;__...;__...;_~......._~;...;_...:::._ ___ Elev. --~-.-~1\q-' ± ~-. ~+ ... --~--·Datum...__..__-____ _
HAMMER: 14-0 =It Drat Sit -_T. C.. P~A ~ - ----- --· ____ : ____ __:~~_:~ ::·:- --
Time·_ - --- ~· - . -
VVeight ___ ~~~~----------------w-at-er-L-~-.-~:~ti~~~~,,-~~---~-----~_-_-_-_-_-_-r---~--~~~~
Orop~--~-~-0~·~·-~-~-----------------------------
I0·?4·H ...
!)ate --SAMPLER: _.......,.,_:...:.'t!,.,..'~ .... -- _s_-T_A._N_t?A;......;..~~D __ S....;f" ___ L ___ l T_-_--·_s...;F<_o_o_N~-_-. _
MH
s DESCRIPTION .r. - . a
ELE.Y.::. II '1 '±. ~ *o ~
----?TI rf', RE;t7Dl SH BRoWN ·_ _ c-t..A., e.:t -~'7.11.-T _____ . . ..... _
;
·...-,.
_-·---
-:
-:--
-STIF-f, MoT:fi, .. C;\? __ ~1\0WN .. ~ ·
- ·· C.l.A1C;1 ·-?tk'T IV/TRAC(;;? 6F -. l71;-CiOM!'07&'P _!',oc-1..:. . -
---
IS> --'?TIF-f", Moll!. .. et7 4~/>.1/?r\OWN . --c.t..-A1f;;,"J <;.1 t...'L .... ... . .. :-
.. ·-~~
·--~l-lt7 or- l?or{IN'1 ·_·e,·· -z.r.; -\0· '1.."1'"1'> -·
~E:;.L.C.VATI oN. esp MAff;v fRoM ToPo MAP .... ... ; •
PENETRATION DATA ci
0 E Standard .; c: 0 :; z c: 0 M u .. Penetration Test
" .. ...: u §~ ...:u: ..c: • .,.., 0. ~~ ~ cu s~ .. "! ., E ~ ... -;~ ;..c: ... ... C:l>. N (Blows per foot) .. ;!:: Q c: .. "' ::1 > 0 10 20 30
'?>-A ~"l - -· - ··- I
?-~ - ')'2. - - - - n .........__
:.-c. '?5 .. - - - - J
'?:D -
'?I G. . . . ~: . - : - ::: -1---1--+---+--rj L.!.. -:. 35 -- .. . 1------+--~~-+...!
.. FL -=-:.4.? ...
44
1-lof£::; H
[...l;'-_ l..\ QL It:>~--- L...l M T : -· fl,...-:. Pt...A'*lv l,...tNr T -
I 40
I
M I Ll LA N I ~I LA.. 'S 11 \5. N. 0 '2
TABLE I_!_ - SUMMARY OF LABOR.ATORY TEST RESULTS
. BORING NO. SAMPLE NO. DEPTH BELOW SURFACE
DESCRIPTION
GRAIN-SIZE ANALYSIS (% Passing)
Sieve 1" 1/2" 114 /110 1120 /140 11100 11200
ATTERBERG L!~HTS Air Dried or Naturai Liquid Limit Plastic Limit Plasticity Index
. Dilatancy Toughness Dry Strength
'UNIFIED SOIL CLASSIFICATION
APPAR_Eij'l' SPECIF:IC GRAVITY
EXPANSION AND CBR TESTS· (Surcharge-51 P. S. F.) Molding Moisture, % Molding Dry Density, P.C.F. Swell upon saturation, % CBR at 0.1" Penetration
MOISTURE-DENSITY RELATIONS OF SOILS (AASHO T-180--57 Method_) Dry to Wet or \Vet to Dry Max. Dry Density (P.C.F.) Optimum Moisture (%)
e. REMARKS:
Date I 1-<.o ·1 By C..M
0- Co.t?
0F'-.OWI-J CLAY 'BY S I t..T
Nl=,1l! r-zAk 8~ 4-s ?8
Mf::QllJ ~ t::1~!21U~ Mt;QI.U.M
Ml::!
I E
t'?~t<P.~'.
MoiTL.ED G.~t>-.'f · 'O!':.OWN QAy 'e.'/ ?!t..i
NAJU B~t.. f2l --
1?0 07
!2li!C.K f;:21,.16l:{T-M~t2
MeQll!M
Ml:j
rz.. '0 ·eJ e.
'2.. ?'- 4.0 I t? - I ~. !r2' MDTILE.t? MO'TTL.SD ~MIJJN G, ~ 'f !? R.O \\1~ C.LAYt;;Y <;>ILT <:...LA" ey .::, 1 L:f
~A-\U~.O..t.. Nai!.HS~t... Bt? ~~ ±ro ~'? "00 4"2.
M'E.QI L~M 2kQ~ M t;;Ql ~~ lVI M~0\11!::::1 M 6!2 ILl tv\ 0LI<a\.\J-MEI2
Mtl Ml--\
WALTER LUM ASSOCIATES, INC. j CIVIL, STRUCTURA_L, SOILS ENGINE_ER.S i
X w 0 z .......
)-1-0 1-C/) <[ ...J a..
e
s~_s72
PLASTICITY CHART ·PROJECT: MILILA~I fiL-L '?\TE. .No. '2
LOCATION: WAI PJO I Ew_A. I OA ~ U, \-\~WAll
90 -. -
80 -- ---
70 -- --
60 ----- -·
CH 50 . --
u,:.• LINE "y v
./ v
v ~ 40
~ / /
CL L 30
20
10
0 0 10
..
