AASHTO TIG

13
AASHTO TIG Ananth Prasad Chief Engineer, Florida DOT

description

AASHTO TIG. Ananth Prasad Chief Engineer, Florida DOT. What is TIG. Vision: “A culture where rapid advancement and implementation of high payoff, innovative technologies is the expectation of the transportation community.". - PowerPoint PPT Presentation

Transcript of AASHTO TIG

Page 1: AASHTO TIG

AASHTO TIG

Ananth PrasadChief Engineer, Florida DOT

Page 2: AASHTO TIG

Vision:“A culture where rapid advancement and implementation of high payoff, innovative technologies is the expectation of the transportation community."

Mission:“Champion the implementation of technology among AASHTO member agencies, local agencies, and their industry partners to improve the Nation’s transportation system."

What is TIG

Page 3: AASHTO TIG

What is TIG Cont’d

• TIG is Technology Implementation Group– Executive Committee

• AASHTO SCOH Members, FHWA and Industry

– Reports to SCOH– Lead States Team Concept for Project Team

Structure

Page 4: AASHTO TIG

What does TIG Do?

• Promote Ready to Use Technologies– Annual Solicitation – Select 2-3 Focus Technologies (Lead States

team)– Select 2-3 Additional Selected Technologies

(AST)

Page 5: AASHTO TIG

2006 Focus Technologies :

AASHTO TIG

• Maintenance Decision Support System (MDSS)– Lead State (South Dakota) (Dave Huft)

• Precast Concrete Paving Slabs (PCPS)– Lead State (New York) (Tim LaCoss)

• Construction Analysis Software Tools (CAST)– Lead State (California) (Michael Samadian)

Page 6: AASHTO TIG

MDSS:

AASHTO TIG

• Uses Real World Data:– Current surface conditions, forecast weather, pavement

composition, available materials, equipment, and work schedules

• To Recommend the following:– Treatment type, application rate, and best time to apply

• To Achieve these benefits:– Timely and effective maintenance, material savings,

environmental benefits, and cost savings

Page 7: AASHTO TIG

CAST:

AASHTO TIG

• CA4PRS– Decision-support tool in selecting most economical

rehab strategies– Integrate schedule estimate with traffic delay

calculation – CalTrans saw a savings of $6M agency and $2M in

user costs in one project ($16M project)

Page 8: AASHTO TIG

PCPS:

AASHTO TIG

• All inclusive Website– Matrix of Multiple Products and Procedures– Clearing House for State Specifications

• Planned Regional Workshop focused on education

• Forum for Community sharing of best practices

Page 9: AASHTO TIG

Additional Selected Technologies (AST):

AASHTO TIG

• Notch Wedge Joint Maker - The Safety Edge - Shoulder Wedge Maker

• Balsi Beam - A Work Zone Protection Device

• Design Build Traffic Signal Projects

Page 10: AASHTO TIG

New 2007 Focus Technologies :

AASHTO TIG

• SPMT – Self Propelled Modular Transporters– Lead State (Florida)

• AMC – Automated Machine Control– Lead State (Minnesota)

Page 11: AASHTO TIG

New 2007 AST :

AASHTO TIG

• Slope Stabilization using Recycled Plastic Reinforcement

• Embedded Data Collector

• Low Profile Barrier Systems

Page 12: AASHTO TIG

Visit the TIG Website

AASHTO TIG

• For more information:– Visit: http://tig.transportation.org/– Contact Keith Platte ([email protected]) for

project and program information

Page 13: AASHTO TIG

Questions ???

AASHTO TIG