Anchorage
-
Upload
vasilachedan -
Category
Documents
-
view
4 -
download
3
description
Transcript of Anchorage
NOTES:
PAGE:
DRAWN BY:
CHECKED BY:
SCALE:
DATE:
DRAWING TITLE:
PROJECT TITLE:
AMENDMENTS
PREPARED FOR:
PREPARED BY:
U.S. DIVISION
CANADA DIVISION
1/4" = 1'-0"
D. FITZEL
P.O. BOX 301PAYSON, ARIZONA
85547 - 0301UNITED STATES
PH (928) 472-8073FAX (928) 474-8991
841-A S. MACKENZIE AVE.WILLIAMS LAKE, BCV2G 3X8 CANADAPH (250) 392-5577FAX (250)- 392-5581
THEANCHORAGE
MAIN: 914 sq. ft.LOFT: 525 sq. ft.
MARCH 31 2005
3'-0" 2'-0" 1'-6"3'-0"
3'-3" 3'-3"
ALASKANLOG ENDS
12
10
412
1'-6" 2'-0" 3'-0"3'-0"
3'-3" 3'-3"
4
12
12
12
12
4
10
10
4'-0" 5'-6"
2'-0" 2'-0"
4'-0"
2'-0" 2'-0"
4'-0"1'-2"1'-2"
PIONEER LOG HOMES OF BRITISH COLUMBIA LTD. ASSUMES RESPONSIBILITY FOR ARCHITECTURAL DESIGN & CONSTRUCTION OF THE LOG WORK ONLY AS SHOWN IN THIS PLAN, PROVIDED THE LOG
WORK IS CONSTRUCTED BY PIONEER LOG HOMES OF BRITISH COLUMBIA LTD. ALL OTHER ELEMENTS ARE TO BE APPROVED BY
LOCAL BUILDING AUTHORITIES & BUILT TO LOCAL BUILDING CODES. ANY ENGINEERING REQUIRED & RELATED COSTS ARE THE
RESPONSIBILITY OF THE OWNER.
LOG STRUCTURE SETTLING INFORMATION:
THIS IS COMPLETED BY HOLDING THE BOTTOM OF THE THRU-BOLT ROD STATIONARY, WHILE TURNING THE NUT CLOCKWISE UNTIL THE TENSION SPRING ON THE BOTTOM OF THE TRHU-BOLT IS COMPRESSED AND TIGHTENED. THIS NEEDS TO BE DONE TO ALL THRU-BOLTS IN THE HOME WHEN THE HOUSE IS FIRST DELIVERED AND ABOUT EVERY THREE MONTHS FOR THE FIRST THREE YEARS.
TIGHTENING OF THRU-BOLTS:
AS A RULE, WHEN THE THRU-BOLTS HAVE TO BE TIGHTENED ANY EXTERIOR AND INTERIOR VERTICAL STRUCTURAL POSTS WITH SCREW JACKS (STEEL SETTLERS) SHOULD ALSO BE ADJUSTED. THESE POSTS WILL BE ADJUSTED BY THE SCREW JACKS ON EITHER THE TOP OR BOTTOM. THE ADJUSTMENT SHOULD BE APPROXIMATELY THE SAME AMOUNT AS THE THRU-BOLTS BECAUSE YOUR HOME WILL COME DOWN AN AVERAGE AMOUNT ALL THE WAY AROUND THE EXTERIOR WALLS. AN EXCEPTION TO THIS IS AT INTERIOR LOG WALL LOCATIONS; THE SETTLING MAY BE INCREASED SOMEWHAT BECAUSE OF HEAT ON BOTH SIDES OF THE WALL..
