Abstract - Steel Rolling Margin - FEB 2013.pdf

1
LOCATION : ANEKAL IS CODE REFERENCE : IS 1786-2008 Actual in % Theoritical in % 10 TULSYAN 5232/2013 1.000 0.633 0.617 2.59 ± 7 Passed 10 TULSYAN 5232/2013 1.000 0.640 0.617 3.73 ± 7 Passed 10 TULSYAN 5232/2013 1.000 0.637 0.617 3.24 ± 7 Passed 12 TULSYAN 5232/2013 1.000 0.912 0.89 2.47 ± 5 Passed 12 TULSYAN 5232/2013 1.000 0.892 0.89 0.22 ± 5 Passed 12 TULSYAN 5232/2013 1.000 0.925 0.89 3.93 ± 5 Passed 10 TULSYAN 5685/2013 1.000 0.621 0.617 0.65 ± 7 Passed 10 TULSYAN 5685/2013 1.000 0.633 0.617 2.59 ± 7 Passed 10 TULSYAN 5685/2013 1.000 0.620 0.617 0.49 ± 7 Passed 12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed VALUE & BUDGET HOUSING CORPORATION PVT LTD ABSTRACT FOR ROLLING MARGIN OF STEEL - FOR THE MONTH OF FEB 13 Date Dia of Bar (mm) Description TC/ Invoice No. Length (mtrs) Actual wt.(Kg/m) 01.02.2013 PROJECT : VBHC - VAIBHAVA Theoritical wt.(Kg/m) Difference in % Remarks 12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed 12 TULSYAN 5685/2013 1.000 0.901 0.88 2.39 ± 5 Passed 12 TULSYAN 5685/2013 1.000 0.893 0.88 1.48 ± 5 Passed 16 TULSYAN 5685/2013 1.000 1.590 1.58 0.63 ± 5 Passed 16 TULSYAN 5685/2013 1.000 1.597 1.58 1.08 ± 5 Passed 16 TULSYAN 5685/2013 1.000 1.588 1.58 0.51 ± 5 Passed 25 TULSYAN 5685/2013 1.000 3.881 3.85 0.81 ± 3 Passed 25 TULSYAN 5685/2013 1.000 3.886 3.85 0.94 ± 3 Passed 25 TULSYAN 5685/2013 1.000 3.860 3.85 0.26 ± 3 Passed 8 TULSYAN 2517/2012-2013 2518/2012-2013 1.000 0.399 0.395 1.01 ± 7 Passed 8 TULSYAN 2517/2012-2013 2518/2012-2013 1.000 0.381 0.395 -3.54 ± 7 Passed 8 TULSYAN 2517/2012-2013 2518/2012-2013 1.000 0.375 0.395 -5.06 ± 7 Passed Prepared By Checked By 19.02.2013 23.02.2013

Transcript of Abstract - Steel Rolling Margin - FEB 2013.pdf

Page 1: Abstract - Steel Rolling Margin - FEB 2013.pdf

LOCATION : ANEKAL

IS CODE REFERENCE : IS 1786-2008

Actual in % Theoritical in %

10 TULSYAN 5232/2013 1.000 0.633 0.617 2.59 ± 7 Passed

10 TULSYAN 5232/2013 1.000 0.640 0.617 3.73 ± 7 Passed

10 TULSYAN 5232/2013 1.000 0.637 0.617 3.24 ± 7 Passed

12 TULSYAN 5232/2013 1.000 0.912 0.89 2.47 ± 5 Passed

12 TULSYAN 5232/2013 1.000 0.892 0.89 0.22 ± 5 Passed

12 TULSYAN 5232/2013 1.000 0.925 0.89 3.93 ± 5 Passed

10 TULSYAN 5685/2013 1.000 0.621 0.617 0.65 ± 7 Passed

10 TULSYAN 5685/2013 1.000 0.633 0.617 2.59 ± 7 Passed

10 TULSYAN 5685/2013 1.000 0.620 0.617 0.49 ± 7 Passed

12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed

VALUE & BUDGET HOUSING CORPORATION PVT LTD

ABSTRACT FOR ROLLING MARGIN OF STEEL - FOR THE MONTH OF FEB 13

DateDia of Bar

(mm)Description TC/ Invoice No.

Length

(mtrs)

Actual

wt.(Kg/m)

01.02.2013

PROJECT : VBHC - VAIBHAVA

Theoritical

wt.(Kg/m)

Difference in %Remarks

12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed

12 TULSYAN 5685/2013 1.000 0.901 0.88 2.39 ± 5 Passed

12 TULSYAN 5685/2013 1.000 0.893 0.88 1.48 ± 5 Passed

16 TULSYAN 5685/2013 1.000 1.590 1.58 0.63 ± 5 Passed

16 TULSYAN 5685/2013 1.000 1.597 1.58 1.08 ± 5 Passed

16 TULSYAN 5685/2013 1.000 1.588 1.58 0.51 ± 5 Passed

25 TULSYAN 5685/2013 1.000 3.881 3.85 0.81 ± 3 Passed

25 TULSYAN 5685/2013 1.000 3.886 3.85 0.94 ± 3 Passed

25 TULSYAN 5685/2013 1.000 3.860 3.85 0.26 ± 3 Passed

8 TULSYAN2517/2012-2013

2518/2012-20131.000 0.399 0.395 1.01 ± 7 Passed

8 TULSYAN2517/2012-2013

2518/2012-20131.000 0.381 0.395 -3.54 ± 7 Passed

8 TULSYAN2517/2012-2013

2518/2012-20131.000 0.375 0.395 -5.06 ± 7 Passed

Prepared By Checked By

19.02.2013

23.02.2013