A Desal SOP
-
Upload
mohammad-ibnul-hossain -
Category
Documents
-
view
158 -
download
17
description
Transcript of A Desal SOP
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Page 1 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART-D1 DISTILLERS
Page 2 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TO VIEW ANY SOP CLICK ON ITS PAGE NUMBER. TITLE: DISTILLERS Serial no. 1 2 3 4
SOP No. D1-001 D1-002 D1-003 D1-004
DESCRIPTION INTER TRIP TEST SEQUENCE SEA WATER RECEIVING STARTING OF BRINE BLOWDOWN PUMP STARTING OF BRINE RECIRCULATION PUMP COOLING SEAWATER SUPPLY TO EJECTOR CONDENSERS WARMING UP OF EJECTOR STEAM LINE
Page No. 23 24 26 27
5
DI-005
29
6
D1-006
30
7
D1-007
VACUUM RAISING BY HOGGING EJECTOR.
31
8
D1-008
EJECTOR SWITCHING
32
9
D1-009
WARMINGUP OF BRINE HEATER STEAM LINE STEAM ADMISSION & STARTING OF CONDENSATE PUMP
33
10
D1-010
34
Page 3 of 320
Effective
Oct 2002
Q.E.W.C11 12 13 14 D1-011 D1-012 D1-013 D1-014
Issued Date Revision Issued ByMay 2003
Production/Operation 36 37 38 39
STARTING ANTISCALE & ANTIFOAM DOSING STARTING OF DISTILLATE EXTRACTION PUMP STARTING OF SECOND BRINE RECIRCULATION PUMP LOADING UP & STABILISATION
15
DI-015
STARTING OF HIGH PURITY DISTILLATE PUMP
40
16
D1-016
STARTING OF SEAWATER RECIRCULATION PUMP DISTILLER SHUTDOWN PROCEDURE PREPARATIONS LOAD REDUCTION
41
17
D1-017
42
18
D1-018
43
19
D1-019
DUMPING OF DISTILLATE & CUTTING OF STEAMCOLD CIRCULATION & SEALING OF PLANT VACUUM STOPPING COLD CIRCULATION & STARTING DRAINING STOPPING SEAWATER FLOW TO HJS
44
20
D1-020
45
21
D1-021
46
22
D1-022
47
23
D1-023
EMERGENCY SITUATIONS
48
Page 4 of 320
Effective
Oct 2002
Q.E.W.C24 25 26 27 D1-024 D1-025 D1-026 D1-027
Issued Date Revision Issued ByMay 2003
Production/Operation 49 51 52 54
SEAWATER SUPPLY FAILURE STEAM SUPPLY FAILURE INSTRUMENT AIR SUPPLY FAILURE TWO BRINE RECIRCULATION PUMPS TRIP
28
DI-028
TWO BRINE BLOWDOWN PUMPS TRIP TWO CONDENSATE OR DISTILLATE PUMPS FAILURE UNIT POWER SUPPLY FAILURE
55
29
D1-029
56
30
D1-030
57
31
D1-031
BLACKOUT
58
32
D1-032
OPERATIONAL CHECKS
59
33
D1-033
OPERATION OF EJECTORS AT PHASE I & III
60
34
D1-034
OPERATION OF EJECTORS AT PHASE II
65
35
D1-035
OPERATION OF EJECTORS AT PHASE IV
70
36
D1-036
OPERATION OF EJECTORS AT PHASE V
75
Page 5 of 320
Effective
Oct 2002
Q.E.W.C37 38 39 D1-037 D1-038 D1-039
Issued Date Revision Issued ByMay 2003
Production/Operation
OPERATION OF CO2 RECOVERY SYSTEM IN PHASE I, II, & III STARTUP OPERATION OF CO2 RECOVERY SYSTEM IN PHASE I, II, & III SHUTDOWN OPERATION OF TAPROGGE SYSTEM PROCEDURE FOR FLUSHING WITH DISTILLATE WATER HEAT REJECTION SECTION FILLING METHOD FOR PHASE I, II, III, IV & V
80 81 82
40
DI-040
90
41
D1-041
91
42
D1-042
STARTING FLUSHING CIRCULATION FLUSHING OF HEAT RECOVERY & HEAT INPUT SECTIONS FILLING METHOD FOR PHASE V AND CIRCULATION FOR FLUSHING TUBE LEAK DETECTION HEAT REJECT SECTION TUBE LEAK DETECTION HEAT RECOVERY SECTION HYDROSTATIC TEST FOR TUBE LEAKS TUBE LEAK DETECTION IN PHASE II- HEAT REJECT SECTION TUBE LEAK DETECTION HEAT RECOVERY SECTION TUBE LEAK DETECTION HEAT REJECT SECTION PHASE IV
93
43
D1-043
94
44
D1-044
95
45
D1-045
97
46
D1-046
101
47
D1-047
102
48
D1-048
104
49
D1-049
105
Page 6 of 320
Effective
Oct 2002
Q.E.W.C50 51 52 D1-050 D1-051 D1-052
Issued Date Revision Issued ByMay 2003
Production/Operation 107 108 109
TUBE LEAK DETECTION IN PHASE IV HEAT RECOVERY SECTION TUBE LEAK DETECTION IN PHASE V HEAT RECOVERY SECTION TUBE LEAK DETECTION IN PHASE V HEAT REJECT SECTION TUBE LEAK DETECTION IN BRINE HEATE IN ALL PHASES ACID CLEANING PROCEDURE - FILLING WITH SEAWATER ACID CLEANING PROCEDURE PREPARATION ACID CLEANING PROCEDURE STARTING CIRCULATION ACID CLEANING PROCEDURE WARMING UP
53
DI-053
111
54
D1-054
113
55
D1-055
114
56
D1-056
116
57
D1-057
117
58
D1-058
ACID CLEANING PROCEDURE ACID CHARGING ACID CLEANING PROCEDURE FLUSHING WITH SEA WATER ACID CLEANING PROCEDURE DRAINING
118
59
D1-059
119
60
D1-060
120
61
D1-061
BASIC ISOLATIONS FOR SPECIFIC PERMITS
121
62
D1-062
DISTILLER OVERHAUL PERMITS
134
Page 7 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART-D2 BOILERS & DEAERATORS
Page 8 of 320
Effective
Oct 2002
Q.E.W.C63 64 65 GENERAL D2-001 D2- 002
Issued Date Revision Issued ByMay 2003
Production/Operation 138 141 143
WATER QUALITY OF H.P.MAKEUP AND CONDENSATE AND BOILER WATER STARTUP OF DEAERATOR SHUTDOWN OF DEAERATOR
66
D2-003
WHB PRESTARTUP CONDITIONS
144
67
D2-004
WHB STARTUP
145
68
D2-005
WHB SUPPLEMENTARY GAS FIRING
147
69
D2-006
WHB SHUTDOWN PROCEDURES
148
70
D2-007
AUX BOILER PRESTART CHECKS
149
71
D2-008
AUX BOILER STARTUP ON GAS
150
72
D2-009
AUX BOILER PRESTARTUP CHECKS FOR OIL
152
73
D2-010
AUX BOILER STARTUP ON OIL AUX BOILER FUEL CHANGEOVER FROM GAS TO OIL AUX BOILER FUEL CHANGEOVER FROM OIL TO GAS
153
74
D2-011
155
75
D2-012
156
Page 9 of 320
Effective
Oct 2002
Q.E.W.C77 78 D2-013 D2- 014
Issued Date Revision Issued ByMay 2003
Production/Operation
AUX BOILER SHUTDOWN PROCEDURE AUX BOILER PROCEDURE
157 158
79
D2-015
WHB WATER WEDGING PROCEDURE
159
80
D2-016
WHB DEWATERWEDGING PROCEDURE
160
81
D2-017
AUX BOILER WATER WEDGING PROCEDURE
161
82
D2-018
AUX BOILER DEWATERWEDGING PROCEDURE
162
83
D2-019
PTW & WHB PRESSURE PARTS
163
84
D2-020
PTW & WHB NON PRESSURE PARTS
164
85
D2-021
PTW & WHB FUEL GAS SYSTEM HIGH RISK SANCTION FOR WORK AT THE BOILER MECHANICAL & ELECTRICAL ISOLATIONS
165
86
D2-022
166
Page 10 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART- D3 COMMON SERVICES
Page 11 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
87 88 89
GENERAL D3-001 D3-002
OPERATIONAL PROCEDURE COMPRESSED AIR SYSTEM COMPRESSOR STARTUP PROCEDURE COMPRESSOR SHUTDOWN PROCEDURE
169 170 172
90
D3-003
ISOLATION FOR PTW
173
91
D3-004
AIR DRIER OPERATION
174
92
D3-005
INDUSTRIAL WATER SYSTEM PROCEDURE FOR CHANGEOVER OF BOOSTER PUMP ISOLATION FOR PTW
176
93
D3-006
177
94
D3-007
179
95
D3-008
MAKEUP WATER SYSTEM
181
96
D3-009
BEARING COOLING WATER SYSTEM
185
Page 12 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART- D4 FIRE FIGHTINGPage 13 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
97 98 99
D4-001 D4-002 D4-003
ELECTRIC FIRE PUMPS A & B DIESEL FIRE PUMPS A & B ELECTRIC FIRE PUMP C
187 189 192
100
D4-004
DIESEL FIRE PUMP C FIRE MAIN PRSSURE SUSTAINING PUMPS A1, A2, B1 & B2 DELUGE SYSTEM TANK FARM
194
101
D4-005
196
102
D4-006
198
103
D4-007
SPRINKLER FIRE ALARM
200
104
D4-008
FIRE HYDRANTS SAMPLE OF H-1, H-17 & H- 27
202
Page 14 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART- D5 BOPPage 15 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
105 106 107 108
GENERAL D5-001 D5-002 D5-003
SEA WATER PUMPS OPERATIONS PRESTART CHECHS STARTING OF S.W.PUMP AT SWPH A STARTING OF S.W.PUMP AT SWPH B STARTING OF S.W.PUMP AT SWPH C
204 205 206 207
109
D5-004
S W PUMPS RUNNING CHECKS
208
110
D5-005
S W PUMP SHUTDOWN
209
111
D5-006
GT C.W PUMPS A & B
210
112
D5-007
BAND SCREENS A , B , C, D, & E
213
113
D5-008
WASHWATER PUMPS A & B
215
114
D5-009
BAND SCREENS & WASHWATER PUMPS F , G & H
217
115
D5-010
BAND SCREENS 2A & 2B CUMBERLAND ELECTROCHLORINATION STREAMS 1, 2 ,3 & 4 ELECTROCHLORINATION G , H & J
219
116 117
D5-011 D5-012
221 225
Page 16 of 320
Effective
Oct 2002
Q.E.W.C118 D5-013
Issued Date Revision Issued ByMay 2003
Production/Operation
ELECTROCHLORINATION K & L
227
119
D5-014
SCHEDULED CHANGEOVER OF EQUIPMENTS
230
120
D5-015
STARTUP OF RECARBONATION (DTP)
232
121
D5-016
STARTUP OF CO2 COMPRESSOR SYSTEM
233
122
D5-017
STARTUP CHLORINATION PLANT
234
123
D5-018
LIMESTONE FILTERS
235
124
D5-019
RECARBONATION PLANT SHUTDOWN
236
125
D5-020
ELECTROCHLORINATION PLANT SHUTDOWN
237
126
D5-021
FORWARDING PUMPS STARTUP
238
127
D5-022
FORWARDING PUMPS SHUTDOWN
239
Page 17 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART-D6 ELECTRICAL ISOLATIONS
128
GENERAL GENERAL GUIDE LINES Page 18 of 320
240
Effective
Oct 2002
Q.E.W.C129 130 131 132 133 134
Issued Date Revision Issued ByMay 2003
Production/Operation 241 242 243 244 245 247
GENERAL GENERAL GUIDE LINES D6-001 D6-002 D6-003 D6-004 D6-005 ISOLATION OF 6.6KV VCB DEISOLATION OF 6.6KV VCB ISIOLATION OF 6.6KV DEISOLATION OF 6.6KV ISOLATION OF 415V ACB FOR WORK ON PUMP
135
D6-006
ISOLATION OF 415V ACB FOR WORK ON MOTOR ISOLATION OF 415V ACB FOR WORK ON MOTOR STARTER STARTER DEISOLATION OF 415V ACB AFTER WORK ON MOTOR ISOLATION OF 415V ACB AT STATION AUX BOARDS ISOLATION OF 415V ACB AT STATION AUX BOARDS FOR WORK ON MOTOR STARTER DEISOLATION OF 415V ACB AFTER WOPRK ON MOTOR STARTER SUPPLY CHANGING OVER FOR 415V DISTILLER BOARDS SUPPLY CHANGING OVER & RELEASING THE INCOMER AT PHASE I ,II, & III
248
136
D6-007
249
137
D6-008
250
138
D6-009
252
139
D6-010
253
140
D6-011
254
141
D6-012
255
142
D6-013
256
Page 19 of 320
Effective
Oct 2002
Q.E.W.C143 144 145 146 147 D6-014 D6-015 D6-016 D6-017 D6-018
Issued Date Revision Issued ByMay 2003
Production/Operation 264 265 273 274 275
