Central Coalfields Limited

58
A Mini Ratna Company Addendum EIA & EMP For One Time Capacity Enhancement of Existing Karo OCP (Quarry-I) Application for one time increase in capacity under clause 7(ii) of EIA Notification. Project Area (Ha) Mine Capacity (MTPA) Existing Proposed Existing Proposed 226.33 226.33 1.50 2.50 (Bokaro & Kargali Area) Central Coalfields Limited (January, 2016) Prepared at Regional Institute- III Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road Ranchi-834008, Jharkhand

Transcript of Central Coalfields Limited

A Mini Ratna Company

Addendum EIA & EMP For One Time Capacity Enhancement

of Existing Karo OCP (Quarry-I)

Application for one time increase in capacity under clause 7(ii) of EIA Notification.

Project Area (Ha) Mine Capacity (MTPA)

Existing Proposed Existing Proposed

226.33 226.33 1.50 2.50

(Bokaro & Kargali Area)

Central Coalfields Limited

(January, 2016)

Prepared at

Regional Institute- III

Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road

Ranchi-834008, Jharkhand

CONTENTS

Particulars Plate/ Annexure No.

Page No.

Form-I

Addendum EIA & EMP Plate Name Plate No. After Page No.

Location Plan I

Toposheet of Buffer zone II

Land Use Plan III

Geological Plan IV

Final Stage Quarry Plan V

Final Stage Dump Plan VI

Location of Sampling Stations VII

Isopleth of PM10 Without Control Measures VIII

Isopleth of PM10 With Control Measures IX

Post Mining Land Use Plan X

Annexure Name Annexure No. After Page No.

Approval of Karo OCP by CCL Board I

Half Yearly Compliance Report II

MoEF Guidelines for Expansion Project III

Forestry Clearance Letter IV

V

1

Addendum EIA & EMP For One Time Capacity Enhancement of Existing Karo OCP (Quarry-I)

(Proposed Capacity 2.50 MTPA)

1 Introduction

Karo OCP (Quarry-I) is located in Bokaro district of Jharkhand and lies in the B&K Area of CCL.

The PR of Karo OCP was approved by CIL Board for a rated capacity of 3.5 MTY in August, 2006 with an initial capital of 96.53 Crs. Keeping in view the huge demand of coking and non-coking coal, it became necessary to produce maximum possible coal from the mine. As per approved PR, two opencast mines were planned separately in the name of Quarry-I (1.5 MTPA) and Quarry-II (2.00 MTPA).

The EC for this project was granted for 1.50 MTPA capacity in Quarry-I only (limited to part area having released forest land and non-forest land only) vide letter number J-11015/544/2009-IA. II(M) dated 24.12.2014 within lease area of 226.33 Ha (instead of original area of 570.26 Ha). Refer Annexure-II for a copy of half-yearly compliance report.

This opencast mine (Quarry-I) is presently being worked by Shovel Dumper combination. The performance of mine for the last three years is given below.

Year Coal (MT) OBR(Mcum) SR(Cum/T)

2012-2013 0.62 0.33 0.53

2013-2014 0.77 0.39 0.51

2014-2015 1.63 0.68 0.42

Present Proposal

The Project Report of Karo Expansion OCP (11/15 MTPA) with integrated washery was in principally approved on 21.05.2013 by CCL Board. As the forest land in remaining part of the project is awaiting stage-I clearance from MoEF&CC, it is necessary to increase the EC capacity of existing Quarry-I to meet demand of coal in the intervening period. The Public Hearing of Karo Expansion OCP (11/15 MTPA) with integrated washery was held on 05.01.2016, and final EIA & EMP is under preparation.

The present proposal envisages opencast mining upto seam VI/VII/VIII combined in Quarry-I only at an enhanced capacity @ 2.50 MTPA with one time increase in capacity as per MoEF&CC guidelines issued vide office memorandum dated 19.12.2012 & subsequent amendment vide memorandum dated 07.01.2014.

Salient Features of MoEF&CC Guidelines

MoEF&CC issued guidelines for granting environmental clearance for expansion of coal mining projects involving one time production capacity expansion of upto 25% in the existing operation. The guidelines have been issued vide office memorandum

2

No.J-11015/30/2004- IA.II(M) dated 19.12.2012 & subsequent amendment vide memorandum dated 07.01.2014. Amendment vide memorandum dated 07.01.2014 states that:- “for expansion proposals of existing coal mining projects having production capacity upto 8.0 MTPA as per the EC letter, the limit of capacity expansion may be considered as 50% or incremental production of 1.00 MTPA, whichever is more, in the existing mining operation, within the existing mine lease area”. All other stipulations stated in earlier O.M. dated 19.12.2012 will continue to apply in such cases. The Addendum EIA & EMP with necessary enclosures are being submitted for EC of Karo OCP Quarry I (2.50 MTPA capacity proposed as per the new guidelines).

The salient features of the guidelines: Expansion projects for coal mining fall into two categories (i) projects that have obtained EC under the EIA notification 1994 and (ii) projects that have obtained EC under the EIA Notification,2006. The EAC may consider exempting Public Hearing for the capacity expansion proposals of existing coal mining projects, which have obtained EC under any one of these Notifications, which are for one time capacity expansion of up to 25% in the existing mining operation, within the existing mine lease area, under clause 7(ii) of the EIA Notification 2006 subject to the following conditions:-

Para Conditions Actual Status

1 Such an exemption would be considered for those expansion projects which have obtained prior EC and have undergone Public Hearing during the process of obtaining EC.

Public Hearing was held on 24.05.2007 during the process of obtaining EC under EIA Notification, 2006.

2 The proposal is for one time capacity expansion of up to 25% in the existing coal mining operation.

This proposal is for one time capacity expansion of 1.00 MTPA in the existing coal mining operation.

3 There is no additional mine lease area involved.

There is no increase in existing lease area of 226.33 Ha.

4 There is no change in mining method (underground to opencast).

There is no change in mining method.

5 Application for the expansion project shall include a certified report of the Regional Office of the MoEF on the issue of compliance of EC conditions stipulated for the existing project for which EC for the expansion is being sought and necessary action taken there upon by the EAC, in terms of the MoEF Circular No.J-11011/618/2010-IA.II (1) dated 30.5.2012.

Inspection by Director MoEF&CC, Regional Office, Ranchi was done on 22.01.2016.

6 Details of the court cases, if any, pending in any Court of Law against

There is no court case pending in any Court of Law against the

3

the project as well as directions passed by any Court relating to the project shall be furnished by the proponent directly to the Environment Appraisal Committee (EAC). The EAC will deliberate upon the same and the gist of the discussion will be reflected in the minutes of the EAC meetings.

project.

7 Details of notices, if any, issued to the project under the Section 5 of the Environment (Protection) Act, 1986 will be reported by the proponent directly to the EAC. The EAC will deliberate upon the same and the gist of the discussion will be reflected in the minutes of the EAC meeting.

No notice has been issued to the project under the Section 5 of the Environment (Protection) Act, 1986

8 If the project falls in a Critically Polluted Area (CPA) wherein the moratorium has been lifted, the EAC shall examine the measures required to be implemented by the project proponent under the Environment Action Plan prepared by the State Pollution Control Board concerned and status of their Implementation. In such cases, the EAC shall also examine the monitoring data furnished by the project proponent of the environmental quality of the study area /CPA in which the project falls and after due diligence, decide if any additional mitigative measures are required for the expansion.

The project does not fall in a Critically Polluted Area (CPA).

9 25% expansion in production capacity is subject to a ceiling of 2 MTPA of additional production where the transportation of the additional production is proposed by road and of 5 MTPA of additional production if such transportation is proposed by means of a conveyor and /or rail transport.

The coal dispatch is done l through Kargali Washery Railway Siding at about 4.0 km from the mine. The transport upto Kargali Washery/Railway Siding is done by CCL road.

Amendment vide memorandum dated 07.01.2014

10 For expansion proposals of existing coal mining projects having production capacity upto 8.0 MTPA as per the EC letter, the limit of capacity expansion may be considered as 50% or incremental production of 1.00 MTPA, whichever is more, in the existing mining operation, within the existing

The proposed increase in capacity is from 1.50 MTPA to 2.50 MTPA.

4

mine lease area”. All other stipulations stated in earlier O.M. dated 19.12.2012 will continue to apply in such cases.

The one time production capacity expansion of Karo OCP Quarry I (2.50 MTPA capacity), B&K Area, Central Coalfields is a fit case under the guidelines issued vide office memorandum No.J-11015/30/2004-IA.II(M) dated 19.12.2012 and subsequent amendment.

This Addendum EIA & EMP for Karo OCP Quarry I (2.50 MTPA capacity) without increase in lease area and coal dispatch through Kargali Washery/Railway Siding is put up for kind approval of Expert Appraisal Committee (T&C) of MOEF.

Identification of project & project proponent

The project under consideration, i.e. Karo OCP Quarry I (2.50 MTPA capacity) is administratively under B&K Area of CCL headed by General Manager, B&K Area. Geologically, it falls in East Bokaro Coalfield in Bokaro District of Jharkhand. The mailing address of the Project Officer is given below: Karo OCP, B&K Area, Central Coalfields Limited. PO- Bermo Dist- Bokaro, Pin – 829104 Location & Communication

The project is located in the north-eastern part of East Bokaro Coalfield. This OCP lies to the north of Bokaro Colliery and Bermo Quarry of DVC, to the west of Amlo Project and to the east of Konar Project. The block is located between the latitude (N) – 23047’02” – 23048’38” and longitude (E) – 85057’27” – 85058’38”. It is shown in Plate No.-II (Topo sheet scale 1:50000). East Bokaro Coalfield lies in the Gomo-Barkakana-Dehri-On-Sone loop line of Eastern Railway. Nearest railway station is Bermo railway station on this line, which is located at a distance of about 5 Km. from the proposed Karo OCP Quarry I (2.50 MTPA capacity). The east-west running Gomia- Jarangdih- Phusro- Jaina More road, which meets the Bisnugarh-Petarbar road and Dhanbad-Ramgarh road, connects the coalfield with Hazaribagh, Dhanbad and Ranchi. This road is located to the south of Kaveri (Karo-II) block. The block is also connected Bokaro Thermal Power Station in the west and Phusro in the southeast by metal road. The nearest township is Phusro, which is situated at a distance of about 7 Km. Phusro is connected to the G.T. Road by Phusro and Dumri road. The nearest Air Port is Ranchi. However, there is a small airstrip located near Sawang colliery. Refer Location plan at Plate-I.

