7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

13
6955 6960 6965 6970 6975 6980 6975 7000 7025 7050 7000 7000 7000 7025 7050 7000 6950 6950 6950 6975 6975 7000 6975 6975 6950 6955 6955 6960 6965 6970 6970 E 2,524,500 E 2,524,500 E 2,526,000 E 2,526,000 N 1,693,500 N 1,693,500 N 1,692,000 N 1,692,000 REV DATE BY DESCRIPTION SHEET UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE 233001048 DESIGNED CHECKED APPROVED M WITLER K REED McKINLEY COUNTY, NEW MEXICO J CUMBERS 7-01 A B C D E KR KR KR KR KR 07/15/16 10/30/17 04/09/18 09/24/18 10/31/19 ISSUED FOR 30% DESIGN ISSUED FOR 95% DESIGN ISSUED FOR REVISED 95% DESIGN ISSUED FOR LAR LAR: REVISE COVER THICKNESS NORTHEAST CHURCH ROCK PROJECT 95% DESIGN REPOSITORY SUBGRADE - EXISTING RADON BARRIER SCALE IN FEET 150 0 300 EXTENT OF COVER STRIPPING NM HWY 566 LEGEND: EXISTING GROUND SURFACE CONTOUR & ELEVATION, FEET PROPOSED SUBGRADE SURFACE CONTOUR & ELEVATION, FEET UNC PROPERTY BOUNDARY EXISTING ROADS NATURAL DRAINAGE EXISTING FENCE EXISTING SWALES STRUCTURES 7200 7200 NOTE(S): 1. REPOSITORY REGRADED SUBGRADE IS 6 INCHES BELOW THE EXISTING TDA COVER WITH THE SURFACE SWALES FILLED IN. BRANCH SWALE H BRANCH SWALE C EVAPORATION PONDS

Transcript of 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

Page 1: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6

9

5

5

6

9

6

0

6

9

6

5

6

9

7

0

6

9

7

5

6

9

8

0

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7

0

0

0

7000

7

0

2

5

7

0

5

0

7

0

0

0

6

9

5

0

6

9

5

0

6950

6

9

7

5

6

9

7

5

7000

6975

6

9

7

5

6950

6

9

5

5

6

9

5

5

6

9

6

0

6965

6

9

7

0

6970

E 2,524,500

E 2,524,500

E 2,526,000

E 2,526,000

N 1,693,500 N 1,693,500

N 1,692,000 N 1,692,000

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-01

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

09/24/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY SUBGRADE - EXISTING RADON BARRIER

SCALE IN FEET

1500 300

EXTENT OF

COVER STRIPPING

N

M

H

W

Y

5

6

6

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED SUBGRADE SURFACE CONTOUR &

ELEVATION, FEET

UNC PROPERTY BOUNDARY

EXISTING ROADS

NATURAL DRAINAGE

EXISTING FENCE

EXISTING SWALES

STRUCTURES

7200

7200

NOTE(S):

1. REPOSITORY REGRADED SUBGRADE IS 6 INCHES BELOW THE

EXISTING TDA COVER WITH THE SURFACE SWALES FILLED IN.

BRANCH SWALE H

BRANCH SWALE C

EVAPORATION PONDS

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-01 REP POST STRIPPING.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:55 PM BY:KWREED
Page 2: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6

9

7

0

6960

6

9

6

5

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7

0

0

0

7000

7

0

2

5

7

0

5

0

7

0

0

0

6950

6

9

5

0

6

9

5

0

6

9

7

5

6

9

7

5

6975

6

9

7

5

6950

6

9

7

5

6955

6960

6965

6970

6

9

8

0

6

9

8

5

6975

6955

6

9

6

0

6965

6

9

7

0

6

9

8

0

6975

6955

6

9

6

0

6965

6

9

7

0

6

9

8

0

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-02

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

09/24/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

LAR: REVISE COVER THICKNESS

REPOSITORY MINE WASTE FILL BY REMOVAL PHASE

AND TEMPORARY STORMWATER CONTROL BERMS (1 OF 2)

SCALE IN FEET

3000 600

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED WASTE SURFACE CONTOUR &

ELEVATION, FEET

EXISTING ROADS

NATURAL DRAINAGE

EXISTING FENCE

EXISTING SWALES

STORMWATER BERM

CURRENT PLACEMENT AREA

7200

7200

SCALE IN FEET

3000 600

173,594 CY OF MINE WASTE

REPOSITORY MINE WASTE PLACEMENT PHASE 2

445,559 CY OF MINE WASTE (619,153 CY TOTAL)

