ARIMNet 2 Guidelines for Applicants_18_sept_2014

download ARIMNet 2 Guidelines for Applicants_18_sept_2014

of 26

Transcript of ARIMNet 2 Guidelines for Applicants_18_sept_2014

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    1/26

    1

    GUIDELINES FOR APPLICANTS

    ARIMNet 2 Call 2014-15

    SUBMISSION

    Pre-proposal by December 1st

    , 2014

    Full Proposal by May 11 th 2015

    on

    http://arimnet-call.eu/

    Coordination of the Agricultural ResearchIn the Mediterranean Area

    ARIMNet 2 is an ERA-NET funded by the European Commission´s 7th Framework Programme .

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    2/26

    2

    CONTENTS

    Introduction

    1. A joint transnational Call 4

    2. Scope and topics 43. Participation and funding of Research Projects 5

    3.1 Participation from ARIMNet network with national funding 53.2 Participation from ARIMNet network with institutional funding 53.3 Participation from outside ARIMNet network 5

    4. Call schedule 5

    5. Call Management and Secretariat 6

    6. STEP 1: Submission of Pre-Proposals 6

    6.1 The Research Consortium Coordinator 76.2 Content of the pre-proposals 76.3 Information to be completed through the online submission tool 8

    7. Eligibility check 9

    7.1 ARIMNet 2 eligibility criteria 97.2 National eligibility criteria 97.3 Applicants from countries not providing funds for the call 9

    8. STEP 2 : Submission of full proposals 108.1 Content of the full proposals 108.2 Information to be completed through the online submission tool 12

    9. Process overview and Selection Criteria 12

    9.1 General organisation 129.2 The process 12 9.3 Step 1: Pre-proposal evaluation criteria 139.4 Pre-proposal selection 139.5 Step 2: Full-proposal evaluation criteria 149.6 Full proposal selection 159.7 Score description for the evaluation criteria 15

    10. Funding 16

    10.1 Terms of participation 1610.2 Contractual relationships 1610.3 Funding contracts 1610.4 Research Consortium Agreement 1610.5 Intellectual property rights and use and access to results 1710.6 Commencements of projects 18

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    3/26

    3

    11. Project monitoring 18

    ANNEX 1 19 1. A Funder Contribution Table 191. B Funding Scheme per Country 20

    ANNEX 2: Scientific Scope of the Call 21

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    4/26

    4

    Introduction

    The ARIMNet 2 Project (Agricultural Research In the Mediterranean Network) ERA NET (FP7), aims at

    coordinating National Agricultural Research Programmes to strengthen the capacities of its members

    to address in a coordinated way the major challenges that the Mediterranean agriculture is facing.

    While agriculture in the countries around the Mediterranean is facing common issues and challenges,

    Agricultural Research in the Mediterranean is scattered and requires a coordination effort to step up

    the cooperation and coordination of research activities carried out at national level by joining forces

    to promote innovative research and cooperation. It is the purpose and the ambition of the members

    of the ARIMNet 2 Project.

    For more information about ARIMNet 2, please connect to www.arimnet2.net

    1. A joint transnational Call

    ARIMNet 2 is launching a Joint transnational call for research projects proposals based on funds from

    participating countries.It will enable collaborative interdisciplinary projects based on complementarities between scientists,

    disciplines and countries, and sharing of knowledge in a broad scope of research topics. It aims to

    promote international collaboration to create research consortia in order to respond appropriately

    to the global stakes and challenges Mediterranean Agriculture is facing.

    The call is fitted for large projects involving several partners from different countries. Based on a

    common virtual pot of around 7 million Euros, we expect to finance from 8 to 13 projects.

    2. Scope and topics

    - A. Developing sustainable production in the context of increasing ecological and climatic stresses :- 1.Increase in resilience, rusticity and productivity of Mediterranean agricultural production

    systems- 2. Improving inputs management, on the level of the production systems, for economic and

    environmental impacts- 3. Common Mediterranean challenges in animal and plant health- 4. Sustainable Mediterranean Aquaculture and Fisheries

    - B. Food chain from production to consumption: enhancing the advantages of Mediterraneanagriculture and food:- 5. Innovation in the agroindustry- 6. Logistics, supply chain organization, transportation- 7. Food safety, food sanitary issues- 8. Food consumption patterns: consumers’ behaviour, quality of products, diet and nutrition- 9. Agricultural and food policies

    - C. Sustainable management of landscape and resources used by agriculture:- 10. Sustainable management of water and other resources used by agriculture- 11. Landscape and spatial management, competition with other land uses, peri-urban and

    urban agriculture

    (More information in Annex 2 “Scientific Scope of the Call” )

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    5/26

    5

    3. Participation and funding of Research Projects

    The funding for the transnational projects will be based on a virtual common pot instrument. The

    funding principle is that each country funds its own research group(s), while it benefits from the

    research fruits of the multinational team of the Project Consortium.

    Participating countries, funding organisations and funds available are listed in annex 1.

    3.1 Participation from ARIMNet 2 network with national funding

    Researchers participating in projects that have been selected for funding will receive the grant

    directly from their national funding organisation after meeting their national regulations. Funding

    will be administered according to the terms and conditions of responsible national funding body

    taking into account all other applicable national regulations and legal framework.

    Industry may in some countries also bid for funding as members of consortia, but should first check

    the Parties’ national rules for details on funding eligibility of SMEs or large industries.

    3.2 Participation from ARIMNet2 network with institutional funding

    Research groups from countries with “In Kind” participation will have to pro vide a letter from theirlaboratory director attesting that the funds necessary for the realization of the project will beavailable. Travel expenses and joint workshop must be funded in cash with an order of magnitude of10 000 euros per year. The funding of a PhD thesis is recommended. The research team cannotcoordinate the project.

    3.3 Participation from outside ARIMNet 2 network

    Research groups or industry from countries not participating in the call are eligible to apply as part of

    a project consortium but on own resources only. They have to provide a letter attesting that the

    necessary funds for the realization of the project will be available. They can however not coordinate

    a project or have any other vital contribution to the project

    4. Call Schedule

    The review will be carried out in a 2-step procedure following step 1 – submission of Pre-proposals (5

    pages) and step 2 – submission of Full Proposals (30 pages). Only applicants invited to submit a fullproposal can participate to the second step of the selection process.