5

Description of importance to the country and region

Central Coalfields Limited is facing increasing demand of coal because of increased demand from industry and power sector. Continuing and augmentation of coal production from the mines of CCL will help to bridge the gap of demand and supply of coal in India. To meet the growing demand of coal, especially in power and steel sectors, CCL has planned to increase its production capacity from the present production level of 55.65 Mt. of coal during 2014-15 to 67.0 MTPA by 2016-17, ie by end of XIIth Plan Period. Annual coal production of CCL since 1990-91 is given below:

2 Project Description The Detailed Project Report of Karo OCP (3.50 MTPA capacity) was approved by 332nd (No. 5 of 2006) meeting of Board of Directors of CCL held on 12.08.2006 envisaging outsourcing extraction of coal and OB removal at an estimated initial capital investment of Rs. 96.53 Crores (November 2005 price level). The project report has been prepared on the basis of two geological reports, one is “geological report of Karo eastern block” prepared during 1986-87 by RI-3 CMPDI, and other is “geological report of coal exploration, Kavery (Karo-II) block” prepared by MEC in 1994.

The proposed quarry in Karo block envisages to mine composite Seams-VI/VII/VIII up to Seam-XI up to a depth of 100 to 110m. However, it is observed that Seam-VI & VII occur as composite seam and Seam-VIII occurs as a separate seam in the Karo block .Six faults of different magnitudes have been interpreted in Karo- blocks. Dip of the formation is 80 to 100 due south. The general trend of the strike is east-west in Karo. However, minor swings in the strike have been observed in some area. The overall grade of coal has been estimated as Grade- F and W-IV. The present land-use plan (showing main surface features & extent of forest land) and geological plan are enclosed at Plate-III and IV.

6

Mining System The mining and geological conditions of the mine are as follows: - (a) Multiple seams to be worked (b) Steep gradient of 8-10 degree of the coal seams. (c) Variable thickness of OB/Partings. Considering the above mining and geological conditions, shovel-dumper mining system with horizontal slicing has been envisaged for working this OC mine. O.B. Removal The total balance volume of OB to be removed from Quarry-I is estimated as 28.64 Mcum. It is envisaged to dump 6.0 Mcum externally and balance 22.64 Mcum internally. The external dumping would be undertaken during the initial years. Approach road to project has been designed at a distance of 20 m to the north side from toe of external dump. Proposed route of Karo nala diversion has been kept further 80 m from approach road. Dumpers of 35 T capacity have been proposed for OB transportation. Garland drain and retention wall where ever required around external dump have been provided from safety point of view.

The project envisages following dumping option for Quarry-I

I. External Dump I: Area – 37.07 Ha, Highest dump level- +340m (about 30 m above adjoining ground level) and Capacity- 6.0 Mcum.

II. Internal Dump: Area – 84.30 Ha, Highest dump level- +280m (about 20-25 m above adjoining ground level) and Capacity- 22.64 Mcum .

Drilling and Blasting 160mm diameter RBH Electric drills are envisaged for drilling in Top OB and coal benches. One wagon drill of 100-120 mm diameter is envisaged for drilling in thin partings and dirt bands. Mine Boundary for Quarry-1 Northern Boundary Along the incrop of Seam-VI/VII/VIII combined. The present extent of mining has also been considered while defining this boundary. Western Boundary Along faults F3, which is the common floor boundary with Quarry-II. Southern Boundary At a distance of about 30m from the DVC lease line. Eastern Boundary Along the fault F1b that acts as the common floor boundary of this quarry with Amlo (Dhori West) OCP in the east of Quarry-I. Amlo has already worked upto the upthrow side of the fault and the area is free from any OB Dump.

7

Mining & Geological Characteristics of the Quarry

Parameters Unit Min Max

Mineable reserves (MT) 39.04

Total OB (MCum) 28.64

Average Stripping Ratio (Cum/T) 0.73

Capacity (MTY) 2.5

Length along strike at floor Km 0.56 1.09

Length along strike at surface Km 0.75 1.19

Width along dip at floor Km 0.98 1.2

Width along dip at surface Km 1.39 1.90

Depth of quarry m 125

Area of Excavation at floor Sqkm 1.07

Area of Excavation at surface Sqkm 1.48

Minable Reserve & Life of Mine Balance mineable reserves for Quarry-I (as on 31-03-2015) are estimated as 39.04 M.tes with a corresponding volume of OBR of 28.64 Mm3 at an average stripping ratio of 0.73 m3/te. Balance life of mine is 17 years in present proposal. The break-up of the seam wise coal reserves and total volume of OB/partings are given below. Calendar Program

Year Coal (MTPA) TOTAL OB (MCUM) S.R Cum / Te

1 2.5 1.9 0.77

2 2.5 1.92 0.77

3 2.5 1.92 0.77

4 2.5 1.92 0.77

5 2.5 1.92 0.77

6 2.5 1.83 0.73

7 2.5 1.83 0.73

8 2.5 1.83 0.73

9 2.5 1.83 0.73

10 2.5 1.83 0.73

11 2.5 1.83 0.73

12 2.5 1.78 0.71

13 2.5 1.78 0.71

14 2.5 1.78 0.71

15 2.5 1.78 0.71

16 0.89 0.50 0.56

17 0.66 0.46 0.70

Total 39.04 28.64 0.73

8

Water Demand

Total estimated water demand is 750 m3/day. This is proposed to be met from mine water pumping.

Topography & Drainage

The entire topography of the block is rugged and pronounced with hills and valleys. The ground elevation varies from a maximum of 335m in north to a minimum of 236m in the south of the block. The general slop is towards south. The drainage of the block is controlled by Karo nallah which cross the area and flow towards south and ultimately flow into Damodar river between DVC Bermo OCP and Kargali Colliery. The block also has ponds in the south-eastern part. Source of Electrical Power Supply (As per PR):

The estimated connected loads, maximum demand and energy consumption at optimum production level for Karo opencast project are as summarized below-

(A) Connected load : 10987 KW (B) Load In operation : 8499 KW (C) Maximum power demand : 5336 KVA (D) Annual energy consumption : 23.69 MKWh (E) Energy consumption per tonne of coal : 6.77 KWh

The existing system of incoming line of 3.3 KV feeder of regional sub station at Kargali have already been touched optimum level. Hence further loading in this sub station with the existing incoming arrangement cannot be done. Considering the above constraints of regional sub station, it is proposed that the in coming power at 33KV would be drawn from DVC & BTPS through an independent 33KV single circuit over head transmission line with ACSR ‘DOG’ conductor. The feeder length would be 17 Km. approximately. The project would establish 2 nos. sub station of 2x5MVA 33/6.6 KV each. Coal Handling & Dispatch System

Crushed coal (-100 mm size) produced from the mine will be sent by tipping trucks to nearby Kargali washery/ Kargali railway siding or any other siding for rail dispatch.

Land Use Details

SN Particular

Land Requirement of Quarry-I (Ha)

Released

Forest Non-forest Total

1 Quarry 46.69 98.70 145.39

2 External OB dump 21.63 15.44 37.07

3 Haul road 0.00 0.00 0.00

4 CHP 0.00 1.50 1.50

5 Infrastructure 3.93 0.13 4.06

6 Safety zone 5.18 15.72 20.90

9

7 Colony 0.00 14.41 14.41

8 Land for nala diversion

& Road outside lease 0.00 3.00 3.00

Total 77.43 148.90 226.33

Stage-II FC granted for diversion of total 77.43 ha forest land falling in core zone vide letter number: F.No.8-22/2003-FC Dated 31st March 2004. Refer Annexure-IV for reference.

3 Description of the Environment

Ambient Air Quality Ambient air quality study was done in core & buffer zone of Karo OCP during Post-monsoon season of 2004-05 at the following stations. The location of sampling stations is shown on Plate-VII.

Sl. No.

Location Name Location

Code Direction from Site

Distance (km)

Height of the sampling point (m)

1 Core Zone SA - 1 -- -- 3.5

2 Makoli village Sa – 2 SE 3.5 3.5

3 Pusro village SA - 3 S 4.0 3.5

4 Baid Karo village SA - 4 W 2.0 3.0

5 Baridih village SA - 5 N 5.0 3.5

6 Birni village SA - 6 NE 6.0 3.5

RATIONALE BEHIND SAMPLING

CORE ZONE (SA-1) This location is situated in the proposed mining area. It is selected to assess the immediate effects in the mining area and the present data will help to know the increase in pollution levels due to mining operation activities. MAKOLI VILLAGE (SA-2) This location is situated at 3.5 km towards East-South direction and it is selected for Air Quality Monitoring to assess the effects of pollutants in the populated area. PUSRO VILLAGE (SA-3) This location is situated at 4.0 km distance towards south direction from the proposed mine area. Phusro is a small town and thickly populated with high traffic of light and heavy vehicles. It is selected to assess the effect of pollutants in the populated area. BAID KARO VILLAGE (SA-4) This location is situated at a distance of 2,0 Km towards west direction from the proposed mine area. It is selected to assess the effect of pollutants in the populated area. BARIDIH VILLAGE (SA-5)

10

This location is situated at 5 Km distance from site towards north direction and it is selected to assess the effect of pollutants in the populated area. BIRNI VILLAGE (SA-6) This location is situated at a distance of 6 Km from the proposed mine area towards North East direction and it is selected to assess the effect of pollutants in the populated area due to upwards and downwards wind.

OBSERVATION

The observations made during the post monsoon season of air quality data generated at Core Zone, Karo OCP have been presented in the Tabular form. The 24 hourly concentration of SPM, RPM, SO2 and Nox and have been presented for all the six sampling stations in the study area of Karo OCP in Table below:

Sl. No.

Pollutant Location

Code Min.

98th percentile

Max. Average value

1 SPM

SA - 1 67.0 198.79 198.79 156.32

SA - 2 106.18 192.31 192.31 151.70

SA - 3 117.84 195.59 195.59 155.84

SA - 4 103.79 198.54 198.54 139.29

SA - 5 101.87 198.16 198.16 155.52

SA - 6 103.01 185.42 188.60 135.33

2 RPM

SA - 1 16.31 47.70 47.70 37.50

SA - 2 24.42 43.70 43.70 34.87

SA - 3 25.92 43.02 43.02 34.30

SA - 4 25.94 49.63 49.63 36.05

SA - 5 26.48 50.48 50.48 41.42

SA - 6 24.72 44.49 45.26 32.20

3 SO2

SA - 1 4.8 17.5 17.51 12.08

SA - 2 3.2 17.90 17.90 9.4

SA - 3 7.9 26.40 26.40 16.04

SA - 4 1.6 18.90 18.90 7.41

SA - 5 2.4 13.10 13.10 6.55

SA - 6 3.6 15.25 17.20 8.41

4 NOX

SA - 1 6.46 20.60 20.60 14.41

SA - 2 10.4 25.50 25.50 18.23

SA - 3 10.6 20.90 20.90 15.76

SA - 4 2.3 15.60 15.60 18.87

SA - 5 2.34 15.40 15.40 8.62

SA - 6 7.3 19.50 20.60 13.81

Ambient Noise Level Observations

Stn. No.

