July 9, 2021 Ms. Carolyn Bury Project Manager Corrective Action Section 2 Remediation and Re-use Branch U.S. Environmental Protection Agency, Region 5 77 West Jackson Boulevard Chicago, IL 60604-3590 Re: Storm Sewer Rehabiliation Summary Report Franklin Power Products, Inc./Amphenol Corporation Administrative Order on Consent, Docket # R8H-5-99-002 EPA ID # IND 044 587 848 Former Bendix Facility 980 Hurricane Road Franklin, Indiana 46131 Dear Ms. Bury: Industrial Waste Management Consulting Group, LLC (IWM Consulting), on behalf of the “Performing Respondent”, Amphenol Corporation (Amphenol), is submitting this Storm Sewer Rehabilitation Report to document rehabilitation activities completed to the storm sewer located in the vicinity of the Site. The Former Bendix facility is located at 980 Hurricane Road in Franklin, Indiana (Site). A September 2020 video and visual inspection of the interior of the on-Site 60-inch diameter corrugated metal storm sewer pipe, noted that one or more joints had become separated and an approximate 1-inch gap was present where the original seals had deteriorated over time (originally installed in approximately 1976). Only one segment (~100-feet in length) of the storm sewer was inspected in September 2020, however, IWM Consulting believed these conditions were consistent throughout the targeted rehabilitation area, which was approximately 600-feet in length. The storm sewer main is owned by the City of Franklin (City) and repairs were made at no cost to the City. Only sections of the storm sewer main that potentially overlie portions of the dissolved chlorinated volatile organic carbon (VOC) plume and may be attributed to the operations at the former Bendix facility were rehabilitated. A figure displaying the portion of storm sewer targeted for rehabilation has been included as Figure 1. Storm Sewer Main Rehabilitation Activities IWM Consulting contracted with a qualified subcontractor (National Gunite) to rehabilitate the separated storm sewer joints and to re-line the flow invert. Initial inspections indicated that the joints are present approximately every 8 feet, which means approximately 75 joints would be sealed. Joints were found to be separated up to two inches and were potential conduits to the subsurface. The sewer main joints

Transcript of Amphenol Site Storm Sewer Repair July 2021

July 9, 2021

Ms. Carolyn Bury Project Manager Corrective Action Section 2 Remediation and Re-use Branch U.S. Environmental Protection Agency, Region 5 77 West Jackson Boulevard Chicago, IL 60604-3590

Re: Storm Sewer Rehabiliation Summary Report Franklin Power Products, Inc./Amphenol Corporation Administrative Order on Consent, Docket # R8H-5-99-002 EPA ID # IND 044 587 848 Former Bendix Facility 980 Hurricane Road Franklin, Indiana 46131

Dear Ms. Bury:

Industrial Waste Management Consulting Group, LLC (IWM Consulting), on behalf of the “Performing Respondent”, Amphenol Corporation (Amphenol), is submitting this Storm Sewer Rehabilitation Report to document rehabilitation activities completed to the storm sewer located in the vicinity of the Site. The Former Bendix facility is located at 980 Hurricane Road in Franklin, Indiana (Site). A September 2020 video and visual inspection of the interior of the on-Site 60-inch diameter corrugated metal storm sewer pipe, noted that one or more joints had become separated and an approximate 1-inch gap was present where the original seals had deteriorated over time (originally installed in approximately 1976). Only one segment (~100-feet in length) of the storm sewer was inspected in September 2020, however, IWM Consulting believed these conditions were consistent throughout the targeted rehabilitation area, which was approximately 600-feet in length.

The storm sewer main is owned by the City of Franklin (City) and repairs were made at no cost to the City. Only sections of the storm sewer main that potentially overlie portions of the dissolved chlorinated volatile organic carbon (VOC) plume and may be attributed to the operations at the former Bendix facility were rehabilitated.

A figure displaying the portion of storm sewer targeted for rehabilation has been included as Figure 1.

Storm Sewer Main Rehabilitation Activities

IWM Consulting contracted with a qualified subcontractor (National Gunite) to rehabilitate the separated storm sewer joints and to re-line the flow invert. Initial inspections indicated that the joints are present approximately every 8 feet, which means approximately 75 joints would be sealed. Joints were found to be separated up to two inches and were potential conduits to the subsurface. The sewer main joints

Storm Sewer Rehabilitation Summary Report EPA ID # IND 044 587 848

Franklin, Indiana July 9, 2021

Page 2

in the vicinity where the route of the storm main made 90-degree changes in direction were significantly distressed.

The photos below depict the typical joint conditions within the vicinity of the Site prior to rehabilitation activities.

Overall visual separation of joint Joint separation Joint separation

Storm sewer rehabilitation activities were completed between May 12, 2021 and June 17, 2021. The storm sewer was thoroughly cleaned prior to initiation of the rehabilitation activities and the water flow was controlled within the storm main pipe by constructing a temporary sandbag/shotcrete weir system and pumping the storm water through an internal flume system (polyvinyl chloride pipes/hoses) to a down-flow location beyond the work area. The weir and flume system allowed gathered storm water to safely pass through the storm sewer and work area, while allowing for the work area to remain dry, with the exception of during heavy rain events. The temporary weir system allowed for water movement over or through the weirs when heavy rains occured during the work activities. This aided in preventing backups or pooling of water within the upstream portions of the rehabilitation area.

