Application_Report_Part_1_2013-2014 (24-01-2012).PDF

46
Application Report - Part1 Application Status: New Application Sub-Status: ***Note :- All the Dates in the Report are in mm/dd/yyyy format Date of Signature Seal of Institute Name & signature of Director /Principal 1/24/2013 Page 1 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO Printed By : AE348831 All India Council for Technical Education (A Statutory body under Ministry of HRD, Govt. of India) 7th Floor, Chandralok Building, Janpath, New Delhi- 110 001 PHONE: 23724151/52/53/54/55/56/57 FAX: 011-23724183 www.aicte-India.org Guidelines on submission of documents along with print copy of application/s for approvals 1 Setting up new Technical Campus / Converting Existing Technical Institutions into a Technical Campus /Adding new Technical Program/s Refer annexure 17. Ensure that all copies are in A4 size only (Land documents/building drawing may be up to A0 sizes) Ensure that all copies are attested. Please number all copies of documents as given below, Your Regional office code Your Application Id Annexure Number Sr number as in annexure 17 Page number (3 digits) e.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 17.1, WRO 1-11234567 17.10 02 001 WRO 1-11234567 17.10 02 002 The number so generated WRO1-1123456717.1002001 should be written on top of each page with bold pen as shown below W R O 1 - 1 1 2 3 4 5 6 7 1 7 . 1 0 0 2 0 0 1 Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner as shown below. This set of knotted documents should be submitted in a "Flap Folder".

Transcript of Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Page 1: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 1 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

All India Council for Technical Education(A Statutory body under Ministry of HRD, Govt. of India)

7th Floor, Chandralok Building, Janpath, New Delhi- 110 001PHONE: 23724151/52/53/54/55/56/57 FAX: 011-23724183 www.aicte-India.org

Guidelines on submission of documents along with print copy of application/s for approvals

1 Setting up new Technical Campus / Converting Existing Technical Institutions into a Technical Campus /Adding new Technical Program/s

Refer annexure 17.

Ensure that all copies are in A4 size only (Land documents/building drawing may be up to A0 sizes) Ensure that all copies are attested.

Please number all copies of documents as given below,

Your Regional office code

Your Application Id

Annexure Number

Sr number as in annexure 17

Page number (3 digits)

e.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 17.1,

WRO 1-11234567 17.10 02 001WRO 1-11234567 17.10 02 002

The number so generated WRO1-1123456717.1002001 should be written on top of each page with bold pen as shown below

W R O 1 - 1 1 2 3 4 5 6 7 1 7 . 1 0 0 2 0 0 1

Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner as shown below. This set of knotted documents should be submitted in a "FlapFolder".

Page 2: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 2 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Provide index page on top of set of documents as follows,

Region - WRO Application ID : 1-11234567

Annexure Number

Sr number as in annexure 17 (2 digits)of documents which are being submitted now

Page number (3 digits)

From To17.10 02 001 00217.10 03 001 005

Guidelines on submission of documents along with print copy of application/s for approvals

2 § Extension of approval to existing Technical Institution / Technical Campus

§ Increase / reduction in intake in existing courses

§ Adding course/s in existing program

§ Closure of program / course

§ Mandatory provision of supernumerary seats for TFW

§ Introducing / continuing / discontinuing supernumerary seats for PIO

§ Introducing / continuing / discontinuing seats for sons/daughters of NRIs

§ Change of name of the Institute

§ Conversion of Women's Institution into Co-Ed Institution

§ Introducing a Foreign Collaboration with an AICTE approved Indian Institution

Refer annexure 18.

Ensure that all copies are in A4 size only (Land documents/building drawing may be up to A0 sizes)Ensure that all copies are attested.

Page 3: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 3 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Please number all copies of documents as given below,

Your Regional office code

Your Application Id

Annexure Number

Sr number as in annexure 18

Page number (3 digits)

e.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 18.1, WRO 1-11234567 18.10 02 001WRO 1-11234567 18.10 02 002

The number so generated WRO1-1123456718.1002001 should be written on top of each page with bold pen as shown below,W R O 1 - 1 1 2 3 4 5 6 7 1 8 . 1 0 0 2 0 0 1

Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner as shown below. This set of knotted documents should be submitted in a "FlapFolder".

Provide index page on top of set of documents as follows,

Region - WRO Application ID : 1-11234567

Annexure Number

Sr number as in annexure 18(2 digits)of documents which are being submitted now

Page number (3 digits)

From To18.10 02 001 00218.10 03 001 005

Regional Office codes :

Eastern ERO North-West

NWR SouthCentral

SCR South-West

SWR

Northern NRO Central CRO GuwahatiCamp Office

ERO Southern SRO

Western WRO

Page 4: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 4 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Important Note for Payments:

a "It has been observed that some of the institutions applying to AICTE for the approval process are submitting hand filled, over written payment slips (challan) along with the Cheque / Payorder at thecollecting bank branches. We wish to reiterate that payment is to be deposited strictly as per Payment process explained in User manual uploaded on this website. AICTE shall not be able to update any such payment record as hand filled challan shall not have the corresponding Institutiondetails at AICTE end for payment status updation, which will affect institution approval process.

b Institutions which do not follow the AICTE guidelines shall be responsible for rejection/ delay in updation of their application and neither AICTE nor the Collecting Bank shall be responsible for any such consequence."

c No DD / Cheque / PO to be sent to either Head Office / Regional Office of AICTE. Such payments shall not be processed and the applications are liable to be rejected.

Page 5: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 5 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Permanent Institute Id 1-4885880Current Application Number 1-1348313472Application Number of 12-13 1-725041152AICTE File No. 730-50-311(E)/ET/2001Application Type Extension-Expansion-ClosurePermanent Institute Id ,as entered by Existing Institute applying for New Programme

Not Applicable

Do you want to change the Affiliating University Data Not Provided by the Institute

Enter name of the new Affiliating University Data Not Provided by the Institute

Institute Details

Description Details provided by InstituteName of the Institution/Technical campus PRAGATI ENGINEERING COLLEGEAddress 1-378, ADB ROAD, SURAMPALEM,NEAR

PEDDAPURAM,E.G.DIST,A.P.Town/Village SURAMPALEMState/UT Andhra PradeshDistrict EAST GODAVARIPin 533437AICTE Region South-CentralSTD code 8852Land Phone number 252233Cell Number 9848123445FAX Number 252232Email [email protected] Email [email protected] www.pragati.ac.inInstitute Type Unaided - PrivateWomen Institute NMinority Institute NType Of Minority Data Not Provided by the Institute

Name of the Minority NAPAN AAATG5210CPrimary Bank Account number 10300301990Bank Name STATE BANK OF INDIAIFSC Number SBIN0004248Any Unaided Course? NApproval Year of First Course 2001

Date of First Approval by AICTE07/19/2001

Total number of teaching faculty in the Institute for all Programmes:

184

Number of teaching faculty approved by University/Government?:

82

Page 6: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 6 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Are all approved teaching faculty being paid as per VI pay commission?:

Y

Are all the teaching faculty, as per AICTE qualification?:

Y

Do you wish to apply closure of Institute?: NPercentage Grant Received from Government?: 0Whether Institute is operating from Permanent Site/Temporary Site?:

Permanent Site

Whether mandatory disclosure is uploaded in Institute's website?:

Y

Whether the Institute following ICAI(Institute of Chartered Accountants of India) Accounting Formats?:

Y

Fees to be charged, Reservation policy, Admission policy and Document retention policy are duly approved by State Govt?:

Y

Fees to be charged, Reservation policy, Admissionpolicy and Document retention policy are duly approved by Affiliating University?:

Y

Fees to be charged, Reservation policy, Admissionpolicy and Document retention policy are uploaded in Institute's Website?:

Y

List of faculty and data uploaded on the institute web portal

Y

Courses/Approved Intake displayedat the entrance of the institute?