    Call time schedule:

    30 June 2014 Pre-announcement

    15 September 2014 Launch of the call

    STEP 1 EVALUATION OF PRE PROPOSALS

    1 December 2014 Deadline for submitting pre-proposals

    Early December 2014 Eligibility checking

    Mid December First SEC meeting: declaration of conflict of interest and pre-

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    6/26

    6

    proposal attribution to the SEC members

    From mid December

    2014 to February 2015Review of the pre-proposals by the SEC members

    15 February 2015

    Second SEC meeting: pre-proposal ranking, preparation of

    the second step evaluation process (proposition of external

    reviewers for proposals invited to submit to the 2 nd step,

    attribution of the selected projects to a reader and a

    rapporteur).

    27 FebruaryCommunication to the applicants of the first step evaluation

    results.

    STEP 2 EVALUATION OF FULL PROPOSALS

    11 May 2015 Deadline for submission of the full proposal

    From May to September

    2015Peer review process

    ~ 15 September Third SEC meeting: Ranking of the full proposals

    30 September 2015 Approval by the CB of the ranking list (Final selection)

    30 October 2015 Final funding decisions

    From november 2015

    Communication of the final results to applicants.

    Contract signature between partners and funding bodies for

    the successful projects.

    Jan- April 2016 Start of the projects

    5. Call Management and Secretariat

    The Call Secretariat will provide administrative support to applicants regarding the call, calldocuments and procedures. It is the primary point of contact between the research projectconsortium and the ARIMNet 2 Members for all general matters in relation to the call.

    The National Contacts are supporting the Call Secretariat and should be contacted for all mattersregarding national regulations and funding. Please see an overview of the National Contacts in thenational regulations annex (on arimnet website)

    Call Secretariat:Fabrice Dentressangle [email protected]

    Sanaa Zebakh : [email protected]; [email protected]

    6. Submission of Pre-Proposals

    The submission of a pre-proposal is mandatory to participate to this call for proposals. Applicationswill be accepted only via the ARIMNet 2 online submission website.Only one single Pre-Proposal is required for each project covering all of the Research Partners of the

    consortium. The project details should be completed by the Research Partners and submitted by the

    Research Consortium Coordinator on behalf of the Research Consortium in line with the stateddeadlines.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    7/26

    7

    6.1 The Research Consortium Coordinator

    Each consortium must identify a Research Consortium Coordinator, who will have a specific roleduring the submission process and afterwards, if the project is funded.The Research Consortium Coordinator, who will have the following role:

    Be the single point of contact between the ARIMNet 2 Call Office and the Researchers in thepre-proposal and in any successful project, from submission of the proposal onward;

    Submit the Application Form on behalf of the Research Consortium;

    In any commissioned project, compile and submit reports/deliverables to the ARIMNet 2 CallSecretariat on behalf of the Research Consortium

    The Research Consortium Coordinator will NOT be responsible for the financial management of

    ARIMNet 2 research funding, which will be handled directly between national researchers and their

    national funding organisations in each participating country.

    The Research Consortium Coordinator shall inform the Call Secretariat and each of the nationalfunding organisations of any event that might affect the implementation of the project.

    6.2 Content of the pre-proposals

    The Pre-proposal has to be submitted on line and must not exceed 5 pages (annexes are notallowed). The following format should be used: Arial, 10 pt, single space, 2 cm left/right margins, 3cm top/bottom margin. It is mandatory to upload the Forms as unprotected Adobe PDF file. Pre-proposals must be completed in English. Pre-proposals should be precise and concise.

    The pre-proposal must address at least the following items:

    Project Title, acronym and selected topic

    Relevance of the project to the scientific scope of this call, main results for the sector thatcan be expected, main target group and how this will be involved and/or targeted in the

    Project, state of the art relevant to the topic

    Innovative approach: scientific and technological objectives, scientific hypothesis, scientific

    methods/work plan.

    Added-value of the partnership for the Mediterranean of the project being carried outtransnationally.

    Mediterranean added value is the value resulting from the European and Mediterranean

    research project, which is additional to the value that would have resulted from research

    projects funded at national level. The added value may vary, depending on the type of

    project. It may include: relevance to international policy statements, legislative framework or

    management plans; added value to national research projects by linking expertise and efforts

    across national teams; bringing about comparisons at the local level between researcherswho are not used to working together; standardisation of methods, general increase of

    common knowledge relative to the call, etc .

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    8/26

    8

    6.3 Information to be completed through the online submission tool

    Administrative details will have to be fulfilled on line using the ARIMNet 2 submissionwebsite. The following items will be asked:

    1. Project title (max 200 characters)2. Project Acronym (max 20 characters)3. Topic4. Summary of the (pré) proposal (3100 characters space included)5. Keywords (project specific) (max 5 keywords) (max 100 characters)6. Duration of the proposed research project (in months)(max 36 months)7. Coordinator and partner information:

    These forms are filled in with information about one member of the consortium at a time.The filled in information is collated automatically in the generated proposal

    Coordinator / Partner

    Contact person

    Title / position

    Organisation

    Type of organisation

    Acronym

    Address

    Country

    Email

    Phone

    8. Financial plan

    N° ofthe

    partnerCountry

    Funding

    Man-months

    (months)

    Personnel costs

    ConsumablesTravel &

    subsistence Equipment

    Other costs(to be

    specified)* Overheads TOTALPermanentstaff

    Temporarystaff exceptPHD PHD

    Requiredfunding

    Ownfunding

    Total

    7. Eligibility check

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    9/26

    9

    For both step of evaluation, two sets of eligibility criteria in the selection process will be checked: i)

    ARIMNet 2 criteria, ii) national criteria.

    All participants in a bidding consortium should check their eligibility by reference to the guidanceprovided by their potential national funding organisation at the earliest possible stage – pleaseconsult Annex 1 for the list of national funding organisations and for the list of contacts points and

    funder’s priorities and national guidelines (on www.arimnet2.net or http://arimnet-call.eu ).

    The ARIMNet 2 Call Office will be the primary point of contact throughout the application process.