Location Name

Zone Type Leq Noise Level, dB(A)

Day time

Night time

CPCB LIMITS

Day time Night time

SN1 Kaveri ProjectKaro OCP Karo OCP Core zone (Industrial)

43.67 39.10 75 70

SN2 Sarubera village Buffer zone (Residential)

42.53 38.47 55 45

SN3 Makoli village 45.00 41.33

SN4 Kargali village 42.73 39.57

11

SN5 Barkikuri village 43.57 39.97

Water quality status For assessing the water quality, 4 location water-sampling locations were selected as per detail given below and samples were collected for analysis on 11-10-2004.

Stn No.

Name of sampling station Location of sampling station and its description

Type of sample

W1 Barki Jora Nalla at Upstream

Upstream of Karo Expansion OCP Surface water

W2 Barki Jora Nalla at Downstream

Downstream of Karo Expansion OCP -do-

W3 Damodar River, after confluence of Barkijora Nala

Downstream of Karo Expansion OCP do-

W4 Well Water, Karo-I Project

Drinking water source Ground water

Observations

WATER QUALITY DATA Project : Karo-OCP Season : Post Monsoon Location : Barkijora Nalla U/S (W1)

Sl. No.

Parameter Unit Result IS:2296-1982

Norms

1 PH - 6.98 6.5 – 8.5

2 Colour Hazen Units 10 10

3 Temperature oC 23.5 -

4 Turbidity NTU 118 -

5 Total suspended solids mg/l 106 -

6 Total dissolved solids mg/l 403 500

7 Total volatile solids mg/l 28 -

8 Dissolved Oxygen mg/l 5.4 4.0

9 BOD - 5 days, 20oC mg/l 2.0 2.0

10 COD mg/l 22 -

11 Oil & grease mg/l Nil -

12 Residual chlorine mg/l Nil -

13 Chloride (as CI) mg/l 51 250

14 Flouride (as F) mg/l 0.18 1.5

15 Sulphate (as SO4) mg/l 9 400

16 Sulphide (as S) mg/l Nil -

17 Cyanide (as CN) mg/l Nil 0.05

18 Insecticides/pesticides mg/l Nil Absent

19 Phenols (as C6H5OH) mg/l <0.001 0.002

20 Alkalinity to phenolphthalein mg/l Nil -

21 Alkalinity to methyl orange mg/l 99 -

22 Chromium (as Cr) mg/l <0.01 -

23 Copper (as Cu) mg/l <0.01 1.5

12

24 Selenium (as Se) mg/l <0.01 0.01

25 Arsenic (as As) mg/l <0.01 0.5

26 Barium (as Ba) mg/l <0.01 -

27 Cadmium mg/l <0.01 0.01

28 Nickel (as Ni) mg/l <0.01 -

29 Boron (as B) mg/l <0.01 -

30 Mercury (as Hg) mg/l <0.001 -

31 Silver (as Ag) mg/l <0.01 -

32 Lead (as Pb) mg/l <0.01 0.1

33 Zinc (as Pb) mg/l <0.01 15

34 Iron (as Fe) mg/l 1.76 0.3

35 Calcium (as Ca) mg/l 22 -

36 Magnesium (as Mg) mg/l 4 -

37 Total Nitrogen (as N) mg/l 0.10 -

38 Percent sodium % 23.2 -

39 Coliform organisms MPN/100ml >1100 -

Project : Karo- OCP Season :Post Monsoon Location : Barkijora Nalla D/S (W2)

Sl. No.

Parameter Unit Result IS:2296-1982

Norms

1 PH - 7.16 6.5 – 8.5

2 Colour Hazen Units 10 10

3 Temperature oC 23.0 -

4 Turbidity NTU 124 -

5 Total suspended solids mg/l 113 -

6 Total dissolved solids mg/l 504 500

7 Total volatile solids mg/l 31 -

8 Dissolved Oxygen mg/l 5.6 4.0

9 BOD - 5 days, 20oC mg/l 2.0 2.0

10 COD mg/l 25 -

11 Oil & grease mg/l Nil -

12 Residual chlorine mg/l Nil -

13 Chloride (as CI) mg/l 46 250

14 Flouride (as F) mg/l 0.20 1.5

15 Sulphate (as SO4) mg/l 10 400

16 Sulphide (as S) mg/l Nil -

17 Cyanide (as CN) mg/l Nil 0.05

18 Insecticides/pesticides mg/l Nil Absent

19 Phenols (as C6H5OH) mg/l <0.001 0.002

20 Alkalinity to phenolphthalein mg/l Nil -

21 Alkalinity to methyl orange mg/l 136 -

22 Chromium (as Cr) mg/l <0.01 -

23 Copper (as Cu) mg/l <0.01 1.5

24 Selenium (as Se) mg/l <0.01 0.01

25 Arsenic (as As) mg/l <0.01 0.5

26 Barium (as Ba) mg/l <0.01 -

27 Cadmium mg/l <0.01 0.01

13

28 Nickel (as Ni) mg/l <0.01 -

29 Boron (as B) mg/l <0.01 -

30 Mercury (as Hg) mg/l <0.001 -

31 Silver (as Ag) mg/l <0.01 -

32 Lead (as Pb) mg/l <0.01 0.1

33 Zinc (as Pb) mg/l <0.01 15

34 Iron (as Fe) mg/l 1.82 0.3

35 Calcium (as Ca) mg/l 24 -

36 Magnesium (as Mg) mg/l 5 -

37 Total Nitrogen (as N) mg/l 0.12 -

38 Percent sodium % 23.6 -

39 Coliform organisms MPN/100ml >1100 -

Project : Karo- OCP Season : Post Monsoon

Location Confluence point of Barkijora River and Damodar River (W3)

Sl. No.

Parameter Unit Result IS:2296-1982

Norms

1 PH - 7.28 6.5 – 8.5

2 Colour Hazen Units 15 10

3 Temperature oC 23.6 -

4 Turbidity NTU 138 -

5 Total suspended solids mg/l 117 -

6 Total dissolved solids mg/l 343 500

7 Total volatile solids mg/l 37 -

8 Dissolved Oxygen mg/l 5.8 4.0

9 BOD - 5 days, 20oC mg/l 2.0 2.0

10 COD mg/l 29 -

11 Oil & grease mg/l Nil -

12 Residual chlorine mg/l Nil -

13 Chloride (as CI) mg/l 26 250

14 Flouride (as F) mg/l 0.22 1.5

15 Sulphate (as SO4) mg/l 14 400

16 Sulphide (as S) mg/l Nil -

17 Cyanide (as CN) mg/l Nil 0.05

18 Insecticides/pesticides mg/l Nil Absent

19 Phenols (as C6H5OH) mg/l <0.001 0.002

20 Alkalinity to phenolphthalein mg/l Nil -

21 Alkalinity to methyl orange mg/l 111 -

22 Chromium (as Cr) mg/l <0.01 -

23 Copper (as Cu) mg/l <0.01 1.5

24 Selenium (as Se) mg/l <0.01 0.01

25 Arsenic (as As) mg/l <0.01 0.5

26 Barium (as Ba) mg/l <0.01 -

27 Cadmium mg/l <0.01 0.01

28 Nickel (as Ni) mg/l <0.01 -

29 Boron (as B) mg/l <0.01 -

30 Mercury (as Hg) mg/l <0.001 -

31 Silver (as Ag) mg/l <0.01 -

32 Lead (as Pb) mg/l <0.01 0.1

33 Zinc (as Pb) mg/l <0.01 15

34 Iron (as Fe) mg/l 1.90 0.3

35 Calcium (as Ca) mg/l 26 -

36 Magnesium (as Mg) mg/l 10 -

14

37 Total Nitrogen (as N) mg/l 0.16 -

38 Percent sodium % 26.7 -

39 Coliform organisms MPN/100ml >1100 -

Project : Karo- OCP Season : Post Monsoon Location Well Water, Kaveri Project (W4) :

Sl. No.

Parameter Unit Result IS: 10500-1991

Norms

1 PH - 6.94 6.5 - 8.5

2 Colour Hazen Units < 5.0 10

3 Temperature oC 22.3 -

4 Turbidity NTU 8 10

5 Total suspended solids mg/l 18 -

6 Total dissolved solids mg/l 823 -

7 Total volatile solids mg/l 10 -

8 Dissolved Oxygen mg/l 5.2 -

9 BOD - 5 days, 20oC mg/l 2.0 -

10 COD mg/l 24 -

11 Oil & grease mg/l Nil -

12 Residual chlorine mg/l Nil 0.2

13 Chloride (as CI) mg/l 128 250

14 Flouride (as F) mg/l 1.26 1.5

15 Sulphate (as SO4) mg/l 59 250

16 Sulphide (as S) mg/l Nil -

17 Cyanide (as CN) mg/l Nil 0.05

18 Insecticides/pesticides mg/l Nil Absent

19 Phenols (as C6H5OH) mg/l Nil 0.001

20 Alkalinity to phenolphtahline

mg/l Nil -

21 Alkalinity to methyl orange

mg/l 296

-

22 Chromium (as Cr) mg/l <0.01 0.05

23 Copper (as Cu) mg/l <0.01 0.05

24 Selenium (as Se) mg/l <0.01 0.01

25 Arsenic (as As) mg/l <0.01 0.05

26 Barium (as Ba) mg/l <0.01 -

27 Cadmium mg/l <0.01 0.01

28 Nickel (as Ni) mg/l <0.01 -

29 Boron (as B) mg/l <0.01 -

30 Mercury (as Hg) mg/l <0.001 0.001

31 Silver (as Ag) mg/l <0.01 -

32 Lead (as Pb) mg/l <0.01 0.1

33 Zinc (as Pb) mg/l <0.01 5

34 Iron (as Fe) mg/l 0.78 0.3

35 Calcium (as Ca) mg/l 62 75

36 Magnesium (as Mg) mg/l 31 30

37 Total Nitrogen (as N) mg/l 0.32 -

38 Percent sodium % 22.8 -

39 Coliform organisms MPN/100ml 93 Absent

Comparison of Previous Water Quality Status vis-à-vis Present Status

15

NOTE: The concentration of all parameters except pH is in mg/l.

Conclusion: It is observed that the TSS which was found to be quiet high during baseline study may have been due to surface runoff from previous rains. However, during routine monitoring the TSS value has ranged from 28-40 mg/l. this has been primarily due to sedimentation in mine sump / pond , O&G trap at workshop and garland drains. All other parameters as given above are also well within the limit.

4 Detail of Anticipated Environmental impacts & Mitigation Measures

Air Pollution Control

Sources of air pollution The main sources of air pollution are identified as- 1) Drilling & blasting in coal & OB benches. 2) Coal & OB transportation inside the mine. 3) Coal crushing & transportation from mine to Railway Siding. 4) Wind erosion from OB Dump.

Predicted Concentrations of SPM & PM10 For 2.50 MTPA Peak Coal Production

Estimation of dust (TSP) generation at Karo Expansion OCP

The coal production from Karo OCP at the time of data generation (2004-05) for EIA & EMP study was 1.07. This air quality modelling has been done for a peak coal production level of 2.50 MTPA. Micrometeorological and microclimatic parameters were recorded by M/S PDIL, Sindri, Dhanbad by installing one meteorology station in core zone of Karo OCP.