Y

Application Details

Change of Institute Site NIncrease in Intake / Application for New Course YClosure of Course / Reduction in Intake NPIO NNRI NChange of name of the Institute NConversion of Women's Institution into Co-Ed Institution

N

Introducing a Foreign Collaboration with an AICTE approved Indian Institution

N

Introduction of Second Shift NIntroduction of New Dual/Integrated Course N

Payment Details

Page 7: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 7 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Details about Parent Organization

Name of the Parent organization GAYATRI EDUCATIONAL SOCIETYAddress KAKINADATown/Village KAKINADAState/UT Andhra PradeshDistrict EAST GODAVARIPin 533003Website www.pragati.ac.inType of the organization SocietyRegistered with A.P.REGISTRATION ACT,XXI 1860Registration date 03/20/1993

Details about Contact Person

Title Dr.First Name PARUCHURILast Name KRISHNA RAOAddress D.NO.70-14-51, JAYENDRA NAGARTown/Village KAKINADAState/UT Andhra PradeshDistrict EAST GODAVARIPin 533003Designation SECRETARY & CORRESPONDENTSTD code 8852Land Phone number 252233Cell Number 9848123445FAX Number 252232Email [email protected] Cell Number 7702666336Alternate Email Address [email protected]

Land Details

Location RuralNorthern hilly area NNumber of pieces NA Max distance in farthest pieces NA

Latitude and Longitude Latitude - 17, 10, 27Longitude - 82, 2, 56

Total area in acres 25.2Land registered with GAYATRI EDUCATIONAL SOCIETYLand registration date 08/14/2000Land Use Certificate issued by Mandal Revenue Officer

Page 8: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 8 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Land Use Certificate date 08/17/2000Land ownership details Registered Sale DeedMortgage details NPurpose of mortgage NA

Other Land Details

Sr Num

Land Registration No (1)

Date of Registration(2)

Area of Land(3)

Khasra Number(4)

Plot Number/Survey Number(5)

Land Situated At(6)

Land Registered in the name Of(7)

Ownership or Govt Lease(8)

Land Use Certificate Issued(9)

Land Use Certificate Issuing Authority (10)

1 1100/2000 08/17/2000 3.3 203 203/9 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer, Peddapuram

2 1100/2000 08/17/2000 2.98 203 203/10 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer, Peddapuram

3 1106/2000 08/19/2000 .28 203 203/8 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer ,Peddapuram

4 1106/2000 08/19/2000 4.05 203 203/6 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer,Peddapuram

5 1106/2000 08/19/2000 2.2 203 203/11 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer, Peddapuram

6 1099/2000 08/17/2000 2.6 203 203/7 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer,Peddapuram

7 1099/2000 08/17/2000 .56 203 203/4 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer, Peddapuram

8 1099/2000 08/17/2000 2.73 203 203/5 A,B,C

Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer,Peddapuram

Page 9: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 9 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Land Registration No (1)

Date of Registration(2)

Area of Land(3)

Khasra Number(4)

Plot Number/Survey Number(5)

Land Situated At(6)

Land Registered in the name Of(7)

Ownership or Govt Lease(8)

Land Use Certificate Issued(9)

Land Use Certificate Issuing Authority (10)

9 1103/2000 08/18/2000 6.5 203 203/8 Surampalem

GAYATRI EDUCATIONAL SOCIETY

Ownership Yes Revenue Divisional Officer, Peddapuram

Other Land Details Contd

Sr Num

Is the Land Mortgaged(11)

Details of Land If the Land isMortgaged(12)

Land required at the time of First AICTE approval(In Acres)(13)

Land available at the time of First AICTE approval(In Acres)(14)

1 No Data Not Provided by the Institute

25 25.2

2 No Data Not Provided by the Institute

25 25.2

3 No Data Not Provided by the Institute

25 25.2

4 No Data Not Provided by the Institute

25 25.2

5 No Data Not Provided by the Institute

25 25.2

6 No Data Not Provided by the Institute

25 25.2

7 No Data Not Provided by the Institute

25 25.2

8 No Data Not Provided by the Institute

25 25.2

9 No Data Not Provided by the Institute

25 25.2

Building Details

Building status AvailableTotal built up area planned 1314.59Total built up area ready 20886.42Total Instructional area (carpet area) ready in Sqm

12267.28

Total Administrative area (carpet area) ready in Sqm

1517.25

Total Amenities area (carpet area) ready in Sqm 1459.89Activities in the building other than AICTE approved courses

NIL

Page 10: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 10 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Other Building Details

Sr

Nu

m

Bu

ildin

g N

um

ber

(1)

Bu

ildin

g

Nam

e (2

)

San

ctio

ned

Bu

ilt

up

Are

a(3)

Co

nst

ruct

ed

Bu

ilt u

p a

rea(

4)

Ap

pro

ved

Car

pet

Are

a In

stru

ctio

nal

(5)

Co

nst

ruct

ed

Car

pet

Are

a In

stru

ctio

nal

(6)

Ap

pro

ved

Car

pet

Are

a-

Ad

min

stra

tive

(7)

Co

nst

ruct

ed

Car

pet

Are

a A

dm

inst

rati

ve(8

)

Ap

pro

ved

Car

pet

Are

a-

Am

enit

ies(

9)

Co

nst

ruct

ed

Car

pet

Are

a A

men

itie

s(10

)

1

5 Civil Block

3943.77 2629.18 2509.29 1672.86 0 0 209.1 139.4

2

1 Main Building

11473.39 11473.39

5092.92 5092.92 1260.04 1260.04 323.38 323.38

3

2 Mechanical Block

3840.9 3840.9 2698.68 2698.68 301.83 301.83 111.52 111.52

4

4 LibraryBlock

2797.96 2797.96 2797.96 2797.96 0 0 0 0

5

3 Workshop Shed

219 219 219 219 0 0 0 0

6

6 StoresBuilding

66.9 66.9 0 0 55.75 55.75 11.15 11.15

Page 11: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 11 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

7

7 Canteen Building

352.25 352.25 0 0 11.15 11.15 156.1 156.1

8

8 Auditorium

602.1 602.1 0 0 0 0 602.1 602.1

9

9 Generator Shed

172 172 0 0 0 0 172 172

Other Building Details Contd

Sr

Nu

m

To

tal A

rea

Ap

pro

ved

(11)

To

tal A

rea

Co

nst

ruct

ed(1

2)

Act

ivit

ies

Co

nd

uct

ed

in t

he

Bu

ildin

g(1

3)

No

n A

ICT

E

app

rove

d

cou

rses

ru

nin

th

e B

uild

ing

(If

A

ny)

(14)

Nam

e o

f th

eB

uild

ing

P

lan

A

pp

rovi

ng

A

uth

ori

ty(1

5)

Bu

ildin

g

Pla

n

Ap

pro

val

Dat

e(1

6)

Ap

pro

val

Nu

mb

er(1

7)

1 2718.39 1812.26 Academic activities

Nil Panchayat Secretary, Gram Pranchayat, Surampalem

11/07/2012 5

2 6676.34 6676.34 Academic activities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

02/28/2001 19

3 3112.03 3112.03 Academic activities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

03/30/2003 56

4 2797.96 2797.96 Academic activities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

