adem.alabama.gov

Incorporating NPS Intensive Surveys into ADEM’s Monitoring

Strategy

Southeastern Water Pollution Biologists’ Association Meeting

Lake Guntersville, Alabama15 November 2012

Page 2: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys

Figure 1. Unnamed tributary to the Coosa River in North Gadsden Park. This photo, looking downstream, was taken in 2004, prior to project construction.

Figure 2. Unnamed tributary to the Coosa River in North Gadsden Park. This photo, facing upstream, was taken in 2006, one year after project completion.

Page 3: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys Objectives

To document and assess water quality conditions; To provide baseline chemical and biological data to assess trends in

water quality; and, To evaluate the effectiveness of cumulative best management

practices

Page 4: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys Addressing NPS Issues

Waterbody assessment

TMDL development

Watershed management

plan

BMP implementation

Monitoring

Monitoring

Mon

itorin

g

Page 5: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys Small drainages Post-BMP monitoring

Multiple, well–established best management practices (BMPs)

Pre-BMP monitoring Sampling is conducted if no existing data is available Watershed management plans complete BMPs not yet implemented

In target basin if possible

Page 6: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys

NPS, FO, and WQ review:• Use classifications• TMDLs and WMPs• Permits• Existing stations and data• BMP location and type

NPS, FO, and WQ Select: • Sampling sites• Parameters and sampling

frequency$T

$T $T

%U

%U

#S

#S

#S

#S

#S#S

#S

#S

#S #S#S

#S#S

#S#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

#S

FC-10A

FC-10CCRDM-2

CRDM-3

CRDM-1FC-10B

TE06U1

HERM-1

HERM-2

HERM-3

LAWRENCE

MORGAN

CULLMAN

4

12

9

11

116

7

3

13

15

14

10

5

62

8

County-poly.shpBMPsRoadsStreams and rivers

Usecategories.shp4A Approved TMDL5 Impaired

Delistedwaters.shpPathogensSiltation

$T Stormwater/ Construction %U CAFOs#S Industrial Permits#S Existing Sampling Locations#S BMPs

Crowdabout - Herrin Creek Watersheds

5 0 5 10 Miles

Page 7: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys 4 Approaches

Compare to ecoregional reference reach(es) Upstream – downstream comparison Before and after surveys Paired watersheds

Page 8: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys 4 Approaches

Compare to ecoregional reference reach(es) Upstream – downstream comparison Before and after surveys Paired watersheds

Page 9: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys 4 Approaches

Compare to ecoregional reference reach(es) Upstream – downstream comparison Before and after surveys Paired watersheds

Page 10: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys2007 Upstream – downstream

comparisons Upstream stations not flowing

Small watersheds Severe drought conditions

Upstream stations Higher gradient

Page 11: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys 4 Approaches

Compare to ecoregional reference reach(es) Upstream – downstream comparison Before and after surveys Paired watersheds

Page 12: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed SurveysBefore and After Studies: Classic Trend Analysis Challenges

Post-BMP monitoring conducted 1-3 years after BMP implementation

Limited time for BMPs to become fully established

Page 13: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed SurveysBefore and After Studies: Classic Trend Analysis Challenges

A few pre-BMP studies conducted in late 80’s and early 90’s Before and after surveys conducted under different conditions

Drought Herrin Creek: Pre-BMP data could not be collected in 2007

Landuse changes

Page 14: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Table 1. Comparison of watershed characteristics between 1993 and 2006 based on the National Land Cover Datasets (NLCD).

Watershed CharacteristicsNLCD   1993 2006% Landuse      Open water <1 <1  Wetland Total 2 5  Forest Total 52 33    Deciduous 29 29    Evergreen 6 2    Mixed 17 2  Other grasses/Shrub/scrub 1 6  Pasture/hay 28 38  Cultivated crops 10 8  Development  4 10  Barren/Mining/Transitional 3 1

ADEM’s NPS Intensive Watershed Surveys

Page 15: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed SurveysBefore and After Studies: Classic Trend Analysis Challenges

A few pre-BMP studies conducted in late 80’s and early 90’s Changes in methodology Changes in taxonomy Before and after studies conducted by different agencies Pre-data not collected at best site for monitoring BMPs Availability of data collected

Page 16: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys 4 Approaches

Compare to ecoregional reference reach(es) Upstream – downstream comparison Before and after surveys Paired watersheds

