AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December...

34
AU480, Cus Rev. A (Dec A For Train These jo in the job Referenc AU48 AU48 AU48 stomer, Job Aid B cember 2013) AU ning Purpos b aids are s b aid is corre ces: 80 Chemistry 80 Chemistry 80 Chemistry Booklet U48 B ses Only hortened ve ect as of the y Analyzer U y Analyzer U y Analyzer Q 80 Boo rsions of pro date publish Users Guide Users Guide Quick Respo Jo ok ocedures fou hed. Verify y Volume 1 P Volume 2 P onse Guide P Beck ob klet und in the re you have the PN BM480V PN BM480V2 PN B0480Q kman Coulter Pro b A t eference bel e correct info 1AB (Augus 2AB (Augus RG (Novem Page ofessional Develo Aid ow. Informa ormation. st 2010) st 2010) mber 2009) 1 of 34 opment ation

Transcript of AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December...

Page 1: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, CusRev. A (Dec

A

For TrainThese join the job Referenc• AU48• AU48• AU48

stomer, Job Aid Bcember 2013)

AU

ning Purposb aids are s

b aid is corre

ces: 80 Chemistry80 Chemistry80 Chemistry

Booklet

U48B

ses Only hortened ve

ect as of the

y Analyzer Uy Analyzer Uy Analyzer Q

80 Boo

rsions of prodate publish

Users GuideUsers GuideQuick Respo

Jook

ocedures fouhed. Verify y

Volume 1 P Volume 2 P

onse Guide P

Beck

obklet

und in the reyou have the

PN BM480VPN BM480V2PN B0480Q

kman Coulter Pro

b At

eference bele correct info

1AB (Augus2AB (AugusRG (Novem

Page ofessional Develo

Aid

ow. Informaformation.

st 2010) st 2010)

mber 2009)

1 of 34 opment

ation

Page 2: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

AU480® Chemistry Analyzer

WARNINGS AND PRECAUTIONS Read all product manuals and consult with Beckman Coulter-trained personnel before attempting to operate the instrument. Beckman Coulter, Inc. urges its customers and employees to comply with all national health and safety standards such as the use of barrier protection. This may include, but is not limited to, protective eyewear, gloves, suitable laboratory attire when operating or maintaining this or any other automated laboratory equipment.

INTENTION FOR USE This document is not intended to replace the information in your Users Guide or Quick Response Guide. Information in the Users Guide and Quick Response Guide supersedes information in any other manual.

REVISION STATUS Rev. A (December 2013) Based on AU480 software version 1.71

TRADEMARKS AU480® Chemistry Analyzer

Page 3: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 3 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Table of Contents Set the Start Condition .................................................................................................... 5 Check and Load Reagents .............................................................................................. 6 Load a Fixed (Assigned) Reagent ................................................................................... 7 Perform Analyzer Calibration .......................................................................................... 8 Perform Quality Controls for All Tests ............................................................................. 9 Perform Quality Control for Selected Tests ................................................................... 10 Manual Programming for Samples on Racks ................................................................ 11 Manual Programming for STAT Samples ...................................................................... 12 Perform Add On and Rerun Tests on Racks ................................................................. 13 Perform Add On and Rerun Tests on STAT Table ........................................................ 14 Recall Patient Results ................................................................................................... 15 Print RB/CAL/QC Reports ............................................................................................. 16 Transfer Data to Host .................................................................................................... 17 Calibration Verification .................................................................................................. 19 Review and Print QC ..................................................................................................... 21 Delete QC Data and Enter Comments .......................................................................... 22 Set Calibrator Lot Concentrations ................................................................................. 23 Configure New QC Lot Parameters ............................................................................... 24 Daily Analyzer Maintenance .......................................................................................... 25 Load ISE Reagents (ISE Option only) ........................................................................... 27 Perform ISE Clean (ISE Option only) ............................................................................ 28 Perform ISE Calibration (ISE Option only) .................................................................... 29 Define a User Menu ...................................................................................................... 30 Save or Load System Parameters ................................................................................ 31 Save Data to External Media ......................................................................................... 32 Perform an End Process ............................................................................................... 33 Perform and Recover from an Emergency Stop ............................................................ 34 

Page 4: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 4 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Page 5: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 5 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Set the Start Condition

Page 6: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 6 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Check and Load Reagents

Page 7: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 7 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Load a Fixed (Assigned) Reagent

Reagent alreadyfixed?