03/05/2009 76

5 219 219 Academic activities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

03/05/2009 77

6 66.9 66.9 Common facilities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

12/30/2006 133

7 167.25 167.25 Common Nil Panchayat 08/04/2010 4

Page 12: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 12 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

facilities Secretary, Gram Panchayat, Surampalem

8 602.1 602.1 Common facilities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

08/04/2010 5

9 172 172 Common facilities

Nil Panchayat Secretary, Gram Panchayat, Surampalem

08/04/2010 6

Programme and courses

Sr Num

Course Unique Id(1)

Programme(2) Level(3) Course(4) Shift(5) FT/PT(6)

Started In (7)

Applying For(8)

Course duration

(9) 1 1-

1349555046ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1st Shift FULL TIME

2002 EoA Only 4

2 1-1349555049

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1st Shift FULL TIME

2004 EoA & Increase in intake

4

3 1-1349555051

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

INFORMATIONTECHNOLOGY

1st Shift FULL TIME

2001 EoA Only 4

4 1-1349555053

MCA POST GRADUATE

MASTERS IN COMPUTER APPLICATIONS

1st Shift FULL TIME

2007 EoA Only 3

5 1-1349555055

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

2nd Shift FULL TIME

2010 EoA Only 4

6 1-1349555057

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE ANDENGINEERING

2nd Shift FULL TIME

2010 EoA Only 4

7 1-1349555059

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1st Shift FULL TIME

2011 EoA Only 4

8 1-1349555181

ENGINEERINGAND TECHNOLOGY

POST GRADUATE

POWER ELECTRONICS AND ELECTRICAL DRIVES

1st Shift FULL TIME

2011 EoA Only 2

9 1-1349555183

ENGINEERINGAND TECHNOLOGY

POST GRADUATE

EMBEDDED SYSTEMS

1st Shift FULL TIME

2009 EoA Only 2

Page 13: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 13 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Course Unique Id(1)

Programme(2) Level(3) Course(4) Shift(5) FT/PT(6)

Started In (7)

Applying For(8)

Course duration

(9) 10 1-

1349555185ENGINEERINGAND TECHNOLOGY

POST GRADUATE

VLSI SYSTEM DESIGN

1st Shift FULL TIME

2010 EoA Only 2

11 1-1349555187

ENGINEERINGAND TECHNOLOGY

POST GRADUATE

COMPUTER SCIENCE ANDENGINEERING

1st Shift FULL TIME

2007 EoA Only 2

12 1-1349555189

ENGINEERINGAND TECHNOLOGY

POST GRADUATE

COMPUTER SCIENCE

1st Shift FULL TIME

2010 EoA Only 2

13 1-1349555191

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

CIVIL ENGINEERING

1st Shift FULL TIME

2012 EoA Only 4

14 1-1349555193

ENGINEERINGAND TECHNOLOGY

POST GRADUATE

CAD/CAM 1st Shift FULL TIME

2012 EoA Only 2

15 1-1349555195

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE & ENGINEERING

1st Shift FULL TIME

2001 EoA Only 4

16 1-1349555197

ENGINEERINGAND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1st Shift FULL TIME

2001 EoA & Increase in intake

4

Programme and courses Contd

Sr Num

Course Unique Id

(10)

Programme(11)

Course(12)

Current intake (12-13) (13)

Applied for intake (13-14) (14)

University Board(15)

NRI (16)

PIO(17)

Foreign collaboration (18)

Accreditationstatus(19)

1 1-1349555046

ENGINEERING AND TECHNOLOGY

ELECTRICAL AND ELECTRONICS ENGINEERING

120 120 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N ACCREDITED

2 1-1349555049

ENGINEERING AND TECHNOLOGY

MECHANICAL ENGINEERING

60 180 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N ACCREDITED

Page 14: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 14 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Course Unique Id

(10)

Programme(11)

Course(12)

Current intake (12-13) (13)

Applied for intake (13-14) (14)

University Board(15)

NRI (16)

PIO(17)

Foreign collaboration (18)

Accreditationstatus(19)

3 1-1349555051

ENGINEERING AND TECHNOLOGY

INFORMATION TECHNOLOGY

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N ELIGIBLE-NOT APPLIED

4 1-1349555053

MCA MASTERS IN COMPUTER APPLICATIONS

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT ACCREDITED

5 1-1349555055

ENGINEERING AND TECHNOLOGY

ELECTRONICS &COMMUNICATION ENGG

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

6 1-1349555057

ENGINEERING AND TECHNOLOGY

COMPUTER SCIENCE AND ENGINEERING

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

7 1-1349555059

ENGINEERING AND TECHNOLOGY

MECHANICAL ENGINEERING

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

8 1-1349555181

ENGINEERING AND TECHNOLOGY

POWER ELECTRONICS AND ELECTRICAL DRIVES

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

9 1-1349555183

ENGINEERING AND TECHNOLOGY

EMBEDDED SYSTEMS

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

10 1-1349555185

ENGINEERING AND TECHNOLOGY

VLSI SYSTEMDESIGN

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

Page 15: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 15 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Course Unique Id

(10)

Programme(11)

Course(12)

Current intake (12-13) (13)

Applied for intake (13-14) (14)

University Board(15)

NRI (16)

PIO(17)

Foreign collaboration (18)

Accreditationstatus(19)

11 1-1349555187

ENGINEERING AND TECHNOLOGY

COMPUTER SCIENCE AND ENGINEERING

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

12 1-1349555189

ENGINEERING AND TECHNOLOGY

COMPUTER SCIENCE

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT APPLICABLE

13 1-1349555191

ENGINEERING AND TECHNOLOGY

CIVIL ENGINEERING

60 60 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT ELIGIBLE

14 1-1349555193

ENGINEERING AND TECHNOLOGY

CAD/CAM

18 18 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT ELIGIBLE

15 1-1349555195

ENGINEERING AND TECHNOLOGY

COMPUTER SCIENCE & ENGINEERING

120 120 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N NOT ACCREDITED

16 1-1349555197

ENGINEERING AND TECHNOLOGY

ELECTRONICS &COMMUNICATION ENGG

120 240 Jawaharlal Nehru Technological University, Kakinada

Not interested

Not interested

N ACCREDITED

Instructional Area

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

1 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CF1 69.7 Ready Ready Ready Ready

Page 16: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 16 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

2 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF10 69.7 Ready Ready Ready Ready

3 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF11 69.7 Ready Ready Ready Ready

4 ENGINEERING AND TECHNOLOGY

POST GRADUATE

5 Civil Block

Classroom

CF12A 34.85 Ready Ready Ready Ready

5 ENGINEERING AND TECHNOLOGY

POST GRADUATE

5 Civil Block

Classroom

CF12B 34.85 Ready Ready Ready Ready

6 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CF2 69.7 Ready Ready Ready Ready

7 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CF3 69.7 Ready Ready Ready Ready

8 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CF4 69.7 Ready Ready Ready Ready

9 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CF5 69.7 Ready Ready Ready Ready

10 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF6 69.7 Ready Ready Ready Ready

11 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF7 69.7 Ready Ready Ready Ready

12 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF8 69.7 Ready Ready Ready Ready

Page 17: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 17 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

13 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Classroom

CF9 69.7 Ready Ready Ready Ready

14 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Additional Workshop

CG1 209.1 Ready Ready Ready Ready

15 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Additional Workshop

CG2 209.1 Ready Ready Ready Ready

16 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CG3 69.7 Ready Ready Ready Ready

17 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CG4 69.7 Ready Ready Ready Ready

18 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CG5 69.7 Ready Ready Ready Ready