REPOSITORY MINE WASTE PLACEMENT PHASE 3

A

7-04

A

7-04

N

M

H

W

Y

5

6

6

N

M

H

W

Y

5

6

6

LIMITS OF WASTE PHASE 2

LIMITS OF WASTE PHASE 3

EDGE OF FINAL COVER SURFACE EDGE OF FINAL COVER SURFACE

SCALE IN FEET

3000 600

INITIAL STORMWATER CONTROL BERM

A

7-04

N

M

H

W

Y

5

6

6

EDGE OF FINAL COVER SURFACE

CENTERLINE OF INITIAL

STORMWATER BERM

NOTE(S):

1. MINE WASTE PLACEMENT PHASES CORRESPOND TO MINE

REMOVAL PHASES SHOWN IN SECTION 3. PLACEMENT SHOWN

WITHOUT VOLUME REDUCTION FOR COMPACTION.

2. STORMWATER BERMS CONSTRUCTED OF CLEAN BORROW SOIL

MEETING COVER MATERIAL SPECIFICATIONS.

3. PHASE 1 PTW TO BE DISPOSED OFFSITE

SCALE IN FEET

3000 600

A

7-04

N

M

H

W

Y

5

6

6

EDGE OF FINAL COVER SURFACE

NO PLANNED PLACEMENT OF MINE WASTE (NOTE 3)

REPOSITORY MINE WASTE PLACEMENT PHASE 1

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-02 REP WASTE LIFTS.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:55 PM BY:KWREED
Page 3: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6

9

7

5

6

9

7

0

6

9

8

0

6

9

7

5

6955

6960

6965

6

9

7

0

6

9

8

0

6

9

8

5

6

9

8

5

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7

0

0

0

7000

7

0

2

5

7

0

5

0

7

0

0

0

6950

6

9

5

0

6

9

5

0

6

9

7

5

6

9

7

5

6975

6

9

7

5

6950

6975

6955

6960

6965

6970

6

9

8

0

6

9

8

5

6

9

8

5

6

9

7

5

6

9

6

0

6

9

6

5

6

9

7

0

6

9

8

0

6

9

8

5

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-03

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

09/24/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

LAR: REVISE COVER THICKNESS

REPOSITORY MINE WASTE FILL BY REMOVAL PHASE

AND TEMPORARY STORMWATER CONTROL BERMS (2 OF 2)

SCALE IN FEET

3000 600

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED WASTE SURFACE CONTOUR &

ELEVATION, FEET

ROADS

NATURAL DRAINAGE

EXISTING FENCE

EXISTING SWALES

CURRENT PLACEMENT AREA

7200

7200

SCALE IN FEET

3000 600

34,272 CY OF MINE WASTE (696,884 CY TOTAL)

REPOSITORY MINE WASTE PLACEMENT PHASE 5

28,356 CY OF MINE WASTE (725,240 CY TOTAL)

REPOSITORY MINE WASTE PLACEMENT PHASE 6

A

7-04

A

7-04

N

M

H

W

Y

5

6

6

N

M

H

W

Y

5

6

6

EDGE OF FINAL COVER SURFACE

EDGE OF FINAL COVER SURFACE

43,459 CY OF MINE WASTE (662,612 CY TOTAL)

REPOSITORY MINE WASTE PLACEMENT PHASE 4

A

7-04

N

M

H

W

Y

5

6

6

EDGE OF FINAL COVER SURFACE

NOTE(S):

1. MINE WASTE PLACEMENT PHASES CORRESPOND TO REMOVAL

PHASES SHOWN IN SECTION 3.

LIMITS OF WASTE PHASE 4

LIMITS OF WASTE PHASE 5

LIMITS OF WASTE PHASE 6

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-03 REP WASTE LIFTS 2.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:55 PM BY:KWREED
Page 4: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

ELE

VA

TIO

N (F

T)

ELE

VA

TIO

N (F

T)

STATION (FT)

6920

6930

6940

6950

6960

6970

6980

6990

7000

7010

7020

7030

6920

6930

6940

6950

6960

6970

6980

6990

7000

7010

7020

7030

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-04

A

B

C

D

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY MINE WASTE FILL PROFILE BY REMOVAL PHASE

A

7-04

REPOSITORY PROFILE

FILL PROGRESSION

0

0

SCALE IN FEET

VERT

HORZ 80 160

20 40

BASE OF TAILINGS

SUBGRADE

(RADON BARRIER)

EXISTING GROUND

TOP OF MINE WASTE AT 995,000 CY

TOP OF PHASE 5 MINE WASTE

TOP OF PHASE 6 MINE WASTE

TOP OF PHASE 4 MINE WASTE

REPOSITORY RESERVE

TOP OF MINE WASTE AT 918,000 CY

2%

(TY

P.)

