6 Uhg Theory

69
Unit Hydrographs Transforming the Runoff

Transcript of 6 Uhg Theory

Page 1: 6 Uhg Theory

Unit Hydrographs

Transforming the Runoff

Page 2: 6 Uhg Theory

Unit Hydrograph Theory

Moving water off of the watershed… A mathematical concept Linear in nature Uses convolution to transform the

excess precipitation to streamflow….

Page 3: 6 Uhg Theory

The Basic Process

Excess Precip. Model

Excess Precip.

Excess Precip.

Runoff Hydrograph

Runoff Hydrograph

Stream and/or Reservoir “Routing”

Downstream Hydrograph

Basin “Routing” UHG Methods

Necessary for a single basin

Unit Hydrographs

Page 4: 6 Uhg Theory

Unit Hydrograph TheoryUnit Hydrograph Theory

Sherman - 1932 Horton - 1933 Wisler & Brater - 1949 - “the hydrograph of surface runoff

resulting from a relatively short, intense rain, called a unit storm.”

The runoff hydrograph may be “made up” of runoff that is generated as flow through the soil (Black, 1990).

Page 5: 6 Uhg Theory

Unit Hydrograph “Lingo”Unit Hydrograph “Lingo”

Duration Lag Time Time of Concentration Rising Limb Recession Limb (falling

limb) Peak Flow Time to Peak (rise time) Recession Curve Separation Base flow

Page 6: 6 Uhg Theory

Graphical RepresentationGraphical Representation

Lag time

Time of concentration

Duration of excess precip.

Base flow

Page 7: 6 Uhg Theory

Methods of Developing Methods of Developing UHG’sUHG’s

From Streamflow Data Synthetically

Snyder SCS Time-Area (Clark, 1945)

“Fitted” Distributions

Page 8: 6 Uhg Theory

Unit HydrographUnit Hydrograph

The hydrograph that results from 1-inch of excess precipitation (or runoff) spread uniformly in space and time over a watershed for a given duration.

The key points : 1-inch of EXCESS precipitation Spread uniformly over space - evenly over the

watershed Uniformly in time - the excess rate is constant over

the time interval There is a given duration

Page 9: 6 Uhg Theory

Derived Unit HydrographDerived Unit Hydrograph

0.0000

100.0000

200.0000

300.0000

400.0000

500.0000

600.0000

700.0000

0.00

00

0.16

00

0.32

00

0.48

00

0.64

00

0.80

00

0.96

00

1.12

00

1.28

00

1.44

00

1.60

00

1.76

00

1.92

00

2.08

00

2.24

00

2.40

00

2.56

00

2.72

00

2.88

00

3.04

00

3.20

00

3.36

00

3.52

00

3.68

00

Baseflow

Surface Response

Page 10: 6 Uhg Theory

Derived Unit HydrographDerived Unit Hydrograph

0.0000

100.0000

200.0000

300.0000

400.0000

500.0000

600.0000

700.0000

0.0000 0.5000 1.0000 1.5000 2.0000 2.5000 3.0000 3.5000 4.0000

Total Hydrograph

Surface Response

Baseflow

Page 11: 6 Uhg Theory

Derived Unit HydrographDerived Unit Hydrograph

Rules of Thumb :… the storm should be fairly uniform in nature and the excess precipitation should be equally as uniform throughout the basin. This may require the initial conditions throughout the basin to be spatially similar. … Second, the storm should be relatively constant in time, meaning that there should be no breaks or periods of no precipitation. … Finally, the storm should produce at least an inch of excess precipitation (the area under the hydrograph after

correcting for baseflow).

Page 12: 6 Uhg Theory

Deriving a UHG from a Deriving a UHG from a StormStormsample watershed = 450 mi2sample watershed = 450 mi2

0

5000

10000

15000

20000

25000

0 8 16 24 32 40 48 56 64 72 80 88 96 104

112

120

128

Time (hrs.)

