AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury....

11
As of 021600APR20 AWARDED ACF CONTRACTS 8 Projects = 9,693 Beds

Transcript of AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury....

Page 1: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

AWARDED ACF CONTRACTS8 Projects = 9,693 Beds

Page 2: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

JACOB K. JAVITS CONVENTION CENTER – NEW YORK, NYARENA TO HEALTHCARE (A2HC)

Location: New York, NY

MSC: North Atlantic Division (NAD)

FEMA Region: II

FEMA MA ($): $65M

Type: Arena (A2HC)

Patient Type: non-COVID

Facility Size: 470,000 SF

Beds: 2,900 beds

Anticipated peak of COVID-19 cases in NY is estimated to be by mid to late April.

Projection of COVID-19 Cases by 04MAY20

Construction TimelineAssessment MA received 22 MAR 20

Construction MA received 23 MAR 20

Contract Awarded/NTP 25 MAR 20

Construction Start 30 MAR 20

Required Delivery 08 APR 20

Estimated Completion 08 APR 20

Actual Completion

Total Days 10

Days Early/Late

Phase 1: 99% completePhase 2: 80% complete

Planned – 1st and 3rd FloorsJacob K. Javits Convention Center

In Progress

655 West 34 St, Manhattan, NY 10014

1st Floor (Ph3)900 total PCU24 nurses stations

3rd Floor (Ph2)1,000 total PCU26 nurses stations40 isolation units60 ICU units6k SF lab area

Notes:

USACE coordinated design changes for Phase 2 which include converting 40 patient care units (PCU) to isolations units and relocating multiple PCU to provide a 6k SF area for lab equipment. There will also be 60 PCU dedicated for ICU beds and equipment. Pending changes for Phases 2&3 include patient nourishment rooms and staff break rooms. PCU count reduced by approximately 100 units between initial architectural layout and design changes.

Javits New York Medical Station (JNYMS) has received 11 patients.

Page 3: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

WESTCHESTER CONVENTION CENTER – WHITE PLAINS, NYARENA TO HEALTHCARE (A2HC)

Location: White Plains, NY

MSC: North Atlantic Division (NAD)

FEMA Region: II

FEMA MATO ($): $30M

Type: Arena (A2HC)

Patient Type: COVID-19

Facility Size: 26,000 sq ft

Beds: 100 Beds

Anticipated peak of COVID-19 cases in NY is estimated to be by mid to late April.

Projection of COVID-19 Cases by 04MAY20

Construction TimelineAssessment MA received 18 MAR 20

Construction MA received 23 MAR 20

Contract Awarded/NTP 27 MAR 20

Construction Start 27 MAR 20

Required Delivery 15 APR 20

Estimated Completion 17 APR 20

Actual Completion

Total Days 22

Days Early/Late

Notes: 15% Complete of patient care units built out; total of 48 (inside) 52 (temporary facility)

PlannedWestchester Convention Center

In Progress

198 Central Avenue White Plains, NY 10606

Assembled 90% of tent 1, 80% tent 2, 20% tent 3, 0% tent 4 – new temporary structures west parking lot location.

PHOTO

TBD

Page 4: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

SUNY STONY BROOK – NEW YORK, NYALTERNATE CARE FACILITY (ACF)

Location: Stony Brook, NY

MSC: North Atlantic Division (NAD)

FEMA Region: II

FEMA MA ($): $101M

Type: Open Space ACF

Patient Type: NON-COVID-19

Facility Size: 255,676 sq ft

Beds: 1038 Beds

Anticipated peak of COVID-19 cases in NY is estimated to be by mid to late April.

Projection of COVID-19 Cases by 04MAY20

Construction TimelineAssessment MA received 18 MAR 20

Construction MA received 24 MAR 20

Contract Awarded/NTP 29 MAR 20

Construction Start 29 MAR 20

Required Delivery 19 APR 20

Estimated Completion 19 APR 20

Actual Completion

Total Days 22

Days Early/Late

Notes: Overall contract status 26% complete. Site work ongoing and arrival of equipment and supplies/materials underway.