1% (TYP.)

5

%

(T

Y

P

.)

TOP OF PHASE 3 MINE WASTE

TOP OF PHASE 2 MINE WASTE

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-04 REP LIFT PROFILES.dwg LAYOUT:Profile PLOT DATE:10/30/2019 3:56 PM BY:KWREED
Page 5: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

7000

6

9

7

56

9

7

0

6

9

8

0

6

9

8

5

6

9

9

0

6

9

9

5

6

9

7

5

6955

6

9

6

0

6

9

6

5

6

9

7

0

6

9

8

0

6

9

8

5

6

9

9

0

6

9

9

5

6

9

8

5

6

9

9

0

6

9

9

5

2

.0

%

2

0

.

0

%

5.0%

5

.

0

%

5

.

0

%

5

.0

%

5.0%

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7

0

0

0

7

0

0

0

6

9

5

0

6

9

7

5

6950

7

0

0

0

6

9

5

0

7

0

0

0

E 2,52

4,500

E 2,52

4,50

0

E 2,52

6,000

E 2,52

6,00

0

N 1,692,000 N 1,692,000N 1,692,000 N 1,692,000

6

9

7

5

7

0

0

0

6

9

5

5

6

9

6

0

6

9

6

5

6

9

7

0

6

9

8

0

6

9

8

5

6

9

9

0

6

9

9

5

7

0

0

0

6

9

8

5

6

9

9

0

6

9

9

5

6

9

7

5

7

0

0

0

6

9

7

0

6

9

8

0

6

9

8

5

6

9

9

0

6

9

9

5

2

.0

%

5.0%

5

.0

%

5

.

0

%

5

.

0

%

5.0%

2

0

.

0

%

7005

6975

7

0

0

0

7025

7

0

5

0

6

9

7

5

6950

6

9

5

0

7

0

0

0

E 2,524,500

E 2,52

4,50

0

E 2

,5

26

,0

00

E 2

,5

26

,0

00

N 1,692,000 N 1,692,000N 1,692,000 N 1,692,000

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-05

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

09/24/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

LAR: REVISE COVER THICKNESS

REPOSITORY TOP OF MINE WASTE

AND COVER GRADING PLAN

SCALE IN FEET

1500 300

SCALE IN FEET

2000 400

AT 995,000 CY OF MINE WASTE

REPOSITORY TOP OF MINE WASTE SURFACE

AT 995,000 CY OF MINE WASTE

REPOSITORY TOP OF COVER SURFACE

A

7-06

B

7

-0

6

A

7-06

B

7

-0

6

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED SURFACE CONTOUR & ELEVATION, FEET

EXISTING ROADS

NATURAL DRAINAGE

EXISTING SWALES

STRUCTURES

7200

7200

EDGE OF FINAL COVER SURFACE

EDGE OF MINE WASTE AT

995,000 CY OF WASTE

EDGE OF FINAL COVER SURFACE

EDGE OF MINE WASTE AT

995,000 CY OF WASTE

B

R

A

N

C

H

S

W

A

L

E

C

B

R

A

N

C

H

S

W

A

L

E

C

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-05 REP WASTE GRD PLAN 1M.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:56 PM BY:KWREED
Page 6: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

ELE

VA

TIO

N (F

T)

ELE

VA

TIO

N (F

T)

STATION (FT)

6920

6930

6940

6950

6960

6970

6980

6990

7000

7010

7020

7030

6920

6930

6940

6950

6960

6970

6980

6990

7000

7010

7020

7030

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00

5

.0

%

2.0

%

5

.0

%

ELE

VA

TIO

N (F

T)

ELE

VA

TIO

N (F

T)

STATION (FT)

6950

6960

6970

6980

6990

7000

7010

7020

6950

6960

6970

6980

6990

7000

7010

7020

0+00 1+00 2+00 3+00 4+00 5+00

2.0

%

3.4%

2

0

.