Flo

w (

cfs)

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

Pre

cip

itat

ion

(in

ches

)

Page 13: 6 Uhg Theory

Separation of BaseflowSeparation of Baseflow

... generally accepted that the inflection point on the recession limb of a hydrograph is the result of a change in the controlling physical processes of the excess precipitation flowing to the basin outlet.

In this example, baseflow is considered to be a straight line connecting that point at which the hydrograph begins to rise rapidly and the inflection point on the recession side of the hydrograph.

the inflection point may be found by plotting the hydrograph in semi-log fashion with flow being plotted on the log scale and noting the time at which the recession side fits a straight line.

Page 14: 6 Uhg Theory

Semi-log PlotSemi-log Plot

1

10

100

1000

10000

100000

29 34 39 44 49 54 59 64 69 74 79 84 89 94 99 104

109

114

119

124

129

134

Time (hrs.)

Flo

w (

cfs)

Recession side of hydrograph becomes linear at approximately hour

64.

Page 15: 6 Uhg Theory

Hydrograph & BaseflowHydrograph & Baseflow

0

5000

10000

15000

20000

25000

0 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105

112

119

126

133

Time (hrs.)

Flo

w (

cfs)

Page 16: 6 Uhg Theory

Separate BaseflowSeparate Baseflow

0

5000

10000

15000

20000

25000

0 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105

112

119

126

133

Time (hrs.)

Flo

w (

cfs)

Page 17: 6 Uhg Theory

Sample CalculationsSample Calculations

In the present example (hourly time step), the flows are summed and then multiplied by 3600 seconds to determine the volume of runoff in cubic feet. If desired, this value may then be converted to acre-feet by dividing by 43,560 square feet per acre.

The depth of direct runoff in feet is found by dividing the total volume of excess precipitation (now in acre-feet) by the watershed area (450 mi2 converted to 288,000 acres).

In this example, the volume of excess precipitation or direct runoff for storm #1 was determined to be 39,692 acre-feet.

The depth of direct runoff is found to be 0.1378 feet after dividing by the watershed area of 288,000 acres.

Finally, the depth of direct runoff in inches is 0.1378 x 12 = 1.65 inches.

Page 18: 6 Uhg Theory

Again - Summing Flows

Continuous process represented with discrete time steps

Page 19: 6 Uhg Theory

Obtain UHG OrdinatesObtain UHG Ordinates

• The ordinates of the unit hydrograph are obtained by dividing each flow in the direct runoff hydrograph by the depth of excess precipitation.

• In this example, the units of the unit hydrograph would be cfs/inch (of excess precipitation).

Page 20: 6 Uhg Theory

Final UHGFinal UHG

0

5000

10000

15000

20000

25000

0 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105

112

119

126

133

Time (hrs.)

Flo

w (

cfs)

Storm #1 hydrograph

Storm#1 direct runoff hydrograph

Storm # 1 unit hydrograph

Storm #1 baseflow

Page 21: 6 Uhg Theory

Determine Duration of UHGDetermine Duration of UHG

The duration of the derived unit hydrograph is found by examining the precipitation for the event and determining that precipitation which is in excess.

This is generally accomplished by plotting the precipitation in hyetograph form and drawing a horizontal line such that the precipitation above this line is equal to the depth of excess precipitation as previously determined.

This horizontal line is generally referred to as the -index and is based on the assumption of a constant or uniform infiltration rate.

The uniform infiltration necessary to cause 1.65 inches of excess precipitation was determined to be approximately 0.2 inches per hour.

Page 22: 6 Uhg Theory

Estimating Excess Precip.Estimating Excess Precip.

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Time (hrs.)

Pre

cip

itat

ion

(in

ches

)

Uniform loss rate of 0.2 inches per hour.

Page 23: 6 Uhg Theory

Excess PrecipitationExcess Precipitation

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Time (hrs.)

Exc

ess

Pre

c. (

inch

es)

Small amounts of excess precipitation at beginning and end may

be omitted.

Derived unit hydrograph is the result of approximately 6 hours

of excess precipitation.