NORMALISING THE INCOMING SUPPLY IN 415V DISTILLER BOARD SUPPLY CHANGING OVER & RELEASING THE INCOMER IN PHASSE - IV NORMALISING THE INCOMING SUPPLY IN PHASE IV 415V DISTILLER BOARDS SUPPLY CHANGING OVER IN DISTILLER BOARDS 13 & 14 SUPPLY CHANGING OVER IN STATION AUXILIARY BOARDS 7A, 7B, 8A & 8B NORMALISING THE INCOMING SUPPLY IN 415V STATION AUX BOARDS RELEASING OF 415V DISTILLER BOARDS FOR ANNUAL OVERHAUL RELEASING OF 415V DISTILLER BOARDS AT PHASE I, II, III & IV ELECTRICAL ISOLATION FOR OVERHAUL PERMIT OF DISTILLER -13 ELECTRICAL ISOLATION FOR OVERHAUL PERMIT OF DISTILLER -14 TAKING DISTILLER TRANSFORMER IN SERVICE AFTER COMPLETION OF MAINTENANCE ON TXR, OCB, & ACB INTERTRIP TEST SEQUENCE
148
D6-019
276
149
D6-020
277
150
D6-021
278
151
D6-022
279
152
D6-023
280
153
D6-024
282
154
D6-025
284
Page 20 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART-D7 EMERGENCY CONTINGENCY PROCEDURE
Page 21 of 320
Effective
Oct 2002
Q.E.W.C155 D7-001 BLACK OUT
Issued Date Revision Issued ByMay 2003
Production/Operation
287
156
D7-002
OIL SLICK CONTINGENCY PLAN
289
Page 22 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
RAF-A DESALINATION STANDARD OPERATION PROCEDURESPART-D1 DISTILLERS
Page 23 of 320
Effective
Oct 2002
Q.E.W.CSOP No
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS
D1-001
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
DISTILLER START-UP PROCEDUREDSCE/PERMIT ENGINEER/SUPERVISOR/DIST
Location OPERATION Field CCR/DCR
INTERTRIP TEST SEQUENCE
Prior to start-up, the following items are to be checked and confirmed. Piping connections are tightened, all related drain valves are closed and hogging ejector vapour suction valve is opened. Strainers are cleaned where applicable. Pump lubrication is adequate, cooling/flushing/sealing water is in service and pumps suction valves are opened. Instrument air is in service and control valves opening position match to controller output. All control valves are closed and their isolation valves are opened and the bypass valve is closed. All instrument devices are available and functioning. The chemicals are prepared in local day tanks and power supply for the mixer motors are turned ON at their circuit breakers. The 6.6 kV and 415V electrical supplies to the electrical equipment are available and the selectors on their circuit breakers are positioned in control room. Steam and seawater supplies are ready for service.Page 24 of 320
*
* *
*
* *
* *
Effective
Oct 2002
Q.E.W.CSOP No
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS
D1-002
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SPERVISORS CCR/DCRLocation Field CCR/DCR
Seawater Receiving Confirm that, all heat reject section water boxes vent isolation valves are opened and all drain isolation valves are closed. Open seawater reject TCV(SW-19FCV-102A/SW-2TCV005/SW-19FCV1002A/TCV104/QL-FV-604) by 15% for Phase I & III, also open seawater reject TCV by 15% for Phase II, IV & V. Gradually, open the S W main isolation valve (SW1/VSW-1/SW-1/SW-1/QL-MV-600) of the seawater inlet up to 25% (at Phase IV & V it is motorized valve, except distiller No. 10). When water boxes venting are completed and seawater to reject pressure indicator goes up to 2.7 barg or higher and becomes stable, gradually open seawater main isolation valve(SW-1/VSW-1/SW-1/SW-1/QL-MV-600)100%, then maintain the reject flow as required by TCV(SW-19FCV102A/SW-2TCV-005/SW-19FCV1002A/TCV104/QL-FV604) and close vent isolation valves of water boxes. Start Fe SO4 dosing at Phase IV. To start shell filling, confirm that hogging ejector vapour suction isolation valve (VA-11/VAE-1/VA-11/VA-11/LQPage 25 of 320 *
*
*
*
*
*
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
XV-793) is opened, and seawater make-up FCV(SW22,FCV012/VFW2,FCV-502/SW-22,FCV-012/FCV104/QL-V-619) isolation valves (U/S: SW-21/VFW-1/SW21/SW-2/QL-V-630 & D/S: -/VFW-3/-/QL-V-629) are opened and bypass isolation valve (SW-24/VFW-4/SW24/SW-4/QL-V-631) is closed. Open seawater make-up FCV (SW22,FCV012/VFW2,FCV-502/SW-22,FCV-012/FCV-104/ QL-V-619)as required to adjust the last stage level to the normal working level. At Phase IV, adjust seawater deaerator level by opening seawater make-up FCV(SW22,FCV012/VFW2,FCV-502/SW-22,FCV-012/FCV-104/ QL-V-619), and then adjust the last stage level by opening deaerator LCV(LCV-106). Start Na2 SO3 dosing at Phase IV; the dosing is in seawater make-up outlet line from seawater deaerator.
*
Page 26 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-003
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR / DCRLocation Field CCR/DCR
Starting of Brine Blowdown Pump Confirm that: - BlowdownLCV(BD-8,LCV-001/VBD-8,LCV352/BD-8,LCV-001/LCV-103/QN-LV-752) isolation valves (U/S: BD-7/VBD-7/BD-7/BD85/QN-V-609& D/S: BD-8/VBD-8/BD-8/-/QN-V610) are opened and bypass isolation valve(BD10/VBD-10/BD-10/B-86/QN-V-611) is closed. - Blowdown pump suction isolation valve(BD-1,BD2/VBD-1,VBD-2/BD-1,BD-2/B-79,B-80/QN-V600,QN-V-605) and casing with suction vent isolation valves are opened. - Sealing/flushing water is in service.Page 27 of 320
* *
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation * *
Open Blow down discharge isolation valve(BD-5,BD6/VBD-5,VBD-6/BD-5,BD-6/B-81,B-82/QN-V-603,QNV-608) of blowdown pump upto 20% to fill up discharge line with seawater and open discharge vent isolation valve and then close the pump discharge isolation valve(BD5,BD-6/VBD-5,VBD-6/BD-5,BD-6/B-81,B-82/QN-V603,QN-V-608). When last stage level rises up to 80%, release E.P.B. Emergency Push Button then start the pump. Check the discharge pressure, and then open the discharge isolation valve (BD-5,BD-6/VBD-5,VBD-6/BD-5,BD-6/B81,B-82/QN-V-603,QN-V-608) and close the discharge vent isolation valve. Check the electric current, and make sure that there is no abnormal noise or vibration from the pump. Adjust FCV (seawater make-up) (SW22,FCV012/VFW2,FCV-502/SW-22,FCV-012/FCV-104/ QL-V-619) & LCV (BD-8,LCV-001/VBD-8,LCV352/BD-8,LCV-001/LCV-103/QN-LV-52)to keep last stage level around 90% and seawater make-up flow around 1000 t/hr. Open the discharge isolation valve (BD-5,BD-6/VBD5,VBD-6/BD-5,BD-6/B-81,B-82/QN-V-603,QN-V-608). of the other pump to make it in standby position for emergency auto changeover.TITLE: DISTILLERS SOP No
* * *
D1-004
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCR
Page 28 of 320
Effective
Oct 2002
Q.E.W.COPERATION
Issued Date Revision Issued ByMay 2003
Production/OperationLocation Field CCR/DCR
Starting of One Brine Recirculation Pump & Establishing of Cold Circulation Confirm that: - Brine Pump suction isolation (B-3,B4/VBR1,VBR2/B-3,B4/B-1,B-2/QM-MV-600,QMMV604)valve is opened. - Suction(V-28,29/VVA-16,17/VA-28,29/B-V-4,8/ QQV-601,603), casing(Ph-1~4 N/A//QQV-600,602 ) and discharge (BD-52,53/N/A/BD-52,53/B-V1,2,5,6/QM-V-658,659,660 )vent valves are opened. - Sealing/flushing/cooling water is in service. - Oil level for thrust bearing and motor bearing, where applicable, are normal. - Opening & closing sequence of Brine pump discharge motorised valves (B-7/VBR-5/B-7/B3/QM-MV603 & B-8/VBR-6/B-8/B-4/QM-MV607). - Taprogge ball strainers are in backwash position. - Open emergency blowdown isolation valve (B9/VEB-1/B-9/B-7/--) or discharge motorised valve(B-7/VBR-5/B-7/B-3/QM-MV603 & B8/VBR-6/B-8/B-4/QM-MV-607). and FCV (recirculating brine at Phase I to IV) (B14,FCV-001/VBR-7,FCV-503/B-14FCV-107) up to 30% to fill up the discharge line with seawater, and then close the valves. Open vent isolation valves and close drain isolation valves of water boxes for heat recovery section and brine heater. Get clearance from the generation to start the brine recirculation pump. Open FCV (B-14,FCV-001/VBR-7,FCV-503/B-14FCVPage 29 of 320 * * * * * * * *
* *
*
*
*
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation * * * *
107/QM-FV-666)(Isolation Valves U/S:B-13/NA/B13/NA/NA & D/S:B-15/NA/B-15/NA/NA)15%, release E.P.B. then start BRP-B and then open discharge motorised valve 100% for priming the water boxes. At Phase V the priming will be by the discharge motorised valve, and after priming the water boxes, open the motorised valve(B-7/VBR-5/B-7/B-3/QM-MV603 & B8/VBR-6/B-8/B-4/QM-MV-607). 100% and adjust the flow by FCV FCV (B-14,FCV-001/VBR-7,FCV-503/B14FCV-107/QM-FV-666). Check the discharge pressure and electric current, and make sure that there is no abnormal noise and vibration from the pump. Vent the discharge line, and keep the pump running under close observation. Open self-flushing isolation valve and isolate the industrial water at Phase IV. Close the water box vent valves after venting is completed. Adjust recirculating brine flow while maintaining first and last stage level. Start debris separator system at Phase I, III & V. Start Na2SO3 dosing at Phase I & III; the dosing is in the common discharge line of the brine recirculation pumps.