0

%

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-06

A

B

C

D

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY PROFILES

A

7-06

REPOSITORY PROFILE

AT 995,000 CY OF MINE WASTE

B

7-06

REPOSITORY PROFILE

AT 995,000 CY OF MINE WASTE

0

0

SCALE IN FEET

VERT

HORZ 80 160

20 40

0

0

SCALE IN FEET

VERT

HORZ 80 160

20 40

TOP OF COVER AT 995,000 CY OF MINE WASTE

EXISTING GROUND

SUBGRADE

(EXISTING RADON BARRIER)

BASE OF TAILINGS

TOP OF MINE WASTE AT 995,000 CY

TOP OF COVER AT 995,000 CY

OF MINE WASTE

TOP OF MINE

WASTE AT

995,000 CY

INITIAL REPOSITORY STORMWATER

RETENTION BERM

1

7-09

SUBGRADE

(RADON BARRIER)

EXISTING GROUND

EAST REPOSITORY

CHANNEL

MINE WASTE

BASE OF TAILINGS

TAILINGS

TAILINGS

C

O

V

E

R

S

Y

S

T

E

M

CO

VE

R S

YS

TE

M

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-06 REP PROFILES.dwg LAYOUT:Profile PLOT DATE:10/30/2019 3:56 PM BY:KWREED
Page 7: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

7005

6

9

7

5

7

0

0

0

6

9

7

0

6

9

8

0

6

9

8

5

6

9

9

0

6

9

9

5

6975

7000

6955

6960

6965

6970

6980

6985

6990

6995

7

0

0

0

6

9

8

5

6

9

9

0

6

9

9

5

2

.0

%

2

0

.

0

%

5.0%

5

.

0

%

5

.

0

%

5

.0

%

5.0%

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7000

7

0

0

0

7

0

2

5

7

0

5

0

7

0

0

0

6

9

5

0

6

9

5

0

6950

6

9

7

5

6

9

7

5

7000

6975

6

9

7

5

6950

E 2,524,500

E 2,524,500

E 2,526,000

E 2,526,000

N 1,693,500 N 1,693,500

N 1,692,000 N 1,692,000

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-07

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

09/24/18

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY FINAL COVER GRADING PLAN

SCALE IN FEET

1500 300

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED SURFACE CONTOUR & ELEVATION, FEET

UNC PROPERTY BOUNDARY

ROADS

NATURAL DRAINAGE

EXISTING FENCE

EXISTING SWALES

STRUCTURES

FLOW DIRECTION

7200

7200

WEST APRON

APPROX 3,000 CY OF ADDITIONAL FILL

WITH EROSION PROTECTION

N

M

H

W

Y

5

6

6

EDGE OF FINAL WASTE PLACEMENT

EDGE OF FINAL COVER SURFACE

EAST REPOSITORY CHANNEL

(NOTE 1)

DILCO HILL DRAINAGE

CHANNEL A (NOTE 1)

DILCO HILL DRAINAGE

CHANNEL B (NOTE 1)

SOUTHWEST REGRADE

APPROX 8,900 CY OF ADDITIONAL FILL

WITH EROSION PROTECTION

P

I

P

E

L

I

N

E

A

R

R

O

Y

O

BRANCH SWALE H

EVAPORATION PONDS

N

O

R

TH

U

PS

TR

EA

M

D

IVE

R

SIO

N

C

H

AN

N

EL

NOTE(S):

1. PERMANENT STORMWATER CONTROL STRUCTURES

DETAILED IN SECTION 9 DRAWINGS.

BRANCH SWALE C

RUNOFF CONTROL DITCH

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-07 REP COVER FINAL CONFIG.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:56 PM BY:KWREED
Page 8: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6975

7000

6960

6965

6970

6980

6985

6990

6995

7

0

0

0

6

9

8

5

6

9

9

0

6

9

9

5

6975

7

0

0

0

7025

7

0

5

0

7

0

0

0

7

0

0

0

7000

7

0

2

5

7

0

5

0

7

0

0

0

6

9

5

0

6

9

5

0

6950

6

9

7

5

6

9

7

5

7000

6975

6

9

7

5

6950

6

9

7

0

E 2,524,500

E 2,524,500

E 2,526,000

E 2,526,000

N 1,693,500 N 1,693,500

N 1,692,000 N 1,692,000

5.0%

5

.

0

%

2

.0

%

2

0

.

0

%

5.0%

5

.0

%

2

.0

%

4

.