Page 24: 6 Uhg Theory

Changing the DurationChanging the Duration Very often, it will be necessary to change the duration of the unit

hydrograph. If unit hydrographs are to be averaged, then they must be of the same

duration. Also, convolution of the unit hydrograph with a precipitation event

requires that the duration of the unit hydrograph be equal to the time step of the incremental precipitation.

The most common method of altering the duration of a unit hydrograph is by the S-curve method.

The S-curve method involves continually lagging a unit hydrograph by its duration and adding the ordinates.

For the present example, the 6-hour unit hydrograph is continually lagged by 6 hours and the ordinates are added.

Page 25: 6 Uhg Theory

Develop S-CurveDevelop S-Curve

0.00

10000.00

20000.00

30000.00

40000.00

50000.00

60000.00

0 6 12 18 24 30 36 42 48 54 60 66 72 78 84 90 96 102

108

114

120

Time (hrs.)

Flo

w (

cfs)

Continuous 6-hour bursts

Page 26: 6 Uhg Theory

Convert to 1-Hour DurationConvert to 1-Hour Duration

To arrive at a 1-hour unit hydrograph, the S-curve is lagged by 1 hour and the difference between the two lagged S-curves is found to be a 1 hour unit hydrograph.

However, because the S-curve was formulated from unit hydrographs having a 6 hour duration of uniformly distributed precipitation, the hydrograph resulting from the subtracting the two S-curves will be the result of 1/6 of an inch of precipitation.

Thus the ordinates of the newly created 1-hour unit hydrograph must be multiplied by 6 in order to be a true unit hydrograph.

The 1-hour unit hydrograph should have a higher peak which occurs earlier than the 6-hour unit hydrograph.

Page 27: 6 Uhg Theory

Final 1-hour UHGFinal 1-hour UHG

0.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

14000.00

Time (hrs.)

Un

it H

ydro

gra

ph

Flo

w (

cfs/

inch

)

0.00

10000.00

20000.00

30000.00

40000.00

50000.00

60000.00

Flo

w (

cfs)

S-curves are lagged by 1 hour and the difference

is found.1-hour unit

hydrograph resulting from lagging S-

curves and multiplying the difference by 6.

Page 28: 6 Uhg Theory

Average Several UHG’sAverage Several UHG’s

It is recommend that several unit hydrographs be derived and averaged.

The unit hydrographs must be of the same duration in order to be properly averaged.

It is often not sufficient to simply average the ordinates of the unit hydrographs in order to obtain the final unit hydrograph. A numerical average of several unit hydrographs which are different “shapes” may result in an “unrepresentative” unit hydrograph.

It is often recommended to plot the unit hydrographs that are to be averaged. Then an average or representative unit hydrograph should be sketched or fitted to the plotted unit hydrographs.

Finally, the average unit hydrograph must have a volume of 1 inch of runoff for the basin.

Page 29: 6 Uhg Theory

Synthetic UHG’sSynthetic UHG’s

Snyder SCS Time-area

Page 30: 6 Uhg Theory

SnyderSnyder

Since peak flow and time of peak flow are two of the most important parameters characterizing a unit hydrograph, the Snyder method employs factors defining these parameters, which are then used in the synthesis of the unit graph (Snyder, 1938).

The parameters are Cp, the peak flow factor, and Ct, the lag factor.

The basic assumption in this method is that basins which have similar physiographic characteristics are located in the same area will have similar values of Ct and Cp.

Therefore, for ungaged basins, it is preferred that the basin be near or similar to gaged basins for which these coefficients can

be determined.