Page 30 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-005
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Cooling Seawater Supply to Ejector Condensers Open the cooling seawater main isolation valve (SW2/SW-7/SW-2/SW-8/QLV-618). Check seawater to vent condenser C/V (SW-6), its by-pass (SW-5) & Isolation Valves (U/S: SW-3, D/S: S/W-4) at Phase I & III. Confirm that seawater flow is established to each condenser and seawater pressure and the flow are normal.* * *
Page 31 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-006
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISOR CCR/DCRLocation Field CCR/DCR
Warming-Up of Ejector Steam Line Confirm that: - Steam trap isolation valves are closed. - Steam drain valves are opened. - Steam isolation valve (S-15/VHS-11/S-15/S10,11/--)(S-16/VHS-12/S-16/S-14,15/--) to each ejector is closed. Drain the accumulated water in vapour lines where applicable. Open steam to ejectors main isolation valve (S-13/S-13/LQ-MV-630) around 10% (at Phase I, III & V). Open the isolation valves (VHS-8/S-7,S-8) of PCVPage 32 of 320
* * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation * * *
(VHS-7/PCV-101) (to ejectors) and close the bypass(VHS9/S-9) valve of PCV(VHS-7/PCV-101), and then open PCV(VHS-7/PCV-101) around 10% (at Phase II & IV). Open the equalising isolation valve of the steam unit isolation valve (U/S: S-8 (MOV)/VHS-1A/S-8 (MOV) /S1/LQ-MV-603, S-9/VHS-1B/S-9/S-3/NA. D/S:S12/A(MOV)/S-12/S-2/NA ) step by step, observing steam drainage. When water draining is reduced, open the trap isolation valves, and when steam draining is finished completely, close the drain bypass isolation valves. Open the steam unit isolation valve (S-8&9/S4002/S8&9/S-252/LQ-V-600) and then close the equalising isolation valve of steam unit isol. V/v(S-8&9/S4002/S8&9/S-252/LQ-V-600).
TITLE: DISTILLERS SOP No
D1-007
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/DIST LOCAL SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 33 of 320
Effective
Oct 2002
Q.E.W.CVacuum Raising by Hogging Ejector
Issued Date Revision Issued ByMay 2003
Production/Operation
Confirm that: - All vent valves, drain valves, sampling valves connected to vacuum zone are closed. - Pump casing drain valves are closed. - Service ejectors are isolated. - Line up stage No. 1 & 2 vapour line to vent condenser at Phase I & III. Slightly open the hogging ejector steam isolation valve (S14/VHS-10/S-14/S-12/LQ-XV-777) to warm up the ejector, and when white smoke exhaust begins, slowly open the isolation valve to full open position. Confirm that pressure indicators go down to lower than 450 mbarA for the first 30 min, when the pressure indicator drops to 200 mbarA, switch over the ejector to service ejectors.
Line diagram of ' VACUUM SYSTEM '
* * * *
* *
TITLE: DISTILLERS SOP No
D1-008
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/DIST LOCAL SUPERVISORS CCRDCRLocation Field CCR/DCR
Ejector SwitchingPage 34 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Confirm that each ejector exhaust isolation valves(VA14/NA/VA-14/VA-9/NA , VA-18/NA/VA-18/VA-14/NA, VA-22/NA/VA-22/NA/N/A ,VA-22/NA/VA-22/NA/NA) are opened. Close the hogging ejector vapour suction isolation valve (VA-11/VAE-1/VA-11/VA-11/LQ-XV-793) and then the steam isolation valve (S-14/VHS-10/S-14/S-12/LQ-XV777). Slowly open the steam isolation valve of the secondary ejector(S-17/VHS-11/S-17/S-13/LQ-XV-783, OR S18/VHS-12/S-18/S-14/LQ-XV-785) to full open position. Then open the vapour suction isolation valve(VA-16/VAE4/VA-16/VA-12/LQ-XV-798 OR VA-17/VAE-5/VA17/VA-13/LQ-XV-800) of the secondary ejector. Slowly open the steam isolation valve (S-15/VHS-11/S15/S-10/LQ-XV-779 OR S-16/VHS-12/S-16/S-11/LQXV-781)of the primary ejector to full open position. Then open the vapour suction isolation valve(VA-12/VAE2/VA-12/VA-7/LQ-XV-794 OR VA-13/VA-3/VA13/VA8/LQ-XV-796) of the primary ejector (at Phase I & III there are three stages service ejector). For more details refer to Operation of Venting System section. Confirm that pressure drop down approximately 30 mbar per 10 min, until reach 100 mbarA.
* * *
*
*
TITLE: DISTILLERS SOP No
D1-009
ACTIVITY
DISTILLER START-UP PROCEDUREPage 35 of 320
Effective
Oct 2002
Q.E.W.CREFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Warming-Up of Brine Heater Steam Line Confirm that: - Steam drain valves are opened. - PCV(s) (to brine heater) (S-10,TCV-071/VHS2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) is closed. Slowly open the equalising valve(s) of PCV) (S-10,TCV071/VHS-2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679)up-stream isolation valve (S-8/VHS-1A,VHS-1B/S-8/S1,S3/LQMV603), when drain become hot, open the isolation valves of steam traps. As the steam exhaust from the drain valves becomes stronger, close the steam drain valves, and confirm that steam traps are functioning. Open PCV(S-10,TCV-071/VHS-2,TCV-004A; VHS2,TCV-004B/S-10,TCV-071/PCV-102A,PCV-102B/LQTV-679) up-stream isolation valve(s(S-8/VHS-1A,VHS-1B/S8/S1,S3/LQ-MV603), (motorised valve at Phase I, III & V), and close the equalising valve(s). Open PCV(S-10,TCV-071/VHS-2,TCV-004A; VHS2,TCV-004B/S-10,TCV-071/PCV-102A,PCV-102B/LQTV-679) Steam PCV down stream isolation valve(s) (S12/VHS-3,VHS-4/S-12/S-2,S-4/--) (motorised valve at Phase II & IV), and the steam trap isolation valves (at Phase V there is no down stream isolation valve).Page 36 of 320
* * * *
* *
* *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-010
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Steam Admission & Starting of Condensate Pump Line diagram of ' STEAM & CONDENSATE ' Confirm that: - Cooling water header isolation valve (HM-6/VCH19/HM-6/O-HM-287/LT-V-625) to the desuperheater is opened (H.P. make-up at Phase I to IV and condensate at Phase V), and isolation valves (U/S:C-16/VCH-15C-16/C-11LT-V-622 &D/S:C-18/VCH-17/C-18/C-12/LT-V-623)of LP. Steam TCV(C-17*TCV-073/VCH-16*TCV-009/C17/TCV-073/TCV-101/LT-TV-814), LCV(C11*LCV-003/VCH-8*LCV-354/C-11/LCV-003/ LCV-101/LT-LV-822) (brine heater), and CRV(C9/VCH-11/C-9/CRV-103-B/LT-XV-841) (condensate) are opened. - Brine heater vent to atmosphere valve is opened (at Phase V, vent line connected to seawaterPage 37 of 320
*
* * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
deaerator vent header at start up only). - B.H LCV (C-11*LCV-003/VCH-8*LCV-354/C11/LCV-003/ LCV-101/LT-LV-822)(U/S:C10/VCH-7/C-10/C-7/LT-V-610)(D/S:C-12/VCH9/C-12/C-8/LT-V-611)(BY-PASSV/V:C-13/VCH10/C-13/C-9/LT-V-612)& TCV (C-17*TCV073/VCH-16*TCV-009/C-17/TCV-073/TCV101/LT-TV-814)are closed, and Condensate CRV(C-9/VCH-11/C-9/CRV-103-B/LT-XV-841) is in dump position. - Open LP. Steam TCV(C-17*TCV-073/VCH16*TCV-009/C-17/TCV-073/TCV-101/LT-TV814) up to 10% and PCV(S-10,TCV-071/VHS2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) step by step and atomising steam to desuperheater at Phase V only.