During the study period from 6th October, 2004 to 31st December, 2004, hourly reading of wind velocity, wind direction, temperature, relative humidity, cloud cover and rainfall data were recorded. The model was run on 24 hours input meteorological file based on the readings taken on 01-12-2004 which represents typical meteorological condition found during the study period.

The incremental coal production is expected to reach a level of 4333 TPD at the peak coal production target of 2.50 MTPA. This coal is proposed to be transported to

Parameters Status as per routine monitoring study (mg/l) MoEF Limit (Schedule-

VI) Sept’ 2014

Dec’ 2014

Mar’ 2015

June’ 2015

Sept’ 2015

pH 7.40 6.94 7.10 7.10 7.44 5.5-9.0

TSS 28 40 32 28 31 100

COD 36 44 36 40 38 250

BOD 2.00 2.00 2.00 2.00 2.00 30

Oil & Grease <2.0 <2.0 <2.0 <2.0 <2.0 10

Nitrate as N 2.2 2.2 2.2 1.3 1.4 10

Iron as Fe <0.06 <0.06 <0.06 <0.06 <0.06 3

16

Kargali Railway Siding by tipping trucks. The increase in activities like coal production, loading, transportation, unloading and storage @ 4333 Tonnes per day will cause adverse impact on the AAQ status. The future anticipated impact on AAQ due to dust emission from various activities related to the proposed coal production has been calculated as per the following table for the future scenario-

Input Data for AQIP

Annual Peak increamental coal production (MTPA) 1.43

Stripping Ratio 0.70

Annual Peak increamental OB generation (Mcum/yr) 1.00

No. of operation days per annum 330.00

Specific gravity of coal (Tonne/m3) 1.60

Density of OB (t/m3) 2.40

Drill hole to hole distance (m) Length Width Depth (D) No. of drill holes

Coal Bench 3.5 3.5 10 32

OB Bench 3.5 3.5 10 36

Capacity of Dumper for OB (Tonne) 35

Avg distance traveled per trip for OB dumping (km) 2.0

Active OB dump Area (Ha) 12.36

Capacity of Dumper for coal (Tonne) 35.00

Avg distance traveled per trip for coal (km) 2.0

Moisture content for OB (M), (%) 4.00

Moisture content for coal (M), (%) 7.00

Sources of Emission

Area of Mine (including external OB dump) (Ha) 182.36

Area of CHP (Ha) 1.5

Length of Metaled road from mine to Kargali washery (km) 1

Assumptions

Quantity of Topsoil (TPD) = 10% of Quantity of OB (TPD)

Maximum not reclaimed OB dump Area at a time = Total OB Dump Area/3

Particulars Formula used Calculated

Vaue

Daily incremental coal production

(TPD)

Annual Peak incremental coal production (MTPA)

x No. of operation days per annum 4333.33

Daily incremental OB generation (m3/d)

Annual Peak incremental OB generation (Mcum/yr) x No. of operation days per annum

3033.33

Volume of coal (m3/d) Daily incremental coal production (TPD) / Specific

gravity of coal (Tonne/m3) 2708.33

Quantity of OB (TPD) Daily incremental OB generation (m3/d) x Density

of OB (t/m3) 7280.00

17

Quantity of Topsoil (TPD) 10% of Quantity of OB (TPD) 728.00

OB Removal

Area of OB benches being blasted in a day (A), (m2)

Daily incremental OB generation (m3/d) / Depth of OB bench (m)

303.33

No. of trips for transportation of OB

per day

Daily incremental OB generation (m3/d) /

Capacity of Dumper for OB (Tonne) 208

Total vehicle km traveled for OB (VKT)

No. of trips for transportation of OB per day x

Avg distance traveled per trip for OB dumping

(km)

416.00

Coal Extraction

Area of coal benches being blasted in a day (m2)

Daily incremental coal production (TPD) / Capacity of Dumper for coal (Tonne)

270.83

No. of trips for transportation of coal per day

Daily incremental coal production (TPD) x Avg distance traveled per trip for coal (km)

123.81

Total vehicle km traveled (VKT) No. of trips for transportation of coal per day x

Avg distance traveled per trip for coal (km) 247.619048

Incremental Emissions (SPM) generation from various activities

SN Activity Incremental Emission Generation (Kg/day)

without control measures

1 Top Soil Removal Quantity of Topsoil (TPD) x Emission Factor for Topsoil

Removal (kg/t)

2 OB Removal

a Drilling No. of drill holes for OB per day x Emission Factor for

drilling in OB

b Blasting 344(Area)0.8 / (Moisture)1.9(Depth)1.8

c Dumper loading by shovel Quantity of OB (TPD) x Emission Factor for OB loading

(kg/t)

d Transportation of OB Total vehicle km traveled for OB (VKT) x Emission Factor

for OB transportation (kg/VKT)

e Unloading of OB Quantity of OB (TPD) x Emission Factor for OB unloading

(kg/t)

f Wind erosion of OB Maximum not reclaimed OB dump Area at a time(ha) x Emission Factor for Wind erosion of OB (kg/ha/hr) x 24

3 Coal Extraction

a Drilling No. of drill holes for coal per day x Emission Factor for

drilling in coal

b Blasting 344(Area)0.8 / (Moisture)1.9(Depth)1.8

18

c Dumper loading by shovel Quantity of coal (TPD) x Emission Factor for coal loading

(kg/t)

d Transportation of Coal on haul

road Total vehicle km traveled for coal (VKT) x Emission Factor

for coal transportation on haul road (kg/VKT)

Incremental Emission factor for

mine (gm/m2/s) Incremental Emission generation from mine (kg/day) x 1000

/ (Area of mine (Ha) x 10000x24x60x60)

4 CHP

a Unloading of coal Quantity of coal (TPD) x Emission Factor for coal unloading

(kg/t)

b Primary Crusher Quantity of coal (TPD) x Emission Factor for Primary

crusher (kg/t)

c Secondary Crusher Quantity of coal (TPD) x Emission Factor for Secondary

crusher (kg/t)

d Loading of coal Quantity of coal (TPD) x Emission Factor for coal loading

(kg/t)

Incremental Emission factor for

CHP (gm/m2/s) Incremental Emission generation from CHP (kg/day) x 1000

/ (Area of CHP (Ha) x 10000x24x60x60)

5 Road from mine to Kargali

washery/Siding

a Transportation of Coal on metaled

road Total vehicle km traveled for coal (VKT) x Emission Factor

for coal transportation on metaled road (kg/VKT)

Incremental Emission factor for

metaled road (gm/m/s) Incremental Emission generation from metaled road

(kg/day) x 1000 / (Length of siding (km) x 1000x24x60x60)

Incremental Emission Generation without control measures (Kg/day) = Incremental Emission

Generation without control measures (Kg/day) x Control Factor (%)

Emissions (SPM) generated from various activities

SN Activity Emission (Kg/day)

Remarks

without control

measures

with control

measures

1 Top Soil Removal 21.11 10.56

Sub-total (1) 21.11 10.56

2 OB Removal

a Drilling 39.24 11.77 50% Pit retention b Blasting 18.93 18.93

19

c Dumper loading by shovel 2.80 2.80

d Transportation of OB 532.48 266.24

e Unloading of OB 21.84 21.84

f Wind erosion of OB 118.62 59.31

Sub-total (2) 733.92 380.90

3 Coal Extraction

a Drilling 13.28 3.98

50% Pit retention

b Blasting 5.97 5.97

c Dumper loading by shovel 15.38 15.38

d Transportation of Coal on haul road 316.95 158.48

Sub-total (3) 351.59 183.81

Total (1+2+3) 1106.61 575.27

Incremental Emission factor for

mine (gm/m2/s) 7.01964E-06 3.64912E-06

4 CHP

a Unloading of coal 30.77 30.77

b Primary Crusher 1213.33 12.13

c Secondary Crusher 2773.33 27.73

d Loading of coal 30.77 30.77

Total (4) 4048.20 101.40

Incremental Emission factor for

CHP (gm/m2/s) 3.124E-03 7.82407E-05

5 Road from mine to Kargali

washery/ Siding

a Transportation of Coal by road 55.71 27.86

Incremental Emission factor for

metaled road (gm/m/s) 6.448E-04 3.224E-04

Control measures given:

1) Making Topsoil wet during removal. 2) Water sprays for drilling in OB bench & coal bench. 3) Water sprinkling of haul & metaled road. 4) Enclosure with dust extraction system at Primary & secondary Crusher. 5) Dust extraction system in drills

20

Air Quality Model A model namely, FDM Version 90121 has been used to predict the impact on the ambient air quality of the core and buffer zone of the study area due to mining operations in Karo Expansion OCP with 1.43 MTPA incremental peak capacity. The dust emission levels from mining operations are based on USEPA publications and an S&T study titled, “Development of emission factors for various mining machineries & operations in opencast coal mines (EE-27)”, which was carried out by CMPDI(HQ) during 2002 to 2008..

Predicted Concentrations of SPM

Zone Category

24 Hours average SPM concentration (µ g/ m3)

Incremental Concentration

without control

measures (BAU)

Incremental Concentration with control measures

Background/ Baseline

concentration

Total predicted

concentration without control

measures (BAU)

Total predicted

concentration with control measures

Permissible limit

A1 53.19 30.13 156.32 209.51 186.45 600

A2 0.00 0.00 151.7 151.70 151.70

A3 0.09 0.05 155.84 155.93 155.89 200 A4 0.00 0.00 139.29 139.29 139.29

A5 0.20 0.11 155.52 155.72 155.63

A6 0.28 0.16 135.33 135.61 135.49

Predicted Concentrations of PM10

Zone Category

24 Hours average PM10 concentration (µ g/ m3)

Incremental Concentration

without control

measures (BAU)

Incremental Concentration with control measures

Background/ Baseline

concentration

Total predicted

concentration without control

measures (BAU)

Total predicted

concentration with control measures

Permissible limit

A1 31.91 18.08 37.5 69.41 55.58 300

A2 0.00 0.00 34.87 34.87 34.87

A3 0.05 0.03 34.3 34.35 34.33 100 A4 0.00 0.00 36.05 36.05 36.05

A5 0.12 0.06 41.42 41.54 41.48

A6 0.17 0.09 32.2 32.37 32.29

21

Refer Plate-VIII & IX for Isopleth of PM10 without & with control measures respectively.