Page 31: 6 Uhg Theory

Basic RelationshipsBasic Relationships

3.0)(catLAG

LLCt

5.5LAG

duration

tt

)(25.0.. durationdurationaltLAGlagalt

tttt

83 LAG

base

tt

LAG

p

peak t

ACq

640

Page 32: 6 Uhg Theory

Final ShapeFinal Shape

The final shape of the Snyder unit hydrograph is controlled by the equations for width at 50% and 75% of the peak of the UHG:

Page 33: 6 Uhg Theory

SCSSCS

SCS Dimensionless UHG Features

0

0.2

0.4

0.6

0.8

1

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5

T/Tpeak

Q/Q

pe

ak

Flow ratios

Cum. Mass

Page 34: 6 Uhg Theory

Dimensionless RatiosDimensionless RatiosTime Ratios

(t/tp)Discharge Ratios

(q/qp)Mass Curve Ratios

(Qa/Q)0 .000 .000.1 .030 .001.2 .100 .006.3 .190 .012.4 .310 .035.5 .470 .065.6 .660 .107.7 .820 .163.8 .930 .228.9 .990 .300

1.0 1.000 .3751.1 .990 .4501.2 .930 .5221.3 .860 .5891.4 .780 .6501.5 .680 .7001.6 .560 .7511.7 .460 .7901.8 .390 .8221.9 .330 .8492.0 .280 .8712.2 .207 .9082.4 .147 .9342.6 .107 .9532.8 .077 .9673.0 .055 .9773.2 .040 .9843.4 .029 .9893.6 .021 .9933.8 .015 .9954.0 .011 .9974.5 .005 .9995.0 .000 1.000

Page 35: 6 Uhg Theory

Triangular RepresentationTriangular RepresentationSCS Dimensionless UHG & Triangular Representation

0

0.2

0.4

0.6

0.8

1

1.2

0.0 1.0 2.0 3.0 4.0 5.0

T/Tpeak

Q/Q

pea

k

Flow ratios

Cum. Mass

Triangular

Excess Precipitation

D

Tlag

Tc

TpTb

Point of Inflection

Page 36: 6 Uhg Theory

Triangular RepresentationTriangular Representation

pb T x 2.67 T

ppbr T x 1.67 T - T T

)T + T( 2

q =

2

Tq +

2

Tq = Q rp

prppp

T + T

2Q = q

rpp

T + T

Q x A x 2 x 654.33 = q

rpp The 645.33 is the conversion used for

delivering 1-inch of runoff (the area under the unit hydrograph) from 1-square

mile in 1-hour (3600 seconds). T

Q A 484 = q

pp

SCS Dimensionless UHG & Triangular Representation

0

0.2

0.4

0.6

0.8

1

1.2

0.0 1.0 2.0 3.0 4.0 5.0

T/Tpeak

Q/Q

pea

k

Flow ratios

Cum. Mass

Triangular

Excess Precipitation

D

Tlag

Tc

TpTb

Point of Inflection

Page 37: 6 Uhg Theory

484 ?484 ?

Comes from the initial assumption that 3/8 of the volume under the UHG is under the rising limb and the remaining 5/8

is under the recession limb.

General Description Peaking Factor Limb Ratio (Recession to Rising)

Urban areas; steep slopes

575 1.25

Typical SCS 484 1.67 Mixed urban/rural 400 2.25 Rural, rolling hills 300 3.33 Rural, slight slopes 200 5.5

Rural, very flat 100 12.0

T

Q A 484 = q

pp

Page 38: 6 Uhg Theory

Duration & Timing?Duration & Timing?

L + 2

D = T p

cTL *6.0

L = Lag time

pT 1.7 D Tc

T = T 0.6 + 2

Dpc

For estimation purposes : cT 0.133 D

Again from the triangle

Page 39: 6 Uhg Theory

Time of ConcentrationTime of Concentration

Regression Eqs. Segmental Approach

Page 40: 6 Uhg Theory

A Regression EquationA Regression Equation

TlagL S

Slope

08 1 0 7

1900 05

. ( ) .

(% ) .

where : Tlag = lag time in hoursL = Length of the longest drainage path in feetS = (1000/CN) - 10 (CN=curve number)%Slope = The average watershed slope in %

Page 41: 6 Uhg Theory

Segmental ApproachSegmental Approach

More “hydraulic” in nature The parameter being estimated is essentially the time of

concentration or longest travel time within the basin. In general, the longest travel time corresponds to the longest

drainage path The flow path is broken into segments with the flow in each

segment being represented by some type of flow regime. The most common flow representations are overland, sheet, rill

and gully, and channel flow.