ADJUSTMENT OF ALL VERTICAL POSTS/STRUCTURAL POST: INTERIOR & EXTERIOR
FRONT ELEVATION RIGHT ELEVATION
REAR ELEVATIONLEFT ELEVATION
A - 1
ELEVATIONS
ELEVATIONS
NOTES:
PAGE:
DRAWN BY:
CHECKED BY:
SCALE:
DATE:
DRAWING TITLE:
PROJECT TITLE:
AMENDMENTS
PREPARED FOR:
PREPARED BY:
U.S. DIVISION
CANADA DIVISION
1/4" = 1'-0"
D. FITZEL
P.O. BOX 301PAYSON, ARIZONA
85547 - 0301UNITED STATES
PH (928) 472-8073FAX (928) 474-8991
841-A S. MACKENZIE AVE.WILLIAMS LAKE, BCV2G 3X8 CANADAPH (250) 392-5577FAX (250)- 392-5581
THEANCHORAGE
MAIN: 914 sq. ft.LOFT: 525 sq. ft.
MARCH 31 2005
7'-6
"
7'-6
"9
'-2"
GUARD RAIL TO LOCAL CODE
STRUCTURAL POST
LOG RIDGE BEAMSEE DETAIL
SHEET
LOG RIDGE BEAM
LOG DORMER BEAM SUPPORTEDBY LOG POSTS. FLATTEN BOTTOM OF
BEAM WHERE POST INTERSECTS. USEWOOD DOWEL BETWEEN
POST AND BEAM
LOFT FLOOR BUILD-UP:2x6 T&G DECKING
OVER LOG FLOOR JOISTS
LOG KICKER BEAM TOSUPPORT RAFTER TAILS
BELOW DORMER
10'-6" HIGH LOG WALLS:HAND CRAFTED, SCRIBE FITTED LOG
WALL WITH BATT INSULATION INLATERAL GROOVES AND NOTCHES.
MAIN FLOOR ASSEMBLY:FINISH FLOOR TO CLIENTS' SPECS
5/8" T&G PLYWOOD SUBFLOOR2x10 WOOD FLOOR JOISTS 16"oc
20"WIDE x 10" THICK POUREDCONCRETE FOOTING. REINFORCEAS PER ENGINEER'S REQUIREMENTS.
8" THICK CONCRETE FOUNDATION WALL. REINFORCE AS PER ENGINEER'S REQUIREMENTS.
POURED CONCRETE PAD FOOTING. REINFORCE ASPER ENGINEER'S REQUIREMENTS.
GLULAM BEAM OR3 PLY 2x10 B/U
WOOD BEAM
STAIRS MAIN TO LOFT:HALF LOG STRINGERS W/
APPROX. 3"x 11" TIMBER TREADS.
LOG POST BETWEENMAIN FLOOR & BEAM
SETTLER AT BASE W/MIN 5" SETTLING SPACE.
SOLID BLOCKING BELOWBETWEEN JOISTS
TYPICAL ROOF ASSEMBLY:METAL ROOFING, COLOR AS PER CLIENTS'SPECS2x4 WOOD STRAPPING 22"oc2x12 WOOD RAFTERS 24"ocBATT INSULATION6 MIL POLY AV BARRIERT&G WOOD PANEL
LOG DORMER BEAM SUPPORTEDBY LOG POSTS. FLATTEN BOTTOM OFBEAM WHERE POST INTERSECTS. USE WOOD DOWEL BETWEEN POST AND BEAM
LOG BEAM TO SUPPORT RAFTER TAILS BELOW DORMER
LOG POST BETWEENDECK FLOOR & BEAMSETTLER AT BASE W/MIN 5" SETTLING SPACE.SOLID BLOCKING BELOWBETWEEN JOISTS
DECKING AS PER CLIENTS'SPECS2x8 JOISTS 24"oc ON3 PLY 2x8 B/U WOOD BEAM
MIN 8" dia. CONCRETE FILLED SONOTUBESITTING ON POURED CONCRETE PAD FOOTING.REINFORCE AS PER ENGINEER'S REQUIREMENTS.