19 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

5 Civil Block

Laboratory

CG6 69.7 Ready Ready Ready Ready

20 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F10 66.91 Ready Ready Ready Ready

21 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F13 66.91 Ready Ready Ready Ready

22 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F14A 66.91 Ready Ready Ready Ready

23 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F14B 66.91 Ready Ready Ready Ready

Page 18: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 18 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

24 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

F15 83.64 Ready Ready Ready Ready

25 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

F16 83.64 Ready Ready Ready Ready

26 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F17 83.64 Ready Ready Ready Ready

27 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F18 83.64 Ready Ready Ready Ready

28 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F1A 66.91 Ready Ready Ready Ready

29 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F1B 66.91 Ready Ready Ready Ready

30 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F1C 66.91 Ready Ready Ready Ready

31 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F1D 66.91 Ready Ready Ready Ready

32 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F2 83.64 Ready Ready Ready Ready

33 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F20A 66.91 Ready Ready Ready Ready

34 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F20B 66.91 Ready Ready Ready Ready

Page 19: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 19 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

35 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F21 66.91 Ready Ready Ready Ready

36 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

F22 83.64 Ready Ready Ready Ready

37 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

F23 83.64 Ready Ready Ready Ready

38 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F25A 66.91 Ready Ready Ready Ready

39 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F25B 66.91 Ready Ready Ready Ready

40 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F25C 16.79 Ready Ready Ready Ready

41 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Buildnig

Laboratory

F3 83.64 Ready Ready Ready Ready

42 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F4 83.64 Ready Ready Ready Ready

43 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

F9 66.91 Ready Ready Ready Ready

44 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

G10 83.64 Ready Ready Ready Ready

45 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

G11 139.9 Ready Ready Ready Ready

Page 20: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 20 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

46 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

G12 139.9 Ready Ready Ready Ready

47 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G13A 83.64 Ready Ready Ready Ready

48 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

G13B 83.64 Ready Ready Ready Ready

49 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G15A 66.91 Ready Ready Ready Ready

50 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G15B 66.91 Ready Ready Ready Ready

51 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G15C 66.91 Ready Ready Ready Ready

52 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G16A 66.91 Ready Ready Ready Ready

53 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G16B 66.91 Ready Ready Ready Ready

54 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G17 66.91 Ready Ready Ready Ready

55 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

G3 139.9 Ready Ready Ready Ready

56 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

G4 139.9 Ready Ready Ready Ready

Page 21: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 21 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

57 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G5 83.64 Ready Ready Ready Ready

58 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

G6 83.64 Ready Ready Ready Ready

59 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

G7 83.64 Ready Ready Ready Ready

60 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF1A 34.85 Ready Ready Ready Ready

61 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF1B 34.85 Ready Ready Ready Ready

62 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF1C 69.7 Ready Ready Ready Ready

63 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF1D 69.7 Ready Ready Ready Ready

64 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF2A 34.85 Ready Ready Ready Ready

65 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Lirbary Block

Tutorial Room

LF2B 34.85 Ready Ready Ready Ready

66 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF2C 69.7 Ready Ready Ready Ready

67 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF2D 69.7 Ready Ready Ready Ready

Page 22: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 22 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

68 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF3A 34.85 Ready Ready Ready Ready

69 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF3B 34.85 Ready Ready Ready Ready

70 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF3C 69.7 Ready Ready Ready Ready

71 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF3D 69.7 Ready Ready Ready Ready

72 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF4A 34.85 Ready Ready Ready Ready

73 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF4B 34.85 Ready Ready Ready Ready

74 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF4C 69.7 Ready Ready Ready Ready

75 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF4D 69.7 Ready Ready Ready Ready

76 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF5A 34.85 Ready Ready Ready Ready

77 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF5B 34.85 Ready Ready Ready Ready

78 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF5C 69.7 Ready Ready Ready Ready

Page 23: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 23 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

79 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF5D 69.7 Ready Ready Ready Ready

80 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF6A 34.85 Ready Ready Ready Ready

81 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Tutorial Room

LF6B 34.85 Ready Ready Ready Ready

82 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF6C 69.7 Ready Ready Ready Ready

83 ENGINEERING AND TECHNOLOGY

POST GRADUATE

4 Library Block

Laboratory

LF6D 69.7 Ready Ready Ready Ready

84 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

4 Library Block

Laboratory

LF7 69.7 Ready Ready Ready Ready

85 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

4 Library Block

Laboratory

LF8 69.7 Ready Ready Ready Ready

86 MCA POST GRADUATE

4 Library Block

Laboratory

LG10 69.7 Ready Ready Ready Ready

87 MCA POST GRADUATE

4 Library Block

Seminar Hall

LG11 139.4 Ready Ready Ready Ready

88 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

4 Library Block

Seminar Hall

LG12 133.5 Ready Ready Ready Ready

89 MCA POST GRADUATE

4 Library Block

Tutorial Room

LG13 36 Ready Ready Ready Ready

Page 24: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 24 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

90 MCA POST GRADUATE

4 Library Block

Classroom

LG4 69.7 Ready Ready Ready Ready

91 MCA POST GRADUATE

4 Library Block

Classroom

LG5 69.7 Ready Ready Ready Ready

92 MCA POST GRADUATE

4 Library Block

Classroom

LG6 69.7 Ready Ready Ready Ready

93 MCA POST GRADUATE

4 Library Block

Laboratory

LG7 69.7 Ready Ready Ready Ready

94 MCA POST GRADUATE

4 Library Block

Laboratory

LG8 69.7 Ready Ready Ready Ready

95 MCA POST GRADUATE

4 Library Block

Laboratory

LG9 69.7 Ready Ready Ready Ready

96 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MF1A 66.91 Ready Ready Ready Ready

97 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF1B 33.45 Ready Ready Ready Ready

98 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF1C 33.45 Ready Ready Ready Ready

99 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF1D 33.45 Ready Ready Ready Ready

100 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Blcok

Laboratory

MF2 83.64 Ready Ready Ready Ready

Page 25: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 25 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

101 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF3 55.76 Ready Ready Ready Ready

102 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MF4A 83.64 Ready Ready Ready Ready

103 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MF4B 83.64 Ready Ready Ready Ready

104 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MF5B 78.07 Ready Ready Ready Ready

105 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF5C 33.4 Ready Ready Ready Ready

106 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MF5D 33.41 Ready Ready Ready Ready

107 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MF8 83.64 Ready Ready Ready Ready

108 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MF9 83.64 Ready Ready Ready Ready

109 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech. Block

Workshop

MG1A 200.73 Ready Ready Ready Ready

110 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG1B 66.91 Ready Ready Ready Ready

111 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MG2 39.05 Ready Ready Ready Ready

Page 26: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 26 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

112 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG3A 66.91 Ready Ready Ready Ready

113 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG3B 66.91 Ready Ready Ready Ready

114 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MG3C 33.46 Ready Ready Ready Ready

115 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG4A 66.91 Ready Ready Ready Ready

116 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG4B 66.91 Ready Ready Ready Ready

117 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG4C 66.92 Ready Ready Ready Ready

118 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MG5A 44.61 Ready Ready Ready Ready

119 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG5B 66.91 Ready Ready Ready Ready

120 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG6A 66.91 Ready Ready Ready Ready

121 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG6B 66.91 Ready Ready Ready Ready

122 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Laboratory

MG6C 66.91 Ready Ready Ready Ready

Page 27: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 27 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

123 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Blcok

Classroom

MS1 83.64 Ready Ready Ready Ready

124 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS10 83.64 Ready Ready Ready Ready