Page 42: 6 Uhg Theory

A Basic ApproachA Basic Approach 2

1

kSV

McCuen (1989) and SCS (1972) provide values of k for several flow situations

(slope in %)

K Land Use / Flow Regime 0.25 Forest with heavy ground litter, hay meadow

(overland flow) 0.5 Trash fallow or minimum tillage cultivation; contour

or strip cropped; woodland (overland flow) 0.7 Short grass pasture (overland flow) 0.9 Cultivated straight row (overland flow) 1.0 Nearly bare and untilled (overland flow); alluvial fans

in western mountain regions 1.5 Grassed waterway 2.0 Paved area (sheet flow); small upland gullies

Flow Type K Small Tributary - Permanent or

intermittent streams which appear as solid or dashed blue lines on USGS

topographic maps.

2.1

Waterway - Any overland flow route which is a well defined swale by

elevation contours, but is not a stream section as defined above.

1.2

Sheet Flow - Any other overland flow path which does not conform to the

definition of a waterway.

0.48

Sorell & Hamilton, 1991

Page 43: 6 Uhg Theory

Triangular ShapeTriangular Shape

In general, it can be said that the triangular version will not cause or introduce noticeable differences in the simulation of a storm event, particularly when one is concerned with the peak flow.

For long term simulations, the triangular unit hydrograph does have a potential impact, due to the shape of the recession limb.

The U.S. Army Corps of Engineers (HEC 1990) fits a Clark unit hydrograph to match the peak flows estimated by the Snyder unit hydrograph procedure.

It is also possible to fit a synthetic or mathematical function to the peak flow and timing parameters of the desired unit hydrograph.

Aron and White (1982) fitted a gamma probability distribution using peak flow and time to peak data.

Page 44: 6 Uhg Theory

Fitting a Gamma DistributionFitting a Gamma Distribution

)1(),;(

1

ab

etbatf

a

bta

0.0000

50.0000

100.0000

150.0000

200.0000

250.0000

300.0000

350.0000

400.0000

450.0000

500.0000

0.0000 1.0000 2.0000 3.0000 4.0000 5.0000 6.0000

Page 45: 6 Uhg Theory

Time-AreaTime-Area

Page 46: 6 Uhg Theory

Time-AreaTime-Area

Time

Q % Area

Time

100%

Timeof conc.

Page 47: 6 Uhg Theory

Time-AreaTime-Area

Page 48: 6 Uhg Theory

Hypothetical ExampleHypothetical Example

A 190 mi2 watershed is divided into 8 isochrones of travel time. The linear reservoir routing coefficient, R, estimated as 5.5

hours. A time interval of 2.0 hours will be used for the computations.

WatershedBoundary

Isochrones

2

345

66

7

8

6

6

5

7

7

1

0

Page 49: 6 Uhg Theory

Rule of ThumbRule of Thumb

R - The linear reservoir routing coefficient can be estimated as approximately 0.75

times the time of concentration.

Page 50: 6 Uhg Theory

Basin BreakdownBasin Breakdown

Map Area #

Bounding Isochrones

Area (mi2)

Cumulative Area (mi2)

Cumulative Time (hrs)

1 0-1 5 5 1.0 2 1-2 9 14 2.0 3 2-3 23 37 3.0 4 3-4 19 58 4.0 5 4-5 27 85 5.0 6 5-6 26 111 6.0 7 6-7 39 150 7.0 8 7-8 40 190 8.0

TOTAL 190 190 8.0

WatershedBoundary

Isochrones

2

345

66

7

8

6

6

5

7

7

1

0

Page 51: 6 Uhg Theory

Incremental AreaIncremental Area

0

5

10

15

20

25

30

35

40

Incr

emen

tal

Are

a (s

qau

re m

iles

)

1 2 3 4 5 6 7 8

Time Increment (hrs)