    7.1 ARIMNet 2 eligibility criteria

    Each project proposal must:

    Involve researchers eligible for funding from at least three countries members of theARIMNet 2 project (at least one from the EU and one from NON EU, see annex 1A) providing

    funds for this call. Additional researchers from other countries are welcome in a Project

    Consortium, but will have to fund their own contribution to the research project (see 3.2 and

    3.3) Projects should be of a duration of maximum three years Be written in English, using the ARIMNet 2 Application Forms provided on the submission

    website

    Be uploaded completed and correctly (including all required documents) via the submissionwebsite before the call deadline (1 st December 2014, 5 PM CET)

    Fit the formal requirements for proposal submission

    MODIFICATIONS OF CONSORTIUM COMPOSITION BETWEEN STEP 1 AND STEP 2 ARE NOT

    ALLOWED

    7.2 National criteria

    Each partner of the consortium have to read carefully the national regulation rules onwww.arimnet2.net or http://arimnet-call.eu to know what budget items are eligible and annex 1Bfor topics priorities.

    To receive funding, applicants must be eligible for funding by the national funding organisationsparticipating in the call (see annex 1). All participants in a bidding consortium should check theireligibility by reference to the guidance provided by their potential national funding organisation atthe earliest possible stage.Eligible costs will be determined by the regulations and conditions of each national fundingorganisation. Subcontracting will be allowed according to the regulations of the national fundingorganisation involved.

    7.3 Applicants from countries not providing funds for the call

    Applicants from countries not partners in the ARIMNet 2 network and thereby not providing fundingfor the call are welcome in Research Consortia, but will have to fund their contribution to theresearch projects themselves. They are not taken into account in the minimum requirement ofeligible partners and countries in the ARIMNet 2 eligibility criteria.

    http://www.arimnet2.net/http://www.arimnet2.net/http://www.arimnet2.net/http://arimnet-call.eu/http://arimnet-call.eu/http://arimnet-call.eu/http://www.arimnet2.net/http://www.arimnet2.net/http://arimnet-call.eu/http://arimnet-call.eu/http://arimnet-call.eu/http://arimnet-call.eu/http://www.arimnet2.net/http://arimnet-call.eu/http://www.arimnet2.net/

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    10/26

    10

    Applicants have to provide a letter attesting that the necessary funds for the realization of theproject will be available. They cannot coordinate a project nor have a vital contribution to theproject.

    8. STEP 2 submission of full proposals

    ONLY PROJECTS THAT HAVE BEEN SUCCESFULLY SELECTED IN THE FIRST STEP AND HAVE BEENINVITED TO SUBMIT A FULL PROPOSAL CAN PARTICIPATE TO THIS SECOND STEP.

    Applications must not exceed 30 pages and will be accepted only via the ARIMNet 2 onlinesubmission website.

    Only one single Proposal is required for each project covering all of the Research Partners of theconsortium. The project details should be completed by the Research Partners and submitted by theResearch Consortium Coordinator on behalf of the Research Consortium in line with the stateddeadlines.

    8.1 Content of the full proposals

    Full proposals should address at least the following items:

    PART B form - full proposal (max 30 A4 pages in total , max 2 A4 pages per partner)

    Part B should be uploaded to the submission site as an unprotected .pdf (not scanned). Please namethe file as: [proposal identification number]_[project acronym (for example: 99_ARIMNet). Thefollowing format should be used: Arial, 10 pt, single space, 2 cm left/right margins, 3 cm top/bottommargin.

    B1 Project acronym

    B2 Project summary suitable for web publishing (not more than 3100 characters space included)

    B3 Background and “State of the Art“ in the field (not more than. 2 pages)

    B4 Description of the project: (not more than 10 pages, all sections and tables of B4 included)a) Aim, objectives and hypotheses

    b) Description of work plan & methods, including list and description of the work packages,description of deliverables and timetable (with work package/responsible partner anddeliverables, optionally in a Gantt Chart).

    Please use the templates below for deliverables.

    Deliverables list

    No1

    Deliverablename

    WP no. Lead participant NatureDissemination

    levelDeliverymonth

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    11/26

    11

    Deliverable numbers in order of delivery dates. Please use the numbering convention .. For example, D4.2 would be the seconddeliverable from work package 4.

    2 Please indicate the nature of the deliverable. For example Report, Paper, Book, Protocol,Prototype, Website, Database, Demonstrator, Meeting, Worksho p…

    3 Please indicate the dissemination level using one of the following codes: PU = Public; INT= Internal(Restricted to other project participants); RE = Restricted to a group specified by the consortium;

    CO = Confidential, only for members of the consortium.4 Measured in months from the project start date (month 1).

    c) Description of novelty in methods

    d) Expected results and their impact/application including the impact in terms of innovation.

    e) Governance and global organization of the project. The management plan should inparticular specify the different meetings planned and describe the project managementstructure and capacity (Qualification of the individual persons involved in themanagement of the project, organisation structure of the project team [including

    subcontractors])

    f) Dissemination plan and/or exploitation of results. The dissemination plan should specifythe planned national and international dissemination activities, communication andpublication plans..

    g) Description and definition of potential risk to the implementation and success of theproject (e.g. in research methods, farm studies, stakeholder involvement), describe howthe chances for success are maximized, and describe the contingency plan.

    B5 Statement describing how/why the proposal has a clear added value of being carried out on a

    transnational basis (Mediterranean added value, transnational impact of the proposed project,including added value for participating countries and cross border problems, description of thespecific integration of participants in the transnational consortium structure) (not more than 1page).

    B6 Description of training opportunities if any (description of training/exchange activitiesforeseen within the project, if applicable) (not more than 0.5 page).

    B7 Description of the societal and ethical aspects (aspects of the project such as environmental,human or animal welfare, intellectual or cultural development, that could cause societal orethical concerns or contribute to progress in these areas) (not more than 0.5 page).

    B8 References used for the project description (please use a format containing the followinginformation: Surname, A., Surname, B. and Surname, C. (Year): Title of paper, Journal, Volume,Pages) max. 30 references.

    B9 Scientific justification of required fundsIn this part, each partner should justify from a scientific and technical point of view, the variousexpenses items mentioned in the part C1 (Financial Plan) (not more than 2 pages per partner).

    B9.1 Partner 1B9.2. Partner 2B9.n Partner n….

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    12/26

    12

    8.2 Information to be completed through the online submission tool

    See §6.3. The information about the consortium will be saved from the first step evaluation, hencethe coordinator will have to verify this information and complete/modified if necessary.

    A more detailed budget will be asked for the second step.