Historical Trend of Ambient Air Quality Parameters in Core Zone Based on Routine Monitoring Data Submitted With Half-yearly Compliance Report

Quarter Ending 24 hrs average concentration (µg/m3)

SPM PM10 SO2 NOX

Sep. 2014 158.50 95.25 <25 22

Dec. 2014 416.50 188.50 <25 20.5

Mar. 2015 375.50 183.50 <25 20

Jun. 2015 457.75 221.25 <25 21

Sept. 2015 194.00 98.00 <25 19

Five quarter average 320.45 157.30 <25 20.5

Coal Mining Standard 600 300 120 120

Conclusion on Historical Trend of Ambient Air Quality Parameters

As per prediction for 2.50 MTPA peak coal production, the predicted concentration of PM10 in core zone is 34.87 – 63.20 µg/ m3 and in the buffer zone is 32.24 - 41.51 µ g/ m3. The increment in core zone is predicted to be 18.08 µg/ m3 for PM10. It is observed that 24 Hours average concentration of PM10 based on last 5 quarters is 157.30 µ g/ m3. Even after adding the predicted increment of 18.08 µg/ m3, the resultant concentration in core zone comes to 175.38 µg/ m3 which is well within NAAQS value of 300 µg/ m3.

Ambient Air Quality Control Measures

Air pollution control measures

Mineral (Coal) is transported from mine to Kargali washery & Railway Siding by internal CCL road ( about 4.0 Km). Green belt, 10 m wide all along the transportation road will be developed and maintained by afforestation.

28 kl mobile water Sprinkler is under operation.

Drills fitted with dust extraction system are used at Karo OCP.

The density of plantations under taken is 2500 plants per ha. So far 8.0 ha. plantation has already been done in nearby areas. Plantations, as stipulated, will be under taken from time to time. Total proposed plantation is 151.25 Ha. Species of plants are sisam, gambhar, Bakain, Mahua, Bambu, Karange, Sal, Kathal, Mango etc. However after post mining stage afforestation shall be done on backfilled areas, ext. OB dump etc.

Vehicular emission is under control and regularly monitored. No vehicles are used for transportation of the mineral without cover of tarpaulins and vehicles are optimally loaded.

Dust masks have been issued to exposed workmen. Occupational

22

health monitoring is done by initial Medical Examination and periodic medical examination through our trained Doctors in our hospitals/dispensaries.

Water Pollution Control Measures

Water pollution control measures

Sumps are created to take care of entire catchments area. The sump capacity is 1.05 lakh m3. Adequate time is given for settlement of silt. Every year sump is being shifted as quarry progresses. Sump dimension: 210m x 50m x 10m

The collected water is being utilized for watering the mine area, roads, green belt development.

Garland drains in appropriate dimensions are being maintained for compliance. Sump capacity is adequate for proper settling of silt materials. Length of garland drains = 300 mtrs.

Retaining wall will be constructed in the toe of the OB dump. At present only internal dumping is being done. Stone pitching will be done to check run-off and siltation.

At colony sewages are treated by septic tank and soak-pit method. An adequate treatment is being done at workshop for which ETP/Oil grease traps is functioning and clear water is recirculating for washing.

Ground Water Conservation

No ground water (bore well) is used for mining operations.

Noise Level Management:

The mining operation may cause noise nuisance if adequate precautions are not taken to keep the noise level within limits. Environment standards for coal mines stipulates that noise level in operational/ working zone shall not exceed 85 dB(A) Leq. The following measures therefore, have been envisaged to reduce the noise level to protect the workers from noise hazard and to adhere to the Environmental standards in respect of noise.

Use of equipment with arrangement for absorbing the operational noise. Foundations of vibrating equipment to be designed with isolators to prevent

vibration so that the noise level does not exceed 85 dB(A) Leq. Control blasting is under taken under supervision of the blasting officer,

proper blast design is prepared to control ground vibration and arrest fly rocks and boulders. Blasting is done with the use of SHOCK TUBES.

Adequate measures have been taken, noise levels are regularly monitored and kept below 85 dBA within work environment. Ear plugs / muffs are provided to mine workers for regular use. Use of insulated cabins for operators.

Use of rubber/ polymer liners in chutes and hoppers. Plantation of trees around the plant area. Routine maintenance of HEMM with prompt replacement of worn-out parts.

23

Land Use as per previous EC

As per earlier approved EIA & EMP of Karo OCP Quarry-I (1.50 MTPA capacity), the lease area is 226.33 Ha, no increase in land requirement is proposed for increase in coal production. The land status is given below:

SN Particular Land Requirement of Quarry-I (Ha)

Released Forest Non-forest Total

1 Quarry 46.69 98.70 145.39

2 External OB dump 21.63 15.44 37.07

3 Haul road 0.00 0.00 0.00

4 CHP 0.00 1.50 1.50

5 Infrastructure 3.93 0.13 4.06

6 Safety zone 5.18 15.72 20.90

7 Colony 0.00 14.41 14.41

8 Land for nala diversion & approach road

(outside core zone)

0.00 3.00 3.00

Total 77.43 148.90 226.33

FC granted for diversion of total 77.43 ha forest land falling in core zone vide letter number: F.No.8-22/2003-FC Dated 31st March 2004. Solid Waste Management & Land Reclamation (Quarry-I)

Dump Type Volume (MCum)

Area (Ha) Top RL (m) Average height (m)

Quarry -I External 6.00 37.07 +340 30

Internal 22.38 84.30 +280 20-25

Total 28.64 121.37 - -

Required land area for External OB dump is 37.07 Ha., including 21.63 ha forest land and 15.44 ha non- forest land. About 21 % of total O.B. will be dumped externally. Strategy For Rehandling Of External OB Dump & Land Reclamation Provision of internal OB dumping has reduced requirement of land for external OB dumping significantly. In addition to this it will also reduce the size of mine void. Only 5.56 Ha of mine void will be left after mine closure with maximum depth of 60-70m, which will be converted into water body. Fund Provision For Rehandling Of External OB Dump & Land Reclamation

SN HEMM for Reclamation --- Amount (Rs Lakh)

1 2. No. Dozer 410 HP 336.72

2 2. No. Loader 5-6 CuM 209.71

24

3 Other (spare engines, contingency and reclamation study) 81.84

4 Biological reclamation of over burden dump @ Rs 60,000/-per Ha for 206.01 Ha (as per approved PR).

123.61

TOTAL 751.88

Source: Appendix-F (Variant-II of PR i.e. Both coal & OB outsourced) of Project Report of Karo OCP (3.5 MTPA) prepared in Nov’ 2005

Other than above, provision of Rs 8637.40 Lakhs has been done in Mine Closure corpus for the purpose of OB dump rehandling.

Time Frame for Land Reclamation It is proposed that the rehandling of internal OB dump would be done in 18th year. This would be followed by plantation on internal dump from 19th year onwards upto 22nd year. So far 8.0 Ha of area has already been planted.

Environmental Impacts

Land: Stage-wise land-use and reclamation area (Ha)

Laduse upto 17th Year Post-reclamation Status after 22nd Year

Particulars Area (Ha) Particulars Area (Ha)

Quarry

145.39

Water body 5.56

Plantation 114.18

Quarry batter 25.65

External OB dump 37.07 Plantation 37.07

Colony 14.41 Public use 14.41

Infrastructure 5.56 CCL use 5.56

Safety zone 20.90 Undisturbed/ vacant 15.34

Plantation 5.56

Land for nala diversion outside

lease

3.00 Water body 3.00

Total 226.33 Total 226.33

Post-mining landuse

SN Particulars Area (Ha)

1 Reclaimed area 151.25

Quarry batter for shrubs 25.65

2 Colony & public utility 14.41

CCL future use 5.56

3 Green belt 5.56

4 Safety zone 15.34

5 Water body 8.56

Total 226.33

25

Refer Plate-X for post-mining land use of lease area.

Mine Closure At Karo OCP The financial assurance for mine closure at Karo OCP (570.26 Ha) has been approved at Rs 9742.16 during 385th meeting of Board of Directors held on 24.02.2012 (No. 2 of 2012) Detail of Escrow Fund For Mine Closure

As per MOC guidelines, a corpus escrow account @ Rs. 6.0 lakhs per Ha of the property leasehold shall be opened with the coal controller organization to meet the expenses of final mine closure. Thus the total expenditure on his front may be calculated in following manner: The cost expenditure after closure of mine will be met from the corpus escrow account deposited by the mine operator. However, the additional amount beyond the escrow account will be provided by the mine operator after estimating the final mine closure cost five years prior to mine closure (as per the mine closure guideline). The progressive mine closure will deal the land reclamation as per the calendar plan of project report. The cost of progressive land reclamation is already part of the project cost. Therefore, the escrow account for mine closure will deal only the final mine closure.

Basis of Calculation

The total mine lease area is 570.26 Ha, so the corpus based on August, 2009 rate is Rs. 3421.56 Lakh @ Rs. 6.0 Lakh/Ha of lease area. The wholesale price index in August, 2009 and April, 2011 is 129.60 and 152.10 respectively. So the current value of corpus is Rs 3421.56x152.10/129.60 Lakh, which comes to Rs. 4015.58 lakh. Since this is an operating/existing mine, this corpus is to be divided by balance life of mine. The balance life of the mine is 33 years. So, by dividing by 33 years, the annual corpus comes to Rs. 120.48 Lakh. This amount is to be deposited in escrow account every year with 5% escalation.

Year Amount in Lakh (Rs.)

1 121.68

2 127.76

3 134.15

4 140.86

5 147.90

6 155.30

7 163.06

8 171.22

26

Year Amount in Lakh (Rs.)

9 179.78

10 188.77

11 198.20

12 208.11

13 218.52

14 229.45

15 240.92

16 252.96

17 265.61

18 278.89

19 292.84

20 307.48

21 322.85

22 339.00

23 355.95

24 373.74

25 392.43

26 412.05

27 432.65

28 454.29

29 477.00

30 500.85

31 525.89

32 552.19

33 579.80

Total 9742.16

As per above an amount will be deposited every year up to the last year of mine life. The amount calculated by the above formula shall be deposited every year by CCL in the Escrow amount opened with the Coal Controller organization in a scheduled Bank. An agreement, outlining detailed terms and conditions of operating the said Escrow Account shall be executed amongst CCL, the Coal Controller and the commercial Bank. However the additional amount beyond the escrow account, if any estimated later on, will be provided by the mine operator after estimating the final mine closure cost five years prior to mine closure (as per the mine closure guideline).

The break-up of Mine Closure Cost as per CMPDI Norms The above escrow account will meet the cost of different activities of Mine Closure cost which is given in the table below:

27

SL.

NO. ACTIVITY

% OF TOTAL

MINE CLOSURE COST

AMOUNT IN

LAKH (RS.)

A Dismantling of Structures

Service Buildings 0.20 19.48

Residential Buildings 2.67 260.12

Industrial structures like CHP, Workshop,

field sub-station etc.