Page 17: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s 2009 NPS Intensive Surveys: Tennessee River Basin

Post BMP Monitoring Big Nance Creek Crowdabout Creek Goose Creek Herrin Creek Robinson Creek Scarham Creek Yellowbank Creek

Pre BMP Monitoring Big Shoal Creek Elam Creek Flat Creek Hester Creek McDaniel Creek Mountain Fork, Flint River

Page 18: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s 2007 NPS Intensive Watershed Surveys: Post-BMPRobinson Creek: F&W stream in the Interior Plateau (71g)• 6.3 mile stream listed as impaired by agricultural sources• Siltation and OE/DO TMDLs completed in 2003• BMPs implemented 2005-2006

• 453 acres of forest riparian buffers were planted

#S

#S

#S

RBNM-1 RBNM-2

RBNM-3

Planted Riparian Forest BufferCategory 4a F&W WatersRobinson Creek WatershedRoads

#S Monitoring Stations

2 0 2 4 Miles

N

Alabama

Page 19: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys: Paired watershed?

Station Area (mi2)Pop'n

per km2%

Urban%

Pasture%

CroplandRBNM-1 9 51 9 38 7.5

2009 Requested Sampling LocationsFLTL-1 9 62 9 3 1.3ELML-1 19 28 5 40 8.7

MCDL-360 11 18 4 46 6.0HERM-1 6 17 4 53 1.4

Existing Assessment DataMFBN-5 10 65 10 48 3.1RTFL-1 15 24 7 54 3.6

CSPJ-70 9 18 5 28 12.7

Page 20: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys: Paired watershed?

Station EcoArea

(mi2)HDG

Gradient (ft/0.5 mi)

Q(cfs) Jan-Mar

Q(cfs) Apr-June

Q(cfs) July-Sept

Q(cfs) Oct-Dec

RBNM-1 71G 9 5 3 0.8 0.2 0.0 0.02009 Requested Sampling Locations

FLTL-1 71G 9ELML-1 71G 19

MCDL-360 71G 11 5 8 0.9 0.2 <0.1 <0.1HERM-1 71G 6 5 9 0.5 0.1 <0.1 <0.1

Existing Assessment DataMFBN-5 71G 11 6 9 1.8 0.5 0.1 0.1RTFL-1 71G 15 5 10 2.5 0.6 0.1 0.1

CSPJ-70 71G 10 5 2 1.9 0.8 0.6 0.3

Page 21: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys: Pre-BMP

Tributary to Robinson Creek, looking towards Robinson Creek, in February of 2005.

Site in the Herrin Creek watershed in 2006.

Page 22: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Surveys: Paired watershed?

Trib to Robinson Creek, Looking toward Robinson Creek, with riparian forest buffer, in April of 2011.

Site in the Herrin Creek watershed in 2006.

Page 23: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Incorporating NPS Surveys into ADEM’s Monitoring Strategy Monitoring Strategy

Link each assessment to disturbances in the watershed Identify naturally similar watersheds

Drainage area, ecoregion, gradient Identify watersheds with similar levels of disturbance

% Landuse, #Permits, Population Density, Roads

Intensive monitoring to assess each site Monthly water quality monitoring (nutrients, sediment) Habitat assessments (Bank stability, embeddedness) Bioassessments (Macroinvertebrates)

Page 24: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

However beautiful the strategy, you should occasionally look at the

results.-Winston Churchill

Page 25: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Minimum Flow (cfs) 0.8 0.6 0.4 0.5 <0.1 0.6 <0.1Maximum Flow (cfs) 3.6 25.9 61.3 19 54.9 20.1 11.8

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 26: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-1

1994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)

Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25

# EPT Families 5 7 6 6 4 7 5

# EPT Genera --- 10 9 7 4 17 7

Water quality

Minimum Flow (cfs) 0.8 0.6 0.4 0.5 <0.1 0.6 <0.1

Maximum Flow (cfs) 3.6 25.9 61.3 19 54.9 20.1 11.8

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2

Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 27: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Minimum Flow (cfs) 0.8 0.6 0.4 0.5 <0.1 0.6 <0.1Maximum Flow (cfs) 3.6 25.9 61.3 19 54.9 20.1 11.8

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 28: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 29: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 30: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 31: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

RBNM-1 RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-11994-1998 2009 2009 2009 2003 2003 2003