* * * * * * * * *
To start the condensate pump, confirm that: - Pump suction valves(C-1/VCH-1/C-1/C-1/LT-V600 &C-2VCH-2/C-2/C-2/LT-V-605), vent valves & Dump V/V(C-8//C-8/NA/LT-V-627) are opened. - Sealing/flushing/cooling water is in service. - Bearing oil level is normal at Phase IV & V.*
* *
*
Fill up the pump casing. Start the pump, and then open the discharge valve (C5/VCH-5/C-5/C-5/LT-V-603) OR(C-6VCH-6/C-6/C-6LTV-608) very slowly . Check discharge pressure and electric current, and vent the discharge line. Open the discharge valve(C-5/VCH-5/C-5/C-5/LT-V-603) OR(C-6VCH-6/C-6/C-6LT-V-608) of the other pump to make it in standby position for emergency auto changeover. Adjust the level of the brine heater by LCV(C-11*LCVPage 38 of 320
* *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
003/VCH-8*LCV-354/C-11/LCV-003/ LCV-101/LT-LV822). Continuous Load Up Increase steam supply to the brine heater step by step, at the same time increase the brine recirculation rate. Confirm that: - Brine temperature rising rate must be less than 20 o C per hour (to prevent the thermal damage to the B. H. tubes). - Brine pressure at the brine heater inlet must be higher than the saturated vapour pressure at its temperature (to prevent flashing in the tube, which will cause scale formation and hammering). When condensate conductivity drops down to 2.5 S/cm, retain(V/V.NO:C-11/VCH-12/C-11/CRV-103-A/LT-XV840) the condensate to the condensate header (V/V. NO:C-22/VCH-12/C-14/C-22/LT-XV-614) and to desuperheating system (V/V. NO:-C-20/VCH14/C-20/C-10/LT-V-620)
TITLE: DISTILLERS SOP No
D1-011 Page 39 of 320
Effective
Oct 2002
Q.E.W.CACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
DISTILLER START-UP PROCEDURE
LOCAL DIST SUPERVISOR CCR/DCRLocation Field CCR/DCR
Starting Antiscale & Antifoam Dosing Line diagram of ' ANTI SCALE & ANTI FOAM ' Confirm that: - Tanks are filled with chemical and they have proper concentration. - All valves in suction and discharge are opened. - Suction strainers are cleaned. - Accumulator gas pressure is adequate. Open the accumulator isolation valves, and open the accumulator drain valves to vent the pumps casing then close them. Start the chemical dosing pumps. Check the discharge pressure and the electric current. Adjust the pumps stroke dial according to the lab instruction.
* * * * * * * *
TITLE: DISTILLERS SOP No
D1-012 Page 40 of 320
Effective
Oct 2002
Q.E.W.CACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCR/TCCLocation Field CCR/DCR
Starting of Distillate Extraction Pump Line diagram of ' DISTILLATE ' Confirm that: - The pump suction isolation valves(DP-1/VDM1/DP-2/DP-2/QQ-V-600 &DP-2/VDM-2/DP-2/DP2QQ-V-604) and casing vent isolation valve is opened. - Sealing/flushing water is in service. - The pump casing is filled up with water by checking temperature of pump casing. - The isolation valves(U/P:DP-10/VDM-7/DP10/DP-7/QQ-V-780&D/S:DP-12/VDM-9/DP12/DP-8/QQ-V-781) of LCV (DP-11*LCV002/VDM8*LCV-353/DP-11*LCV-002/LCV104/QQ-LV-702)and CRV (DP-8/VDM-12/DP8/CRV-101-B/QQ-XV-719) (distillate) are opened - Distillate LCV(DP-11*LCV-002/VDM8*LCV353/DP-11*LCV-002/LCV-104/QQ-LV702)Distillate Retain C/V(VDM-11/CRV-101A/QQ-XV-718)andC/V By-pass (DP-13/VDM10DP-13/DP-9/QQ-V-782) are closed and Distillate dump CRV(DP-8/VDM-12/DP-8/CRV101-B/QQ-XV-719)Iso. V/v.(DP-7,DP-9/ TAG No. N/A/DP-7/N/A/QQ-V-637) is in dump position. When the distillate level comes up, release the E.P.B., and then start the distillate extraction pump.Page 41 of 320
* * * * * * * * * *
* * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Close casing vent valve, check the discharge pressure and electric current then o pen discharge isolation valve(DP-5,DP-6/VDM-5,VDM6/DP-5,DP-6/DP-5,DP-6/QQ-V-603,QQ-V-607) and vent discharge line. Open the discharge valve (DP-5,DP-6/VDM-5,VDM6/DP-5,DP-6/DP-5,DP-6/QQ-V-603,QQ-V-607) and casing vent valve of the other pump to make it in standby position for emergency auto changeover. Open LCV(DP-11*LCV-002/VDM8*LCV-353/DP11*LCV-002/LCV-104/QQ-LV-702), and adjust the distillate level to the working level. When distillate conductivity goes down to acceptable limit, retain the distillate to the distillate header.V/V.NOS:(VDM-13/DP-26/DP-105/QQ-V-608) OR (DP-25/DP106)Iso. V/v Sleeper way (DP-14/DP-13/DP-14/NA/NA).
TITLE: DISTILLERS SOP No
D1-013
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Starting of Second Brine Recirculation Pump When the top brine temperature reach 102 oC, start preparation for starting BRP-A.Page 42 of 320 *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Confirm that: - Pump suction isolation valve (B-3/VBR-1/B-3/B1/QM-MV-600) is opened. - Suction, (V-28,29/VVA-16,17/VA-28,29/B-V-4,8/QQ-V601,603 ), casing (Ph-1~4 N/A// QQ-V-600,602) and discharge vent valves (BD-52,53/N/A/BD-52,53/B-V1,2,5,6/QM-V-658,660 ) are opened. - Sealing/flushing/cooling water is in service. Oil level for thrust bearing and motor bearing where applicable is normal. Get clearance from the generation to start the brine recirculation pump. Release E.P.B. and then start the pump, close the casing vent valve and open motorised discharge valve(B-7/VBR5/B-7/B-3/QM-MV-603). Check the discharge pressure and electric current, and make sure that there is no abnormal noise and vibration from the pump.-
* * * * * * *
*
TITLE: DISTILLERS SOP No
D1-014
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 43 of 320
Effective
Oct 2002
Q.E.W.CLoading Up & Stabilisation
Issued Date Revision Issued ByMay 2003
Production/Operation
Continuously increase the output of PCV(S-10,TCV071/VHS-2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) (steam to brine heater) with the corresponding value of brine flow, until reaching the target values. Once the target condition is achieved, all interlocks to be restored where applicable and controllers to be put on auto mode. After the process is stabilised, start taprogge system. Line up CO2 vent gas to compressor at Phase I, II, III & V.
*
* * *
TITLE: DISTILLERS SOP No
D1-015
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCR
Page 44 of 320
Effective
Oct 2002
Q.E.W.COPERATION
Issued Date Revision Issued ByMay 2003
Production/OperationLocation Field CCR/DCR
Starting of High Purity Distillate Pump After the process is stabilised, start preparation for starting the H.P. distillate pump. Confirm that: - The pumps suction isolation valves(HD-1/VDH1/HD-1/HD-1/QQ-V-615),(HD-2/VDH-2/HD2/HD-2/QQ-V-618)&(HD-3/VDH-3/HD-3/HD3/QQ-V-610) are opened. - Sealing/flushing water is in service. - Isolation valves(U/S:NA/VDH-10/NA/HD-10/QQV-621)(D/S:NA/VDH-12/NA/NA/QQ-V-622) of CRV (HD-13/VDH-11/HD-13/NA/QQ-FV-734)for H.P. Distillate are opened and CRV(HD-14/VDH14/HD-14/CRV-101-B/QQ-XV-788) is in dump position. Though the selection of the pump to operate depends on the demand of H.P. distillate. It is recommended at start up to run each pump for 10 minutes to replace the water stored in suction piping and pump casing. This operation is effective to reduce the conductivity quickly. Select the flow transmitter according to pump selection at Phase IV. Start the pump and open the discharge valve(HD-7/VDH7/HD-7/HD-4/QQ-V-617)OR(HD-8/VDH-8/HD-8/HD5/QQ-V-620)OR(HD-9/VDH-9/HD-9/HD-6/QQ-V-612). Vent the discharge line completely during suction water replacing. Check the electric current. When H.P. distillate conductivity drops down to less than 2.5 S/cm, you can retain(V/V NO:HD-16/VDH-15/HD-16/CRV102-A/QQ-XV-788) it to the H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD-17/HD-51/QQ-V-641)Page 45 of 320
* *
* * * * *
Effective
Oct 2002
Q.E.W.CSOP No
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS
D1-016
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER START-UP PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Starting of Seawater Recycle Pump To control seawater inlet temperature during winter, seawater recycle pump is put in service. Confirm that: - Pump suction valve(SW-38/VSW-3/SW-38/SW5/QL-V-610),discharge valve (SW-15/NA/SW15/SW-7/NA) and casing vent valve(SW-V-1/VVA-9/SW-V-1/SW-V-2/N/A ) are opened. - Sealing/flushing water is in service. - The pump casing is filled up with seawater. - The isolation valve (SW-18/NA/SW18/TagNo.NA/NA)of seawater reject TCVB (SW26*FCV-1002-B/NA/SW-26*FCV-1002B/NA/NA)and down stream isolation valve(SW17/VSW-6/SW-17/SW-7/QL-V-620) of seawater recycle TCV(SW-16*TCV-066/VSW-5*HI010/SW-16/TCV-066/TCV-103/QL-TV-605) are opened at Phase I & III. - Bearing oil level is normal at Phase IV. Get clearance from the generation to start the pump at Phase IV only. If S.W.Recycle flow become less than 2500 m3/hr (phase-iv) pump to be stopped asPage 46 of 320
* * * * * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
recommended by manufacturer. Release E.P.B. and start the pump. Check the discharge pressure and electric current, and make sure that there is no abnormal noise and vibration from the pump. Adjust the seawater flow by opening seawater recycle TCV(SW-16*TCV-066/VSW-5*HI-010/SW-16/TCV066/TCV-103/QL-TV-605). Close seawater reject TCVA (SW-19*FCV-1002-A/ SW-19*FCV1002-A) and open TCVB (SW-26*FCV-1002-B/ SW-26*FCV1002-B) at Phase I & III.TITLE: DISTILLERS SOP No
D1-017
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Preparations for Shutdown The normal shutdown should be carried out according to the guidelines provided in this section. Stop the operation of ball tube cleaning system and set it for ball collection and inform lab. Turn CRV (H.P. Distillate) (HD-14/VDH-14/HD-14/CRV101-B/QQ-XV-788) to dump position if it is on retaining position. Stop H.P. distillate pump, and Isolate the header (ISO.V/V. NO:HD-17/TagNo. NA/HD-17/HD-51/QQ-V641).Page 47 of 320 * * * *
Effective
Oct 2002
Q.E.W.Ccontrollers to be put on manual mode.