    9. Process overview and Selection Criteria

    9.1 General organisation

    The organisation of the decision making process relies on three bodies:

    The Call Board

    The ARIMNet 2 Programme Call Board (CB) comprises the nominated representatives from each

    funding body signing this Memorandum, the Coordinator of the ARIMNet 2 network and the Work

    Package Leaders in charge of transnational activities within the ARIMNet 2 Project. The CB is

    responsible for defining and organising the call, the application procedures and the review of

    proposals. All decisions concerning the call procedures will be taken by the CB. The nominees are

    entitled to make the joint final decision on the basis of the proposals of the scientific Evaluation

    Committee (SEC) of ARIMNet 2 Programme, taking into account the rating by this scientific

    Evaluation Committee.

    Scientific Evaluation Committee

    The Scientific Evaluation Committee (SEC) will be composed of 10 to 20 Mediterranean experts

    based on their acknowledged scientific excellence in the research areas covered by the call. The

    members of the SEC are nominated by the JTC 2014-2015 Call Board. The SEC Chair should be

    independent (preventing any conflict of interest) and the members of the SEC must not represent

    the parties or adopt national considerations. In order to avoid any conflict of interest, the SEC

    members must not apply to this call.

    The Call Secretariat

    The central coordinating body for the ARIMNet 2 call is the Call Secretariat (CS) under theresponsibility of the Work Package Leaders in charge of transnational activities within the ARIMNet 2

    project and the Coordinator. This central coordinating organisation is responsible for the overall

    organisation of the call and the management of the joint international review process according to

    the rules agreed upon by the ARIMNet 2 CB, and will be assisted by the CB.

    9.2 The process

    The evaluation process is designed with a two-step procedure. The pre-proposal evaluation and fullproposal evaluation based on a common (ARIMNet 2 rules) and national eligibility check and ascientific assessment.

    Eligibility of the pre-proposal : After pre-proposal submission online the CS will check theformal eligibility of proposals according to the common eligibility criteria (5.1). On this list of

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    13/26

    13

    formally eligible proposals, parties will check pre-proposal eligibility regarding national andinstitutions’ priorities ( annex 1 and national regulations). The CS will coordinate with therepresentatives of the funding organisations this eligibility step.

    Scientific evaluation of the pre-proposals: The SEC will review the pre-proposals following 3criteria 1) project relevance to the call,2) innovative approach and 3) quality of theMediterranean partnership (see details below). The SEC will propose to the CB a list of

    projects in 2 categories: A: Invited to submit a full proposal or B : not selected for thesecond step. The CB will decide on that list which projects to invite for a full proposalsubmission (second step). All the applicants will be informed by the CS of the final resultsand a short SEC reviewer report will be sent.

    Full proposal eligibility: A second eligibility check will be performed by the CS to verify if thefull proposal is identical to the pre-proposal. Parties will check full proposal eligibilityregarding national formal administrative eligibility criteria. The CS will address all the fulleligible proposals to the Scientific Evaluation Committee .

    - Full proposal scientific assessment is an external written peer review of full proposalsperformed by international experts covering all fields of research addressed in the call (SECmembers and international external reviewers). The step is managed by the SEC, which in areview meeting discusses the applications and ranks them by consensus in a list. The finalselection of funded projects is performed by the CB based on the ranked list provided by theSEC.

    All proposals submitted will be treated confidentially by the ARIMNet 2 Partners and their appointedevaluation experts.

    9.3 Step 1: Pre-proposal evaluation criteria

    During a first meeting pre-proposals will be attributed among the SEC members according to theirscientific skills. For the evaluation, each pre-proposal will be attributed to a rapporteur and a reader.

    The rapporteur and the reviewer will evaluate independently each criteria giving a mark rangingfrom 0 to 5 ( from poor to excellent, see details § 9.7 ) and writing a short comment on each criteria

    and a general comment highlighting the major strength and weakness of the pre-proposal.

    Criteria 1: Relevance to the scientific scope of this call (Relevance and strategic nature of theproject with regard to the call's orientations) (score 0-5).

    Criteria 2: Innovative approach: soundness of scientific and technological objectives(importance of the subject, ability to generate results, potential for progress in the field,

    ambition, innovation and potential breakthroughs) (score 0-5).

    Criteria 3: Added-value of the partnership for the Mediterranean (score 0-5).

    9.4 Pre-proposal selection

    During the second meeting of the SEC (schedule on 15 February 2015), according to the evaluation

    made by the reviewer and the reader, the SEC classify by consensus the pre-proposals in two

    categories: A) Invited to submit a full proposal and B) not invited.

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    14/26

    14

    The Chair of the SEC presents to the CB the list giving motivated reason of the selection. The list will

    be validated by the CB which will take the final decision for full proposal submission.

    The CS will announce to the coordinators if they are successful or not to be invited to submit a fullproposal to the second step and will send a short report (written by the SEC reviewer).

    9.5 STEP 2: Full-proposal evaluation criteria

    The full proposals will be evaluated on peer review process by external reviewers managed bythe Scientific Evaluation Committee of the first step. Similarly to the first step, each full proposalwill be attributed to a rapporteur and a reader of the SEC and for this second step two additional

    external reviewers will be appointed .

    External reviewers (2 for each full proposal) and the SEC members (1 rapporteur and 1 reader for

    each full proposal) will have to evaluate the project by scoring the four criteria (see below) on the

    scale 0-5 (from poor to excellent, see details § 9.7) and by justifying their score with a short comment

    (each criteria has the same weight):

    Criteria 1: Scientific and/or technological excellence - innovation and international competitivenessof the transnational project (score 0-5).

    o scientific excellence in terms of progress of knowledge with respect to the state of the art,conceptual breakthrough.

    o innovative nature in terms of technological innovation or of innovation potential with respectto the current situation.

    o integration of the different disciplinary fields.

    Criteria 2: Quality and efficiency of the implementation and the management (score 0-5).o level of scientific excellence or expertise of the teams, appropriateness of the partnership for

    the scientific and technical objectives.o scientific and technical feasibility of the project, choice of methods, structuring of the project,

    rigour in presenting the final results (deliverables), identification of milestones.o appropriateness of the project management means implemented, quality of the coordination

    plan (project management related to the functional, technical, organisational, temporal and

    financial aspects), involvement of the coordinator.o Time schedule feasibility.o appropriateness and justification of the requested funding (justification of the permanent

    personnel resources, appropriateness of the coordination costs, justification of the temporary

    personnel resources (trainees, PhD students, post-doctoral researchers), evaluation of the sum

    for investments and equipment purchases, evaluation of the other financial items (travel,

    subcontracting, consumables, etc.).

