Alternative Energy and Economic Development in the “Coalfields”
-
Upload
kathleen-webster -
Category
Documents
-
view
218 -
download
3
Transcript of Alternative Energy and Economic Development in the “Coalfields”
Alternative Energy and Economic Development in the “Coalfields”
Wind potential in 11 WV Counties
Coal River Mountain Wind - Low-res
Coal River Mountain Wind - High-res
View of Coal River Mountain from Naoma
Mountain from Naoma with Windmills
Brushy Fork Sludge Impoundment
Ridge on Coal River Mountain
Existing infrastructure - gas lines
View of Pond Knob with Mining
Overview of Developable area
Proposed Mountaintop Removal Permits
11 County Overview
Cherry Pond Wind - Low-res
Cherry Pond Wind - Hi-res
Cherry Pond Wind Before Mining
Cherry Pond Wind After Mining
Cherry Pond Landscape Before Mining
Cherry Pond Landscape After Mining
Energy Potential from Wind Development
Wind Power Potential on Coal River Mountain:
229 Turbines would produce 140 Megawatts of electricity, enough to power 91,180 homes.
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
0 20 40 60 80 100 120 140
Annual Energy Production
CoalCoal
WindWind
Years of Operation
Mil
lio
ns
of
Kil
ow
att
Ho
urs
0
40,000
80,000
120,000
160,000
200,000
0 20 40 60 80 100 120 140
Cumulative Energy Production
CoalCoal
WindWind
96 Years96 Years
Years of Operation
Mil
lio
ns
of
Kil
ow
att
Ho
urs
0
50
100
150
200
250
300
0 5 10 15 20 25 30 35 40 45
Annual Employment
CoalCoal
WindWind
Years of Operation
An
nu
al E
mp
loym
ent
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0 5 10 15 20 25 30 35 40 45
Cumulative Jobs Created
CoalCoal
WindWind
18 Years18 Years
Years of Operation
Nu
mb
er o
f 1-
Yea
r Jo
bs
Existing Surface Mines in Appalachia
Correlation Between Mining and Poverty
Correlation Between Mining and Unemployment
Surface Mines in the Vicinity - 2003
Proposed Surface Mines Simulation