0.30 29.23

B Permanent Fencing of mine void and other dangerous area

Random rubble masonry of height 1.2 metre

including levelling up in cement concrete

1:6:12 in mud mortar

1.50 146.13

C Grading of highwall slopes

Levelling and grading of highwall slopes 1.77 172.44

D OB Dump Reclamation

Handling/ Dozing of external OB Dump in to mine void

88.66 8637.40

Bio-reclamation including soil spreading,

plantation and maintenance

0.40 38.97

E Landscaping

Landscaping of the clear land for improving

its esthetic

0.30 29.23

F Plantation

Plantation over area obtained after

dismantling

0.50 48.71

Plantation around the fencing 0.20 19.48

Plantation over the cleared off external OB

Dump

0.02 1.95

G Monitoring/ Testing of paramaters for three years

Air Quality 0.22 21.43

Water Quality 0.20 19.48

H Enterpreneurship Development

(Vocational/ skill development training

for sustainable income of affected people

0.26 25.33

I Miscellaneous and other mitigative measures

2.00 194.84

J Manpower cost for supervision 0.80 77.94

TOTAL 100.00 9742.16

Socio-Economic Issues:

The project has given a boost to the economy of the area by providing primary and secondary employment to local people. The infra-structural facilities provided by the project is benefitting local villagers also. The mine closure activity is likely to significantly reduce the impact of industrial activity on the land apart from increasing the green cover and surface water availability. The standard of living of the local inhabitants has improved significantly due to indirect employment and service opportunities.

28

Resettlement & Rehabilitation of PAPs Detail of Project Affected Families (PAFs) to be shifted

SN Name of the Village No. of PAFs

Type of dwellings

Kutcha Mixed Pucca

1 Amlo Village 108

Amlo Basti 84 32 36 16

Muslim Tola 24 9 10 5

2 Karo Village 52

Karo Basti 26 10 11 5

Karo Purana Colony 26 10 11 5

160 61 68 31

Proposed Time Frame of Shifting of PAFs

SN Name of the

Village No. of PAFs

Number of families with year of shifting

2016-17 2017-18 2018-19 2019-20 Total

1 Amlo Village 108

Amlo Basti 84 20 20 20 24 84

Muslim Tola 24 12 12 0 0 24

2 Karo Village 52

Karo Basti 26 10 16 0 0 26

Karo Purana Colony

26 10 16 0 0 26

Total 160 52 64 20 24 160

Proposed rehabilitation site is situated near Hindustan Bridge, south of Hathia Pathar & Damodar river. Area of site is 51.53 Acre, at a distance of about 8-9 km from project.

Proposed Employment to Land Losers

SN Name of Village No. of

families Estimated employment to

land losers

1 Amlo Village 108 178.70 Acre

Amlo Basti 84 89 jobs to be given to land

losers Muslim Tola 24

2 Karo Village 52 86.04 Acre

Karo Basti 26 43 jobs to be given to land

losers Karo Purana Colony 26

Total 160 132

jobs to be given to land losers

29

Till date, 113 land losers have already been provided employment against tenancy land apart from cash compensation of Rs 58.85 Lakh.

Corporate Social Responsibility

Corporate Social Responsibility (CSR) is taken up at Karo OCP together with other projects at B&K Area level. Different villages falling in core zone and adjoining areas are benefited through CSR activities run at Area level. The nature of benefits include maintenance of ponds and community buildings, well digging and renovation, road repair, renovation of schools and construction of boundary wall, medical camps, water supply, skill development for employment generation etc. The current financial outgo on this head is Rs 123.12 Lakh per annum for 2014-15. The expenditure on CSR activities in B&K Area in last few years is given below:

Activity-wise CSR Expenditure in B&K Area

Particulars Amount (Rs Lakh)

2013-14 2014-15 2015-16*

Infrastructure/ sanitation 120.46 19.87 87.50

Education & skill development 55.12 45.41 24.00

Drinking Water 8.16 15.80 65.40

Health 5.52 6.60 7.00

Sanitation - - -

Environment - - 16.00

Sports 6.57 14.80 -

Others - 20.64 -

Total 195.83 123.12 199.90

Note: *Approved for 2015-16

Coal India Limited amended its CSR Policy in 2014 as per new Companies Act, 2013. As per new CSR Policy of CIL, the fund for community development activities should be allocated based on 2% of the average net profit of the company for the three immediate preceding financial years or Rs 2.0 per Tonne of coal production of previous year whichever is higher. Out of this 80% of the budgeted amount would be spent within the radius of 25 km of the project and 20% of the budget would be spent in other parts of Jharkhand.

Detail of Last Public Hearing The details are as given below.

A Date of Advertisement 21.04.2007

B Newspapers in which the advertisement appeared

Hindustan & Dainik Jagran

C Date of public hearing (DD/MM/YYYY)

24.05.2007

D Public Hearing Panel chaired by & Additional Collector, Bokaro District

30

members present Sr Environment Engineer, JSPCB, RANCHI

E No. of people attended the public hearing meeting and number of people from the lease area.

Approximately 100

F Summary/details of public hearing in tabular form

Given below

SN Name and Address

Queries/ Suggestions/Issues Reply of Project Proponent

1

Sri Keshav Mahto,

Village:Karo, Bokaro.

Mines have affected the environment. Air & Water are affected. There is scarcity of

drinking water. What action is being taken for this by management? Common

people should get facility. Mines should come up. Local

people should get employment.

Sri R.N.Sahu, the Acting General Manager, Bokaro &

Kargali Area from CCL management side replied the issues raised by members:

1. Arrangement shall be made to check pollution according to provisions of Environment Management Plan. Attention

shall be given to the problems of water & dust. Attention

shall be given so that people may not face much problem.

2. Employment shall be given

to displaced as per rules. Provision of Rs.38 crores has

been met for this in the project report. Action as per

the Environment Management plan shall be ensured.

2

Sri Meghnad Singh, Village :Karo, Distt:

Bokaro

Villages should be developed and not to be destroyed.

Environmental care should be more emphasized.

3

Sri Baketu Mahto,Village :Karo, Distt:

Bokaro

There is no proper arrangement to check

pollution. Employment should be arranged .People should get facility .There should be no ill-effect of mines on local

habitat.

4

Sri Nandfeesh KumarVillage :Karo, Distt:

Bokaro

There is scarcity of water Attention should be given to local people against ailment.

There should be proper arrangement to check

pollution.

5

Sri B.N.Singh, Village: Bermo

Basti, Distt: Bokaro

Production should go on & .mines should be opened

.Attention should be given to avoid any loss to the persons residing for years. Permission should not be given to throw fly-ash nearer to any habitat place to prevent air pollution.

3. Displaced shall be properly rehabilitated where

all basic amenities like water ,school, medical facilities are available.

Water sprinkling arrangement shall be made on Coal Transport Roads.

4.Proper training for self

supporting business to the displaced shall be given to

6

Sri Arjun Ram, Village: Bermo

Basti, Distt: Bokaro

Mines should come up. Proper attention should be given on the environment. Area should

be developed.

31

7

Narayan, Mahto Village :Bermo

Basti, Distt: Bokaro

Sri Debnath, Mahto Village :Bermo Basti, Distt: Bokaro

Sufficient water is not available for drinking & irrigation

.Arrangement should be made for this.

start their own business. Tankers shall be provided in

case of scarcity of water.

5 Medical camps shall be organized for medical

check-up and necessary medicines shall be provided. 6. Community Development works are being taken up

by CCL Management, which will be enhanced further.

8

Sri Debnath, Mahto Village :Bermo Basti, Distt: Bokaro

We are displaced from Karo mines .Our land has been taken for the mines and pollution has increased.

Attention should be given on pollution. We should get

proper compensation otherwise we will not allow to

continue the mine.

5 Analysis of Alternatives Not applicable, as this is one time capacity expansion of existing project within existing area.

6 Environmental Monitoring Program

For effective implementation, a time bound action plan for environmental management including all aspects isl being followed by the project. Samples for study of air quality, water quality, ground water level and noise level are collected and tested quarterly at strategic places representing all the categories of location. The same is submitted regularly on half-yearly basis to Eastern Regional Office of MOEF at Bhubaseswar and on annual basis to Jharkhand State Pollution Control Board.

7 Project Benefits

Development of Karo Expansion OCP has considerably improved the socio-economic status of the adjoining areas. This has resulted in following benefits:

Improvements in Physical Infrastructure Improvements in Social Infrastructure Increase in Employment Potential Contribution to the Exchequer Meet energy requirement Post-mining Enhancement of Green Cover

8 Environmental Management Plan

Central Coalfields Limited, the owner of this project has already set-up an Environmental Cell headed by Deputy General Manager at its HQs. The cell provides

32

necessary support that is required for Environmental Management of various projects

and mines under the jurisdiction of the company. 9 Disclosure of Consultants

Environmental baseline data generation was done from 6th October, 2004 to 31st December, 2004. The detail of consultants employed for different studies is given below.

SN

Nature of Study Name of the Agency

1 Geological Report CMPDI, a subsidiary of Coal India Ltd., is a premier consultancy organization engaged in mineral exploration, land resource management through remote sensing survey, coal petrography, mine planning, coal preparation & utilization, design of coal handling plants, environmental management of coal projects etc. The environmental laboratory of CMPDI is recognised by Central Pollution Control Board, Ministry of Environment & Forests, Government of India and accredited with ISO-9001 certification. It undertakes baseline environmental data generation, EIA, EMP and monitoring various factors related environment.

2 Project report

3 Land-use study

4 Hydro-geological Study

5 Seasonal Ambient Air Quality Study

PDIL, Sindri, Dhanbad

6 Ambient Noise Level Study

7 Soil Quality study

8 Water Quality study

9 Flora & Fauna study ST. Xavier’s College, Ranchi

10 Socio- Economic Study

10 Capital Expenditure on Environmental Control Measures As Per PR

SN Particulars Amount (Rs Lakh)

Pollution Control

1 Anti-pollution measures in mine & Industrial area 1325.64

2 Anti-pollution measures in township 121.12

Sub Total (1) 1446.76

Other Mitigation Measures

3 Cost of rehabilitation 566.40

4 Cost of compensatory afforestation 1108.10

5 Cost of restoration 751.88

6 Other provisions 27.00

7 Compensation for tenancy land 429.65

Sub Total (2) 2883.03

Grand Total (1+2) 4329.79

33

Source: Appendix-F (Variant-II of PR i.e. Both coal & OB outsourced) of Project Report of Karo OCP (3.5 MTPA) prepared in Nov’ 2005. Cost of rehabilitation of 160 PAFs taken from approved PR of 11 MTPA Karo Exp OCP.

Mine closure corpus of Rs 9742.16 Lakhs was approved during 385th meeting of Board Of Directors held on 24.02.2012 (No. 2 of 2012).

Revenue Expenditure on Environmental Control Measures Rs 8.16 per tonne (approx) of coal produced (Appendix-E of PR of 3.50) prepared in Nov’ 2005.

