Cyberwalk launched at manesar

download Cyberwalk launched at manesar

of 20

  • date post

    26-May-2015
  • Category

    Real Estate

  • view

    221
  • download

    0

Embed Size (px)

Transcript of Cyberwalk launched at manesar

  • 1. AARONE GROUP is a Delhi based, real estate development group,with over 20 years experience in developing residential andcommercial projects. Established in 1988, it has a diverse portfolioof over 75 completed projects in NCR, Simla and Indore. The Groups flagship project Select CITYWALK a 1.4 million sqft, $130 million mixed-use development in the heart of SouthDelhi, has been awarded Indias Most Admired Shopping Centrefor 3 consecutive years. COUNTYWALK, a full integrated 220 acre residential township inIndore, launched in October 2009 has received phenomenalresponse, 40% already developed and sold Other projects by Aarone Group which are in the pipeline include A 50 acre premium Luxury residential project in South Delhi a 1 lakh sq ft Shopping centre project in Jammu a boutique health spa & resort in Mussoorie

2. Plot10 acres, Corner plot with 60m road on 1 side & 30mon 2 sidesLocationSector 8, IMT Manesar, GurgaonPart of 150 acres IT HubTypeMixed-use developmentComponentsIT & Office spaceCommercial/Retail & RecreationService Apartments/residential suitesTowersTower A, B, C, D & EReady for fit out April 2011Green RatingIGBC LEED - Gold rated pre-certified campusLand TitleDirect allotment by HSIIDC in the name of SofedRetailer Pvt. Ltd. 3. Efficient large floor plates, high floor to floor clearance and wide column spans Each tower has independent drop off points and dedicated entry exit points to the basements Parking for approx. 2000 cars, scalable to higher capacity in the future 100% power back up facility Separate passenger lifts, executive lifts and service elevators Interactive landscaped plaza with walkways, water bodies, sitting areas and greenery Plug and play business centre for start up companies, Large conference/training rooms toprovide training to 200-300 people Power voice & data communications with fiber optic connectivity 24 Hour CCTV security system in common area and parking. Gold rated Green Building certified by LEEDs, Pre-certification obtained from IGBC Pre approved plans from the relevant authorities 4. Campus designed by Dubai based International architects Arkiplan Execution of Arkiplan design to be carried out by Design Forum International a reputed Delhibased Architectural firm Efficient floor plates with 80% efficiency and high floor to floor clearances (4 and 4.2 meters) Floor plate sizes ranging from 12000 sq ft to 50,000 sq ft. Entire scheme based on the modern Vaastu principles and natural being Green design features recycle water, reduce waste and save energy enable up to 30%savings in day to day operation costs 300 ft high signature tower is the highlight of the campus with an iconic 4 floor cutout in thecenter of the Tower 5. LOCATIONPLOT NO. CP-09, SEC-8IMT MANESARGURGAON 6. Advantage Manesar Under the new master plan 2021, Manesar is a part of Gurgaon, which is already the single largest destinationfor Multinational and Indian corporations. Situated in the 3,000 acre Industrial hub at IMT Manesar, on the Delhi-Mumbai Industrial Corridor (DMIC) 150 acre dedicated IT Hub, already houses companies like HCL, Bharti Airtel & Agilent Technologies Large integrated residential townships with over 35 million. sq. ft. being developed within 10 kms Multinational giants such as Suzuki, Honda, Mitsubishi, Baxter, Denso have already inked success stories in IMTManesar It has been rated by C&W (Oct07) as amongst the 6 key growth areas in the entire country Best-in-class infrastructure with adequate power, water supply, wide roads, super specialty hospital, golfcourse, hotels, helipad and many moreConnectivity & Accessibility Just 30 min from Delhi IGI Airport, 20 min drive from IFFCO Chowk Connected via NH8, KMP Expressway and Northern Peripheral Road (NPR) or Dwarka expressway) to entireNCR Delhi Metro route proposed up to Manesar ISBT (inter state bus terminus) proposed at Manesar Wide signal free roads and best-in-class infrastructure 7. CYBERWALK 8. Tower ATower ETower B Tower C Tower D 9. TOWER A EVERGREEN TOWERBuilding SpecificationsAverage