    Criteria 3: Potential impact: contribution to the advancement of knowledge and innovationapproaches and socio-economic aspects, stakeholder involvement (score 0-5).

    o strategy for technology transfer and for exploiting the potential of the project results, ifrelevant; industrial or technological application prospects and economic and commercial

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    15/26

    15

    potential, business plan, integration in the industrial activity. Credibility of the described

    technology transfer and the method for exploiting the results.o potential for utilisation or integration of the project results by the scientific or industrial

    community or society, and impact of the project in terms of knowledge acquisition.o benefit for society, public health, consideration of environmental issues.o openness to stakeholders.

    Criteria 4: Contribution to capacity building, transnational activities (score 0-5).o complementarity of the partnership for the Mediterranean.o actions to promote scientific and technical culture and communication.o actions for the dissemination of scientific results in higher education.o Training and mobility (for partners funded on these items by their corresponding party)

    During a third meeting, proposals are ranked by consensus in the Scientific Evaluation Committee

    meeting in descending order based on the average overall score and discussions. This will lead the

    SEC to classify full-proposals in three categories:(A) very good, should be accepted(B) good but would need further improvements to be financed(C) to be refused

    In the first category (A) the projects will be ranked according to their scientific quality and an A+

    category will concentrate the few outstanding projects.

    9.6 STEP 2: Full-proposal selection

    The Chair of the SEC will present to the Call Board the ranking list and explains it. Based on thisranking, a list of projects will be recommended for National funding by the parties.

    After the approval of the final list by respective funding agencies, the CS will – on behalf of theParties to this agreement – send notification letters and the reviewer’s report to all projectconsortia coordinators to inform them of the result of the final funding decision. Only after this

    communication, sent in copy to the funders involved, each Party will enter into the contractingprocess with the national researchers of successful Project Consortia.

    9.7 Score description for the evaluation criteria

    0 weakThe (pre-) proposal fails to address the criterion under examination or

    cannot be judged due to missing or incomplete information.

    1 poorThe criterion is addressed in an inadequate manner, or there are

    serious inherent weaknesses

    2 fairWhile the (pre-) proposal broadly addresses the criterion, there are

    significant weaknesses.

    3 good The (pre-) proposal addresses the criterion well, althoughimprovements would be necessary.

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    16/26

    16

    4 Very goodThe (pre-) proposal addresses the criterion very well, although certain

    improvements are still possible.

    5 excellentThe (pre-) proposal successfully addresses all relevant aspects of the

    criterion in question. Any shortcomings are minor.

    10. Funding

    10.1 Terms of participation

    The national funding for the ARIMNet 2 Call is offered under the coordination of the FP7 ERA-NETARIMNet “Coordination of Agricultural Research in the Mediterranean”. Research participants arerequired to recognise the coordinating role of ARIMNet 2 throughout the duration of fundedresearch projects until approval of the final report. Research Consortia will be asked for feedback onprocesses in order to help refine these for future use.

    10.2 Contractual relationships

    Regarding the call and the funding, ARIMNet 2 has a coordination role and does not directly providefunding. All of the contracts and funding procedures remain the full responsibility of the nationalresearch funding agencies.Each national funding agency will enter into a contract (or any official documents acting as contract)with the relevant researcher and it has to ensure that these contracts are synchronised both in timeand content, so that the Project Consortium can deliver transnational outputs as described in theproject proposal. The national funding agencies have to ensure that common ARIMNet 2 conditionsare met (e.g. common commencement date of a given project, reporting requirements etc.).

    10.3 Funding contracts

    For the whole duration of the contract it is the responsibility of the Project Consortium Coordinatorto inform the Call Secretariat of any changes which might affect the implementation of the project(e.g. work plan, consortium modifications) and other changes such as changes in contact details. TheResearch Partners shall also inform their national funding agency of those changes affecting thenational contract.If a change occurs to the Project Consortium which poses a risk to the project, the issue has to besolved by the consortium (in line with any Consortium Agreement). The Call Secretariat must be keptinformed of such events.

    Any changes in the work plan should be only minor, but will need to be authorised by all of thefunding agencies involved before amendments to the contract by the national funding agencies canbe issued.

    10.4 Research Consortium Agreement

    The consortia selected for funding must enter into a Consortium Agreement, in order to manage thedelivery of the project activities, finances, Intellectual Property Rights (IPR) and to avoid disputeswhich might be detrimental to the completion of the project.It will be the responsibility of the Project Consortium Coordinators to draw up a ConsortiumAgreement suitable to their own group. The Consortium Agreement will normally be under the law

    and legal system of the country of the Project Consortium Coordinator. The purpose of thisdocument is:

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    17/26

    17

    To underpin the Project Partners collaboration and provide the Project Partners with mutualassurance on project management structures and procedures, and their rights andobligations towards one another;

    To assure the funding agencies involved that the Project Consortia have a satisfactorydecision making capacity and that Project Partners are able to work together in a synergisticmanner.

    The following items (as a minimum) should be addressed by the Consortium Agreement:

    purpose of and definitions used in the Consortium Agreement

    names of organisations involved

    organisation and management of the project

    role and responsibilities of the Research Consortium Coordinator and the Research Partners:person in charge, their obligations and key tasks, conditions for their change

    deliverables (transnational reports and if relevant requirements for national reports wherecoordination is required)

    resources and funding

    confidentiality and publishing

    Intellectual Property Rights (how this issue will be handled between Research Partners)

    decision making within the consortium

    handling of internal disputes

    the liabilities of the Research Partners towards one another (including the handling of defaultof contract).

    It is recommended that Project Consortia use the DESCA (Developed Simplified ConsortiumAgreement) standard model for Consortium Agreements. More information about DESCA can befound from their website: http://www.desca-2020.eu

    The Consortium Agreement must be signed by all Parties of the Project Consortium.

    10.5 Intellectual property rights and use and access to results

    The ARIMNet 2 partners will take all reasonable steps to ensure that information provided in theapplication is treated as confidential subject to submission to the members of its committees andmerit review and to any obligations under law.Results and new Intellectual Property Rights (IPR) resulting from projects funded through theARIMNet 2 Call will be owned by the Project Partners according to the regulations in theirConsortium Agreement and if not conflicting with the respective national regulations.Researchers are encouraged to actively exploit the results of the research project and make themavailable for use, whether for commercial gain or not, in order for public benefit to be obtained fromthe knowledge created.All ARIMNet 2 Partners shall have the right to use documents, information and results submitted bythe Project Partners for their own purposes, provided that this is compatible with the protection of

    http://www.desca-2020.eu/http://www.desca-2020.eu/http://www.desca-2020.eu/http://www.desca-2020.eu/

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    18/26

    18

    intellectual property rights, confidentiality obligations, and the legitimate interests of the owner ofany foreground involved.