SOLIDBLOCKING
12
12
10
4
CRAWLSPACE
1A-2
1A-2
2x8
JO
ISTS
24
" oc
2x10 FLOOR JOISTS 16" oc
36
'-0"
12'-0" 12'-0"
1'-7" 10'-5" 10'-5" 1'-7"
12'-0" 3'-3" 8'-9"
11'-0"11'-0"
8'-1
0"7
'-8"
11'-6
"12
'-0"
9'-8
"8
'-0"
18'-4
"
26
'-9"
9'-3
"
4'-0
"3
'-0"
3'-6
"
24'-0" 5'-6"
12'-0" 12'-0"
8" THICK CONCRETE FOUNDATION WALL.REINFORCE AS PER ENGINEER'S DESIGN REQUIREMENTS.
20" WIDE x 10" DEEPPOURED CONCRETE FOOTING.REINFORCE AS PER ENGINEER'S DESIGN REQUIREMENTS.
POURED CONCRETE PAD FOOTING. REINFORCE AS REQUIRED.(4 PLACES)
STRUCTURAL POST
BEAM POCKET
BEAM POCKET
MIN. 8" dia. CONCRETEFILLED SONOTUBE
SITTING ON POUREDCONCRETE PAD FOOTING.
REINFORCE AS PERENGINEER'S
REQUIREMENTS.TYP ALL DECK FOOTINGS
3 -
2 X
8 B
EAM
2 X 8 JOISTS24"oc
B/U WOOD
BEAM
B/U WOOD BEAM
GL
UL
AM B
EAM
CRAWLSPACE
GENERAL NOTES ON FOUNDATIONS AND FOOTINGS
1. CONCRETE STRENGTH TO BE 2500 PSI @ 28 DAYS FOR FOOTINGS TO BE3000 psi @ 28 DAYS FOR CONCRETE SLAB.2. FOOTING DEPTH TO BELOW FROST LEVEL. CONSULT LOCAL BUILDINGDEPARTMENT FOR LOCAL FROST PENETRATION DEPTHS.3. ALL FOOTING SIZES AND REINFORCING SPECIFICATIONS ON THIS PLAN AREBASED ON A MINIMUM GROUND BEARING CAPACITY OF 1500 psf OR GREATER.4. SINCE SOILS < 11 psi CAN SWELL OR REBOUND, THE FOUNDATION AND FOOTINGSDESIGN MUST COMPLY WITH LOCAL BUILDING CODE REGULATIONS AND GOODBUILDING PRACTICES.5. ALL SONOTUBES SUPPORTING LOG POSTS TO HAVE 1 ½" dia. REDI-RODLOCATED AT THE CENTER. REDI-ROD TO BE 36" LONG AND TO PROJECTAPPROX. 12" ABOVE TOP OF SONOTUBE (U.N.O.)
GENERAL NOTES1. ALL ENGINEERING INSPECTIONS AND COSTS REQUIRED AT ANY TIME FOR THE BUILDING WILL BE THE SOLE RESPONSIBILITY OF THE OWNER2. CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE.3. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALEDDIMENSIONS.4. ALL WORK SHALL CONFORM TO THE CURRENT EDITION OF THE LOCALBUILDING CODE.5. INFORMATION CONTAINED ON THESE DRAWINGS SHALL BE AT THE DISCRETION OF THE CONTRACTOR PROVIDED IT MEETS WITH THE ABOVE REQUIREMENTS AND REPRESENTS SOUND BUILDING PRACTICE.6. ALL DIMENSIONAL LUMBER TO BE SPF No. 2 OR BETTER . UNLESS NOTED OTHERWISE. (U.N.O.)7. PROVIDE SMOKE DETECTORS AS REQUIRED, PREFERABLY ONE PERLIVING SPACE. AT LEAST ONE SMOKE ALARM IS TO BE LOCATED NOT MORE THAN 24" FROM THE HIGHEST POINT INSIDE THE STRUCTURE. ALL DETECTORS TO BE PERMANENTLY WIRED 110 V. INTERCONNECTED EACH FLOOR.W/ BATTERY BACK-UP.8. PERIMETER DRAIN, IF REQUIRED, TO BE IN ACCORDANCE WITH LOCALBUILDING CODE.9. FLOOR JOISTS TO REST ON 2x6 TREATED SILL PLATE OR DOUBLE TOPPLATE.10. 