Issued Date Revision Issued ByMay 2003
Production/Operation
Interlocks to be cancelled where applicable and the
TITLE: DISTILLERS SOP No
D1-018
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/DIST LOCAL SUPERVISORS CCR/DCRLocation Field CCR/DCR
Load Reduction Reduce brine recirculation flow and steam supply by closing FCV(B-14,FCV-001/VBR-7,FCV-503/B-14FCV107/QM-FV-666) & PCV (S-10,TCV-071/VHS-2,TCV004A; VHS-2,TCV-004B/S-10,TCV-071/PCV102A,PCV-102B/LQ-TV-679) step by step. Brine top temperature reducing rate must be kept less than 20 oC/hr, and brine recirculation flow should be decreased in a way so that first stage brine level be constant.Page 48 of 320 *
* *
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
When top brine temperature is reduced to 102 oC, shut down BRP-A by following normal procedure. Close CO2 vent gas isolation valve(CO-1001A,B/CO1001C,D,E,F/CO1001G,H/N/A//QG-V-635) to the CO2 recovery system. Turn CRV (condensate) (C-9/VCH-11/C-9/CRV-103B/LT-XV-841 to dump position when conductivity of condensate increases, then close LCV (brine heater) (C11*LCV-003/VCH-8*LCV-354/C-11/LCV-003/ LCV101/LT-LV-822), and line up the cooling water to desuperheater (HM-6/VCH-19/HM-6/O-HM-287/LT-V625) from the H.P. make-up header (from condensate header at Phase V), then isolate condensate header (V/V. NO:-C-22/VCH-12/C-14/C-22/LT-XV-614) .
*
*
TITLE: DISTILLERS SOP No
D1-019
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/LOCAL SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 49 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Dumping of Distillate & Cutting of Steam When distillate conductivity increases, turn CRV (distillate) CRV(DP-8/VDM-12/DP-8/CRV-101-B/QQXV-719)Iso. V/v.(DP-7,DP-9/ TAG No. N/A/DP7/N/A/QQ-V-637) to dump position and isolate distillate header.V/V.NOS:-(VDM-13/DP-26/DP-105/QQ-V-608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP-14/DP13/DP-14/NA/NA).. Stop seawater recycle pump if it is running. When brine recirculation temperature become lower than 60 oC, cut steam to brine heater, then close isolation valves (up-stream isolation valve()s(S-8/VHS-1A,VHS-1B/S8/S1,S3/LQ-MV603)down stream(S-12/VHS-3,VHS-4/S12/S-2,S-4/--), of PCV(s)(S-10,TCV-071/VHS-2,TCV004A; VHS-2,TCV-004B/S-10,TCV-071/PCV102A,PCV-102B/LQ-TV-679) and stop the chemical dosing pumps. Close TCV (C-17*TCV-073/VCH-16*TCV-009/C17/TCV-073/TCV-101/LT-TV-814) Cooling water header isolation valve (HM-6/VCH-19/HM-6/O-HM-287/LT-V625) and TCVs isolation valves(U/S:C-16/VCH-15C16/C-11LT-V-622 &D/S:C-18/VCH-17/C-18/C-12/LT-V623) ( Isolate H.P. make-up header in Phase1- 4 and in Phase V isolate condensate header). Stop condensate pump at brine heater shell level around 55%. When distillate flow falls down, close LCV (distillate) (DP-11*LCV-002/VDM8*LCV-353/DP-11*LCV002/LCV-104/QQ-LV-702), then stop distillate extraction pump. Slowly decrease the flow of the seawater make-up.* * * * *
*
* * * *
Page 50 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-020
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Cold Circulation & Sealing of Plant Vacuum Keep the recirculation until top brine temperature and bottom brine temperature become equal to seawater makeup temperature. Seal plant vacuum and then close the steam isolation valves of the ejectors(S-15,17,19,16,18,20/VHS11A,11B/S-15,17,19,16,18,20/S-10,S13,S-11,S-14/LQXV-779,783,781,785). Close steam to ejector PCV(VHS-7/PCV-101) and its isolation valves at Phase II & IV, and close the ejector steam main isolation valve(VHS-8/S-7,S-8). Close steam to ejector main isolation valve at Phase I, III & V. steam to ejectors main isolation valve (S-13/S-13/LQ-MV-630) Close the steam unit valve (S-8&9/S4002/S-8&9/S252/LQ-V-600), confirm that its equalizers valve is completely closed.
* * *
*
Page 51 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-021
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Stopping of Cold Circulation & Starting of Draining Release plant vacuum by slowly opening the suction valve (VA-11/VAE-1/VA-11/VA-11/LQ-XV-793)of hogging ejector to full open position. Stop debris separator at Phase I, III & V. Stop feeding seawater make-up. Stop Na2 SO3 dosing. Close the discharge motorised valve of BRP-B(B-8/VBR6/B-8/B-4/Q-M-MV-607) and stop the pump. Open the vent valves and the drain valves of the water boxes of HRS and brine heater, avoid overflow. Close LCV (brine blowdown) (BD-8,LCV-001/VBD8,LCV-352/BD-8,LCV-001/LCV-103/QN-LV-52)when shell level is minimum, and stop brine blowdown pump. Open blowdown LCV ((BD-8,LCV-001/VBD-8,LCV352/BD-8,LCV-001/LCV-103/QN-LV-752)and its bypass isolation valve(BD-10/VBD-10/BD-10/B-86/QN-V-611),Page 52 of 320 * * * * * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
also open all drain valves related to brine shell for natural draining. Open emergency blowdown valve (B-9/VEB-1/B-9/B-7/--) for faster draining of water boxes and tube bundles at Phase I to IV. Drain out distillate channel, if it is required.
*
TITLE: DISTILLERS SOP No
D1-022
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
DISTILLER SHUTDOWN PROCEDURE
CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Stopping of Seawater Flow to HJS Close the cooling seawater main isolation valve (SW2/SW-7/SW-2/SW-8/QLV-618) to ejector condensers. Close the seawater main isolation valve (motorised valve at Phase IV & V (SW-1/VSW-1/SW-1/SW-1/QL-MV600), and stop Fe SO4 dosing at Phase IV. Open the vent valves and the drain valves of the water boxes of HJS, avoid overflow.* * * *
Page 53 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-023
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
EMERGENCY SITUATIONS
CCR/DCR/LOCAL DIST SUPERVISORS DSCE/PERMIT ENGINEER/CCR/DCR
EMERGENCY SITUATIONSPlant emergency can be classified in to two categories depending on the status of the brine recirculating pumps during the emergency. The first one is that one of the pumps can be operated, in this case the load should be reduced, then the plant should be put in cold running. The second one is that the pump can not be operated in this case the plant should be shut down completely.
Page 54 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-024
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Seawater Supply Failure When interlock is cancelled or not available, plant will continue to run in case of seawater supply failure. Cut steam to ejectors (S-15,17,19,16,18,20/VHS11A,11B/S-15,17,19,16,18,20/S-10,S13,S-11,S-14/LQXV-779,783,781,785). , open the water boxes vent valves of the heat reject section and stop seawater recycle pump, if it is running. Cut steam to brine heater PCV (S-10,TCV-071/VHSPage 55 of 320 * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation * * * *
2,TCV-004A; VHS-2,TCV-004B/S-10,TCV-071/PCV102A,PCV-102B/LQ-TV-679) , close ejectors vapour section isolation valves(VA-12,VA13/VAE-2,VAE-3/VA12,VA13/VA-7,VA-8,LQ-XV-794,LQ-XV-796), isolate the main steam supply line (S-8&9/S4002/S-8&9/S252/LQ-V-600), and then depressurise it. Close the seawater main isolation valve (SW-1/VSW1/SW-1/SW-1/QL-MV-600), and close the cooling seawater to ejector condensers isolation valve (SW-2/SW7/SW-2/SW-8/QLV-618). . Close LCV (condensate) (C-11*LCV-003/VCH-8*LCV354/C-11/LCV-003/ LCV-101/LT-LV-822)(U/S:C10/VCH-7/C-10/C-7/LT-V-610) & TCV (cooling water to super heater) (C-17*TCV-073/VCH-16*TCV-009/C17/TCV-073/TCV-101/LT-TV-814). Turn CRV (C9/VCH-11/C-9/CRV-103-B/LT-XV-841) to dump position and stop condensate pump and isolate the headers (V/V. NO:-C-22/VCH-21/C-22/ Tag No N/A /LT-XV-614) . Brine shell level to be maintained by stopping brine blowdown pump and keeping the plant run in closed circulation. Turn CRV (HD-14/VDH-14/HD-14/CRV-101-B/QQ-XV788) to dump position of H.P. distillate. Stop the operation of ball tube cleaning system and set it for ball collection. Reduce the brine recirculation flow then shut down one brine recirculation pump. Turn CRV CRV(DP-8/VDM-12/DP-8/CRV-101-B/QQXV-719)Iso. V/v.(DP-7,DP-9/ TAG No. N/A/DP7/N/A/QQ-V-637) to dump position of distillate when conductivity becomes high. Close LCV (distillate) (DP-11*LCV-002/VDM8*LCV353/DP-11*LCV-002/LCV-104/QQ-LV-702),and stop distillate extraction & H.P. distillate pumps, then isolate the headers V/V.NOS:-(VDM-13/DP-26/DP-105/QQ-VPage 56 of 320
*
* *
* * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP14/DP-13/DP-14/NA/NA) H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD-17/HD-51/QQ-V-641) .. Follow normal shutdown completion work.
TITLE: DISTILLERS SOP No
D1-025 Page 57 of 320
Effective
Oct 2002
Q.E.W.CACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Steam Supply Failure Isolate the main steam supply line (S-8&9/S4002/S8&9/S-252,254,256,258/LQ-V-600),, close ejectors steam isolation valves(S-15,17,19,16,18,20/VHS-11A,11B/S15,17,19,16,18,20/S-10,S13,S-11,S-14/LQ-XV779,783,781,785). and the vapour section isolation valves(VA-12,VA13/VAE-2,VAE-3/VA-12,VA13/VA7,VA-8,LQ-XV-794,LQ-XV-796),, and then depressurise the isolated sections. Close LCV (condensate) (C-11*LCV-003/VCH-8*LCV354/C-11/LCV-003/ LCV-101/LT-LV-822)(U/S:C10/VCH-7/C-10/C-7/LT-V-610)& TCV (cooling water to super heater) (C-17*TCV-073/VCH-16*TCV-009/C17/TCV-073/TCV-101/LT-TV-814), turn CRV (C-9/VCH11/C-9/CRV-103-B/LT-XV-841) to dump position, and stop condensate pump and isolate the headers(V/V. NO:C-22/VCH-21/C-22/ Tag No N/A /LT-XV-614). Turn H.P CRV (HD-14/VDH-14/HD-14/CRV-101-B/QQXV-788) to dump position of H.P. distillate. Stop the operation of ball tube cleaning system, and set it for ball collection. Reduce the brine recirculation flow and proceed to shut down one brine recirculation pump. Turn Dist. CRV (DP-8/VDM-12/DP-8/CRV-101-B/QQXV-719) to dump position of distillate when conductivityPage 58 of 320
* * * * * * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
becomes high. Close LCV (distillate) (DP-11*LCV-002/VDM8*LCV353/DP-11*LCV-002/LCV-104/QQ-LV-702),and stop distillate extraction & H.P. distillate pumps, then isolate the headers distillate header.V/V.NOS:-(VDM-13/DP26/DP-105/QQ-V-608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP-14/DP-13/DP-14/NA/NA).& H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD17/HD-51/QQ-V-641) Keep the plant on cold circulation or follow normal shut down completion work.