9

%

6940

6950

6960

6970

6940

6950

6960

6970

0+00 1+00 2+00 3+00

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-08

B

C

D

E

F

KR

KR

KR

KR

KR

10/30/17

04/09/18

09/24/18

06/06/19

10/31/19

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR

REVISED FOR NRC RAI

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

COVER SURFACE EROSION PROTECTION

SCALE IN FEET

1500 300

N

M

H

W

Y

5

6

6

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED POST STRIPPING SURFACE CONTOUR &

ELEVATION, FEET

UNC PROPERTY BOUNDARY

ROADS

NATURAL DRAINAGE

EXISTING FENCE

EXISTING SWALES

STRUCTURES

COVER SLOPE A (D50 = 1.5 INCHES)

COVER SLOPE B (D50 = 2 INCHES)

COVER SLOPE C (D50 = 3.5 INCHES)

COVER SLOPE D (D50 = 1.5 INCHES)

7200

7200

NOTE(S):

1. COVER SLOPES A, B, AND C DESIGNED BY DWYER

ENGINEERING, LLC.

2. COVER SLOPE D DESIGNED BY STANTEC.

COVER SLOPE C

4

7-09

COVER SLOPE B

3

7-09

COVER SLOPE A

2

7-09

COVER SLOPE B

3

7-09

COVER SLOPE C

4

7-09

EVAPORATION PONDS

COVER SLOPE D

5

7-09

1

-

1

-

REPOSITORY COVER TO CHANNEL TRANSITION

RUNOFF CONTROL DITCH

RUNOFF CONTROL DITCH

EXISTING GROUND

REPOSITORY COVER

COMPLETED SECTION WITH COVER IN PLACE

6

7-10

A

7-10

D

7-10

C

7-10

B

7-10

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-08 REP DRAINAGE LENGTHS.dwg LAYOUT:Plan PLOT DATE:10/30/2019 3:57 PM BY:KWREED
Page 9: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-09

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

06/06/19

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

REVISED FOR NRC RAI

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY COVER DETAILS

1

7-09

INITIAL REPOSITORY PERIMETER STORMWATER RETENTION BERM

(NOT TO SCALE)

2

7-09

COVER SLOPE A (TOP SLOPES)

(NOT TO SCALE)

3

7-09

COVER SLOPE B (SIDE SLOPES)

(NOT TO SCALE)

4

7-09

COVER SLOPE C (LOWER SIDE SLOPES)

(NOT TO SCALE)

8'

5%

2

1

1

1 (MIN)

(MIN)

TOP OF COVER SYSTEM

SURFACE EROSION CONTROL (NOTE 2)

SOIL COVER WITH

ROCK, (D50 = 3.5"), 33% BY VOLUME

5

%

SOIL COVER

SOIL COVER

SOIL COVER

SOIL COVER WITH

ROCK, (D50 = 2"), 33% BY VOLUME

SOIL COVER WITH

ROCK, (D50 = 1.5"), 33% BY VOLUME

31.5"

22.5"

18"

36"

14"

40"

4'

BOTTOM OF COVER SYSTEM

EXISTING GROUND SURFACE

DISPOSED MINE

WASTE MATERIAL

SUBGRADE (IMPROVED RADON BARRIER)

5%

5

%

2

%

~ DISPOSED MINE WASTE MATERIAL (COMPACTED) ~

~ DISPOSED MINE WASTE MATERIAL (COMPACTED) ~

~ DISPOSED MINE WASTE MATERIAL (COMPACTED) ~

NOTE:

1. COVER SLOPES A, B, AND C DESIGNED BY DWYER ENGINEERING, LLC.

COVER SLOPE D DESIGNED BY STANTEC.

APPROXIMATE EXTENTS OF RADON

BARRIER IMPROVEMENTS

CLEAN FILL (SOIL COVER)

3' M

IN

NOTE:

1. CLEAN FILL FOR BERMS TO BE GRADED INTO SOIL COVER LAYER.

2. SEE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN

3. MAINTAIN 3-FOOT HEIGHT ABOVE DISPOSED MINE MATERIAL SURFACE FOR STORMWATER CONTROL.

5

7-09

COVER SLOPE D (20% SLOPE)

(NOT TO SCALE)

ROCK (D50 = 1.5") COVER

WITH SOIL, 15% BY VOLUME

2

0

%

~

D

IS

P

O

S

E

D

M

IN

E

W

A

S

T

E

M

A

T

E

R

IA

L

(C

O

M

P

A

C

T

E

D

) ~

54"

54"

54"

4

8

"

6

"

1

2

"

3

0

"