2x6 TREATED SILL PLATE TO BE ANCHORED TO FOUNDATION WALL USING MIN. 5/8" dia. STEEL ANCHOR BOLTS W/ 2" x 2" x 3/16" WASHERS SPACED NOT MORE THAN 4'-0" o.c..11. SITE PLAN AND LEGAL SHALL BE SUPPLIED AND COMPLETED BY OWNER.12. OWNER AND CONTRACTOR SHALL CHECK THE SPECIFICATIONS AGAINST THE BLUEPRINTS.13. ACTUAL DOORS AND WINDOWS USED ON THE JOB MAY VARY IN MAKE-UP AND APPEARANCE FROM BLUEPRINT UNLESS SPECIFIED.14. OWNER TO ENSURE THAT THE FOLLOWING IS COMPLETE PRIOR TO THEARRIVAL OF THE LOG PACKAGE. FIRST FLOOR FRAMING TO BE COMPLETE AND SUBFLOOR INSTALLED. 1x4 WOOD SPACERS TO BE NAILED TO SUBFLOOR AT LOG WALL LOCATIONS FOR LOG WALLS TO SIT ON. A 2x4 WOOD SPACER WILL BE USED IN ADDITION TO THE 1x4 IF A POURED CONCRETE TOPPING FOR HEATING IS TO BE USED ON THE FIRST FLOOR. ALL EXTERIOR WOOD SPACERS TO HAVE SILL SEAL ABOVE AND BELOW WITH A GALVANIZED DRIP EDGE ABOVE THE WOOD SPACERS AND SILL SEAL. THIS DRIP EDGE TO BE BROWN, GREEN, COLORED OR COPPER.15. OWNER TO PROVIDE 1x4 WOOD SPACERS WHICH ARE TO BE USED AT THE TOPS OF LOG WALLS AND LOG ROOF MEMBERS (PURLINS, RIDGE BEAMS) WHICH SUPPORT THE ROOF.
4" M
IN.
4" M
IN.
14 -1/2"
3" 4 1/4" 4 1/4" 3"
1 1/4
"1 1
/2"
1 1/4
"
3" 4 1/4" 4 1/4" 3"
1 1/4
"1 1
/2"
1 1/4
"
ANCHOR BOLT LOCATIONS
SOLID GLU-LAM WOOD BLOCKBETWEEN JOISTS. TYPICALLYONE BLOCK PER EVERY EIGHTFEET.
USE (4) 3/8" x 16" GRK FASTNERSTO SCREW FIRST ROUND OF LOGSTO WOOD BLOCK.
WOOD FLOOR JOIST
WOOD FLOOR JOIST
CONCRETE WALL TOP PLATE
COUPLING AS REQUIRED
CONCRETE WALL
2 - 5/8" dia. J-BOLTSPER BLOCK MIN 3" IN
BLOCK MIN 7" INCONCRETE
SOLID GLU-LAM BLOCKING BETWEEN JOISTS COUNTERSINK FOR NUT AND COUPLING AS REQUIRED.
3/4" GAP FOR FLOOR FINISH
USE (4) 3/8" x 16" GRK FASTNERSTO SCREW FIRST ROUND OF LOGS
TO WOOD BLOCK.
1x4 WOOD SPACER & 2x4 IFGYP-CRETE TOPPING
5/8" dia. ANCHOR BOLT
WOOD FLOOR JOIST
SOLID GLU-LAM WOOD BLOCKBETWEEN JOISTS. APPROX. 5 1/8" WIDEAND SAME DEPTH AS JOISTS.COUNTERSINK FORNUT AND COUPLING. PLACE AS SHOWNON FOUNDATION PLAN.
3/4" dia. NUT AND COUPLERIF REQUIRED.