TITLE: DISTILLERS SOP No
D1-026
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Instrument Air Supply Failure In case of instrument air supply failure, each control valve will performs in accordance with fail safe operation as shown below. Plant can no more be kept on continuous operation.
Fail safe operation of control valves are as following: TCV (cooling water to desuper heater) (HM-6/VCHPage 59 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
19/HM-6/O-HM-287/LT-V-625) full open. TCV (SEAWATER RECIRCULATION) TCV(SW16*TCV-066/VSW-5*HI-010/SW-16/TCV-066/TCV103/QL-TV-605) CLOSE TO MINIMUM FLOW. TCV (SEAWATER TO REJECT) (SW-19FCV102A/SW-2TCV-005/SW-19FCV1002A/TCV104/QLFV-604) LOCKED & TAGGED. LCV (condensate) (C-11*LCV-003/VCH-8*LCV-354/C11/LCV-003/ LCV-101/LT-LV-822)(U/S:C-10/VCH-7/C10/C-7/LT-V-610) locked & tagged. LCV (brine blowdown) (BD-8,LCV-001/VBD-8,LCV352/BD-8,LCV-001/LCV-103/QN-LV-52)locked & tagged. LCV (distillate) (DP-11*LCV-002/VDM8*LCV-353/DP11*LCV-002/LCV-104/QQ-LV-702),locked & tagged. LCV (S/W M/U from deaerator to last stage) (LCV106)full open at Phase IV PCV (steam to ejector)(VHS-7/PCV-101) full close at Phase II & IV. PCV (steam to brine heater) PCV (S-10,TCV-071/VHS2,TCV-004A; VHS-2,TCV-004B/S-10,TCV-071/PCV102A,PCV-102B/LQ-TV-679) full close. FCV (SW-22,FCV012/VFW2,FCV-502/SW-22,FCV012/FCV-104/QL-V-619) (seawater make up) full close. FCV (brine recirculation) FCV(B-14,FCV-001/VBR7,FCV-503/B-14FCV-107/QM-FV-666) locked & tagged. CRV (distillate) (DP-8/VDM-12/DP-8/CRV-101-B/QQXV-719) dump. CRV (H.P. distillate) (HD-14/VDH-14/HD-14/CRV-101B/QQ-XV-788) dump. CRV (C-9/VCH-11/C-9/CRV-103-B/LT-XV-841) (condensate) dump. Isolate the steam line to brine heater PCV(S-10,TCV071/VHS-2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) up-stream isolation valve(s(S-8/VHS-1A,VHS-1B/S-8/S1,S3/LQ-MV603), Steam PCV down stream isolation valve(s) (S-12/VHSPage 60 of 320
* * *
* * *
* *
* *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
3,VHS-4/S-12/S-2,S-4/--) . Stop the operation of ball tube cleaning system, and set it for ball collection. Keep the brine recirculation with one BRP by adjusting brine FCV (B-14,FCV-001/VBR-7,FCV-503/B-14FCV107/QM-FV-666) manually or by its bypass isolation valve(B-16/NA/B-16/NA/NA) if available, and keep ejectors system in service for cooling down the recirculating brine (at Phase II & IV maintain steam to ejector through PCV bypass line)(VHS-9/S-9). Maintain Brine shell level by adjusting blowdown LCV (BD-8,LCV-001/VBD-8,LCV-352/BD-8,LCV-001/LCV103/QN-LV-52) and seawater make-up FCV (SW-22,FCV012/VFW2,FCV502/SW-22,FCV-012/FCV-104/ QL-V-619) manually or by adjusting their bypass isolation valve(SW-24/VFW4/SW-24/SW-4/QL-V-631). Stop seawater recycle pump if it is running, and stop condensate pump, H. P. distillate pump and distillate extraction pump then isolate the headers Condensate Header(V/V. NO:-C-22/VCH-21/C-22/ Tag No N/A /LTXV-614) H.P. distillate header (ISO.V/V. NO:HD17/TagNo. NA/HD-17/HD-51/QQ-V-641) distillate header.V/V.NOS:-(VDM-13/DP-26/DP-105/QQ-V-608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP-14/DP13/DP-14/NA/NA).. After performing the above, follow normal shutdown completion work. After the instrument air supply restoration, all control valves should be checked for full operations.
Page 61 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-027
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/DIST LOCAL SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 62 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Two Brine Recirculation Pumps Trip When interlock is cancelled or not available, the other pumps will continue to run in case of two BRPs trip. Isolate the steam line to brine heater PCV(S-10,TCV071/VHS-2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) up-stream isolation valve(s(S-8/VHS-1A,VHS-1B/S-8/S1,S3/LQ-MV603), Steam PCV down stream isolation valve(s) (S-12/VHS3,VHS-4/S-12/S-2,S-4/--). - Open the water boxes vent valves of heat recovery section and close discharge motorised valves of BRPs(B-7/VBR-5/B-7/B-3/QM-MV603 & B8/VBR-6/B-8/B-4/QM-MV-607). . Stop the ball tube cleaning system, if it is running. Isolate the main steam supply line (S-8&9/S4002/S-8&9/S252/LQ-V-600),, close ejectors steam isolation valves(S15,17,19,16,18,20/VHS-11A,11B/S-15,17,19,16,18,20/S10,S13,S-11,S-14/LQ-XV-779,783,781,785). and the vapour section isolation valves(VA-12,VA13/VAE2,VAE-3/VA-12,VA13/VA-7,VA-8,LQ-XV-794,LQ-XV796),, and then depressurise the isolated sections.. Close LCV (condensate) (C-11*LCV-003/VCH-8*LCV354/C-11/LCV-003/ LCV-101/LT-LV-822)(U/S:C10/VCH-7/C-10/C-7/LT-V-610) & TCV (cooling water to desuper heater) (HM-6/VCH-19/HM-6/O-HM-287/LT-V625), turn CRV (C-9/VCH-11/C-9/CRV-103-B/LT-XV841) to dump position, and stop condensate pump then isolate the headers(V/V. NO:-C-22/VCH-21/C-22/ Tag No N/A /LT-XV-614). Turn CRV to dump position of distillate (DP-8/VDM12/DP-8/CRV-101-B/QQ-XV-719) and H.P. distillate (HD-14/VDH-14/HD-14/CRV-101-B/QQ-XV-788). Close LCV (distillate) (DP-11*LCV-002/VDM8*LCV353/DP-11*LCV-002/LCV-104/QQ-LV-702), and stop distillate extraction & H.P. distillate pumps then isolate the headers distillate header.V/V.NOS:-(VDM-13/DP-26/DPPage 63 of 320
* * * * * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
105/QQ-V-608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP-14/DP-13/DP-14/NA/NA). H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD-17/HD-51/QQ-V641). Close LCV (blowdown) (BD-8,LCV-001/VBD-8,LCV352/BD-8,LCV-001/LCV-103/QN-LV-52)and stop brine blowdown pump. Make sure to leave the level in the brine shell at the working level. After performing the above, follow normal shutdown and complete the work.
TITLE: DISTILLERS SOP No
D1-028
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/DIST LOCAL SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 64 of 320
Effective
Oct 2002
Q.E.W.CTwo Brine Blowdown Pumps Failure
Issued Date Revision Issued ByMay 2003
Production/Operation
Open emergency blowdown isolation valve (B-9/VEB-1/B9/B-7/--) and continue on-load operation. Attention to be paid to the brine recirculation pump motor load. Operating under this condition should not be for long time, because of abnormal brine blowdown; the concentration of brine will increase with the time.
*
*
TITLE: DISTILLERS SOP No
D1-029
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 65 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Two Condensate or Distillate Extraction Pumps Failure Load-down followed by cold run is to be applied.* *
TITLE: DISTILLERS SOP No
D1-030
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
EMERGENCY SITUATIONS
DSCE/PERMIT ENGINEER/CCR/DCR/LOCAL DIST SUPERVISORS CCR/DCRLocation Field CCR/DCR
Page 66 of 320
Effective
Oct 2002
Q.E.W.CUnit Power Supply Failure
Issued Date Revision Issued ByMay 2003
Production/Operation
Unit power supply failure will cause BRP-A and all 415V pumps to trip and the motorised valves will not function. If the power supply cant be restored immediately, plant to be de-loaded and put on cold circulation with BRP-B. Cut steam to brine heater PCV (S-10,TCV-071/VHS2,TCV-004A; VHS-2,TCV-004B/S-10,TCV-071/PCV102A,PCV-102B/LQ-TV-679) and isolate the steam to brine heater line. - Close discharge valve of BRP-A (B-7/VBR-5/B7/B-3/QM-MV603 )manually. Isolate all headers; distillate header.V/V.NOS:-(VDM13/DP-26/DP-105/QQ-V-608) OR (DP-25/DP-106)Iso. V/v Sleeper way (DP-14/DP-13/DP-14/NA/NA); H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD17/HD-51/QQ-V-641);Condensate Header (V/V. NO:-C22/VCH-21/C-22/ Tag No N/A /LT-XV-614).. Keep circulation with BRP-B and maintain the last stage brine level through emergency blowdown line (B-9/VEB1/B-9/B-7/--) and blowdown LCV (BD-8,LCV-001/VBD8,LCV-352/BD-8,LCV-001/LCV-103/QN-LV-52). When circulated brine temperature becomes close to seawater temperature, seal plant vacuum or follow normal shutdown completion work.