125 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS2 83.64 Ready Ready Ready Ready

126 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS3 83.64 Ready Ready Ready Ready

127 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Tutorial Room

MS4 55.76 Ready Ready Ready Ready

128 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS5A 83.64 Ready Ready Ready Ready

129 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS5B 83.64 Ready Ready Ready Ready

130 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Drawing Hall

MS6 200.74 Ready Ready Ready Ready

131 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS8 83.64 Ready Ready Ready Ready

132 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

2 Mech.Block

Classroom

MS9 83.64 Ready Ready Ready Ready

133 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S12 83.64 Ready Ready Ready Ready

Page 28: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 28 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

134 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S13 83.64 Ready Ready Ready Ready

135 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S14 83.64 Ready Ready Ready Ready

136 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S15 83.64 Ready Ready Ready Ready

137 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S16 83.64 Ready Ready Ready Ready

138 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S17 83.64 Ready Ready Ready Ready

139 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S18 83.64 Ready Ready Ready Ready

140 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

S1A 133.14 Ready Ready Ready Ready

141 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Seminar Hall

S1B 133.14 Ready Ready Ready Ready

142 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

S1C 68.29 Ready Ready Ready Ready

143 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Laboratory

S2 83.64 Ready Ready Ready Ready

144 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S23 83.64 Ready Ready Ready Ready

Page 29: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 29 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Level(2)

BuildingNumber (3)

BuildingName(4)

Room Type (5)

Room Number (6)

Average Carpet Area(7)

Flooring(8)

Wall & Painting(9)

Elec & lighting(10)

Furniture & Fixtures(11)

145 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Builidng

Classroom

S24 83.64 Ready Ready Ready Ready

146 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S25 83.64 Ready Ready Ready Ready

147 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S3 83.64 Ready Ready Ready Ready

148 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S4 83.64 Ready Ready Ready Ready

149 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S5 83.64 Ready Ready Ready Ready

150 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S7 83.64 Ready Ready Ready Ready

151 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S8 83.64 Ready Ready Ready Ready

152 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

1 Main Building

Classroom

S9 83.64 Ready Ready Ready Ready

153 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

3 Workshop

Laboratory

WS 219 Ready Ready Ready Ready

Instructional Area Common facilities

Building Number(1)

Building Name(2)

Room Type(3)

Room Id(4) Area(5) Flooring(6) Wall & Painting (7)

Elec & lighting (8)

Furniture & Fixtures(9)

1

Main Building

Computer Center

F7 167.28 Ready Ready Ready Ready

4

Library Block Library&Reading Room

LG-1 501.82 Ready Ready Ready Ready

Page 30: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 30 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Building Number(1)

Building Name(2)

Room Type(3)

Room Id(4) Area(5) Flooring(6) Wall & Painting (7)

Elec & lighting (8)

Furniture & Fixtures(9)

4

Library Block Library&Reading Room

LG-2 100.36 Ready Ready Ready Ready

Administrative Area

Sr Num

Building Number(1)

Building Name (2)

Room Type (3)

Room Id (4)

Area (5) Flooring(6)

Wall & Painting(7)

Elec & Lighting(8)

Furniture & fixtures (9)

1 1 Main Building

Board Room

F 24 111.52 Ready Ready Ready Ready

2 1 Main Builidng

Department Office

F 5 22.3 Ready Ready Ready Ready

3 1 Main Building

Cabin for Head of Dept

F 5A 11.15 Ready Ready Ready Ready

4 1 Main Building

Faculty Room

F 5B 55.75 Ready Ready Ready Ready

5 1 Main Building

Department Office

F-11 22.3 Ready Ready Ready Ready

6 1 Main Building

Cabin for Head of Dept

F-11A 11.15 Ready Ready Ready Ready

7 1 Main Building

Faculty Room

F-11B 133.83 Ready Ready Ready Ready

8 1 Main Building

Other G-1A 22.3 Ready Ready Ready Ready

9 1 Main Building

Exam Control Office

G-1B 33.45 Ready Ready Ready Ready

10 1 Main Building

Principal Directors Office

G-2A 33.45 Ready Ready Ready Ready

11 1 Main Building

Placement Office

G-2B 33.45 Ready Ready Ready Ready

12 1 Main Building

Security G-7A 11.15 Ready Ready Ready Ready

13 1 Main Building

Department Office

G-8 22.3 Ready Ready Ready Ready

14 1 Main Building

Cabin for Head of Dept

G-8A 11.15 Ready Ready Ready Ready

15 1 Main Building

Faculty Room

G-8B 133.83 Ready Ready Ready Ready

16 1 Main Building

Office All Inclusive

G18,19 301.05 Ready Ready Ready Ready

17 7 Canteen Building

Pantry forStaff

KG-3A 11.15 Ready Ready Ready Ready

18 6 Stores Building

Central Store

M-1 33.45 Ready Ready Ready Ready

19 6 Stores Building

Maintenance

M-2 11.15 Ready Ready Ready Ready

20 6 Stores Building

Housekeeping

M-3 11.15 Ready Ready Ready Ready

21 1 Main Building

Cabin for Head of Dept

MF 5A 133.8 Ready Ready Ready Ready

Page 31: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 31 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Building Number(1)

Building Name (2)

Room Type (3)

Room Id (4)

Area (5) Flooring(6)

Wall & Painting(7)

Elec & Lighting(8)

Furniture & fixtures (9)

22 2 Mech.Block Department Office

MF-6 22.3 Ready Ready Ready Ready

23 2 Mech.Block Cabin for Head of Dept

MF-6A 11.15 Ready Ready Ready Ready

24 2 Mech.Block Faculty Room

MF-6B 134.55 Ready Ready Ready Ready

25 1 Main Building

Department Office

S-11 22.3 Ready Ready Ready Ready

26 1 Main Building

Department Office

S-19 22.3 Ready Ready Ready Ready

27 1 Main Building

Cabin for Head of Dept

S-19A 11.15 Ready Ready Ready Ready

28 1 Main Building

Faculty Room

S-19B 66.91 Ready Ready Ready Ready

29 1 Main Building

Cabin for Head of Dept

S-1A 11.15 Ready Ready Ready Ready

30 1 Main Building

Faculty Room

S-1B 156.1 Ready Ready Ready Ready

Amenities Area

Sr Num

Building Number(1)

Building Name (2)

Room type(3)

Room Id (4) Area(5) Flooring(6)

Wall & Painting(7)

Elec & Lighting (8)

Furniture & Fixtures(9)

1 5 Civil Block Boys Common Room

CF13 111.52 Ready Ready Ready Ready

2 1 Main Building

First aid cum Sick Room

F-11C 11.15 Ready Ready Ready Ready

3 1 Main Building

Toilet F-19 27.88 Ready Ready Ready Ready

4 1 Main Building

Toilet F-6 27.88 Ready Ready Ready Ready

5 1 Main Building

Toilet F-6A 27.88 Ready Ready Ready Ready

6 1 Main Building

Toilet F-6B 27.88 Ready Ready Ready Ready

7 1 Main Building

Toilet G-13C 27.88 Ready Ready Ready Ready

8 1 Main Building

Toilet G-14 27.88 Ready Ready Ready Ready

9 1 Main Building

Toilet G-14A 27.88 Ready Ready Ready Ready

10 1 Main Building

Toilet G-14B 27.88 Ready Ready Ready Ready

11 1 Main Building

Toilet G-14C 27.88 Ready Ready Ready Ready

12 1 Main Building

Toilet G-14D 27.88 Ready Ready Ready Ready

13 1 Main Building

Toilet G-14E 27.88 Ready Ready Ready Ready

14 1 Main Building

Others G-2A 11.15 Ready Ready Ready Ready

Page 32: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 32 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Building Number(1)