T

Y

P

E

II F

IL

T

E

R

M

A

T

E

R

IA

L

G

E

N

E

R

A

L

F

IL

L

, C

O

M

P

A

C

T

E

D

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-09 DETAILS.dwg LAYOUT:7-09 PLOT DATE:10/30/2019 3:57 PM BY:KWREED
Page 10: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6970

6980

6990

6970

6980

6990

0+00 1+00 2+00

6965

6970

6980

6990

6965

6970

6980

6990

0+00 1+00 2+00

6950

6960

6970

6950

6960

6970

0+00 1+00 2+00 3+00

6965

6970

6980

6990

6965

6970

6980

6990

0+00 1+00 1+50

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

M WITLER

K REED

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

7-10

A

B

C

D

E

KR

KR

KR

KR

KR

07/15/16

10/30/17

04/09/18

06/06/19

10/31/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

REVISED FOR NRC RAI

LAR: REVISE COVER THICKNESS

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

REPOSITORY COVER DETAILS

6

7-10

COMPLETED SECTION WITH COVER IN PLACE (TYPICAL)

(NOT TO SCALE)

APPROXIMATE EXTENTS OF RADON

BARRIER IMPROVEMENTS

EXISTING GROUND SURFACE

REPOSITORY TOP OF COVER

SOIL COVER WITH ROCK

SOIL COVER

SUBGRADE (IMPROVED RADON BARRIER)

REPOSITORY TOP OF WASTE

DISPOSED MINE WASTE

EXTENT OF COVER SURFACE

EXISTING RADON BARRIER

A

7-10

CROSS SECTION A

COVER SLOPE TYPE A

0

0

SCALE IN FEET

VERT

HORZ 20 40

5 10

EXISTING

GROUND

SURFACE

EXISTING

GROUND

SURFACE

(COVER)

EXISTING

GROUND

SURFACE

EXISTING

GROUND

SURFACE

B

7-10

CROSS SECTION B

COVER SLOPE TYPE B

0

0

SCALE IN FEET

VERT

HORZ 20 40

5 10

C

7-10

CROSS SECTION C

COVER SLOPE TYPE C

0

0

SCALE IN FEET

VERT

HORZ 20 40

5 10

D

7-10

CROSS SECTION D

COVER SLOPE TYPE D

0

0

SCALE IN FEET

VERT

HORZ 20 40

5 10

5

%

5

%

2%

2

0

%

2

7-09

3

7-09

4

7-09

5

7-09

1.2%

SLOPE COVER A

DISPOSED MINE WASTE

SLOPE COVER B

SLOPE COVER C

SUBGRADE

(IMPROVED RADON BARRIER)

5

%

COVER SLOPE D

EAST REPOSITORY

DRAINAGE CHANNEL

A

9-04

RUNOFF

CONTROL

DITCH

F

9-04

EAST REPOSITORY

DRAINAGE CHANNEL

A

9-04

SOIL COVER WITH ROCK

OVER EXISTING COVER

DISPOSED MINE WASTE

DISPOSED MINE WASTE

DISPOSED MINE WASTE

TAILINGS

EXISTING COVER AND

RADON BARRIER

(REMAINS)RIPRAP

RIPRAP

NATURAL GROUND

SUBGRADE

(IMPROVED RADON BARRIER)

EXISTING

RADON

BARRIERTAILINGS

SUBGRADE

(IMPROVED RADON BARRIER)

RIPRAP

TAILINGS

SUBGRADE

(IMPROVED RADON

BARRIER)

NATURAL GROUND

EXISTING

FILL

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\07-95.2_WASTE_REPOSITORY_DESIGN\NECR 7-09 DETAILS.dwg LAYOUT:7-10 PLOT DATE:10/30/2019 3:57 PM BY:KWREED
Page 11: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6

9

5

0

6950

6

9

5

0

6

9

2

5

E 2,523,000

E 2,523,000

N 1,691,000 N 1,691,000N 1,691,000 N 1,691,000

6

9

5

0

6

9

7

5

5

:

1

2

.

5

:

1

5

.

3

%

E 2,522,000

E 2,522,000

N 1,692,000 N 1,692,000N 1,692,000 N 1,692,000

5

.