* * *
* *
*
*
TITLE: DISTILLERS SOP No
D1-031
ACTIVITY
EMERGENCY SITUATIONSPage 67 of 320
Effective
Oct 2002
Q.E.W.CREFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
DSCE/PERMIT ENGINEER/CCR/DCR/LOCAL DIST SUPERVIOSRS CCR/DCRLocation Field CCR/DCR
BlackoutIsolate the steam line to brine heater PCV(S-10,TCV071/VHS-2,TCV-004A; VHS-2,TCV-004B/S-10,TCV071/PCV-102A,PCV-102B/LQ-TV-679) up-stream isolation valve(s(S-8/VHS-1A,VHS-1B/S-8/S1,S3/LQ-MV603), Steam PCV down stream isolation valve(s) (S-12/VHS3,VHS-4/S-12/S-2,S-4/--). - Fully open the water boxes vent valves and close discharge motorised valves of BRPs (B-7/VBR5/B-7/B-3/QM-MV603 & B-8/VBR-6/B-8/B4/QM-MV-607). . Isolate the main steam supply line (S-8&9/S4002/S8&9/S-252/LQ-V-600),, close ejectors steam isolation valves(S-15,17,19,16,18,20/VHS-11A,11B/S15,17,19,16,18,20/S-10,S13,S-11,S-14/LQ-XV779,783,781,785). and the vapour section isolation valves(VA-12,VA13/VAE-2,VAE-3/VA-12,VA13/VA7,VA-8,LQ-XV-794,LQ-XV-796),, and then depressurise the isolated sections. Close the seawater main isolation valve(SW-1/VSW1/SW-1/SW-1/QL-MV-600), and close the cooling seawater to ejector condensers isolation valve(SW2,3,6,4,5,8/SW-7,VSW-8&9,VSW-11/SW-2,3,6,4,5,8/ SW-8,9,10,11/QL-W-618,QL-W-616). Isolate all headers distillate header.V/V.NOS:-(VDM13/DP-26/DP-105/QQ-V-608) OR (DP-25/DP-106)Iso.Page 68 of 320 * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
V/v Sleeper way (DP-14/DP-13/DP-14/NA/NA). H.P. distillate header (ISO.V/V. NO:HD-17/TagNo. NA/HD17/HD-51/QQ-V-641)Condensate Header(V/V. NO:-C22/VCH-21/C-22/ Tag No N/A /LT-XV-614) . Shutdown completion work is to follow to keep the plant ready for start up.
TITLE: DISTILLERS SOP No
D1-032
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operational Checks
CCR/DCR SUPERVISORS/ OPERATORS CCR/DCRLocation Field CCR/DCR
Local and CCR/DCR indicators are to be regularly read and their indication values are to be recorded on the log form. Rotating machines are to be checked for the following items: - Suction and discharge pressure. - Electric current. - Flow rate.Page 69 of 320
*
*
* *
* * *
Effective
Oct 2002
Q.E.W.C-
Issued Date Revision Issued ByMay 2003
Production/Operation * * * * * * * * * * *
Bearing temperature and noise. Shaft seal. Vibration. Lubricant colour and level. Gas pressure in the accumulator for reciprocating pumps to be checked regularly. Strainers to be changed over and cleaned once a week where applicable. Chemical level of the local day tanks to be checked at regular intervals. Chemical dosing rate should be checked and adjusted as process requirement. All instruments should be checked regularly. Plant to be checked frequently for symptom of leakage The site to be kept clean at all the time.TITLE: DISTILLERS SOP No
D1-033
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DIST LOCAL SUPERVISORS CCRLocation Field CCR/DCR
Operating of Ejectors at Phase I & III Starting Hogger Ejector Make sure all vapour valves(VA-1,2,3,4,5,6,7,8,11/ VA1,2,3,4,6,7,8,11)of the distiller connected to venting system are in open position and service ejectors (VA-12/VAPage 70 of 320 *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation * * *
12)OR VA-13/ VA13)(VA-16/VA-16) OR VA-17/VA-17) are isolated and ensure sufficient sea water flow to surface condensers by opening inlet and outlet valves (SW-8/SW/8)&(SW-10/SW-10)(SW-11/SW-11)(SW-12/SW-12) Line up stage No. 1 & 2 vapour line (Tag No. N/A)to pre-condenser. Open steam isolation valve(S-14/S-14) to hogger ejector. Open vapour isolation valve (VA-11/VA-11)to hogger ejector.
TITLE: DISTILLERS SOP No
D1-033
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DIST LOCAL SUPERVISORS CCRLocation Field CCR/DCR
Page 71 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
Changing Over from Hogger to Service Ejectors Set-A Close vapour isolation valve to hogger ejector(VA-11/ /VA-11) Close steam isolation valve to hogger ejector(S14/ S-14). Put tertiary ejector-A in service by opening steam isolation valve (S-19 /S-19/ then vapour isolation valve (VA-20/VA-20). Put secondary ejector-A in service by opening steam isolation valve(S-17/S-17) then vapour isolation valve(VA16/ VA-16 ) Put primary ejector-A in service by opening steam isolation valve(S-15/ S-15) then vapour isolation valve(VA-12/ VA-14). Change over stage No. 1 & 2 vapour line(Tag No. N/A) from pre-condenser to inter condenser-A.* * * * * *
TITLE: DISTILLERS SOP No
D1-033
ACTIVITY REFERENCE RESPONSIBILITY
Operation of Venting System
DIST LOCAL SUPERVIOSRS Page 72 of 320
Effective
Oct 2002
Q.E.W.CCOMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
CCRLocation Field CCR/DCR
Changing Over from Service Ejectors Set-A to Set-B*
Put tertiary ejector-B in service by opening steam isolation valve(S-20/S-20) & discharge valve (VA-23/VA-23/) then opening vapour isolation valve(VA-21/ /VA-21) then stop tertiary ejector-A by closing vapour isolation valve(VA-20/VAE-20) then closing steam isolation valve(S-19/ S-19) Put secondary ejector-B in service and Stop secondary ejector-A . Put primary ejector-B in service and stop primary ejectorA.
*
* *
TITLE: DISTILLERS SOP No
D1-033
ACTIVITY REFERENCE
Operation of Venting System
Page 73 of 320
Effective
Oct 2002
Q.E.W.CRESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
LOCAL DIST SUPERVISOR CCR/DCRLocation Field CCR/DCR
Stopping Service Ejector & Sealing the Plant Vacuum Stop primary ejector by closing vapour isolation valve (VA-12,13/VA-12,13) then close steam isolation valve(S15,16/S-15,16). Stop secondary ejector. Stop tertiary ejector. Change over stage No. 1 & 2 vapour line(Tag No. N/A ) to pre-condenser.* * * *
TITLE: DISTILLERS SOP No
D1-033
ACTIVITY
Operation of Venting SystemPage 74 of 320
Effective
Oct 2002
Q.E.W.CREFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Releasing Plant Vacuum Release plant vacuum by slowly opening the vapour suction isolation valve(VA-11/VA-11) of the hogging ejector.
*
TITLE: DISTILLERS SOP No
D1-034 Page 75 of 320
Effective
Oct 2002
Q.E.W.CACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
Operating of Ejectors at Phase II
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Operating of Ejectors at Phase - II Starting Hogger Ejector Make sure all vapour valves(,VAE2,VAE3,VAE4)of the distiller connected to venting system are in open position and service ejectors(VAE-2 ,VAE3)are isolated. Open steam isolation valve to hogger (VHS-10)ejector. Open vapour isolation valve(VAE-1) to hogger ejector.* * *
TITLE: DISTILLERS SOP No
D1-034 Page 76 of 320
Effective
Oct 2002
Q.E.W.CACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
Operation of Venting System
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Changing Over from Hogger to Service Ejectors Set-A Close vapour isolation valve to hogger (VAE-1)ejector and then close steam isolation valve (VHS-10)to hogger ejector. Establish sea water flow to the condensers by opening Inlet valves(VSW-8/9,VSW-11/12) Put secondary ejector-A in service by opening vapour outlet isolation valve(N/A), then steam isolation valve(VHS-11) and then vapour isolation valve(VAE-4) to inter condenser-A. Put primary ejector-A in service by opening steam isolation valve(VHS-11) and then vapour isolation valve to pre-condenser-A.(VAE-2) Line up after condenser level control float valve (VAE8,10) to inter condenser-A. Line up Pre-condenser-A shell drain (VAE-20,24,26) connected to last stage brine shell.
* *
* * *
Page 77 of 320
Effective
Oct 2002
Q.E.W.CSOP No
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS
D1-034
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Changing Over from Service Ejectors Set-A to Set-B Confirm that S/W is lined up to condensers set-B. Seal the vacuum by closing vapour isolation valves of pre-condenser-A(VAE-2) and inter condenser-A(VAE-4) then close steam isolation valves.(VHS-11,VHS-11) Close after condenser shell drain line to inter condenserA isolation valve(VAE-8,10) and close pre-condenser-A shell drain to last stage brine shell isolation valve(VAE20,24,26). Put secondary ejector-B in service by opening vapour outlet isolation valve(N/A), then steam isolation valve(VHS-12,VHS-12) and then vapour to inter condenser-B isolation valve(VAE-5). Open after condenser shell drain to inter condenser-B isolation valve(VAE-9,11) and line up Pre-condenser-B shell drain (VAE21,25,27)connected to last stage brine shell. * *
* *
*
Page 78 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-034
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Stopping Service Ejector & Sealing the Plant Vacuum Seal the vacuum by closing vapour isolation valves of pre-condenser(VAE-2,3) and inter condenser(VAE4,5) then close steam isolation valves(VHS-11,11,VHS-12,12). Close after condenser shell drain line to inter condenser isolation valve(VAE8,10,VAE-9,11) and close precondenser shell drain to last stage brine shell isolation valve(VAE-20,24,26,VAE21,25,27).
* *
Page 79 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-034
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Releasing Plant Vacuum Release plant vacuum by slowly opening the suction isolation valve of the hogging ejector(VAE-1).
*
Page 80 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-035
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR DCRLocation Field CCR/DCR
Operation of Ejectors at Phase IV Starting Hogger Ejector Make sure all vapour valves (V-5,51) of the distiller connected to venting system are in open position and service ejectors (V-7,8712,13) are isolated. Open steam isolation valve (S-12) to hogger ejector. Open vapour isolation valve(VA-11) to hogger ejector.* * *
Page 81 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-035
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR DCRLocation Field CCR/DCR
Changing Over from Hogger to Service Ejectors Set- A Open all ejector outlet vapour isolation valves (VA9,10,14,15). Establish sea water flow in contact condensors by opening inlet valves (SW-9/SW-10/SW-11) Close vapour isolation valve (VA-11) to hogger ejector and then close steam isolation valve (S-12) to hogger ejector. Put secondary ejector-A in service by opening steam isolation valve (S-13) then open vapour isolation valve(VA-12). Put primary ejector-A in service by opening steam isolation valve(S-10) then open vapour line isolation valve(VA-7).* * * *
Page 82 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1035
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR DCRLocation Field CCR/DCR
Changing Over from Service Ejectors Set-A to Set-B Put secondary ejector-B in service by opening steam isolation valve (S-14)then opening vapour isolation valve(VA-13).Stop secondary ejector-A by closing vapour isolation valve(VA-12) then closing steam isolation valve(S-13). Put primary ejector-B in service and stop primary ejectorA.
*
*
Page 83 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-035
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR DCRLocation Field CCR/DCR
Stopping Service Ejector & Sealing the Plant Vacuum
Stop secondary ejector by closing vapour isolation valve(VA-12,VA13) then close steam isolation valve(S13,S-14). Stop primary ejector.
* *
Page 84 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-035
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
LOCAL DIST SUPERVISOR CCRLocation Field CCR/DCR
Releasing Plant Vacuum Release plant vacuum by slowly opening the suction isolation valve(VA-11) of the hogging ejector.