Building Name (2)

Room type(3)

Room Id (4) Area(5) Flooring(6)

Wall & Painting(7)

Elec & Lighting (8)

Furniture & Fixtures(9)

15 1 Main Building

Guest House

GH 33.45 Ready Ready Ready Ready

16 7 Canteen Building

Cafeteria KG 156.1 Ready Ready Ready Ready

17 8 Auditorium Sports Club

M4 200.7 Ready Ready Ready Ready

18 8 Auditorium Auditorium M5 401.4 Ready Ready Ready Ready 19 6 Stores

BuildingStationery Store

M6 11.15 Ready Ready Ready Ready

20 9 Generator Shed

Others P1 60 Ready Ready Ready Ready

21 1 Main Building

Toilet S-20 27.88 Ready Ready Ready Ready

22 1 Main Building

Toilet S-6 27.88 Ready Ready Ready Ready

23 1 Main Building

Girls Common Room

S26 100.35 Ready Ready Ready Ready

Circulation Area

Sr Num

Building Number(1)

Building Name (2)

Area Type(3)

Average Carpet Area(4)

Flooring(5)

Wall & Painting(6)

Elec & Lighting (7)

Furniture & fixtures(8)

Sanitary Fittings (9)

1 1 Main Building

Corridors 3862 Yes Ready Ready Ready Y

2 2 Mechanical Block

Other Areas (inSq m)

890 Yes Ready Ready Ready Y

3 5 Civil Block Other CommonArea (in Sq m)

547 Yes Ready Ready Ready Y

Other Facilities

All Weather Approach (Motorized Road) YBackup Electric Supply YBarrier free Environment YCCTV Security YERP Software YElectric Supply YGeneral Insurance YGroup Insurance YInstitution Web Site YInsurance for Students YStand Alone Language Laboratory (Minimum 25 PCs up to total intake of 1000.Further additional 25 PCs per intake of 1000):

Y

Medical & Counseling YNotice Boards YPublic Announcement System YPotable Water Supply YPost & Banking/ATM YProjectors in Classrooms YSafety Provisions Y

Page 33: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 33 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sewage Disposal System YStaff Quarters NTelephone & FAX YTransport Facility YVehicle Parking YFirst Aid Y

Laboratory Details

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

1 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

ANALOG COMMUNICATION LAB

0 5000 281068 N

2 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

C PROGRAMMING LAB

0 20000 3850970 N

3 ENGINEERING AND TECHNOLOGY

POST GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

CAD /CAM LAB

1880000 0 706000 Y

4 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

CAD/CAM LAB

600000 10000 1080000 N

5 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

FIRST YEAR/OTHER

1 Machanical Building

CHEMISTRY LAB

50000 30000 254239 N

6 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

COMMON COMPUTER CENTRE

20000 0 2172950 N

7 ENGINEERING AND TECHNOLOGY

POST GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

COMPUTER PROGRAMMING LAB

0 10000 1075000 Y

Page 34: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 34 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

8 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

COMPUTER PROGRAMMING LAB -1

0 20000 3016469 N

9 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 MAIN BUILDING

COMPUTER PROGRAMMING LAB ?2

450000 20000 2209706 N

10 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 MAIN BUILDING

COMPUTER PROGRAMMING LAB ?3

0 20000 1814000 N

11 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

DIGITAL COMMUNICATION LAB

0 5000 281383 N

12 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 MAIN BUILDING

DIGITAL LIBRARY LAB

0 5000 753750 N

13 ENGINEERING AND TECHNOLOGY

POST GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

ECE COMPUTER LAB

1200000 15000 2167939 Y

14 ENGINEERING AND TECHNOLOGY

POST GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

EEE COMPUTER LAB

0 5000 1060866 Y

Page 35: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 35 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

15 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 Main Bulding

ELECTRICAL CIRCUITS LAB

0 10000 353703 N

16 ENGINEERING AND TECHNOLOGY

POST GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

ELECTRICAL MACHINES LAB

150000 15000 1315260 N

17 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

ELECTRICAL MEASUREMENTS LAB

0 10000 287526 N

18 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

ELECTRONIC DEVICES & CIRCUITS

100000 5000 517165 N

19 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Mechanical Building

ENGINEERING WORKSHOP PRACTICE

0 15000 178823 N

20 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

FIRST YEAR/OTHER

1 Main Building

ENGLISH LAB

150000 10000 1131400 N

21 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

FUELS & LUBRICANTS LAB

50000 15000 77254 N

22 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

HEAT TRANSFER LAB

0 1000 243810 N

Page 36: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 36 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

23 ENGINEERING AND TECHNOLOGY

POST GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

HYDRAULICS & HYDRAULIC MACHINERY LAB

0 5000 328820 N

24 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 Main Building

INTEGRATED CIRCUITS LAB

100000 5000 288088 N

25 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

INFORMATION TECHNOLOGY

1 Main Building

IT LAB -1

0 20000 432800 N

26 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

INFORMATION TECHNOLOGY

1 Main Building

IT LAB -2

0 20000 1149300 N

27 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

INFORMATION TECHNOLOGY

1 Main Building

IT WORKSHOP

0 10000 1047193 N

28 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

MECHANICS OF SOLIDS

0 5000 520238 N

29 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

METALLURGYAND INSTRUMENTATION LAB

0 5000 131840 N

30 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

METROLOGY & MACHINE TOOLS LAB

400000 10000 959682 N

31 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

MICRO PROCESSORS& INTERFACING LAB

400000 5000 473674 N

Page 37: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 37 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

32 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

MICROWAVE & OPTICAL COMMUNICATION LAB

50000 5000 577568 N

33 ENGINEERING AND TECHNOLOGY

POST GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

MOBILE COMPUTING RESEARCH LAB

0 20000 301500 N

34 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

FIRST YEAR/OTHER

1 Machanical Building

PHYSICS LAB

50600 10000 133526 N

35 ENGINEERING AND TECHNOLOGY

POST GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

POWER ELECTRONICS & DRIVE LAB

100000 10000 440000 Y

36 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRICAL AND ELECTRONICS ENGINEERING

1 MAIN BUILDING

POWER ELECTRONICS LAB

50000 5000 460503 N

37 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 MAIN BUILDING

PRODUCTION TECHNOLOGYLAB

0 10000 254323 N

38 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

ELECTRONICS & COMMUNICATION ENGG

1 MAIN BUILDING

PULSE AND DIGITAL CIRCUITS LAB

100000 5000 322384 N

Page 38: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 38 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Sr Num

Programme(1)

Leve (2)

Course (3)

BuildingNumber(4)

Building Name (5)

Name of Lab(6)

Yearly Budget(E) (7)

Yearly Budget (C) (8)

Investment till Date(9)

Research Lab?(10)

39 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

COMPUTER SCIENCE AND ENGINEERING

1 Main Building

SOFTWARE

125000 0 415225 N

40 ENGINEERING AND TECHNOLOGY

UNDER GRADUATE

MECHANICAL ENGINEERING

1 Machanical Building

THERMAL ENGINEERING LAB

0 10000 508001 N

Library Books

Programme(1) Titles (2) Volumes(3) International Journals (4)

National Journals (5)

ENGINEERING AND TECHNOLOGY

4959 35292 8 88

Library Facilities

Working Hrs.(1)

E journal Subscription (2)

Annual Budget (3)

Area in Sqm(4)

Library Management Software(5)

Bar Code or RF Tab book handling(6)

ReprographicFacility(7)

Reading Room Capacity(8)

9 A.M TO 7 P.M

SPRINGER ASTM ELSEVIER J-GATE IEEE ACCESS SPRINGER

1762000 501.82 Sq Mts Yes Yes Y 300

eJournal Declaration Status of declaration check box

BY CLICKING THIS CHECK BOX THE INSTITUTE HEREBY DECLARES THAT IT HAS SUBSCRIBED FOR ALL THE REQUIRED E-JOURNALS AS MENTIONED IN APPROVAL PROCESS HANDBOOK 2013-2014.