Karo OCP

1. Ranchi -130 km2. Bokaro -30 km3. Nearest Rly. Stn.-Bermo at 4 km4. Airport – At Ranchi

PLATE-I

LOCATION MAP

KARO OCP

M

e

ta

m

o

rp

h

ic

L

in

e

Charak Pania Village

DVC LEASEHOLD LINE

2

40

296.50

CCK5

246.34

CMEK10

272.26

CMEK11

264.91

CMEK12

313.92

CMEK13

247.28

CMEK14

CMEK15

330.34

CMEK16

290.34

CMEK17

312.10

CMEK18

322.91

CMEK19

249.85

CMEK20

268.57

CMEK21

290.33

CMEK22

331.97

CMEK23

289.26

CMEK24

343.87

CMEK25

235.20

CMEK27

238.07

DGK1

242.44

DGK2

250.50

DGK3

332.07

DGK4

327.81

DGK5

242.08

MBK1

265.84

MBK10

MBK11

283.33

MBK12

282.34

MBK13

257.63

MBK14

240.34

MBK15

236.76

MBK2

250.34

MBK3

242.06

MBK4

246.71

MBK5

312.41

MBK6

244.11

MBK7

243.86

MBK8

250.17

MBK9

228.55

NCBK27

266.60

NCBK39

282.54

NCBK40

251.72

NCBK41

319.00

NCBK42

276.09

NCBK43

244.88

NCBK45

262.26

NCBK46

250.19

NCBK47

313.46

NCBK48

305.04

NCBK49

243.10

NCBK51

336.73

NCBK52

271.27

NCBK55

337.84

NCBK56

300.67

NCBK58

284.23

NCBK73

297.95

NCBK75

298.47

NCBK78

3500E

3500E

4000E

4000E

4500E

4500E

5000E

5000E

5500E

5500E

6000E

6000E

6500E

6500E

7000E

7000E

7500E

7500E

8000E

8000E

1500N 1500N

2000N 2000N

2500N 2500N

3000N 3000N

3500N 3500N

4000N 4000N

4500N

4500N

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

NF

Amlo OC

NF

Workshop

Sub Station

NF

35

363

44

42

54

56

53

55

48

47

46

45

3940

49

41

1

2

7

1

1

2

7

2

1

2

7

3

1

2

7

4

1

2

7

0

60

62

291

292

287

273

270

268

267

265

264

303

22524

223

31615

18

313

231

247

248

249

230

229

250

252

253255

56

276

257

259

61

60

63

62

37

234

235

36

238

233

232

40

243

244

245

44

242

278

270

250

257

258

376

377

251

402

370

380

384

365

371

382

381

383

385

373

372

368

367

363

362

360

361

328

325

58

375

260

379

378

333

332

334

338

339

359

337335

336

140

341

342

158

159

1

6

0

1

6

1

162

155

157

345

340

343

154

153

163

164

165

166

313

314

315

316

330

323

326282

238

281

267

266

261

262

264

265

249

248

246

245

245

247

243

242

240

239

202

204

213

214

205

210

211

212

207

208

209

222

219

218

215

216

217

199

221

195

194

232

268

292

190

291

303

191

289

290

189

172

170

171

95

297

300

311

318

310

93

280

235

269

270

271

272

278

275

274

312

2

3

7

2

3

6

305

279

402

304

307

306

3

0

5

3

0

1

3

0

5

3

2

0

3

7

7

3

1

7

2

8

8

28

29

27

220

23

25

4

0

6

192

196

66

181

180

179

177

147

149

77

78

146

348

51

152

347

349

76

145

75

73

74

64

70

69

49

15

18

48

13

16

53

50

63

61

17

9

10

11

12

18

19

20

21

23

24

46

55

56

28

39

41

42

43

60

45

27

29

30

31

33

35

36

38

59

61

58

63

19

20

21

22

76

77

78

80

81

2

3

4

5

6

8

9

10

11

12

282

44

42

54

56

53

55

48

47

46

45

3940

49

41

1

2

7

1

1

2

7

2

1

2

7

3

1

2

7

4

1

2

7

0

60

62

291

292

287

273

270

268

267

265

264

303

22524

223

31615

18

313

231

247

248

249

230

229

250

252

253255

56

276

257

259

61

60

63

62

37

234

235

36

238

233

232

40

243

244

245

44

242

278

270

250

257

258

376

377

251

402

370

380

384

365

371

382

381

383

385

373

372

368

367

363

362

360

361

328

325

58

375

260

379

378

333

332

334

338

339

359

337335

336

140

341

342

158

159

1

6

0

1

6

1

162

155

157

345

340

343

154

153

163

164

165

166

313

314

315

316

330

323

326282

238

281

267

266

261

262

264

265

249

248

246

245

245

247

243

242

240

239

202

204

213

205

210

211

212

207

208

209

222

219

218

215

216

217

199

221

195

194

232

268

292

190

291

303

191

289

290

189

172

170

171

95

297

300

311

318

310

93

280

235

269

270

271

272

278

275

274

312

2

3

7

2

3

6

305

279

402

304

307

306

3

0

5

3

0

1

3

0

5

3

2

0

3

7

7

3

1

7

2

8

8

28

29

27

220

23

25

4

0

6

192

196

66

181

180

179

177

147

149

77

78

146

348

51

152

347

349

76

145

75

74

64

70

69

49

15

18

48

13

16

53

50

63

61

17

9

10

11

12

18

19

20

21

23

24

46

55

56

28

39

41

42

43

60

45

27

29

30

31

33

35

36

38

59

61

58

63

19

20

21

22

76

77

78

80

81

2

3

4

5

6

8

9

10

11

12

282

358

226

198

Sub Block 5 MR

176

Proposed road to Karo OCP

KA

RO

N

AL

A

A

M

L

O

N

A

L

A

NON FOREST

FOREST

FOREST

NON FOREST

Gati nala

Baid karo

FOREST

+329

+325

+308

+292

+284

+282

+252

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FOREST

FO

RE

ST

Forest Land

Released Forest Land

10TH YEAR STAGE

5TH YEAR STAGE

5TH YEAR STAGE

10TH YEAR STAGE

Coal Handling plant

Quarry-II

Quarry-I

Ext Dump 'A'

Ext Dump 'B'

70

GMK Land

Tenancy Land

Area 226.33 Ha

PLATE-III

1

F4

F4

F5

F5

F6

F6

F3

F2b

F2a

F1a

F1b

F2

F1

F(II)4

F3a

VI,VII

X

VI,VII,VIII

QUARRY-2

QUARRY-1

M

E

T

A

M

O

R

P

H

I

C

L

I

N

E

2

3

5

2

3

5

2

3

5

2

3

5

2

35

2

3

5

24

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

24

0

2

4

0

2

4

0

24

0

2

4

0

2

4

5

2

45

2

4

5

24

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4 5

2

4

5

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

25

0

25

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

50

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

5

25

5

2

5

5

25

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

60

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

26

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

27

0

2

7

5

2

7

5

27

5

2

7

5

2

7

5

2

7

5

2

7

5

2 75

27

5

27

5

2

7

5

2

7

5

2

7

5

2

7

5

2

7

5

2

7

5

2

75

2

7

5

2

8 0

2

80

2

8

0

28

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

28

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

28 0

28

0

2

8

5

28

5

2

8

5

2

8

5

2

8

5

28 5

28

5

28

5

2

8

5

2

8

5

2

8

5

2

85

2

8

5

2

8

5

2

8

5

2

8

5

2 8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

9

0

2

9

0

2

9

0

29

0

29

0

2

9

0

2

9

0

2

9

0

2

9

0

29

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

29

0

2

9

0

2

90

2

9

0

2

9

0

2

90

2

9

0

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

95

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

95

29

5

2

9

5

2

9

5

2

9

5

2

9

5

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

5

3

05

3

0

5

3

0

5

3

0

5

3

0

5

30

5

3

0

5

3

0

5

3

0

5

3

0

5

3

0

5

30

5

30

5

3

0

5

30

5

3

0

5

3

0

5

3

0

5

3

05

30

5

3

0

5

3

0

5

3

0

5

3

0

5

3

0

5

3

0

5

3

05

3

0

5

3

0

5

31

0

3

1

0

3

1

0

3

1

0

31

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

31

5

3

1

5

31

5

3

1

5

3

1

5

3

15

31

5

3

1

5

3

1

5

3

1

5

3

1

5

31

5

3

1

5

3

1

5

3

1

5

3

1

5

3

2

0

3

2

0

32

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

20

3

2

0

3

2

0

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

32

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

3

0

3

3

0

3

3

0

33

0

3

3

0

3

3

0

3

3

0

3

30

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

33

5

3

3 5

3

3

5

3

35

3

3

5

3

3

5

3

3

5

3

4

0

3

4

0

34

0

3

4

0

3

4

5

3

4

5

34

5

3

5

0

3

5

0

3

50

3

5

5

3

55

3

6

0

36

0

3

6

5

3

7

0

37

0

3

7

5

3

7

5

3

8

0

GODO BLOCK

T

T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

2

40

296.50

CCK5

246.34

CMEK10

272.26

CMEK11

264.91

CMEK12

313.92

CMEK13

247.28

CMEK14

CMEK15

330.34

CMEK16

290.34

CMEK17

312.10

CMEK18

322.91

CMEK19

249.85

CMEK20

268.57

CMEK21

290.33

CMEK22

331.97

CMEK23

289.26

CMEK24

343.87

CMEK25

CMEK27

238.07

DGK1

242.44

DGK2

250.50

DGK3

332.07

DGK4

327.81

DGK5

242.08

MBK1

265.84

MBK10

MBK11

283.33

MBK12

282.34

MBK13

257.63

MBK14

240.34

MBK15

236.76

MBK2

250.34

MBK3

242.06

MBK4

246.71

MBK5

312.41

MBK6

244.11

MBK7

243.86

MBK8

250.17

MBK9

228.55

266.60

NCBK39

282.54

NCBK40

251.72

NCBK41

319.00

NCBK42

276.09

NCBK43

244.88

NCBK45

262.26

NCBK46

250.19

NCBK47

313.46

NCBK48

305.04

NCBK49

243.10

NCBK51

336.73

NCBK52

271.27

NCBK55

337.84

NCBK56

300.67

NCBK58

284.23

NCBK73

297.95

NCBK75

298.47

NCBK78

DVC Bermo Leasehold Line

Charak Pania Village

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+ +

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

++

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+

+ +

+

+

+

+

+

+

OLD KARO COLONY

F2

NEW COLONY KARO II

F3

25

3

5

8

0

3

0

5

10

15

20

15

20

25

IX

X

XI

BERMO

BERMO

XI

VI,VII,VIII

IX

III

V

X

XI

XI

XI

XI

VI,VII

VIII

IX

X

VIII

IX

III

V

V

X

3500E

3500E

4000E

4000E

4500E

4500E

5000E

5000E

5500E

5500E

6000E

6000E

6500E

6500E

7000E

7000E

7500E

7500E

1500N 1500N

2000N 2000N

2500N 2500N

3000N 3000N

3500N 3500N

4000N 4000N

4500N

4500N

Gati nala

Baid karo

POND

Sector A

Sector B

Sector C

Sector D

45

Gati Nala

Karo Nala

EXISTING QUARRY FLOOR

EXISTING QUARRY SURFACE

KAVERI BLOCK

Copyright in these drawings is vested in CMPDI.