3

%

6

8

7

5

6

9

0

0

6

9

2

5

6

9

0

0

6

9

0

0

6

9

2

5

6

9

0

0

6

9

0

0

6

9

2

5

6

9

2

5

6

9

5

0

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7

+

0

0

8

+

0

0

9

+

0

0

1

0

+

0

0

1

1

+

0

0

1

2

+

0

0

1

3

+

0

0

1

4

+

0

0

1

5

+

0

0

1

6

+

0

0

1

7

+

0

0

1

8

+

0

0

1

9

+

0

0

2

0

+

0

0

2

1

+

0

0

2

2

+

0

0

2

2

+

4

7

7

+

0

0

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4+00

5

+

0

0

6

+

0

0

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7

+

0

0

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7

+

0

0

2

.

5

:

1

5

:

1

2

.

0

:

1

2

.

5

:

1

7

.

5

:

1

2

.

5

:

1

2

.5

:1

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

PW

PW

PW

P

W

P

W

P

W

P

W

P

W

P

W

P

W

P

W

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GAS

GAS

GAS

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

GA

S

GA

S

GA

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

N HAWS

J ERICKSON

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

9-09

A

B

C

D

RW

KR

RW

KR

07/15/16

10/30/17

04/09/18

11/01/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR RAI2

MILL SITE REPOSITORY AREA STORMWATER CONTROLS

RIPRAP CHUTE

SCALE IN FEET

1000 200

N

M

H

I

G

H

W

A

Y

5

6

6

LEGEND:

EXISTING GROUND SURFACE CONTOUR &

ELEVATION, FEET

PROPOSED SURFACE CONTOUR & ELEVATION, FEET

DRAINAGE CHANNEL

EXISTING ROADS

NATURAL DRAINAGE

EXISTING FENCE

STRUCTURES

OVERHEAD POWER LINE

LIMITS OF EARTHWORK

D

50

= 27" RIPRAP

D

50

= 3" RIPRAP

BOTTOMLAND SEED MIX

7200

P

I

P

E

L

I

N

E

A

R

R

O

Y

O

C

9-10

B

9-10

A

9-10

EVAPORATION PONDS

RUNOFF CONTROL

DITCH

7200

RIPRAP BASIN

1

9-11

D

9-10

PW

EL PASO GAS PIPELINE

RIGHT OF WAY

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\09-95.2_MILL_SITE_SW_CONTROLS\NECR 9-09 ROCK JETTY.dwg LAYOUT:Plan PLOT DATE:11/7/2019 2:04 PM BY:KWREED
Page 12: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

6920

6930

6940

6950

6960

6920

6930

6940

6950

6960

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00

6900

6910

6920

6930

6940

6950

6960

6900

6910

6920

6930

6940

6950

6960

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00

6860

6870

6880

6890

6900

6910

6920

6930

6940

6950

6960

6860

6870

6880

6890

6900

6910

6920

6930

6940

6950

6960

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00

6860

6870

6880

6890

6900

6910

6920

6930

6940

6950

6860

6870

6880

6890

6900

6910

6920

6930

6940

6950

1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

N HAWS

J ERICKSON

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

9-10

A

B

C

D

RW

KR

RW

KR

03/15/16

10/30/17

04/09/18

11/01/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR RAI2

MILL SITE REPOSITORY AREA STORMWATER CONTROLS

RIPRAP CHUTE SECTIONS

A

9-10

SECTION A

C

9-10

SECTION C

D

9-10

SECTION D

B

9-10

SECTION B

EXISTING GROUND SURFACE

DESIGN GROUND

EXISTING GROUND SURFACE

EXISTING

GROUND

SURFACE

EXISTING GROUND SURFACE

DESIGN GROUND

DESIGN GROUND

DESIGN GROUND

0

0

SCALE IN FEET

VERT

HORZ 70 140

17.5 35

EXTENT OF BEDROCK SURFACE

(ASSUMED)

EXTENT OF

ROCK SURFACE (ASSUMED)

RUNOFF CONTROL DITCH (EXISTING)

RUNOFF CONTROL DITCH

ARROYO

FLOW

TYPICAL CHUTE RIPRAP

AND BEDDING DETAIL

RIPRAP BASIN DETAIL

1

9-11

2B

9-11

10'

28'

28'

2B

9-11

TYPICAL CHUTE RIPRAP

AND BEDDING DETIAL

2B

9-11

A

9-10

B

9-10

C

9-10

TOP OF 27" RIPRAP ON BANK

TYPICAL RIPRAP

LAYER DETAIL

3

9-11

TYPICAL UPPER SIDE SLOPE

RIPRAP LAYER DETAIL

3

9-11

TYPICAL RIPRAP

LAYER DETAIL

3

9-11

TYPICAL UPPER SLOPE

RIPRAP AND BEDDING

LAYER DETAIL

3

9-11

1

0

'