Fix (assign) a reagent position:

Select Position from the “Reagent Display” drop-down listSelect an available bottle position to fix the reagent (select row to highlight)Select Position Setting F2Select Fixed Reagent optionSelect Close. A blue box with an asterisk (*) displays to the left of “Pos.” number for fixed reagent positions

Edit a fixed reagent position:

Select Edit F1Select the test name from the “Test Name” drop-down listSelect reagent type from “Type” drop-down listOptional: Enter a “Lot No.” according to laboratory protocolOptional: Enter a “Bottle No. (SN)” according to laboratory protocolSelect a bottle size from the “Bottle Size” drop-down listSelect Close

Select HomeSelect Reagent Management jump buttonSelect Details tab

Fix another reagent?

Load a fixed reagent:

Lift and remove the reagent refrigerator coverPlace/replenish R1 and/or R2 bottle(s) in assigned reagent positions in the refrigeratorReplace the reagent refrigerator cover

Perform a reagent check:

Select Reagent Check F5 from the Reagent Management screenSelect Check specified positions optionSelect StartSelect tests for the fixed reagents loaded from the Select Position windowSelect OKReview the Main and Details tabs to verify reagents

Initialize onboard stability for fixed reagents (Optional):

Note: To utilize the feature, a Lot and Bottle (SN) No. is required for fixed reagents.

Select the fixed reagent from the Details tab (select row to highlight)Select Initialize Onboard Stability button to reset “Onboard Remaining” timeSelect OKRepeat for other required fixed reagents

Yes

Yes

No

No

Page 8: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 8 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform Analyzer Calibration

Page 9: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 9 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform Quality Controls for All Tests

Page 10: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 10 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform Quality Control for Selected Tests

Page 11: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 11 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Manual Programming for Samples on Racks

Page 12: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 12 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Manual Programming for STAT Samples

Select HomeSelect STAT Status jump buttonSelect Sample button

Manually requisition sample:

Enter “Sample ID” (barcode number)Select the test(s) to run on the sample. Selected tests are highlighted in blueIf a manual dilution was made, select Sample Dilution F7 and enter the dilution rateSelect Demographics tab to enter required patient demographic informationSelect Entry F1 to save requisition

Select Exit F2Select Pending List F4 to view a list of samples requisitionedOptional: Select the sample from the Pending List and select Go to view the specific sample requisitionSelect Close to close the Pending List

Select Test Requisition tabSelect sample type from the “Type” drop-down listSelect Start Entry F1

Requisitionadditional samples of the same or different

sample type?

Select Exit F2DifferentSelect Test Requisition tab

Same

No

Select STAT Status buttonCheck the “Kind” and “Type” columns for position assignments on the STAT table

Open the small cover of the STAT table and load samples in appropriate positions with barcodes facing out. Press the green TABLE ROTATION/DIAG button to rotate the tableClose the small cover

STATtable busy?(amber light

flashing)

Select STAT Pause F2Select OKWait for amber light by the STAT table to stop flashing

Select STAT Start F1Review errors on the Error List in the STAT Start Window and perform any corrective actions, if necessarySelect Start from the STAT Start Window

No

Yes

Page 13: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 13 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform Add On and Rerun Tests on Racks

The information listed below is required to order an add on or rerun. This information can be found on the Sample Status screen or on the printed report.