floor plate size of 35000 sq ftLarge column free spans from 8 - 11 metersFloor to floor height of 4.2 meter (Clear height - 3.6meter)Ground floor height 4.8 meter (Clear height - 4.2meter)Amenities & FeaturesSpectacular view of the green central plaza from everyfloorExclusive elevators for executives and CEOs10 Mitsubishi passenger elevators with speeds of 1.75m/sEarmarked server areas strengthened with loading of1000kg/sq meterInteresting mix of Retail, F&B and recreational zone onthe ground floor3 floor high sunlit atrium and grand entrance withworld class interiors overlooking the central plaza 10. Building Specifications G+9-storey twin towers Average floor plate size 30,000 sq ft approx. Large column free spans of 8 Meter Floor to floor height of 4 meter (Clear height - 3.4meter) Ground floor height 4.8 meter (Clear height - 4.2meter)Amenities & facilities 5 floors seamlessly merge the indoors with theoutdoors on the skyscraper Food courts and cafeterias on the ground floor &roof tops Plug & play business center planned on the 1st floor Special stilt parking for senior management andexecutives Landscaped roof top cafeterias with 300 peoplesitting capacity Commercial/Retail areas are located on the groundfloor overlooking the central plaza Pre-strengthened server areas with designed load of1000kg/sq meter 11. Two identical towers house the serviced apartmentsdeveloped keeping in view the walk to workconcept and to cater to the increasing lodgingrequirements of the modern day business. Theyhave European-styled coffee shops and swimmingpools on the terrace floors with bar. 147 serviced apartments with kitchenettes Connecting corridor at the ground floor housesthe reception lobby Spectacular views from each of rooms European styled coffee shops Fine dining areas Conference and training facilities Fitness center & spa Swimming pools on the terrace floors with bar Large sun-lit atriums in each of the towers 12. LEED (Leadership in Energy & Environment Design) India for Core & Shell Pre-certified Gold ratingcertified by IGBC (Indian Green Building Council) The design enables approx. 30% savings in operational costs Width of floor plates and faade design enable 80% of the office areas to be day lit HVAC Air-conditioning systems Use of high performance glass & double glazed units, insulated walls for better HVAC performance Use of Chillers with Environment-friendly refrigerants and use of VAVs, heat recovery systems and VFDs for better HVAC performance. Use of air quality censors to manage CO2 levels thereby increasing employee efficiency and ensuring amore energetic and happy environment LandscapesWalls and rooftops insulated to prevent heat gain and landscaped with greensLocal stones and recycled materials being used to reduce wastage and reduce carbon footprint Central Plaza landscaped with trees, water features and soft and hard scapes, large trees being planted all along the periphery and ensuring a green environment Water 80% of used water recycled and utilized for irrigation and HVAC build up Ground water recharging done through pits and sumps Low water consuming plants & trees will be used 13. Architects Arkiplan Consulting Architects and Engineers Dubai, UAE Design Forum International New Delhi Project Management Company Synergy Property Development Services Structural Consultants BMSF Design Consultants Pvt. Ltd. Structural Proof Consultant: Jaitly Associates Services Consultants Spectral Services Consultants Pvt. Ltd. Landscape Design: Integral Designs LEED/Green Building Consultants: Environmental Design Solutions Contractors Civil : Sun Nirman Infrastructure Pvt. Ltd. Faade: Consolidated Engineering Company Elevators ETA Melco - Mitsubishi 14. Construction in full swing for Phase 1 (Tower A,Tower E & Tower D). Civil construction for Tower A, E and D is completed. Tender for Faade has been awarded and work hasstated at site. Tower B & C have been put on hold as of now andwill be taken up in Phase II Tower A, E & D, expected to complete and ready forfit out by Sep,2011 15. Thank You! Authorised Sales Associates REALMAXX REALTY SOLUTIONS Nisar Ahmad9582311131104, G.K. House Sant Nagar East of KailshNew delhi-65Aarone Group011-646092926th Floor Office Tower, Select CitywalkA-3 District Center SaketNew Delhi 110017