GALV. DRIP EDGE. BROWNOR GREEN
FINISH FLOOR TO CLIENTS SPECS.ON PLYWOOD SUBFLOOR
LOG WALL
LOG WALL - SCREW FIRST LOG TO BLOCK USE (4) 3/8" x 16" GRK SCREWS
MIN. 6" IN BLOCK
"GRK" SPACING PATTERNFOR ANCHORING FIRST ROUND OF LOG WALL
"GRK" SPACING PATTERNFOR ANCHORING FIRST ROUND OF LOG WALL
FIRST ROUND ANCHORING DETAIL OVER CONC. FDTN. WALNOTE: USE "GRK" FASTENERS AS INDICATED
FIRST ROUND ANCHORING DETAIL OVER CONC. FDTN. WALNOTE: USE "GRK" FASTENERS AS INDICATED
FIRST ROUND ANCHORING DETAILPROVIDE ONE EVERY 8'-0" A - 2
FOUNDATION PLAN & SECTIONS
FOUNDATIONPLAN
& SECTIONS
FOUNDATION PLAN
CROSS SECTION
NOTES:
PAGE:
DRAWN BY:
CHECKED BY:
SCALE:
DATE:
DRAWING TITLE:
PROJECT TITLE:
AMENDMENTS
PREPARED FOR:
PREPARED BY:
U.S. DIVISION
CANADA DIVISION
1/4" = 1'-0"
D. FITZEL
P.O. BOX 301PAYSON, ARIZONA
85547 - 0301UNITED STATES
PH (928) 472-8073FAX (928) 474-8991
841-A S. MACKENZIE AVE.WILLIAMS LAKE, BCV2G 3X8 CANADAPH (250) 392-5577FAX (250)- 392-5581
THEANCHORAGE
MAIN: 914 sq. ft.LOFT: 525 sq. ft.
MARCH 31 2005
4'-0
"4
'-0"
4'-0
"4
'-0"
5'-0
"
8'-0
"
5'-0"4'-0"
4'-0"3'-0"
4'-0"5'-0"
3'-0"6'-8"
8'-0"
7'-0"
2'-0"6'-8"
6'-8"2'-0"
6'-8
"2
'-8"
6'-8
"2
'-8"
2'-8"6'-8"
16 R
. @ 7
" 15
T. @
10"
SDSD
DW
1A-2
1A-2
36
'-0"
4'-0
"
36
'-0"
18'-4
"8
'-0"
9'-8
"
9'-3
"10
'-3"
16'-6
"
5'-6
"7
'-2"
5'-8
"4
'-0"
4'-0
"9
'-8"
6'-0" 12'-0" 6'-0"
24'-0" 6'-0"
4'-4" 3'-10" 3'-10" 3'-3" 4'-2" 4'-7"
10'-3" 2'-6" 11'-3" 5'-6"
16'-6
"13
'-4"
6'-2
"
11'-0"
5'-6
"19
'-6"
LOG & TIMBERSTAIRS TO CODE
LOG POST w/STEEL SETTLER
LOG POST w/STEEL
SETTLERLOG POST w/
STEELSETTLER
DECK
LOG BEAM
LOG BEAM
LO
G F
LO
OR
JO
IST
VAULTED
VAULTED
DINING
KITCHEN
COV'DENTRY
LO
G K
ICK
ER
BE
AM
LO
G K
ICK
ER
BE
AM
110 V. - TO BEINTERCONNECTED
EACH FLOOR
UTILITYROOM
110 V. - TO BEINTERCONNECTED
EACH FLOOR
BEDROOM
LOG BEAM
LO
G F
LO
OR
JO
IST
GREAT ROOM
BATHDN
5'-0"3'-6"
5'-0"3'-6"
5'-0"3'-6"
3'-0
"4
'-0"
6'-8
"2
'-8"
6'-0
"6
'-8"
DN16 R. @ 7" 15 T. @ 10"
SD
1A-2
1A-2
24'-0" 5'-6"
22
'-4"
13'-8
"
4'-0
"19
'-6"
16'-6
"
9'-3
"10
'-3"
16'-6
"
6'-3" 2'-6" 3'-3" 12'-0"
5'-6
"11'-
0"
5'-2
"5
'-1"
6'-0
"6