Y

Computational Facility

Page 39: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 39 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Legal SystemSoftware(1)

Legal Application Software(2)

Internet Bandwidth in mbps(3)

Internet ContentionRatio(4)

PC exclusively available to students (5)

PCs available in Administrative Office(6)

Number of PCs available inLibrary(7)

Number of PCs in language lab(8)

PCs available to FacultyMembers(9)

Printers available to student(10)

11 20 14 Other 793 6 28 75 4 44

Hostel Facility

Sr

Nu

m

Nu

mb

er o

f ro

om

s h

avin

g 1

b

ed/r

oo

m

(are

a o

f ro

om

)(1)

Bu

ildin

g N

um

ber

(2)

Nam

e o

f B

uild

ing

(3)

Nu

mb

er o

f ro

om

s h

avin

g 2

b

ed/r

oo

m

(are

a o

f ro

om

)(4)

Bu

ildin

g N

um

ber

(5)

Nam

e o

f B

uild

ing

(6)

Nu

mb

er o

f ro

om

s h

avin

g 3

b

ed/r

oo

m

(are

a o

f ro

om

)(7)

Bu

ildin

g N

um

ber

(8)

Nam

e o

f B

uild

ing

(9)

Nu

mb

er o

f ro

om

s h

avin

g 4

b

ed/r

oo

m

(are

a o

f ro

om

)(10

)

Bu

ildin

g N

um

ber

(11)

Nam

e o

f B

uild

ing

(12)

1 Boys 6 (20)1 Block -

A6 (20) 1 Block

-A5 (18) 1 Block

-A5 (18) 1 Block

-A

2 Girls 10 (40) 2 Block-

B10 (45) 2 Block

-B9 (40) Block

-ABlock-B

8(36) 2 Block-B

Page 40: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 40 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Operational Funds

Bank Name(1) Account Number(2) Bank Statement Date(3) Cash Balance(4)

State Bank of India, Peddapuram

SB A/C No. 30368068593 Data Not Provided by the Institute

3818970

State Bank of India, Peddapuram

CA A/C No. 30793762440 Data Not Provided by the Institute

30891

State Bank of India, Commercial Branch, Kakinada

SB A/C No. 10300301990 Data Not Provided by the Institute

5067057

State Bank of India, Commercial Branch, Kakinada

OD A/C No. 30134205991 Data Not Provided by the Institute

2500000

State Bank of India, Commercial Branch, Kakinada

SB A/C No. 30358516388 Data Not Provided by the Institute

3599791

ING VYSYA BANK , Kakinada SB A/C No. 738010130689 Data Not Provided by the Institute

3100854

State Bank of India, Commercial Branch, Kakinada

FDR No.32395573961 Data Not Provided by the Institute

2500000

State Bank of India, Commercial Branch, Kakinada

FDR No. 32418921056 Data Not Provided by the Institute

2500000

Financial Details

Income from Central Government 0Income From State Government 0Income From Student Fees 99255445Income From Donations 0Income From UGC 0Income From Other Bodies 0Income From Other/ Internal Revenue 2016884Salary Teaching Staff 34834801Remuneration to Visiting/Guest: 862800Salary Non-teaching Staff: 16254486 Library 498105 Equipment 5184002Building Maintenance 3960248Other Expenditure 38104498

Technical Campus Details Year(1) Technical Campus

Details(2)Parent Institute Id(3)

Parent Institute Name(4)

Child Institute Id(5)

Child Institute Name(6)

Company/Industry Details

Are you a Company/Industry wishing to set up a new Institute?:

No

Type of Company/Industry: Not Applicable

Page 41: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 41 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Is the company having Minimum 100 Cr Turnoverfor the last 3 years? (Attach supporting doc):

Not Applicable

Company/Industry PAN Number: Not Applicable

Company/Industry TAN Number: Not Applicable

Company/Industry Registered Address: Not Applicable

Company/Industry Year of Registered: Not Applicable

Grants Received Details

Sr Num

Name of Grant(1)

Year in which Grant wasSanctioned(2)

SanctionedLetter Number(3)

Date of Sanctioned Grant(4)

Date of Receiving Grant(5)

Activity Related toGrant Conducted From(6)

Activity Related toGrant Conducted upto(7)

Submitted Final Utilization certificate(8)

UtilizationcertificateReferenceNumber(9)

Date of submission of Final Utilization Certificate(10)

Grants Received

Sr Num Name of Grant(11)

Final Settlement of Grant(12)

Balance of Grant to be received from AICTE(13)

Balance of Grant to be Refunded to AICTE(14)

Remarks(15)

Ombudsman/Grievance Details

Grievance Committee Appointment Yes

OMBUDSMAN Appointment Yes

Ombudsman Appointment/Grievance Committee Details

Sr Num

Committee Type (1)

Appointment Order reference Number(2)

Date of Appointment(3)

Name of the Committee Member(4)

Profession (5)

Address(6)

AssociatedWith(7)

Mobile Number(8)

e Mail Address(9)

Fax No.(10)

1 Grievance Redressal

Ref: (i) No -1-101/DPG / AICTE

12/20/2012 Prof. N. RAMAM

PROFESSOR

PRAGATI ENGINEERING COLLEGE

9849431481

[email protected]

2 Grievance Redressal

Ref: (i) No -1-101/DPG / AICTE

12/20/2012 Mr. K.RAGHURAM

Assoc.Prof PRAGATI ENGINEERING COLLEGE

9676743338

[email protected]

3 Grievance Redressal

Ref: (i) No -1-101/DPG / AICTE

12/20/2012 Mr. T. NIROSH KUMAR

Asst.Prof PRAGATI ENGINEERING COLLE

9492490760

[email protected]

Page 42: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 42 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

GE4 Grievance

RedressalRef: (i) No -1-101/DPG / AICTE

12/20/2012 Mrs. K.RAMA DEVI

Assoc.Prof PRAGATI ENGINEERING COLLEGE

9440337658

[email protected]

5 Grievance Redressal

Ref: (i) No -1-101/DPG / AICTE

12/20/2012 Mrs. Ch .Vasantha Lakshmi

Assoc.Prof PRAGATI ENGINEERING COLLEGE

9347226907

[email protected]

6 OMBUDSMAN

Proc No. E1 / Ombudsman/2012

12/11/2012 Justice B.V.RangaRaju

Former Judge, A.P High Court

PRAGATI ENGINEERING COLLEGE

8852252233

[email protected]

Anti-Ragging Related Details Provided by the Institute

Constitution of Anti-Ragging Committee Yes

Constitution of Anti-Ragging Squad Yes

Affidavit obtained from all Students Yes

Appointment of Counselors Yes

Affidavit obtained from parents of all the students Yes

Affidavit obtained from students staying in Hostel Yes

Affidavit obtained from parents of students stayingin Hostel

Yes

Anti-Ragging Committee/Squad Details

Sr Num

CommitteeType (1)