    10.6 Commencements of projects

    A project can commence as soon as the Call Office has been informed by the Project ConsortiumCoordinator about the conclusion of the national contracts. Once the national contract comes intoforce, eligible national costs may be claimed as per national procedures. In the interim period,researchers may commence work on the project at their own risk and costs.

    11. Project monitoring

    Interim monitoring procedures will be mandatory for all applicants involved in the funded projects.These will be independent of other specific national requirements.

    Additionally, there will be a final report at the end of the project, which has to be delivered to theCall Secretariat within two months following project conclusion. Two meetings (one mid-term

    meeting and a final one) will be organised to share and capitalise experience to the benefit of theARIMNet 2 community and beyond. Those meetings that would gather the coordinators of theprojects should be included in the budget required.

    Written reports and deliverables will be sent out for evaluation by the international experts and therelevant national funding agencies. The project deliverables shall only be deemed approved whenthe Call Secretariat confirms approval to the Project Consortium Coordinator, or (if modifications arerequired) confirms to the Project Consortium Coordinator approval of the modified version of anydeliverable.

    Project reports must be produced in English, and may be produced in other languages at the Project

    Partners ’ discretion. The Project Partners are jointly responsible for the delivery of work, and the CallSecretariat will only accept reports delivered by the Research Consortium Coordinator on behalf ofthe consortium.

    Where required, each participant must report progress on its own component of the work to thenational funding organisations in line with national contractual obligations. This also applies tofinancial reports.

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    19/26

    19

    ANNEX 1

    1. A Funder Contribution Table

    Country Funding

    Partner

    Contribution up

    to (in k€)

    EU or Non EU

    country Algeria MESRS In Kind NON EU

    Croatia KRS In Kind EU

    Egypt ASRT 600 NON EU

    Egypt ARC 40 NON EU

    France ANR 2000 EU

    Greece DEMETER 100 in cash100 In Kind EU

    Israel MOARD 300 NON EU

    Italy MIPAAF 800 EU

    Malta MCST In kind EU

    Morocco MESRSFC 800 NON EU

    Portugal FCT 400 EU

    Slovenia MIZS 300 EU

    Spain INIA 200 EU

    Tunisia MESR 600 NON EU

    Tunisia IRESA 300 NON EU

    Turkey GDAR 600 NON EU

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    20/26

    20

    1.B Funding Scheme per Country

    TOPICS 2014 Call A N R

    M I Z S

    1

    M I P A A F

    I N I A

    F C T

    D E M E T E R

    K R S

    G D A R

    M O A R D

    M E S R S F C

    M E S R

    I R E S A

    M E S R S

    A S R T

    A R C

    M C S T

    F r a n c e

    S l o v e n

    i a

    I t a

    l y

    S p a

    i n

    P o r t u g a

    l

    G r e e c e

    C r o a

    t i a

    T u r k e y

    I s r a e

    l

    M o r o c c o

    T u n

    i s i a

    T u n

    i s i a

    A l g e r i a

    E g y p

    t

    E g y p

    t

    M a

    l t a

    1. Increase in resilience, rusticity and productivityof Mediterranean agricultural production systems X X X X X X X X X X X X X2. Improving inputs management , at the level of theproduction systems X X X X X X X X X X X X X X X3. Common Mediterranean challenges in animal andplant health X X X X X X X X X X X X X4. Sustainable Mediterranean Aquaculture andFisheries X X X X X X

    5. Innovation in the agroindustry X X X X X X X X X6.Logistics, supply chain organization,transportation X X X X X X X

    7.Food safety, food sanitary issues X X X X X X X X X X X X8.Food consumption patterns: consumers’behavior, quality of products, diet and nutrition X X X X

    9.Agricultural and food policies X X X X X X X X X

    10. Sustainable management of water and otherresources used by agriculture X X X X X X X X X X X X X11. Landscape and spatial management,competition with other land uses, peri-urban andurban agriculture

    X X X X X X

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    21/26

    21

    Annex 2

    Scientific Scope of the Call

    ContextThe countries of the Mediterranean basin face a number of similar problems in relation toagriculture, mainly as regards the use and management of natural resources, such as soil and water,crop protection and threats to the security and sustainability of agricultural production resultingfrom climate change.

    To this respect, Mediterranean basin concentrates almost all the key global challenges agriculture isfacing in the world, and thus should concentrate intense research efforts. But for the moment, that isnot the case. Issues are too often looked separately each side of the Mediterranean Sea. There is agreat need to enhance research effort through multilateral cooperation both to strengthen theeconomies of the Mediterranean countries and to help to find solutions to global challenges. This has

    been underlined in several global forum and reports during last years like IAASTD Report on CWANAregion (2008), AARINENA e-consultation for the GCARD (2010), CIHEAM Report on the Future ofagriculture and food in Mediterranean countries (2008) and the PARME analysis of foresightsconcerning the Mediterranean area (2010, presented in Palma October 2010). All these documentsare a sound and strong basis for designing the call.The first characteristic of the Mediterranean area is that its natural environment is characterized by ahigh level of vulnerability. And today, its sensitive ecosystems are threatened by pressures of variouskinds. The Mediterranean region is considered one of the regions of the world most threatened byclimate change which could worsen stresses that are already high: drought, extreme climatic eventsfrequency, crop and animal endemic and emerging diseases.

    Secondly, the Mediterranean region is one of the hotspots of the global biodiversity, with aremarkable richness in cultivated and wild species characterising this area. This diversity is clearly anasset for the region that could be valued through specific agricultural and food products and thatcould be used to face new challenges such as climate change adaptation. It also has to be preservedas a common heritage.

    Thirdly, water is a scarce resource in most of the Mediterranean countries and its availabilitydecreases. In several countries water use is reaching the level of available resources. Besides,overexploitation of ground water raises several other environmental problems such as soil salinity. Inthe future, agriculture will be more and more seriously in competition with other users, whichimplies to find solutions for limiting losses and ensuring more efficient use of the water resource.