'-0"
4'-6
"
GIARD RAIL TO CODE
EAGLECARVING
LOG POST w/ SIDESFLATTENED WHERE FRAMEWALLS TIE IN
OPENLOFT
BATH
WIC
4' RAKE
4' RAKE
4' RAKE
4' RAKE
CLOSET
STEPUP
2x6 @ 16" oc FRAME WALL OVER 2 PLY 2x12 SPF#2 & BTR RAFTERS
LO
G R
IDG
E B
EAM
LO
G D
OR
ME
R B
EAM
LO
G D
OR
ME
R B
EAM
OPEN TO
BELOW
2x12 SPF #2 & BTRRAFTERS @ 24" oc
2x12
SP
F #
2 &
BTR
RAF
TER
S @
24
" oc
MASTERBEDROOM
110 V. - TO BEINTERCONNECTED
EACH FLOOR
LOFT FLOOR ASSEMBLY:
2x6 T&G WOOD DECKINGLOG FLOOR JOISTS
LOFT PLUMBING FLOOR ASSEMBLY:
FINISH FLOOR TO CLIENTS SPECS5/8" PLYWOOD SUBFLOOR
2x8@ 16" oc JOISTS ON EDGE2x6 T&G WOOD DECKING
LOG FLOOR JOISTS
6'-0"6'-8"
6'-8"2'-8"
FLOOR PLANS
FLOORPLANS
A - 3
MAIN FLOOR PLAN LOFT FLOOR PLAN
NOTES:
PAGE:
DRAWN BY:
CHECKED BY:
SCALE:
DATE:
DRAWING TITLE:
PROJECT TITLE:
AMENDMENTS
PREPARED FOR:
PREPARED BY:
U.S. DIVISION
CANADA DIVISION
1/4" = 1'-0"
D. FITZEL
P.O. BOX 301PAYSON, ARIZONA
85547 - 0301UNITED STATES
PH (928) 472-8073FAX (928) 474-8991
841-A S. MACKENZIE AVE.WILLIAMS LAKE, BCV2G 3X8 CANADAPH (250) 392-5577FAX (250)- 392-5581
THEANCHORAGE
MAIN: 914 sq. ft.LOFT: 525 sq. ft.
MARCH 31 2005
6" M
IN.
2 x 6 WOODMUD SILL
SIMPSON BEAM SEAT
CONCRETEFOUNDATION
WALL
MIN. 1/2" AIR SPACE AT SIDESAND END OF BEAM
WOOD BEAM
WOOD FLOOR JOIST
TOP ROUND OF LOG WALL
5/8" THREADED ROD
LOG WALL
SILL SEAL TOP ANDBOTTOM OF SPACER
1x4 WOOD SPACER PROVIDING3/4" GAP FOR FLOOR FINISH
FLOOR FINISH AS PER CLIENTS SPECS.
GALV. DRIP EDGEBROWN OR GREEN
THRU-BOLTS: USE 2 3/4" x 3/8"TIMBER WASHER W/ 5/8" NUT @ TOP &
BOTTOM OF THREADED ROD
5/8" ANCHOR BOLT
WOOD FASCIAS
ROOF RAFTERS TO SIT ON1x4 WOOD SPACER. THISENSURES A 3/4" GAP FORFINISH CEILING TO SLIDE INTO
SOLID WOOD BLOCKING. DEPTHEQUAL TO JOIST DEPTH
PLYWOOD SHEATHING
HAND PEELED LOG WALLWOOD RAFTERS SPACEDAS PER PLAN
ROOF CHOICE MATERIALS TO CLIENTS SPECS.
WOOD BLOCKING BETWEEN RAFTERS
CHANNEL PROVIDED BY SPACER FOR CLG. FINISH
HAND CRAFTED, SCRIBEFITTED LOG WALL
1X4 WOOD SPACER
VAPOUR BARRIER TO RUNBETWEEN SPACER AND
INSULATION
WOOD FASCIA
HAND PEELED LOG POST WITHBASE SQUARED TO SETTLE
THROUGH DECK.