Appointment Order reference Number(2)

Date of Appointment(3)

Name of the CommitteeMember(4)

Profession(5)

Address(6)

Associated With(7)

Mobile Number(8)

Fax No(9)

e Mail Address(10)

1 Anti-Ragging Committee

Proceeding No.1 /PEC-ANTIRAGG

07/10/2012 Dr. S Sambhu Prasad

Principal Pragati Engineering College

Pragati Engineering College

7893103266

8852252232

[email protected]

2 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.M.V.Haranatha Babu

Director (Management)

Pragati Engineering College

Gayatri Educational Society

7702666336

8852252232

[email protected]

3 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.S.V.Ramana Murthy

Dean (R&D)

Pragati Engineering College

Pragati Engineering College

7702666338

[email protected]

4 Anti-Ragging

Proceeding No.1/PEC-

07/10/2012 Dr.A.Kailasa Rao

Director Pragati Enginee

Pragati Engineerin

9848052319

raoa_kailasa@yah

Page 43: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 43 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Committee ANTIRAGG ring College

g College oo.co.in

5 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.K.Ananda Mohan

Director (Admin)

Pragati Engineering College

Pragati Engineering College

9948033445

[email protected]

6 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Dr.G.Raghuram

Director Pragati Engineering College

Pragati Engineering College

9948211344

[email protected]

7 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.N.Ramam

Prof. of Chemistry

Pragati Engineering College

Pragati Engineering College

9948612244

[email protected]

8 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.Y.JayaBabu

HOD MCA Pragati Engineering College

9949804660

[email protected]

9 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.BGK Prasad

Prof. of CSE

Pragati Engineering College

9949033174

[email protected]

10 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.K.Satyanarayana

HOD EEE Pragati Engineering College

9490916767

[email protected]

11 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.A.Nageswara Rao

HOD CSE Pragati Engineering College

9642995525

[email protected]

12 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.M.V.Rajesh

HOD IT Pragati Engineering College

7702482324

[email protected]

13 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.V.Prasanth

HOD ECE Pragati Engineering College

9866246104

[email protected]

14 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Smt.Ch.Vasantha Lakshmi

HOD ME Pragati Engineering College

9347226907

[email protected]

15 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.T.Satyanarayana

HOD BSH Pragati Engineering College

Parent 9490480223

[email protected]

16 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof.S.Vamsi Kiran

Training & Placement Officer

Pragati Engineering College

7702666337

[email protected]

17 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Prof. G.Naresh

NBA Co-Ordinator

Pragati Engineering College

9849898440

[email protected]

18 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Dr.R.Sridhar

Doctor Sushritha Clinic,Sarpavaram Jn,Kakinada

Parent 8978568002

[email protected]

19 Anti-Ragging

Proceeding No.1/PEC-

07/10/2012 Sri.B.Gopichand

Manager 2-24-4/2,

Parent 9948027799

gopichand_b@gm

Page 44: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 44 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

Committee ANTIRAGG Srinagar,Kakinada

ail.com

20 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri. S.V.Subba Rao

Manager (Accounts)

City Office, PEC, Srinagar, Kakinada

Parent 9948022344

[email protected]

21 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.V.Krishna Murthy

Business Samalkot

Parent 7702922144

[email protected]

22 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Smt.K.Rama Devi

Teaching Pragati Engineering College

Girls Hostel Warden

9440337658

[email protected]

23 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Ms.D.Jyothirmai

Teaching Pragati Engineering College

Girls Representative

9908286935

[email protected]

24 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Smt.K.Aravinda

Teaching Pragati Engineering College

Girls Representative

9949183736

[email protected]

25 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.G.Avinash

Teaching Pragati Engineering College

Boys Hostel Warden

9948612244

[email protected]

26 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.Bharat Mataji

Circle Inspector ofPolice

Jaggampeta Police Station, Jaggampeta

Police Department

9440796529

[email protected]

27 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.B.V.Ramana

Sub Inspector ofPolice

Gandepalli Police Station, Gandepalli

Police Department

9440904841

[email protected]

28 Anti-Ragging Committee

Proceeding No.1/PEC-ANTIRAGG

07/10/2012 Sri.Md.M.R.Ali Khan

Station House Officer

Gandepalli Police Station

Police Department

9440391845

[email protected]

29 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Sri.A.Ravindranadh

Works Manager

Pragati Engineering College

Pragati Engineering College

7702666334

[email protected]

30 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Sri.B.Papa Rao

Sr.Assistant Pragati Engineering College

Pragati Engineering College

9866172537

[email protected]

31 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Sri.G.S.Siva Kumar

Teaching Pragati Engineering College

Pragati Engineering College

9949811979

[email protected]

32 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Sri. A.Ramesh

Teaching Pragati Engineering College

Pragati Engineering College

9951486516

[email protected]

Page 45: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 45 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

33 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Smt.G.J.Phani bala

Teaching Pragati Engineering College

Pragati Engineering College

7702500144

[email protected]

34 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Ms.Rubia Tasneem

Teaching Pragati Engineering College

Pragati Engineering College

9032018067

[email protected]

35 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Sri. P.Praveen

Teaching Pragati Engineering College

Pragati Engineering College

9912919210

[email protected]

36 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Mr.A.Saikumar

Student Pragati Engineering College

Pragati Engineering College

7386034571

[email protected]

37 Anti-Ragging Squad

Proceeding No.2/PEC-ANTIRAGG

09/22/2012 Mr.Thirmurthulu

Student Pragati Engineering College

Pragati Engineering College

9908791720

[email protected]

Page 46: Application_Report_Part_1_2013-2014 (24-01-2012).PDF

Application Report - Part1

Application Status: NewApplication Sub-Status:

***Note :- All the Dates in the Report are in mm/dd/yyyy format

Date of Signature

Seal of Institute Name & signature of Director  /Principal

1/24/2013 Page 46 of 46 Please submit the hard copy of this Report to Regional Officer only if Application status is Submitted to RO

Printed By : AE348831

DECLARATIONBY THE PRINCIPAL/DIRECTOR OF THE INSTITUTE

I, as the Head of the Institution, hereby declare:

a) That, I have carefully gone through the AICTE Notification dated 27th September 2012, published inthe Gazette of India - Extraordinary Part 3, Section (iv) and also the various provisions mentioned inthe Approval Process Hand Book 2013-14.

b) That, I am fully aware of the data uploaded by me in respect of my institute on the web portal.

c) That, I am aware that there is no provision of correction of data, alteration of data, subsequentediting and appeal etc. for the online application once uploaded on the web portal.

d) That, I am also aware that application for seeking Extension of Approval, Increase/Reduction ofintake, Addition of new courses, Dual Degree course, Integrated Course, Second Shift Programme,Part-time program, Change of site, Closure of course, Supernumerary Seats under PIO, NRI, Change ofname, and Conversion of women institute into Co-ed institute (as applicable), shall be processed asper relevant provisions enumerated in the Approval Process Hand Book 2013-14.

e) That, I am aware of the Deficiencies (if any) pointed out in the Report generated online, based on thefactual data uploaded by my institute on the portal.

f) That, I am also aware that the institute is eligible for grant of Extension of Approval,Increase/Reduction of intake, Addition of new courses, Closure of course, supernumerary seats underPIO, NRI, Change of name, Dual Degree course, Integrated course, Second shift programme, Part-timeprogram, Change of site, Conversion of women institute into Co-ed institute (as applicable) only onfulfillment of prescribed norms & requirements as mentioned in the Approval Process Hand Book2013-14.