Unauthorised copying or use is not permitted.

Rev. Description Date Sign.

Sl No.

Particulars Ref. Number

Reference Drawings

SymbolParticulars

Legend

Sl No.

Notes

Sl No.

Particulars

A

B

C

01

02

03

04

05

Customer

Job Title

Subject

Job No.

Activity Name Designation Signature Date

Checked

Approved

Jayant Chakravarty

Dr A Sinha

HOD(MP)

R.D.

Scale

Drg.No.

Sheet

REV. No.

CENTRAL COALFIELDS LIMITED

341301

Created

CreatedKanchan Sinha

Sr. Mgr(Excvn)

1: 4000

1 of 1

R3 OCM 0 0 0

Sand stone

All values are in meters.

1

Bore holes

Coal seams incrop

06

07

08

01

Geological Plan of Karo Eastern Block, East Bokaro CF

02

Working Plan of Karo Seam Quarry (X to VI) as on 31/03/05

03

MECL Geological Plan

R III/G/2476

Colliery Plan

9 3 9

Fault

01

02

Geological Map of Kaveri Block (MEC/RNC/Do. No. 69/94) has been considered for

03 Geological Map of Karo Eastern Block RI-3/G/4549 has been considered for

Surface Contours

Boreholes Drilled by MECL

Boreholes Drilled by CMPDIL

Boreholes Drilled by CCL

32

5

MBK 25

NCBK/CMEK 13

CCK 10

MEC/RNC Drg.

No-69/94

16/3/2013

16/3/2013

16/3/2013

09

Talchir Formations

T

BOKARO KARGALI-NE BLOCK

10

Quarry boundary

A MINI RATNA COMPANY

CMPDI,RI-III

Chief D/MMohan Kumar

Geological Block boundary

PLATE-IV

+280

+310

+250

+250

+250

M

e

ta

m

o

r

p

h

ic

L

in

e

DVC Bermo Leasehold Line

01 4

5

5

0

1

1

5

1

1

5

4

1

0

4

0

1

1

1

6

1

6

5

7

0

8

0

1

2

1

5

1

3

0

3

5

0

1

5

5

6

0

1

1

5

1

7

0

6

0

1

1

7

5

1

5

0

1

6

5

0

1

8

9

0

1

8

5

5

1

7

21 5

2

3

5

2

9

1

5

0

0

2

1

0

2

3

2

5

2

0

2

3

0

2

2

0

2

1

0

1

2

2

0

5

5

2

2

5

+300

+290

+280

+270

+260

+250

+240

E1

I1

G1

J1

+242

2

3

5

2

3

5

2

3

5

2

3

5

2

35

2

3

5

24

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

2

4

0

24

0

2

4

0

2

4

5

2

45

2

4

5

24

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

4

5

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

0

2

5

5

25

5

2

5

5

25

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

5

5

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

6

0

2

60

2

6

5

2

6

5

2

6

5

2

6

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

6

5

2

7

0

2

7

0

2

7

0

2

7

0

2

7

0

2

7

5

2

7

5

27

5

2

7

5

2

7

5

2

7

5

2

7

5

2

75

2

7

5

2

80

2

80

2

8

0

28

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

2

8

0

28 0

28

0

2

8

5

28

5

2

8

5

2

8

5

2

8

5

28 5

28

5

2

8

5

2

8

5

2

8

5

28

5

2

8

5

2

8

5

2

8

5

2

9

0

2

9

0

2

9

0

29

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

2

9

0

29

0

2

9

0

2

90

2

9

0

2

9

0

2

90

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

29

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

9

5

2

95

29

5

2

9

5

2

9

5

2

9

5

2

9

5

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

0

3

0

5

3

05

3

0

5

3

0

5

3

0

5

30

5

3

0

5

30

5

30

5

3

0

5

3

0

5

3

0

5

3

05

30

5

3

0

5

3

0

5

3

0

5

3

0

5

3

0

5

3

0

5

3

05

3

0

5

3

0

5

31

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

0

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

3

1

5

31

5

3

1

5

31

5

3

1

5

3

1

5

3

1

5

3

1

5

31

5

3

1

5

3

1

5

3

1

5

3

2

0

3

2

0

32

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

2

0

3

20

3

2

0

3

2

0

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

2

5

3

3

0

3

3

0

3

3

0

33

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

3

3

0

33

5

3

3 5

3

3

5

3

3

5

3

4

0

3

4

0

3

4

5

3

4

5

3

5

0

3

5

0

3

5

5

3

6

0

3

6

5

3

7

0

37

0

3

7

5

3

7

5

3

8

0

D

F

I

3500E

3500E

4000E

4000E

4500E

4500E

5000E

5000E

5500E

5500E

6000E

6000E

6500E

6500E

7000E

7000E

7500E

7500E

1500N 1500N

2000N 2000N

2500N 2500N

3000N 3000N

3500N 3500N

4000N 4000N

4500N

4500N

+310

+310

+250

+220

+280

+280

+250

+250

+250

+250

+220

+220

+220

+250

+250

+220

+220

+220

+220

+250

+220

+220

+190

+160

+160

+190

+160

+220

+220

+

2

2

0

+220

+220

+190

+190

+190

+160

+280

+280

+280

+250

+296

+190

+160

+220

+250

+280

+220

+250

+260

+250

+260

+270

+265

+250

+250

+280

+250

+220

+190

+190

3

1

0

+220

+190

+250

E1G1

D'

F'

Sl No.

Particulars Ref. Number

Reference Drawings

SymbolParticulars

Legend

Sl No.

01

02

03

04

05

341301

All values are in meters.

06

07

08

09

01Geological Plan of Karo Eastern Block, East Bokaro CF

02

Working Plan of Karo Seam Quarry (X to VI) as on 20/10/03

03

Floor Contour & Isochore Plan of Seam-VI, Karo Eastern Block

R III/G/2476

Colliery Plan

R III/G/2442

FINAL STAGE QUARRY PLAN

CENTRAL COALFIELDS LIMITED

DesignationSubject

Job Title

CMPDI, R.I.-III

A MINI RATNA COMPANY

III R

Activity

Checked

Approved

Drg.No.

Created

Scale

Name

0

Rev.No.

Sheet

Signature

Job No.

Date

Customer

0 M

1 : 4000

Created

Copyright in these drawings is vested in CMPDI.

Unauthorised copying or use is not permitted.

O C 0 9 4 1

SURFACE COUNTOUR

FLOOR COUNTOUR OF BASE SEAM

FAULT

EXTERNAL DUMP

PROPOSED DIVERTION KARO NALA

2

65

1 7 0

PROPOSED APPROACH ROAD

PROPOSED QUARRY OUTLINE

Jayant Chakravarty

Dr A Sinha

HOD(MP)

R.D.

Kanchan SinhaSr Mgr(Excvn)

16/3/2013

16/3/2013

16/3/2013

PLATE-V

+280

+310

+300

+290

+280

+270

+260

+250

+240

+242

+310

+310

+250

+220

+280

+280

+250

+250

+220

+160

+296

+250

+265

+190

+250

+220

+220

+220

+250

+250

+220

+250

+220

+160

+160

+220

+220

+190

+190

+190

+280

+280

+280

+250

+190

+160

+220

+250

+280

+220

+250+250

+260

+270

+265

+250

+280

+250

+220

+190

+190

+190

+220

+160

+190

+220

+190

+220

+190

Sl No.

Particulars Ref. Number

Reference Drawings

SymbolParticulars

Legend

Sl No.

01

02

03

04

05

341301

All values are in meters.

06

07

08

09

01

Geological Plan of Karo Eastern Block, East Bokaro CF

02Working Plan of Karo Seam Quarry (X to VI) as on 20/10/03

03Floor Contour & Isochore Plan of Seam-VI, Karo Eastern Block

R III/G/2476

Colliery Plan

R III/G/2442

FINAL STAGE DUMP PLAN

CENTRAL COALFIELDS LIMITED

DesignationSubject

Job Title

CMPDI, R.I.-III

A MINI RATNA COMPANY

III R

Activity

Checked

Approved

Drg.No.

Created

Scale

Name

0

Rev.No.

Sheet

Signature

Job No.

Date

Customer

0 M

1 : 4000

Created

Copyright in these drawings is vested in CMPDI.

Unauthorised copying or use is not permitted.

O C 0 9 4 2

SURFACE COUNTOUR

FLOOR COUNTOUR

FAULT

EXTERNAL DUMP

PROPOSED DIVERTION KARO NALA

INTERNAL DUMP

Jayant Chakravarty

Dr A Sinha

HOD(MP)

R.D.

Kanchan SinhaSr Mgr(Excvn)

16/3/2013

16/3/2013

16/3/2013

5

+220

+250

+250

+250

ROM

STOCKYARD

PLATE-VI

+292

FOREST

Ext Dump 'A'(31.8Ha)

+340

+280

+310

Cap-6.0Mcum

+300

+290

+280

+270

+260

+250

+240

+280

+220

+160

+250

+265

+190

+250

+220

+220

+220

+250

+220

+220

+220

+190

+190

+190

+280

+280

+280

+190

+160

+250

+280

+220

+250+250

+260

+270

+265

+250

+280

+250

+220

+190

+190

+220

+190

Sl No.

Particulars Ref. Number

Reference Drawings

SymbolParticulars

Legend

Sl No.

01

02

03

04

05

341301

All values are in meters.

06

07

08

09

01

Geological Plan of Karo Eastern Block, East Bokaro CF

02

Working Plan of Karo Seam Quarry (X to VI) as on 20/10/03

03

Floor Contour & Isochore Plan of Seam-VI, Karo Eastern Block

R III/G/2476

Colliery Plan

R III/G/2442

FINAL STAGE DUMP PLAN

CENTRAL COALFIELDS LIMITED

DesignationSubject

Job Title

CMPDI, R.I.-III

A MINI RATNA COMPANY

III R

Activity

Checked

Approved

Drg.No.

Created

Scale

Name

0

Rev.No.

Sheet

Signature

Job No.

Date

Customer

0 M

1 : 4000

Created

Copyright in these drawings is vested in CMPDI.

Unauthorised copying or use is not permitted.

O C 0 9 4 2

SURFACE COUNTOUR

FLOOR COUNTOUR

FAULT

EXTERNAL DUMP

PROPOSED DIVERTION KARO NALA

INTERNAL DUMP

Jayant Chakravarty

Dr A Sinha

HOD(MP)

R.D.

Kanchan SinhaSr Mgr(Excvn)

16/3/2013

16/3/2013

16/3/2013

5

+250

+250

I

n

f

r

a

s

t

r

u

c

t

u

r

e

PLATE-VI

+292

FOREST

Ext Dump 'A'(31.8Ha)

+340

+280

+310

Cap-6.0Mcum