    A better management of natural resources is thus a condition to maintain the sustainability ofagriculture. Agriculture has a significant role to play in producing environmental services for theentire society. However, simultaneously, developing agricultural production is a priority for mostcountries in the Mediterranean region.

    Agriculture is already contributing significantly to the economy in particular in the south and easternMediterranean countries, where agriculture accounts for 10 to 15% of the GDP (against 2 to 3% inthe Mediterranean EU member states) and where people working in agriculture is around 20 % oftotal employment. In the south and eastern Mediterranean countries rural population is showing nodecline in absolute term, and is highly dependent on agriculture, due to the lack of employment in

    other sectors. Consequently, the development of agriculture in Mediterranean countries cannot

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    22/26

    22

    follow the same historical path of European agriculture modernization based on a strong decrease ofrural population.

    Productivity growth in agriculture has been high during the past (often higher in southMediterranean countries than in EU member countries) but remains globally insufficient to respondto the increase in food demand associated with the high population growth rate. SeveralMediterranean countries are large importers of agricultural and food products, with a declining food

    trade balance. South Mediterranean countries are importing on international markets basiccommodities (cereals, meat, vegetable oils), however they are also exporters of products for whichthey have a comparative advantage: fruits, vegetables and olive oil.

    In this context, Mediterranean agriculture should find specific paths to develop simultaneously asustainable agriculture for producing basic food commodities and to take advantage of its specificassets for more specific products that can generate income all over the supply chains. Thisdevelopment should necessarily be implemented with a high level of attention towards resourcesmanagement and environmental impacts of land uses.

    The present call is part of the ERANET- ARIMNet project that involves 12 partner countries from

    north, east and south of the Mediterranean, and whose purpose is to strengthen multilateralcooperation in Agricultural Research.

    Under this call, we will support projects that will add to the existing programs by addressing theMediterranean agriculture issues in a collaborative way between Mediterranean countries researchteams and through innovative approaches. Different topics and issues can be addressed in theresearch proposals, compatible with the fields identified by stake holders, through mobilizing a largeset of disciplines going from genetic to social sciences and combining/integrating them.

    Therefore, the call is mainly defined by impacts and targets as challenge facing Mediterranean basin.Projects should contribute to build sustainable research cooperation dynamics and if possible initiate

    or strengthen joint structures. Proposals should necessarily include teams from at least threecountries of ARIMNet (including at least one from the EU and one from the Southern and EasternMediterranean Countries)

    Scope of the call

    Research proposal should address scientific issues that could help to meet the challenges faced by

    Mediterranean agriculture and fisheries. Those challenges, for this first joint action, are defined in

    the three following topics and 11 subtopics. Answers could be more focused on some specific points

    or address transversal issues. Integrated and multidisciplinary approaches would be appreciated, asthey are generally needed to address complex issues.

    A. Developing sustainable production in the context of increasing ecological and climaticstresses

    Facing climatic change and pressure in water availability, protecting the natural resources and the

    environment need an evolution of the current production practices. Simultaneously, the challenge

    for agriculture and fisheries is to face an increasing food demand and to contribute to economic and

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    23/26

    23

    social development. This implies innovations in the production systems and requires researches on

    several issues that concern different aspects of agricultural production, aquaculture and fisheries.

    1. Increase in resilience, rusticity and productivity of Mediterranean agricultural productionsystemsIn the Mediterranean area, climatic conditions, in particular climate variability, lead to the need for

    developing production systems able to cope with risk and uncertainty. Rusticity and flexibility of the

    different components and the whole is a major factor of resilience of the systems and this is required

    to improve their competitiveness and sustainability. Therefore, research is needed to improve

    simultaneously the productivity of agricultural system and their sustainability and resilience. Several

    issues have to be addressed in this perspective: genetic breeding of varieties tolerant to abiotic

    (drought, high air temperature, soil salinity, soil pollution, soil water depletion, and ground water

    level rising etc., and to other climate hazards), and/or biotic (major pests and diseases) stresses,

    genetic breeding of species, use of local biodiversity, development of new farming systems

    combining different activities and species, diversification of cropping systems using local crop

    species, development of rich protein crops...

    2. Improving inputs management, on the level of the production systems, for economic andenvironmental impactsIrrigation induced in many areas of the Mediterranean region a significant increase in agricultural

    production. However, problems associated with overuse of water have emerged that threaten the

    water resources in terms of quantity. Other problems emerged from non-sustainable ways of

    farming. Erosion and loss of soil fertility is becoming a major problem in several places in the

    Mediterranean. Intensive use of chemicals (fertilizers and pesticides) has also generated water

    quality and other environmental problems. Moreover Agriculture generates co products, by productsand waste waters that are currently not properly taken care of both in environmental and economic

    terms. Several research issues should be considered in order to improve the sustainability of those

    production systems: water saving techniques, on-farm improved efficiency of input uses integrated

    water and nutrient management, integrated crop and pest management, recycling and reuse of

    agricultural wastes and waste waters and design of innovative farming systems. These issues should

    be addressed through different approaches and by collaborative research between different

    disciplines. The projects dealing with issues raised at a larger level than the farm level should be

    submitted in the subtopic 10.

    3. Common Mediterranean challenges in animal and plant healthThe development of endemic or emerging animal and plant diseases is a major problem for both the

    productivity and human health all around the Mediterranean. The Mediterranean is a hotspot not

    just for biodiversity but also for the emergence of animal and plant diseases. The effects of climate

    change favor the persistence of pandemic animal diseases, the resurgence of epidemics and the

    emergence of new pathogens. This issue of animal and plant health must be addressed taking into

    account different levels of integration: from the ecology and biology of pathogens and vectors, to the

    issues of sanitary monitoring, health control and socioeconomics both at the farm and regional level.

    4. Sustainable Mediterranean Aquaculture and Fisheries.

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    24/26

    24

    Coastal zones are of strategic importance to the Mediterranean Countries. They are a source of work

    and a living area for a large part of the population and they are a major source of food and raw

    materials. Research to increase the sustainability of aquaculture and fisheries should be done taking

    into consideration the need to increase the economic performance of the activities while preserving

    natural resources.

    B. Food chain from production to consumption: enhancing the advantages of MediterraneanAgriculture and Food

    Several products benefiting from specific Mediterranean natural advantages and know-how are

    already competitive and provide high value-added to farmers and other actors in the supply chains

    (fruit, vegetables, olive oil...) They already benefit from a domestic and international demand for

    products entering in the Mediterranean diet. However, researches are needed to enhance their

    development in a way that they can really contribute to the economic development of rural areas.