Sample Number (e.g. S. No. 0003)Sample Kind (Routine or Emergency)Sample Type

Requisition an add on or rerun test:

Select Add On F5Verify the correct “Sample Kind” rack (Routine or Emergency) in which the sample was initially processed is displayed. Select the Switch button if you need to change the sample kindSelect sample type from the “Type” drop-down listEnter the sample number in both of the “Sample No.” fieldsNote: Enter a range of sample numbers if an add on or rerun is required on multiple samples for the same tests. Select the Select Tests to be Repeated optionSelect the test(s) to add on or rerunSelect OK

Select Pending List F4 to view a list of samples requisitionedOptional: Select the sample from the Pending List and select Go to view the specific sample requisition. Tests with an asterisk (*) are pending processingSelect Close to close the Pending List

Select HomeSelect Rack Requisition Sample jump buttonSelect Sample buttonSelect Test Requisition tab

Place samples with barcodes in appropriate rack(s)for sample kind (Routine or Emergency) and sample type

and place rack(s) on the rack supply unit

Select Start from the main button barReview errors on the Error List in the Start Window and perform any corrective actions, if necessarySelect Start from the Start Window

The analyzer may generate a “MEASURE COMPLETED FOR THE READ SAMPLE ID” alarm when the sample barcode is read.

Verify the sample is in process from the Sample Status screen

Note: This procedure applies only for samples that require anadd on or rerun test to be processed using the same sample ID,

rack type, and index as the original sample.

Page 14: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 14 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform Add On and Rerun Tests on STAT Table

The information listed below is required to order an add on or rerun. This information can be found on the Sample Status screen or on the printed report.

Sample Number (e.g. S. No. P0003)Sample Type

Requisition an add on or rerun test:

Select Add On F5Select sample type from the “Type” drop-down listEnter the sample number in both of the “Sample No.” fieldsNote: Enter a range of sample numbers if an add on or rerun is required on multiple samples for the same tests. Select the Select Tests to be Repeated optionSelect the test(s) to add on or rerunSelect OK

Select Pending List F4 to view a list of samples requisitionedOptional: Select the sample from the Pending List and select Go to view the specific sample requisition. Tests with an asterisk (*) are pending processingSelect Close to close the Pending List

Select HomeSelect STAT Status jump buttonSelect Sample buttonSelect Test Requisition tab

The analyzer may generate a “MEASURE COMPLETED FOR THE READ SAMPLE ID” alarm when the sample barcode is read.

Verify the sample is in process from the Sample Status screen

Note: This procedure applies only for STAT samples that require anadd on or rerun test to be processed on the STAT table using the

same sample ID and index as the original sample.

Select STAT Status buttonCheck the “Kind” and “Type” columns for position assignments on the STAT table

Open the small cover of the STAT table and load samples in appropriate positions with barcodes facing out. Press the green TABLE ROTATION/DIAG button to rotate the tableClose the small cover

STATtable busy?(amber light

flashing)

Select STAT Pause F2Select OKWait for amber light by the STAT table to stop flashing

Select STAT Start F1Review errors on the Error List in the STAT Start Window and perform any corrective actions, if necessarySelect Start from the STAT Start Window

No

Yes

Page 15: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 15 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Recall Patient Results

Page 16: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 16 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Print RB/CAL/QC Reports

Page 17: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 17 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Transfer Data to Host

Page 18: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 18 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

This page intentionally left blank.

Page 19: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 19 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Calibration Verification

Select Menu ListSelect Calibration menuSelect Calibration Verification sub-menuSelect Material Parameter button

Select test from the “Test Name” drop-down listSelect sample type from the “Type” drop-down listSelect Edit F1

For each level of the calibration verification material:

Enter the level name in the “Material Name” columnEnter the sample ID (barcode number) in the “Material ID” column. Up to three sample IDs can be assigned to each level for three replicatesSelect the “Evaluate” check box to include the material level for the calibration verificationEnter the “Expected Value” (from calibration verification material package insert)Enter the “Tolerance Value” (determined by laboratory)Select Confirm F1

Enterparameters for

anothertest?