/ CL-_ML /
v 20 30
DATE rt-ea~1'Q
/ v
/ v
ML
40 50 60 70
LIQUID LIMIT
BY C.M.
I C, • . '2:-b
80
• l E.
... ..
MH 8 OH
90 100 110 120 130
WALTER LUM ASSOCIATES, INC. I C_IVIL, STRUCTURAL, SOILS ENGINEERS I
\ \ \
1./
f'ROJECT LOCATIO!'-J
MILILANI FILL SITE 51< ETCH.·.~---.·.
No. '2 ·:-· WA.I PlOP ;• E::'NA"; "OAHU H6WAil • a
TA><. MAP Kr:-7: 'l-S~ol POR. I -'----'-----'---
WALTER LUM ASSOCIATES, INC. B CIVIL, STRUCTURAL, SOILS ENGINEERS ~
t ;,.
.. ;1_fP. ~~.:' ' ~ .a,
•,'
.. ,.
. -~· '•' ·,
, ~ o-\ t (' • . . -·-- .... ....---------- ... -......,...
..... ; ·, --: ./ .. :·.:.") t'j..:
· .. : :. ~. •-;-'.'( . . '
.. ... :
·.· ..
1 • ,r
.-.. -~ .· --r·
'tf'
~,. '.;
... -.
.: ..
~ .. · .. :' . ·. ' . ..... •, . ., • ·"~~:·· • ... ,.:~.::~ ~··::.:·~··· c .. ~~~~: ••
-:.o.f· .~ •• ~~- '
_: > < ':\:!::·:::,: .: :":·~.· ·. ~-:·~. .....l '~ ";' ~ .... . :;·
. <.4. :>",.J'.' ·-~ .. ~~·. ~ : '; ... :_:~-
.. ..,_::'
.·.:·: ,·
..• : ,' ~ - ~ l·. '
·, ';•. t . .:._v.-. . ~ .. . ~ ~ ' . .
~ I \ •
,,- ' '>
- .. _,
V'- ·,.r ~\. "'
. ~· : ;~ ~: :-·-; -.. -.__
. ' ~-,, ... :: • .!'-'
-,., •• .... -.-:· ·~"" :·-:.· ••• < • ·.::.
' • t : '~ ... ~. ··--:>;:; '. _,.
I • • • ~ ·~ •
' .
.1.·.·" .,..,. :
: ... -· ·:-;. . ; '
·· .. · ........ \ _,_ -·'.• ~-~t: ' . r
-'· - ~ ·:: ', .. . •' ~- ~· .
. '(.
i' •• -.· ...... r: 4 .. :~ "l' • ••
:.·. -"'' -··
.. _,t~ .,. .•• '\ •
. ,
.-·
...
. ·"-'<, ·--:~,. J ..... . ·": .,
';.
.........
. ---'
_ r'ILL VOII?S WITH t:OMfAC.lt::t7 :.._:..:_: Sf:J..~v:L MM~KI P.L- o K -~~-~~ L-oW C:1 ~P.l7f::: CoNC ~ere- .
SE:CIIOl~ NOT 1o ?C..AL...t::
l~('t flt .. ."'fi:;-1' MA"iE:RI~L (we..t:I--C,RA.pt;t;> ~RANUL...A" MAie~IAL 11/i..! MAxtMuM "'io PUS I $1 "l.E:? • s.....e7~ 71-!AN IO /o
. rA?711~C1 NO. "Z.OO '51E::V ~ •)
ht....l- '\/OiD7 P.JE:\!.•,lf::et-t f';out..t'C:It-'7 A_7 Muc..H A.S f'l\P.CfiC:.Af?~E; ( ~/± B ovt..t> E ~s) .. · '.
ST~l f' o~f' t.oo::;e: MAiefllP. \...... I:?OI-Ji-.1 To STI rf CtR.OUI-..it?
SLop& To PMtN
FIGtURE- l FROPOSct/ 130ULDE:R !=ILL .
. JyflLLLAt'.!J_ FILL 5LTc·: No.__?...~--~:_::._.~-
·_wP:.:I:P-19 ~:e:wA j _ oAHL.i., HAw~u _ ....... : ·-·---·--···-·-- __ TA':l< MAP Ke'j ~-. _-'1-5 ~-0'2.. :·f~bi"?..~ 1..~--
_ WAlTE':_LU~_ASSOCIATE5, INC. ~· CI'IIL, STRUCTU~AL, SOILS ENGINoERS · •
-----~---------·· ... __ ..
LIMirATIONS
In general, soil formations are commonly erratic and rarely uniform or
regular. The boring logs indicate the approximate subsurface soil
conditions encouptered only at the drill holes where the borings were
made at the times designated on the logs and may not represent conditions
at other locations or at other dates. Soil conditions and water levels
may change with the passage of time and construction methods or improve
ments CJ.t the site.
During construction, should subsurface conditions much different from
those in the borings be observed, encountered, or otherwise indicated,
we should be advised immediately to review or reconsider our recommen
dations in light of the new developments.
·If there is a substantial lapse of time between the submission of this
report and the start of work at the site, or if conditions have changed
·due to natural causes, plan changes, or construction operations at or
adjacent to the site,.it is recommended that this report be reviewed to
determine the applicabiiity of the recommendations considerip.g the time
lapse, changed conditions, and changes in the state of the art of soil
engineering.
Our professional services were performed, findings obtained CJ.nd
recommendations prepared in accordance with generCJ.lly accepted engineering
practices. This warranty is in lieu of all other warranties expressed or
implied.