The photos below depict the storm water wier and pumping system utilized during the project.

Temporary weir and pump intake Discharge hose and supply lines Down-flow discharge area

Storm Sewer Rehabilitation Summary Report EPA ID # IND 044 587 848

Franklin, Indiana July 9, 2021

Page 3

National Gunite sealed the joints with a 18-inch full circumferential band using 2-inches of 5,000 pounds per square inch (psi) shotcrete (after it is allowed to cure for 28-days). In addition, the invert of the pipe received a structural lining from the 05:00-07:00 position. The shotcrete throughout the structural rehabilitation was enhanced with 2-inch by 2-inch, 12-gauge, welded wire mesh reinforcement and the final thickness of the shotcrete was approximately 2-inches (1-inch below and 1-inch above the wire mesh). The wire mesh was anchored to the storm sewer pipe using self-taping screws and the wire mesh was tied into the anchors with 16-guage annealed tie wire.

The photos below depict the installation process and equipment utilized to rehabilitate the selected portions of the storm water main.

View of wire mesh at joint View of wire mesh in invert

View of dewatering pump and shotcrete mixing equipment View of compressor for shotcrete application

Following the completion of lining activities, the temporary weir system and all pumping equipment were removed. A final video inspection of the storm sewer main was completed to document final pipe conditions.

Storm Sewer Rehabilitation Summary Report EPA ID # IND 044 587 848

Franklin, Indiana July 9, 2021

Page 4

The following photos depict the typical joint and invert conditions within the rehabilitated portion of the storm sewer main following completion of work activities.

Repaired Joint

Lined Invert

Typical view of repaired storm pipe joint Typical view of lined invert

View of repaired main turn at SS-North View of repaired main turn at SS-South (Northeast corner)

Conclusions

Based on the final video inspection, the storm sewer rehabilitation activities appear to have adequately sealed any potential areas where water could enter or exit the storm main. This should assist during the implementation of future remediation activities at the Site (i.e., in-situ injections).

Storm Sewer Rehabilitation Summary Report EPA ID # IND 044 587 848

Franklin, Indiana July 9, 2021

Page 5

Please do not hesitate to contact the undersigned with questions or if you require additional information regarding this submittal.

Sincerely,

IWM CONSULTING GROUP, LLC

Christopher D. Parks, LPG #2169 Bradley E. Gentry, LPG #2165 Senior Project Manager Vice President/Brownfield Coordinator

cc: Joseph Bianchi, Amphenol (electronic only) Carolyn Bury, U.S. EPA Region 5, RRB CAS2 (electronic only)

i WM 13•UE-i•J§il:t€1€i-J-i ■ lat

Figure

• s Ill 0

/

~--·-·-·

I I I

I I I

□ □

D

-·-·

D D D

I, I I ·1 I 1s I ......_,

D

!Iii

0

□ o

I ~

I

-·-·---·~

. - . _I. ---i

I

I

0 I

I Ii

0/2 ~

0

I I I \ \

I

I I I I I I I

\ \

UPPER SHELBYVILLE ROAD

UNKNOWN

RET

ENTI

ON

PON

D

BASTIN LOGAN

BUILDING

PAVEMENT

FORMER PLATING ROOM

FORMER WASTE WATER TREATMENT COVERED

OUTDOOR CONCRETE PADGARAGESTORAGEBUILDING

250130

SS-WEST

SS-NORTH

SS-SOUTH

SS-EAST 1

MW-20

MW-26

MW-27

MW-3

MW-21

MW-28

MW-23

MW-22

MW-29

MW-24 IT-1A

MW-25

MW-12R MW-30

MW-35IT-2MW-36

NEW

OLD

MW-9

250120

250110

250053

250052

250090 250100

RW-4

RW-3

RW-5

RW-1RW-2

BARN

P&T SYSTEM

BUILDING

SHELTER

GARAGE

FOR

MER

HU

RR

ICAN

E RO

AD

PARKIN

G

HAMILTON AVENUE

LEGEND

RESIDENTIAL HOME STORM SEWERPROPERTY LINE (APPROXIMATE)ABANDONED MONITORING WELL * DETACHED GARAGES & SHEDS NOT SHOWN REHABILITATION AREA MONITORING WELL STORM SEWER

NON-RESIDENTIAL STRUCTURERECOVERY WELL SANITARY SEWERPIEZOMETERS

PRIMARY BUILDING WALLS

DRAWN BY: L. STRUM

0' 80' DATE: 9/27/99 FIGURE 1 FORMER AMPHENOL RFI/CMS REVISED: 01/07/2021 STORM SEWER 980 HURRICANE ROAD

SCALE IN FEET HWPA #111291-01 FRANKLIN, INDIANAREHABILITATION DWG. NO. 111291S1

CIT

Y O

F FR

ANKL

IN S

TREE

T D

EPAR

TMEN

T

N. FO

RSYTH

E STREET

P-5

P-4

P-6

P-3

250055 250056

250056

250080 GLENDALE DRIVE