Process calibration verification material:

Place samples with barcodes in appropriate rack(s) for sample kind (Routine or Emergency) and sample type and place rack(s) on the rack supply unitSelect Start from the main button barReview errors on the Error List in the Start Window and perform any corrective actions, if necessarySelect Start from the Start Window

Requisition tests for calibration verification material:

Select HomeSelect Rack Requisition Sample jump buttonSelect Sample buttonSelect Test Requisition tabSelect Switch button to select “Sample Kind” (Routine or Emergency)Select sample type from the “Type” drop-down listSelect Start Entry F1Enter “Sample ID” (barcode number)Select tests to be evaluated for the calibration verificationSelect Batch Entry F3Select the Number of Samples option and enter the number of samples to be processedSelect OKNote: The sample IDs will automatically increment by one for each sample in the batch.Select Exit F2Select Pending List F4 to view a list of samples requisitioned

After sample processing completes,

continue to the next page to verify

calibration

Note: This procedure applies only for racks

in barcode mode. You will need to use

barcodes labels that increment by one digit.

Yes

No

Page 20: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, CusRev. A (Dec

stomer, Job Aid Bcember 2013)

Booklet

Calibraation Verrification

Beck

n, contin

kman Coulter Pro

nued

Page 2ofessional Develo

20 of 34 opment

Page 21: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, CusRev. A (Dec

stomer, Job Aid Bcember 2013)

Booklet

RReview and Prin

Beck

nt QC

kman Coulter Pro

Page 2ofessional Develo

21 of 34 opment

Page 22: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 22 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Delete QC Data and Enter Comments

Select Menu ListSelect QC menuSelect QC Data Review sub-menuSelect Main tab

Select index from the “Index” drop-down listSelect the check box for QC in the “Sample Kind” columnLeave “*” in the “Search Sample No.” and “QC No.” fields to search for all QC data in the selected indexOptional: Enter a Sample No., QC No., or Control ID to search for specific QC data in the selected index

Deletedata for

entire sample or specific

test?

Select Sample tab

Select Edit F1

Select OK

Note: A “d” flag will appear in the “Data Flag” column for each displayed test.

Select Test tab

Select test from the“Test Name” drop-down list

Sample Test

Select Edit F1

Enter a “d” flag in the “Data Flag” column for the test data to be deleted

Deleteall displayed

data?

Enter a comment?

Select Confirm F1

Select Index Comment F3 to enter a comment for the indexSelect Test Comment F4 to enter a comment for the testSelect OK

No

Yes

Yes

No

Select Delete F2

Page 23: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 23 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Set Calibrator Lot Concentrations

Select Menu List

Select Parameters menu

Select Calibration Parameters sub-menu

Select Calibrators button

Select the desired calibrator

Note: Select the down arrow to view more calibrators.

Select Edit F1

Enter new “Lot No.” and “Expiration” information

Select Set Conc Value F5

Select the calibrator name to edit from the“Calibrator” drop-down list

The concentration values for the tests of the selected calibrator display (highlighted in white)

Note: Select the down arrow to view moretests for the selected calibrator.

Enter the new concentration values (from the insert in the calibrator kit) for each test in the calibrator

Select Close

Select OK to the confirmation message

Select Confirm F1

Note:This procedure applies only for

calibrators that are already defined on

the analyzer.

Page 24: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 24 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Configure New QC Lot Parameters

Page 25: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 25 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Daily Analyzer Maintenance

Inspect the Syringes for Leaks

Verify the system is in Warm Up or Standby modeOpen the front right door of the analyzer

For each syringe:Visually inspect the case head for any cracks or leaks/condensationUse a lint-free cloth to check the top and bottom connections of the syringe case head and the bottom fixing screw for leaksVerify the fixing nut and piston fixing screw are tight

Close the front right door of the analyzer

Inspect the Wash Solution Roller Pump for Leaks

Verify the system is in Warm Up or Standby modeOpen the front left door of the analyzer

For the wash solution roller pump tubing:Visually inspect for cracks; use a clean dry cloth to check for any leaksVerify the connectors are tight; turn connector clockwise to tighten