ALLOW MIN. 5" SETTLINGSPACE AT TIME OF SET UP.
2x WOOD DECK JOISTS
MIN. 8" dia. CONCRETE FILLED SONOTUBESITTING ON CONCRETE PAD FOOTING.
STEEL SETTLER SITTING ONDECK NAIL TO BLOCKING ATCORNERS.
FLOOR SUPPORT BEAM1 1/2" dia. REDI-ROD 36" LONG. 12" EXTENDEDABOVE TOP OF CONCRETE.
INTERIOR SUBFLOOR
2x WOOD DECK JOISTS
METAL JOIST HANGER
PRESSURE TREATED LEDGERBOLTED TO FRAMING
CONCRETE FOUNDATIONWALL
EXTERIOR DECKING
WOOD RIM JOIST
SIMPSON PB 66 COLUMN BASE
SEE PLAN & ENGINEERING SCHEDULE
SLAB REINFORCEMENTAS REQUIRED
ENGINEERED BEAM
SIMPSON PC 66 COLUMN CAP
6x6 PT STRUCTURAL POST
#4 HORIZONTAL @ TOP OF WALL, @MID POINT & (2) IN FOOTING COVERED BY 3" MIN. CONCRETE.
LENGTH OF REBAR STUB EQUALS 30 BAR DIAMETERS (MIN.)
CONCRETESTEM WALL
FINISHED GRADE TOSLOPE AWAY FROM
STRUCTURE
P.T. 2 x 6 WOODMUD SILL
DRAINPIPE &DRAINROCK PER
LOCAL CODE.#4 VERTICAL EVERY 48" o.c.
5/8" dia. STEEL ANCHOR BOLTS W/ 2"x2"x3/16 WASHERS, @ 48" o.c.
BEND BOTTOM OFREBAR & ALTERNATE
DIRECTION OF BEND.
BOTTOM OF FOOTINGTO BE 18" MIN. BELOWUNDISTURBED SURFACE.
WINDOW TRIM
INSULATED GLASS
WINDOW SILL
BATT INSULATION ANDSETTLING SPACE
SETTLING SPACEBETWEEN TRIM AND TOP
OF CUT
WINDOW HEAD JAMB
HEADER LOG
INSULATED GLASS
1 1/4" THICK SETTLING CROWN
WALL LOG - BEVEL OPTIONAL
SCREW FASTENER
2x8 WOOD BUCK
WINDOW TRIM
2x4 KEYWAY
INSULATION SURROUND
INSULATED GLASS
WINDOW SIDE JAMBFASTENED TO WOOD BUCK ONLY
BATT INSULATION ANDSETTLING SPACE
SETTLING SPACEBETWEEN TRIM AND TOP
OF CUT
HEADER LOG
DOOR UNIT
DOOR HEAD JAMB
1 1/4" THICK SETTLING CROWN
WALL LOG - BEVEL OPTIONAL
SCREW FASTENER
DOOR SIDE JAMBFASTENED TO WOOD BUCK ONLY
DOOR TRIM
INSULATION SURROUND
DOOR UNIT
2x8 WOOD BUCK
CUT 2"x4" KEYWAY FOR 3" x 1-1/2" x O.188" HSSTUBING HEIGHT TO MATCH LENGTH OF DOOR JAM.
KEYWAY
DOOR OR WINDOWOPENING
RUN ELECTRICAL WIRESIN KEYWAY BEHIND 2 x 4& DRILL OVER TO BOX LOCATION
FLATTEN LOG FORFACE PLATE
ELECTRICAL BOXWOOD
SPACER
RIM JOISTDRILL THROUGH LOGTO INSIDE OF RIM JOIST
WASHER
3/8" x 6" MS PLATE
THREADED RODWELDED TO PLATE
1/4" HOLES FOR NAILING,4 PLACES EACH PLATE
FLOOR JOIST
SOLID BLOCKINGBETWEEN JOISTS @BELOW SETTLER
LOG COLUMN
ALLOW MIN 5" SETTLERSPACE AT SET UP 1 1/2" NF REDI-ROD 9"LONG
1 1/2" NF NUT
HANDRAIL TOTERMINATEAT POST
1/2 LOG STRINGER
3" x 11" TIMBERTREAD
HANDRAIL TO BE 36" ABOVE NOSING OF TREAD. BALUSTERS TO BE SPACED SUCH THAT A 4" Ø SPHERE CANNOT PASS THRU
3/4" FINISH FLOOR
3/4" SUBFLOOR2x8 JOISTS 16" o.c.
