Annexure-i of 168-4 Manesar Loi 20.07.2015

2
ANNEXURE - I Techincal Parameters Parameters Requirements from M/s Heritage Creation 1 Construction Age Completeness Certificate 2 Built Up Area & Floors offered Approx. 82,000 Sq.Feet. 3 Not Available 4 Not Available Landlord to confirm 5 Not Available 6 To be done by landlord Agreed 7 Landlord to confirm Agreed 8 9 Agreed 10 Elevator / Lift 11 Agreed 12 Agreed if Needed 13 14 Already provided 15 LAN Cabling etc Not Done Not applicable 16 Agreed 17 18 Already provided 19 Sr. No. Owner's / M/s MS Furnishers Pvt. Ltd. comments as on 20.07.2015 Competion Cetificate Obtained, we shall produce the same, as and when needed.. Owner to confirm & share updated CAD layout drgs of all the floors including office area build at GF front side & all Electrical drgs Shall provide you the same Load sanctioned, connected & Transformer availabity from DHBVNL (kVA) 500 KVA Transformer, Min Connected load 300 KVA immediate & 200KVA within 2-3 months to be done by Owner Agreed, We shall bear Connection Cost, Transformer Cost and Installation Cost only. DG installed Capacity available at site & its running condition (kVA & year of mfg / installation, Hrs run already) As discussed, we shall not provide the same, LESSEE can install at their own cost LT panel, AVR / Servo, Change Over, Earthing Pits & other Electrical Installations LESSEE shall install at their own cost Entry / Exit Gates for Staff & Material movement Ceiling Height (From lower end of the Beam-Slab) / each floor Floor Load Bearing Capacity (Kg / Sq. Mtrs) Min reqd 600 Kg, may require further increase 580 Kg / Sq Mtrs as per Architect email we shall provide the As built drawing as per provided by HSIDC Water Based Fire Extinguishing system Landlord to confirm & make this fully functional Provision for 2 Lifts is there, Lifts to be installed Prefer to have one Goods Lift we shall install only ONE LIFT Water proofing on roof, walls, window/ door frames required to prevent seepage To be done by landlord within fitout period Kota stone flooring to be done on 2nd floor To be done by landlord within fitout period Paint, White wash, inside & outside, all other repairs, seepage & other damages as needed in Building To be done by landlord within fitout period Agreed.As per working condition Water storage tank capacity - roof top & underground Trench Covers of Concrete needs to be replaced by Solid Iron Covers To be done by landlord within fitout period Boundry wall on all sides to be raised To be done by landlord within fitout period Height of Boundary wall is as per HSIIDC Norms, we can install Barbed wires, if required Source of Water for toilets, Pantry, horticulture etc & Drinking Submersible pump / boring is required To be done by landlord within fitout period All the toilets on each floor & water harvesting shall be made functional To be done by landlord within fitout period Agreed for Ground and First Floor

Transcript of Annexure-i of 168-4 Manesar Loi 20.07.2015

SelfANNEXURE - ITechincal ParametersSr. No.ParametersRequirements from M/s Heritage CreationOwner's / M/s MS Furnishers Pvt. Ltd. comments as on 20.07.2015Comments of M/s Heritage Creation/ Prospective Tenant1Construction Age Completeness CertificateCompetion Cetificate Obtained, we shall produce the same, as and when needed..ok2Built Up Area & Floors offeredApprox. 82,000 Sq.Feet.Owner to confirm & share updated CAD layout drgs of all the floors including office area build at GF front side & all Electrical drgsShall provide you the sameok3Load sanctioned, connected & Transformer availabity from DHBVNL (kVA)Not Available500 KVA Transformer, Min Connected load 300 KVA immediate & 200KVA within 2-3 months to be done by OwnerAgreed, We shall bear Connection Cost, Transformer Cost and Installation Cost only.agreed4DG installed Capacity available at site & its running condition (kVA & year of mfg / installation, Hrs run already)Not AvailableLandlord to confirmAs discussed, we shall not provide the same, LESSEE can install at their own costagreed5LT panel, AVR / Servo, Change Over, Earthing Pits & other Electrical InstallationsNot AvailableLESSEE shall install at their own costagreed6Entry / Exit Gates for Staff & Material movementTo be done by landlord Agreedok7Ceiling Height (From lower end of the Beam-Slab) / each floorLandlord to confirmAgreedok8Floor Load Bearing Capacity (Kg / Sq. Mtrs)Min reqd 600 Kg, may require further increase580 Kg / Sq Mtrs as per Architect emailwe shall provide the As built drawing as per provided by HSIDCok9Water Based Fire Extinguishing system Landlord to confirm & make this fully functionalAgreedagreed10Elevator / Lift Provision for 2 Lifts is there, Lifts to be installedPrefer to have one Goods Lift we shall install only ONE LIFTagreed11Water proofing on roof, walls, window/ door frames required to prevent seepageTo be done by landlord within fitout periodAgreedagreed12Kota stone flooring to be done on 2nd floorTo be done by landlord within fitout periodAgreed if Neededagreed13Paint, White wash, inside & outside, all other repairs, seepage & other damages as needed in BuildingTo be done by landlord within fitout periodAgreed.As per working conditionok14Water storage tank capacity - roof top & undergroundAlready providedagreed15LAN Cabling etcNot DoneNot applicable ok16Trench Covers of Concrete needs to be replaced by Solid Iron CoversTo be done by landlord within fitout periodAgreedok17Boundry wall on all sides to be raisedTo be done by landlord within fitout periodHeight of Boundary wall is as per HSIIDC Norms, we can install Barbed wires, if requiredok18Source of Water for toilets, Pantry, horticulture etc & Drinking Submersible pump / boring is requiredTo be done by landlord within fitout periodAlready providedok19All the toilets on each floor & water harvesting shall be made functionalTo be done by landlord within fitout periodAgreed for Ground and First Floorok