Inspect the Wash Solution and Replenish As Needed

Verify the system is in Warm Up or Standby mode

Inspect the wash solution level:Verify there is a sufficient quantity of wash solution for typical daily use; the system uses approximately 0.5 L per day for 2,000 tests per day

To replenish the wash solution:Pull the wash solution tank forward and unscrew the cap to remove the cap and connector from the tankReplace the tank with a new wash solution tankInsert the level sensor in the tank, tighten the cap and place the wash solution tank in the analyzer

Close the front left door of the analyzer

Inspect the Printer and Paper

Verify the printer is onVerify that there is enough paper in the printer

Daily Maintenance procedures continued on the next page

Inspect the Stability of the Upper Cover

Verify that the cover is stable and remains in the upright position when raised

Page 26: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 26 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Daily Maintenance, continued

Page 27: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 27 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Load ISE Reagents (ISE Option only)

Page 28: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 28 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform ISE Clean (ISE Option only)

Select Home

Select Analyzer Maintenance jump button

Select ISE Maintenance button

Open the small cover of the STAT table

Press the green TABLE ROTATION/DIAG button on the analyzer to rotate the STAT table until the CLEAN position is accessible

Fill a Hitachi cup with approximately 1 mL of ISE Cleaning Solutionand place it in the CLEAN position

Close the small cover of the STAT table

Select Cleaning F5

Select OK to begin the ISE cleaning procedure

Note: The system mode displays Standby|Maintenance and theamber light by the STAT table flashes while the ISE clean is in process.

When the procedure is complete (system mode is Standby), remove and discard the ISE clean sample cup from the STAT table

Note: Verify the “Performed” and “Pending” date and time have automatically updated for the “Auto-washing Sample Pot &Electrode Line” procedure on the ISE Maintenance screen.

Verify the system is in Warm Up or Standby mode

CAUTION:Pressing the green button

during the clean will STOP the

procedure.

Page 29: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 29 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform ISE Calibration (ISE Option only)

Page 30: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 30 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Define a User Menu

Page 31: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 31 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Save or Load System Parameters

Page 32: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 32 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Save Data to External Media

Page 33: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, CusRev. A (Dec

stomer, Job Aid Bcember 2013)

Booklet

Peerform aan End P

Beck

Process

kman Coulter Pro

Page 3ofessional Develo

33 of 34 opment

Page 34: AU AU480 Joobb Aid Boookklet · AU480, Customer, Job Aid Booklet Page 2 of 34 Rev. A (December 2013) Beckman Coulter Professional Development AU480® Chemistry Analyzer WARNINGS AND

AU480, Customer, Job Aid Booklet Page 34 of 34 Rev. A (December 2013) Beckman Coulter Professional Development

Perform and Recover from an Emergency Stop

Press the EM STOP button on the front of the analyzer

Press Ctrl + Alt + Delete on the keyboard

Select Shutdown from the Windows windowto turn off the computer

Remove all racks from the rack transport belts

When the system has completely shut down,press the RESET button on the front of the analyzer,

and wait at least 5 seconds before proceeding

Press the ON button on the front of the analyzerto turn on the analyzer and computer

Select OK to the “Database retrieval is required” message on the System Start window

Select:

Current Index to continue in the current index, orNew Index to create a new indexSelect OK

Allow the lamp to warm up for the required20 minutes before starting analysis of samples

Note: The system stays in the Warm Up mode for 1.5 hours following an emergency stop.

After 20 minutes, bypass Warm Up to Standby modeto start sample analysis:

Select HomeSelect Analyzer Maintenance jump buttonSelect Standby F4Select OK to the messageVerify the mode changes to Standby

EM STOPbutton pressed during sample

analysis?

Perform W1 to clean cuvettes:

Select HomeSelect Analyzer Maintenance jump buttonSelect W1 F5Select Start

Note: The W1 procedure takes~9 minutes to complete. No

Yes