EXTENT OF

ROCK SURFACE

(ASSUMED)

EXTENT OF

ROCK SURFACE

(ASSUMED)

5

.3

%

2A

9-11

2A

9-11

2A

9-11

50'

INLET

APRON

END D

50

= 27" RIPRAP

2.5

1

2.5

1

2.5

1

5

1

2.5

1

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\09-95.2_MILL_SITE_SW_CONTROLS\NECR 9-10 MILL SITE PIPELINE PROFIL.dwg LAYOUT:Profile PLOT DATE:11/7/2019 2:11 PM BY:KWREED
Page 13: 7200 ELEVATION, FEET 7200 PROPOSED SUBGRADE SURFACE ...

N

1

,

6

9

1

,

0

0

0

N

1

,

6

9

1

,

0

0

0

E

2

,

5

2

2

,

5

0

0

E

2

,

5

2

2

,

5

0

0

E

2

,

5

2

2

,

1

0

0

E

2

,

5

2

2

,

1

0

0

N

1

,

6

9

0

,

7

5

0

N

1

,

6

9

0

,

7

5

0

6880

6

8

8

0

6

8

9

0

6

9

0

0

6

9

1

0

6

8

8

0

6

8

9

0

6

9

0

0

6

9

1

0

6876

6876

6

8

7

8

6878

6878

REV DATE BY DESCRIPTION

SHEET

UNITED NUCLEAR CORPORATION AND NORTHEAST CHURCH ROCK MINE

233001048

DESIGNED

CHECKED

APPROVED

NORTHEAST CHURCH ROCK PROJECT 95% DESIGN

N HAWS

J ERICKSON

McKINLEY COUNTY, NEW MEXICO

J CUMBERS

9-11

A

B

C

D

RW

KR

KR

KR

03/15/16

10/30/17

04/09/18

11/01/19

ISSUED FOR 30% DESIGN

ISSUED FOR 95% DESIGN

ISSUED FOR REVISED 95% DESIGN

ISSUED FOR LAR RAI2

MILL SITE REPOSITORY AREA STORMWATER CONTROLS

RIPRAP CHUTE DETAILS

SCALE IN FEET

600 120

B

-

B

-

SECTION B - RIPRAP BASIN

(NOT TO SCALE)

2B

9-11

TYPICAL CHUTE RIPRAP AND BEDDING DETAIL

FOR AREAS OF FILL (NOT TO SCALE)

3'

2.5

1

5

.3

%

65'

2A

9-11

NOTES:

1. PREPARE AND COMPACT UPPER FOOT TO MINIMUM 95% OF MAXIMUM DRY DENSITY PER STANDARD PROCTOR.

2. COMPACT TO 95% MAXIMUM DRY DENSITY PER STANDARD PROCTOR IN 6-INCH LIFTS.

D

50

= 27" RIPRAP

RIPRAP LAYER

TYPE II FILTER LAYER

TYPE I FILTER LAYER

GENERAL FILL, COMPACTED

(SEE NOTE 2)

54"

6"

8"

3

9-11

TYPICAL UPPER SIDE SLOPE RIPRAP AND BEDDING DETAIL

(NOT TO SCALE)

D

50

= 3-INCH RIPRAP LAYER

TYPE II FILTER LAYER

COMPACTED SUBGRADE

(SEE NOTE 1)

6"

6"

24"

COMPACTED SUBGRADE

(SEE NOTE 1)

380'

OUTLET APRON

D

50

= 27" RIPRAP

RIPRAP LAYER

TYPE II FILTER LAYER

TYPE I FILTER LAYER

54"

6"

8"

COMPACTED SUBGRADE

(SEE NOTE 1)

2A

9-11

TYPICAL CHUTE RIPRAP AND BEDDING DETAIL

FOR AREAS OF CUT (NOT TO SCALE)

1

9-11

RIPRAP BASIN - PLAN

100'

2B

9-11

AutoCAD SHX Text
pw:\\amervpwint03.mwhglobal.com:AM_PROJECTS02\Documents\_General Electric\GE NECR Design\Civil\Sheet Sets\NECR-95%%%_V2_REVISED_DESIGN_DRAWINGS\09-95.2_MILL_SITE_SW_CONTROLS\NECR 9-11 JETTY DETAILS.dwg LAYOUT:Profile PLOT DATE:11/7/2019 2:16 PM BY:KWREED