PlannedSUNY Stony Brook

In Progress

100 Nicholls Road, Stony Brook, NY 11794

Notes: Site grading for temporary access road continues. Installation of pedestals and stakes for tents underway.

Page 5: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

SUNY OLD WESTBURY– OLD WESTBURY, NYARENA TO HEALTHCARE (A2HC)

Location: Old Westbury, NY

MSC: North Atlantic Division (NAD)

FEMA Region: II

FEMA MA ($): $116.5M

Type: Arena (A2HC)

Patient Type: NON-COVID-19

Facility Size: 207,000 sq ft

Beds: 1022 Beds

Anticipated peak of COVID-19 cases in NY is estimated to be by mid to late April.

Projection of COVID-19 Cases by 04MAY20

Construction TimelineAssessment MA received 18 MAR 20

Construction MA received 23 MAR 20

Contract Awarded/NTP 29 MAR 20

Construction Start 31 MAR 20

Required Delivery 19 APR 20

Estimated Completion 19 APR 20

Actual Completion

Total Days 20 days

Days Early/Late

ACF (1,022 Units) STATUS: 8% Complete

PlannedSUNY Old Westbury

In Progress

223 Store Hill Road Campus Center H-310, Old Westbury, NY 11568

Notes: Gymnasium flooring, sprinkler, plumbing, electric install has started. Structural gravel on first field to be completed today. Baseball site disassembly has started. Tent order was released.Nursing stations released for fabrication and patient room partitions ordered.

Page 6: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

MCCORMICK PLACE HALL A - CHICAGO, ILARENA TO HEALTHCARE (A2HC)

Location: Chicago, IL

MSC: Great Lakes and Ohio River Division (LRD)

FEMA Region: V

FEMA MA ($): $15M

Type: Arena (A2HC)

Patient Type: COVID-19

Facility Size: 840,000 SF

Beds: 1750 low acuity beds 2301 S King Dr. West 34 St. Chicago, IL 60616

In progress, 0 % complete

PlannedMcCormick Place Hall A

In Progress

Anticipated peak of COVID-19 cases in the Chicagoland area is estimated to be by 20 April 2020.

Projection of COVID-19 Cases by 20 April 20

Supplies and equipment set up in corner of Hall A (2 April 2020).

Construction TimelineAssessment MA received 26 March 20

Construction MA received 26 March 20

Contract Awarded/NTP 28 March 20

Construction Start 29 March 20

Required Delivery 24 April 20

Estimated Completion 24 April 20

Actual Completion

Total Days 27 days

Days Early/Late

Page 7: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

MCCORMICK PLACE HALL B - CHICAGO, ILARENA TO HEALTHCARE (A2HC)

Location: Chicago, IL

MSC: Great Lakes and Ohio River Division (LRD)

FEMA Region: V

FEMA MA ($): $15M

Type: Arena (A2HC)

Patient Type: COVID-19

Facility Size: 496,000 sq ft

Beds: 750 medium acuity beds

Anticipated peak of COVID-19 cases in the Chicagoland area is estimated to be by 20 April 2020.

PlannedMcCormick Place Hall B

In Progress

2301 S King Dr. West 34 St. Chicago, IL 60616

Projection of COVID-19 Cases by 20 April 20

In Progress, 0 % CompleteConstruction areas laid out; scaffolding set up (2 April 2020).

Construction TimelineAssessment MA received 26 March 20

Construction MA received 26 March 20

Contract Awarded/NTP 28 March 20

Construction Start 29 March 20

Required Delivery 24 April 20

Estimated Completion 24 April 20

Actual Completion

Total Days 27 days

Days Early/Late

Page 8: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

MCCORMICK PLACE HALL C - CHICAGO, ILARENA TO HEALTHCARE (A2HC)

Location: Chicago, IL

MSC: Great Lakes and Ohio River Division (LRD)

FEMA Region: V

FEMA MA ($): $15M

Type: Arena (A2HC)

Patient Type: COVID-19

Facility Size: 209,500 sq ft

Beds: 500 low acuity beds

PlannedMcCormick Place Hall C

In Progress

2301 S King Dr. West 34 St. Chicago, IL 60616

Anticipated peak of COVID-19 cases in the Chicagoland area is estimated to be by 20 April 2020.