Habitat Parameters (% Maximum Score)Sedimentation 58 70 58 59 46 86 77

Riparian Buffer Zone 85 50 48 48 50 73 25# EPT Families 5 7 6 6 4 7 5# EPT Genera --- 10 9 7 4 17 7Water quality

Dissolved oxygen (mg/L) 1.6 6.2 5.1 5.5 2.5 6.3 7.2Median NO3+NO2-N (mg/L) 0.659 0.589 0.572 0.321 2.193 0.222 0.32

Median Total phosphorus (mg/L) 0.081 0.038 0.076 0.156 0.031 0.032 0.058

Page 32: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s NPS Intensive Watershed Survey Results

0

3

6

9

12

15

18

1 2 3 4 5 6 7 8

# EP

T G

ener

a

Human Disturbance Gradient

# EPT Genera

Page 33: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s 2009 NPS Intensive Watershed Surveys: Robinson Creek

RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-1

Date (m/d/yyyy) 6/2/2009 6/30/2009 6/2/2009 5/26/1998 4/30/2003 6/23/2003

Width (ft) 15 12 12 25 20 7

Canopy Cover Shaded Mostly shaded Mostly shaded Mostly open Mostly shaded Open

Depth (ft)

Riffle 0.3 0.3 0.2

Run 1.5 1.0 0.8 2 0.6 0.5

Pool 2.5 1.5 1.5 2.5 1.5 1.5

% of Reach

Riffle 5 --- 30 20

Run 50 75 85 --- 45 40

Pool 50 20 15 --- 25 40

% of Substrate

Bedrock 30 2 80

Boulder 20 1 1 10 1

Cobble 15 2 3 40

Gravel 10 5 15 1 2 40

Clay 10 75 2 2

Mud/muck 0 0 1

Sand 10 5 60 75 5

Silt 2 5 10 15 12

Organic Matter 3 5 13 8 2 2

Physical Characteristics

Page 34: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

ADEM’s 2009 NPS Intensive Watershed Surveys: Robinson Creek

RBNM-1 MCDL-360 HERM-1 CSPJ-70 MFBN-5 RTFL-1

Date (m/d/yyyy) 6/2/2009 6/30/2009 6/2/2009 5/26/1998 4/30/2003 6/23/2003

Width (ft) 15 12 12 25 20 7

Canopy Cover Shaded Mostly shaded Mostly shaded Mostly open Mostly shaded Open

Depth (ft)

Riffle 0.3 0.3 0.2

Run 1.5 1.0 0.8 2 0.6 0.5

Pool 2.5 1.5 1.5 2.5 1.5 1.5

% of Reach

Riffle 5 --- 30 20

Run 50 75 85 --- 45 40

Pool 50 20 15 --- 25 40

% of Substrate

Bedrock 30 2 80

Boulder 20 1 1 10 1

Cobble 15 2 3 40

Gravel 10 5 15 1 2 40

Clay 10 75 2 2

Mud/muck 0 0 1

Sand 10 5 60 75 5

Silt 2 5 10 15 12

Organic Matter 3 5 13 8 2 2

Physical Characteristics

Page 35: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Did paired watershed assessments help? Multiple lines of evidence

Helped sift through inevitable questions when comparing data collected during different years and/or by different agencies

Provided standard for evaluation when pre-BMP data was unavailable

Page 36: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

How can we improve our surveys? Site selection:

Include a characterization of all study reaches during the recon Additional indicators:

Pebble count? Percent vegetated and bank angle? SWPB-ians: Suggestions on “interim” measures of success

would be much appreciated!

Page 37: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Process cannot help where these watersheds are located

Page 38: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Could TALU help?

Page 39: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Could TALU help?

Page 40: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Could TALU help?

Page 41: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Could TALU help?

Page 42: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Food for Thought• We measure impairment in miles and improvement in feet

• 303d/TMDL waters on mainstem

• Best “success” seen in watersheds <3 mi2

#S

#S

#S

RBNM-1 RBNM-2

RBNM-3

Planted Riparian Forest BufferCategory 4a F&W WatersRobinson Creek WatershedRoads

#S Monitoring Stations

2 0 2 4 Miles

N

Alabama

Page 43: Adem.alabama.gov Incorporating NPS Intensive Surveys into ADEM’s Monitoring Strategy Southeastern Water Pollution Biologists’ Association Meeting Lake.

Food for Thought• Prioritize watersheds for project implementation?

• Strategic habitat units?

• More cost-effective to prevent impairment than to fix it?• Healthy watersheds initiative?