ACCELERATED BRIDGE CONSTRUCTION
Ross Clark Circle Bridge Slide
Dothan, Alabama
![Page 2: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/2.jpg)
![Page 3: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/3.jpg)
231 431
231
![Page 4: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/4.jpg)
![Page 5: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/5.jpg)
Ross Clark Circle (west side)
� US 231
� Built in 1950s
� Divided Four Lane
� Average Daily Traffico design – 5,000 o current > 40,000o 20 year ≈ 73,000
![Page 6: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/6.jpg)
Beaver Creek Culvert
� 3 BBL 10’(↔) x 6’ (↨)
� 155 ft long
� 20’ fill
� Structurally Deficient(severely cracked)
� Opening has immersed
![Page 7: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/7.jpg)
UTILITIES WATER
SEWER
OVERHEAD
ELECTRIC
TELEPHONE /
CABLE
![Page 8: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/8.jpg)
Exit End
![Page 9: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/9.jpg)
Entry End
![Page 10: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/10.jpg)
![Page 11: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/11.jpg)
![Page 12: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/12.jpg)
Contractor provides
engineered design
![Page 13: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/13.jpg)
Temporary Shoring Boxes and Falsework
Temporary Shoring Boxes
Used to construct the
permanent bridge
abutment piles and cap
seats
Temporary Falsework
Used to construct the new bridge
superstructure adjacent to the
permanent structure location and
for support during the bridge slide
![Page 14: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/14.jpg)
Temporary Falsework
![Page 15: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/15.jpg)
Temporary Shoring Boxes
� Cost effective
� Used material that was
readily available to McInnis
Construction
� Could be installed quickly at
the project site
� Could be de-constructed
� Could be re-used on future
projects
![Page 16: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/16.jpg)
In order to ensure
proper geometry
controls and check
constructability, McInnis
Construction set up a
pre-fabrication site at
their home office to
verify the temporary
shoring box geometry
and fit-up, pick weights
and crane reach
requirements,
fabrication steps,
transportation
requirements, and de-
construction sequence
Pre-Fabrication Site
Thompson Engineering coordinated the AASHTO
LRFD design of the temporary shoring box with
McInnis Construction in order to optimize
construction means & methods.
![Page 17: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/17.jpg)
Lay-Down Area
Construction activities
continued concurrently as
the shoring boxes were built
in the Lay-Down area.
![Page 18: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/18.jpg)
A two phase traffic control was used to maintain traffic during excavation and installation of the shoring boxes. The first phase shifted traffic to the inside with excavation on the outside.
![Page 19: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/19.jpg)
A plan note required existing traffic to be maintained during peak hours, therefore McInnis Construction installed the shoring boxes during the weekend including nighttime work to minimize impacts to traffic.
![Page 20: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/20.jpg)
To stay within the crane capacity the upper lid and side sill plates were erected separately.
![Page 21: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/21.jpg)
Backfilling and approach roadway asphalt being completed.
![Page 22: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/22.jpg)
Corner piles and timber wingwallswere installed to support the approach roadway embankment.
Phase two traffic control shifted traffic to the outside while construction activities were repeated on the inside.
![Page 23: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/23.jpg)
Excavation continued on the inside while traffic was maintained on the outside.
![Page 24: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/24.jpg)
Shoring boxes being erected and set in the trench.
![Page 25: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/25.jpg)
The last of the four shoring boxes being set adjacent to traffic.
Inside excavation.
![Page 26: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/26.jpg)
Pile Driving Preparation
After the shoring boxes were installed, pile layout and geometry control checks were made prior to pile driving.
![Page 27: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/27.jpg)
A similar inside/outside traffic control was used to drive the piles after the upper lids of the shoring boxes were removed. Additional falsework piles were driven on the outside.
![Page 28: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/28.jpg)
After the piles were installed the abutment cap seat was constructed.
![Page 29: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/29.jpg)
Temporary Falsework
Temporary falsework was installed adjacent to the new bridge location to support the new superstructure in preparation for the bridge slide.
![Page 30: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/30.jpg)
The BT-63 inch precast prestressed concrete bulb-tee girders were erected adjacent to the new bridge location on the falsework.
![Page 31: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/31.jpg)
� Shoring system needs to be wrapped with plastic or filter blanket to stop intrusion of sand from backfilling around the box.
� Top sill plate on sidewalls needs reinforcement/stiffness for when asphalt is placed adjacent to it. Sill plate deformation caused the top lid to become extremely difficult to lift and place during lane closure construction.
� Shoring system was designed heavy for reusing purposes. However, we need it to be lighter or have a larger crane so we could set a more completed section during lane closure construction.
� Backfilling the shoring boxes after excavation took the longest time. More ways to improve logistics on job site.
� Prefabricating the boxes worked good. Need to improve on the shipping dimensions and time to fabricate on the job site.
![Page 32: ABC in Alabama_2015 National ABC Conference Presentation](https://reader034.fdocuments.in/reader034/viewer/2022051502/58aa142b1a28ab8a488b663d/html5/thumbnails/32.jpg)
� Owner & Project Designer: Alabama Department of Transportation
� Contractor: McInnis Construction
� Construction Engineer: Thompson Engineering