    Research topics can concern different stages of the food chain: production, food processing,transport, marketing, policies.

    5. Innovation in the agroindustryThe technological aspects of production and transformation are important issues and are closely

    related to market and food chain organisation and to industrial strategies. In particular, it is

    necessary to develop new processing technologies and valorisation of agricultural products and by-

    products for better valorising the local typical products, to boost rural economy, to contribute to a

    transition towards a bio-based society and to create new jobs. The utilisation of the Mediterranean

    biodiversity, the traditional knowledge and culinary heritage could help to develop territories and

    regions as typical products can benefit from “niche” markets. Researches on these issues are

    expected on different fields, and different disciplines from genetics to technological sciences, social

    and management sciences.

    6. Logistics, supply chain organization, transportation

    Logistics is the core of efficient food chain governance. Improving supply chain management is of

    major importance to better link agricultural producers to urban markets. Increasing the efficiency all

    along the food chain includes also reducing post-harvest losses. These remain very high in many

    Mediterranean countries. In some cases, they may represent up to 30-40%. Reducing these losses

    can contribute significantly to improve food security. Research is needed to better understand themechanisms and to find solutions to reduce losses all along the chain, from production to storage,

    transportation and commercialisation.

    7. Food safety, food sanitary issues

    A better control of the quality all along the food chain is an important issue for food safety. In urban

    areas, where food supply is ensured through important amounts of products generally coming from

    agro-industrial systems, problems are often related to technologies that have to be suitable for

    treating large quantities (i.e. cold chain). Improving the articulation between the domestic

    production of small or medium enterprises and the food demand of urban population raises specificquestions of how to ensure food security. Food safety in rural areas may be less important due to the

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    25/26

    25

    proximity between producers and consumers, and to the smaller scale of the firms, however several

    improvements need to be made. Researchers from food technologies sciences and from social

    sciences are invited to address those issues in the production, processing, storage, transportation

    and marketing fields.

    8. Food consumption patterns: consumers’ behaviour , quality of products, diet and nutritionFood quality is a major component of food security. The Mediterranean Area faces major change in

    terms of diet regimes. There are still certain micronutrient deficiencies for categories of population.

    Furthermore diet- and lifestyle- related chronic diseases (diabetes and other diet related diseases…)

    are dramatically increasing. While the traditional Mediterranean diet is considered particularly

    healthy, the Mediterranean is paradoxically one of the areas of the world where overweight and

    obesity are most prevalent —a clear sign of dietary shifts in progress: excess consumption of

    carbohydrates, sugars, saturated fat and salt, lower consumption of fruits, vegetables and fibers. The

    challenges of research in this area are considerable. The complex relationship between diet and

    health in the Mediterranean context needs to be understood, as well as we must better understand

    eating habits, their heterogeneity and their determinants. There are also needs for technologicalinnovation in the industrial development of traditional products, nutritional and health quality of

    processed foods,

    9. Agricultural and food policiesPublic policies have a major role to play to regulate the food system, the impact of agriculture on the

    environment and to help to the development of rural areas. Good functioning of food chains relies

    highly on physical infrastructure but also to a good management of the whole chain by a better

    organization of information systems and administration. These improvements need public

    investments and will help to appeal for private investments and arrival of foreign capital.Implementing new production systems, ensuring spatial organization of land and field patterns that

    could improve the resources management, developing environmental services produced by

    agriculture will also require specific policy instruments. Fields of research on public policies are open

    that will have to address the following issues: land tenure regimes and policies, spatial organisation

    of land uses, sharing of resources between users, long term management of resources compatible

    with the development of rural areas, quality of food and nutrition... Regarding export markets,

    complying with public and private quality standards is an important issue. These standards are

    required by the consumers in the domestic markets as well. On this aspect research is needed on

    various issues that could highlight issues such as quality certification, geographical indications and

    labelling.

    C. Sustainable management of landscape and resources used by agriculture

    10. Sustainable management of water and other resources used by agricultureConservation of water resources and soil fertility, protection of biodiversity, sustainable

    management of agricultural solid wastes and waste waters, are major challenges in the

    Mediterranean area. Risks of degradation are high, in relation with unsustainable agricultural

    techniques, increase of inputs use, climate change. They have to be addressed at the farm level(topic 1), but also at larger scale. Some issues need to be tackled at the river basin level, some others

  • 8/18/2019 ARIMNet 2 Guidelines for Applicants_18_sept_2014

    26/26

    on larger areas, even in some cases (e.g. water management) on international level. They need

    integrated approaches combining different disciplines.

    The increase of the population living in coastal areas is a major change in the Mediterranean area.

    Seasonal and permanent inhabitants living in coastal cities increased as a consequence of population

    growth and/or tourism development. It implies a concentration of population in the cities and an

    urban sprawl along the coasts. Urbanisation competes with agriculture for land that is often the most

    fertile or easier to irrigate. It can also result in an increase in flood risk. Consequences of these

    population dynamic changes should be better analysed in order to find ways to manage this

    development and the relationship between coastal areas and hinterlands.

    11. Landscape and spatial management, competition with other land uses, peri-urban and urbanagriculture

    The diversity of production systems valorises the diversity of soils, slopes, wet areas but can also play

    a non- negligible role in water circulation, fauna and flora dissemination or soil distribution. This

    leads to understand the role of the spatial organization of land and field patterns, the eventual role

    played by network of hedges, woods... on the natural resources and the environment and to definethe means to improve ecological regulations through spatial organization of farming systems. At a

    higher level, the spatial organization of agriculture, forest and pastoral areas, have a strong influence

    in terms of soil quality, water resources and biodiversity. The current dynamics in land uses produce

    new spatial patterns and new relationships between urbanized areas, agricultural areas, hybrid

    spaces between city and countryside, intensive and extensive agricultural zones, pastoral areas and

    uncultivated zone (forest, wetland). This has to be analyzed in a perspective of landscape and land

    uses regulation. Development of peri-urban and urban agriculture raises specific issues of

    environmental and resources management and of marketing channels organisation. These types of

    agricultural systems represent in some countries significant sources of income for poor households,but can generate health problems and pollution as well as positive contributions to the urban

    environment or resource management (use of waste water, environmental amenities). It is necessary

    to better understand these dynamics and their impact on resources and the environment.