*
Page 85 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-036
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DCR/LOCAL DIST SUPERVISORS DCRLocation Field CCR/DCR
Operating of Ejectors at Phase - V Line diagram of ' VACUUM SYSTEM ' Starting Hogger Ejector Make sure all vapour valves(QG-V-605,606,607,608,LQV-600 ) of the distiller connected to venting system are in open position and service ejectors are isolated. Open steam isolation valve(LQ-XV-777) to hogger ejector. Open vapour isolation valve(LQ-XV-793) to hoggerPage 86 of 320 * * *
Effective
Oct 2002
Q.E.W.Cejector.
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-036
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DCR/LOCAL DIST SUPERVISOR DCRLocation Field CCR/DCR
Changing Over from Hogger to Service Ejectors Set-A Open all ejector vapour outlet isolation valves(LQ-V635,638,642,645) locally. Establish sea water to suface condensers by opening valves QLV-616 &QLV-617 Close vapour isolation valve(LQ-XV-793) to hogger ejector and then close steam isolation valve(LQ-XV-777) to hogger ejector. Put secondary ejector-A in service by opening steamPage 87 of 320 * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
isolation valve(LQ-XV-783) then open vapour isolation valve(LQ-XV-798). Put primary ejector-A in service by opening steam isolation valve(LQ-XV-779) then open vapour isolation valve(LQ-XV-794).
TITLE: DISTILLERS SOP No
D1-036
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DCR SUPERVISOR FIELDLocation Field CCR/DCR
Changing Over from Service Ejectors Set-A to Set-B Put secondary ejector-B in service by opening steam isolation valve(LQ-XV-785) then open vapour isolationPage 88 of 320
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
valve(LQ-XV-800), and then stop secondary ejector-A by closing vapour isolation valve(LQ-XV-798) then close steam isolation valve(LQ-XV-783). Put primary ejector-B in service and then stop primary ejector-A.
*
TITLE: DISTILLERS SOP No
D1-036
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DCR SUPERVISOR FIELDLocation Field CCR/DCR
Stopping Service Ejector and Sealing the Plant Vacuum Stop secondary ejector by closing vapour isolationPage 89 of 320
Effective
Oct 2002
Q.E.W.Cvalve(LQ-XV-798,800) then valve(LQ-XV-783,785). Stop primary ejector. close
Issued Date Revision Issued ByMay 2003
Production/Operation
steam
isolation
* *
TITLE: DISTILLERS SOP No
D1-036
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of Venting System
DCR SUPERVISOR FIELDLocation Field CCR/DCR
Releasing Plant Vacuum Release plant vacuum by slowly opening the suctionPage 90 of 320 *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
isolation valve(LQ-XV-793) of the hogging ejector.
TITLE: DISTILLERS SOP No
D1-037
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
Operation of CO2 Recovery System at Phase I, II & III
LOCAL DIST SUPERVISOR DCR
Loca
Field C
CO2 CompressorsPage 91 of 320
Effective
Oct 2002
Q.E.W.CStart-Up
Issued Date Revision Issued ByMay 2003
Production/Operation
Confirm that: - Sealing water isolation valve (DW1013A&1015A,/DW1013C,1015C,DW1013E,1015E/DW1013G,1015 G)is opened. - CO2 recirculating valve(C-101A/B//C-101C/D,E/F//C-101G/H) is closed. - Water separator drain(C-O-1003A,1003B,1046A,1046B//C-O1003C,1003D,1003E,1003F,1046C,1046D,1046E,1046F//C-O1003G,1003H,1046G,1046H) and vent valves(C-101A,101B/C101C,101D,101E, 101F /C-101G,101H)are closed. - Water separator L.C. float V/v and sealing water solenoid valve are de isolated. Line up CO2 from distiller. Open suction (C-101A,101B/C-101C,101D,101E, 101F /C-101G,101H) and discharge valves C-101A,101B/C-101C,101D,101E, 101F /C-101G,101H) of the CO2 compressor. Open sealing water solenoid valve and maintain flow at 4 T/hr. Start the CO2 compressor. Open CO2 recirculation valve(C-101A/B//C-101C/D,E/F//C-101G/H) and maintain flow as required. Open all relevant valves of the standby CO2 compressor and keep the standby selector switch on auto mode for emergency auto-change over.
* * * * * * * * * *
TITLE: DISTILLERS SOP No
D1-038
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
Operation of CO2 Recovery System at Phase I, II & III
LOCAL DIST SUPERVISOR DCR / BOP SUPERVISOR
Page 92 of 320
Effective
Oct 2002
Q.E.W.COPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
Loca
Field C
Shutdown Keep the standby selector switch on manual mode. Stop the CO2 compressor. Isolate gas line from distiller venting system(CO-1001A&B/CO-1001C&D,CO1001E&F/CO-1001G&H). Close sealing water isolation valve and all relevant isolation valves and drain the system if required.* * * *
TITLE: DISTILLERS SOP No
D1-039
ACTIVITY REFERENCE RESPONSIBILITY
OPERATION OF TAPROGGE SYSTEM
LOCAL DIST SUPERVISOR Page 93 of 320
Effective
Oct 2002
Q.E.W.CCOMMUNICATION OPERATION
Issued Date Revision Issued ByMay 2003
Production/Operation
CCR/DCRLocation Field CCR/DCR
Taprogge Operation ( Tube Cleaning System) The following are to be ensured before and during the operation of taprogge plant: The ball strainer is on opposite position. P across the ball strainer is normal. All control valves(B-11,B-12,B-19,B-20/VTR-5,VTR-6, VTR-10,VTR-11/ B-11,B-12,B-19,B-20/HCV-105,HCV106,HCV-107,HCV-108,HCV-109,OB-58/QW-MV601,604,607,612,615620) are available to the mode of selection and all indication lights for them are available on the panel. None of the control valves(B-11,B-12,B-19,B-20/VTR5,VTR-6, VTR-10,VTR-11/ B-11,B-12,B-19,B-20/HCV105,HCV-106,HCV-107,HCV-108,HCV-109,OB-58/ QWMV-601,604,607,612,615620) pass. All hand-operated isolation valves(B-10,B-22,B-23,,B21,B-17,B-18,BV-2,BV-3/ VTR-1,VTR2,VTR3,VTR9,VTR-12,VTR-13,VTR-14,VTR-15/ B-10,B-22,B-23,,B21,B-17,B-18,BV-2,BV-3/B-8,B-53,B-54,B-65,B-66,B-67, B-68,B-58,B-60,B-59,B-61B-62,BV-10,BV-11/QW-V600,602,605,608,609,610,611,613,614,616,617,618,619) are open.* * * * *
Page 94 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
ITLE: DISTILLERS SOP No
D1-039
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
OPERATION OF TAPROGGE SYSTEM
LOCAL DIST SUPERVISOR CCR/DCRLocation Field CCR/DCR
Normal Operation of Taprogge System Select the mode of operation: either auto or manual. Select the type of cleaning cycle: either through recovery stages with brine heater or brine heater only (except Phase I & III). Place ball catcher on catching position. Make one ball circulating pump standby (except Phase I, II & III). Line up the pipelines as per requirement of the system. Box up the vessel with the required numbers of good balls by properly venting the vessel. Check all control valves(B-11,B-12,B-19,B-20/VTR5,VTR-6, VTR-10,VTR-11/ B-11,B-12,B-19,B-20/HCV105,HCV-106,HCV-107,HCV-108,HCV-109,OB-58/ QWMV-601,604,607,612,615620) are in shut position. Reset the alarm switch.Page 95 of 320
* * * * * * * * *
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
In case of auto mode, press the auto start switch, and check that the pump has started and it is taking proper load, the control valves (B-11,B-12,B-19,B-20/VTR-5,VTR-6, VTR-10,VTR-11/ B-11,B-12,B-19,B-20/HCV-105,HCV106,HCV-107,HCV-108,HCV-109,OB-58/ QW-MV601,604,607,612,615620) are operating on time as per selection, and balls are releasing and returning as usual. Press the auto stop switch after releasing of the balls from the vessel (not required at Phase V).In manual mode the pump needs to be started and control valves(B-11,B12,B-19,B-20/VTR-5,VTR-6, VTR-10,VTR-11/ B-11,B-12,B-19,B20/HCV-105,HCV-106,HCV-107,HCV-108,HCV-109,OB-58/ QW-MV601,604,607,612,615620) are opened or closed by pressing the open or close button for each valve.TITLE: DISTILLERS SOP No
*
D1-039
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
OPERATION OF TAPROGGE SYSTEM
LOCAL SUPERVISOR DSCE/PERMIT ENGINEERLocation Field CCR/DCR
Checking of Taprogge Balls Daily, the balls are counted and checked for their suitability to keep them in circulation. New balls are used instead of the balls with following criteria: broken, undersize, soft, hard, heavy, damaged, oversize or lost shape.
*
Page 96 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-039
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION
OPERATION OF TAPROGGE SYSTEM
LOCAL DIST SUPERVISOR
Location OPERATION Field CCR/DCR
Ball Strainer Backwashing After ball collection, if the ball counting is considered good, backwash can be performed for the ball strainer. The backwash is done to clean the ball strainer from any debris, the ball strainer is put on backwash manually by hand operated valves(Tag No. N/A// Tag No. N/A// Tag No. N/A//Tag No. N/A ) during idle hour of the taprogge system (except Phase V). Also the backwash is performed when pressure differentialPage 97 of 320
*
*
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
across the ball strainer exceeds specified limit. Also when taprogge is not in operation, the ball strainer is generally kept on backwash position to keep the catchers clean by flushing out the debris.
TITLE: DISTILLERS SOP No
D1-039
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
OPERATION OF TAPROGGE SYSTEM
LOCAL DIST SUPERVISOR CCR/DCR/DSCE/PERMIT ENGINEERLocation Field CCR/DCR
Special Operation Cycles Beside the normal operation, there are special operations, which are performed when required. These operations are described below:
Page 98 of 320
Effective
Oct 2002
Q.E.W.C
Issued Date Revision Issued ByMay 2003
Production/Operation
TITLE: DISTILLERS SOP No
D1-039
ACTIVITY REFERENCE RESPONSIBILITY COMMUNICATION OPERATION
OPERATION OF TAPROGGE SYSTEM
LOCAL DIST SUPERVISOR DSCE/PERMIT ENGINEERLocation Field CCR/DCR
Blank Cycle Whenever during routine checks the ball collection is poor, the system is put into service for collection cycle, in order to recover the lost balls. This operation is continued up to 3 to 4 times so as to recover most of the lost balls as practicable. Sometime on plant demand or due to any big leakage or fault/defect in the taprogge system, the operation is stoppedPage 99 of 320
*
Effective
O