Projection of COVID-19 Cases by 20 April 20

97% complete; 100% expected on 03 APRIllinois Air National Guard and contractors continue setting up FMS (2 April 2020).

Construction TimelineAssessment MA received 26 March 20

Construction MA received 26 March 20

Contract Awarded/NTP 28 March 20

Construction Start 29 March 20

Required Delivery 03 April 20

Estimated Completion 03 April 20

Actual Completion

Total Days 27 days

Days Early/Late

Page 9: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

METRO SOUTH HOSPITAL- BLUE ISLAND, ILHOTEL TO HEALTHCARE (H2HC)

Location: Chicago, IL

MSC: Great Lakes and Ohio River Division (LRD)

FEMA Region: V

FEMA MA ($): $20M

Type: Arena (H2HC)

Patient Type: COVID-19

Facility Size: 281,256 sq ft

Beds: 350 beds 12935 S Gregory St. Blue Island, IL 60406

PlannedSouth Metro Hospital

In Progress

Anticipated peak of COVID-19 cases in the Chicagoland area is estimated to be by 24 April 2020.

Ground floor, Mezzanine, First Floor

Second Flood, Third Floor, Fourth Floor

Fifth Floor, Sixth Floor, Penthouse

Typical drawings of:

Projection of COVID-19 Cases by 24 April 20

Construction TimelineAssessment MA received 26 March 20

Construction MA received 27 March 20

Contract Awarded/NTP 29 March 20

Construction Start 30 March 20

Required Delivery 24 April 20

Estimated Completion 24 April 20

Actual Completion

Total Days 26 days

Days Early/Late

0% complete

Page 10: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

SHERMAN HOSPITAL - ELGIN, ILHOTEL TO HEALTHCARE (H2HC)

Location: Chicago, IL

MSC: Great Lakes and Ohio River Division (LRD)

FEMA Region: V

FEMA MA ($): $20M

Type: Arena (H2HC)

Patient Type: COVID-19

Facility Size: 371,000 sq ft

Beds: 283 beds 901 Center St. Elgin, IL 60120

PlannedSherman Hospital

In Progress

Anticipated peak of COVID-19 cases in the Chicagoland area is estimated to be by 24 April 2020.

Projection of COVID-19 Cases by 24 April 20

Construction TimelineAssessment MA received 26 March 20

Construction MA received 27 March 20

Contract Awarded/NTP 29 March 20

Construction Start 30 March 20

Required Delivery 24 April 20

Estimated Completion 24 April 20

Actual Completion

Total Days 26 days

Days Early/Late

0% Complete

Page 11: AWARDED ACF CONTRACTS · 2020-04-03 · ACF (1,022 Units) STATUS: 8% Complete. SUNY Old Westbury. Planned. In Progress. 223 Store Hill Road Campus Center H -310, Old Westbury, NY

As of 021600APR20

TCF CONVENTION CENTER – DETROIT, MIARENA TO HEALTHCARE (A2HC)

Location: Detroit, MI

MSC: Lakes & Rivers Division (LRD)

FEMA Region: V

FEMA MA ($): $11.5M

Type: Arena (A2HC)

Patient Type: COVID-19

Facility Size: 600K sq ft (approx.350K being used)

Beds: 1000 beds 1 Washington Blvd, Detroit, MI 48226

Anticipated peak of COVID-19 cases in Detroit is estimated to be by 8-10 April.

Projection of COVID-19 Cases by 10APR

Construction TimelineAssessment MA received 25MAR20

Construction MA received 30MAR20

Contract Awarded/NTP 31MAR20

Construction Start 31MAR20

Required Delivery

Estimated Completion 09APR20

Actual Completion

Total Days 10 Days

Days Early/Late

50% complete; construction moved to 24 hroperations

PlannedTCF Convention Center

In Progress

Hall C – 600 beds

Hall E - 400 beds(similar plan)

TCFCenter