1 1/2" T&G DECKING
LOG FLOOR JOIST WITH TOPFLATTENED FOR FLOORASSEMBLY ABOVE.
CUT KEYWAY FOR T&G DECKING.SUBFLOOR AND FINISH FLOOR
SPIKES
SLOT FOR SPIKE TO SLIDE WITH LOG SETTLING
SPIKE OR LAG
1/2" T&G WOOD FINISH
LOG WALL KEYED FORWALL FINISH
KEYWAY FOR FINISH
1 1/2" x 8" SQUARE DOWELPOSITIONED IN CIRCULAR HOLE..
WOOD RAFTERS SPACEDAS PER PLAN
9 - 11 NAILS PERBYPASS
HAND PEELED LOG POST
ROOF RAFTERS TO SIT ON 1x4 WOOD SPACER. THIS ENSURES A 3/4" GAP FOR FINISH CEILING TO SLIDE INTO.
SOLIDBLOCKINGIF SEISMIC
HAND PEELED LOGRIDGE BEAM.
LOG FLOOR JOIST
MIN. 5" SETTLING SPACE GYPSUM BOARD
GYPSUM BOARD
2x6 WOOD NAILER
2x4 WOOD TOP PLATE
FINISH CEILING TO CLIENTSSPECS.
LOG FLOOR JOIST WITH TOPFLATTENED FOR FLOORASSEMBLY ABOVE.
CUT KEYWAY FOR T&G DECKING.
1 1/2" T&G DECKING
BEAM POCKET DETAIL - FOUNDATION
INTERIOR LOG WALL SHEAR BOLT DETAIL
LOG WALL/ROOF INTERSECTION DETAIL
LOG WALL / ROOF INTERSECTIONLOG WALL / ROOF INTERSECTION
COVERED DECK LOG POST SETTLER DETAIL DECK JOIST/FOUNDATION WALL DETAIL
ALTERNATE INTERIOR FOOTING
TYPICAL CONCRETE STEM WALL & FOOTINGFOR CRAWL SPACES (PER C.B.C. TABLE 18-1-C)
WINDOW SILL DETAILWINDOW SILL DETAIL
WINDOW HEADER DETAIL
WINDOW JAMB DETAILWINDOW JAMB DETAIL
DOOR HEADER DETAIL
DOOR JAMB DETAIL
ELECTRICAL SWITCH DETAIL
PERSPECTIVEVIEW
ELECTRICAL RECEPTICLE DETAIL
4" 6"
1"
1"
6"
1"1" 4"
PLAN VIEW
SIDE VIEW
STEEL SETTLER UNDER LOG COLUMN
STAIR / HANDRAIL DETAIL
LOFT PLUMBING FLOOR
FRAMED WALL/LOG WALL INTERSECTIONFRAMED WALL/LOG WALL INTERSECTION
TOP VIEWTOP VIEW
FRONT VIEW SIDE VIEWFRONT VIEW SIDE VIEW
LOG RIDGE BEAM DETAIL (TYPICAL FOR TOP & BOTTOM OF ALL POSTS EXCEPT @ SETTLER LOCATIONS)LOG RIDGE BEAM DETAIL (TYPICAL FOR TOP & BOTTOM OF ALL POSTS EXCEPT @ SETTLER LOCATIONS)
INTERIOR FRAME WALL SETTLING DETAIL LOFT FLOOR FRAMING DETAIL (EXCEPT BATHROOM)
A - 4DETAILS
DETAILS