WatershedBoundary

Isochrones

2

345

66

7

8

6

6

5

7

7

1

0

Page 52: 6 Uhg Theory

Cumulative Time-Area CurveCumulative Time-Area Curve

0

1

2

3

4

5

6

7

8

9

0 20 40 60 80 100 120 140 160 180 200

Time (hrs)

Cu

mu

lati

ve A

rea

(sq

aure

mil

es)

WatershedBoundary

Isochrones

2

345

66

7

8

6

6

5

7

7

1

0

Page 53: 6 Uhg Theory

Trouble Getting a Time-Area Trouble Getting a Time-Area Curve?Curve?

0.5) Ti (0for 414.1 5.1 ii

TTA

1.0) Ti (0.5for )1(414.11 5.1 ii

TTA

Synthetic time-area curve - The U.S. Army Corps of Engineers (HEC 1990)

Page 54: 6 Uhg Theory

Instantaneous UHGInstantaneous UHG

)1()1(

iiiIUHccIIUH

tR

tc

2

2

t = the time step used n the calculation of the translation unit hydrograph

The final unit hydrograph may be found by averaging 2 instantaneous unit hydrographs that are a t time step apart.

Page 55: 6 Uhg Theory

ComputationsComputationsTime(hrs)

(1)

Inc.Area(mi2)(2)

Inc.TranslatedFlow (cfs)

(3)

Inst. UHG

(4)

IUHGLagged 2

hours(5)

2-hrUHG(cfs)(6)

0 0 0 0 02 14 4,515 1391 0 7004 44 14,190 5333 1,391 3,3606 53 17,093 8955 5,333 7,1508 79 25,478 14043 8,955 11,50010 0 0 9717 14,043 11,88012 6724 9,717 8,22014 4653 6,724 5,69016 3220 4,653 3,94018 2228 3,220 2,72020 1542 2,228 1,89022 1067 1,542 1,30024 738 1,067 90026 510 738 63028 352 510 43030 242 352 30032 168 242 20034 116 168 14036 81 116 10038 55 81 7040 39 55 5042 26 39 3044 19 26 2046 13 19 2048 13

Page 56: 6 Uhg Theory

Incremental AreasIncremental Areas

0

10

20

30

40

50

60

70

80

90

0 2 4 6 8 10

Time Increments (2 hrs)

Are

a In

crem

ents

(sq

uar

e m

iles

)

Page 57: 6 Uhg Theory

Incremental FlowsIncremental Flows

0

5000

10000

15000

20000

25000

30000

1 2 3 4 5 6

Time Increments (2 hrs)

Tra

nsl

ated

Un

it H

ydro

gra

ph

Page 58: 6 Uhg Theory

Instantaneous UHGInstantaneous UHG

0

2000

4000

6000

8000

10000

12000

14000

16000

0 10 20 30 40 50 60

Time (hrs)

Flo

w (

cfs/

inch

)

Page 59: 6 Uhg Theory

Lag & AverageLag & Average

0

2000

4000

6000

8000

10000

12000

14000

16000

0 10 20 30 40 50 60

Time (hrs)

Flo

w (

cfs/

inch

)

Page 60: 6 Uhg Theory

Convolution

Putting It All Together

Page 61: 6 Uhg Theory

The Basic Process….

Excess Precip. Model

Excess Precip.

Excess Precip.

Runoff Hydrograph

Runoff Hydrograph

Stream and/or Reservoir “Routing”

Downstream Hydrograph

Basin “Routing” UHG Methods

Necessary for a single basin

Page 62: 6 Uhg Theory

ConvolutionConvolution

CN = 68 S= 4.706 IA = 0.9412Time Ppt Cum Ppt.cum. ROInc. ROUHG(@360)RO1(UHG)RO2(UHG)RO3(UHG)RO4(UHG)

0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.001 0.7 0.7 0.01 0.01 750.00 0.00 0.00 0.00 0.002 1.2 1.9 0.16 0.15 1500.00 0.00 9.77 0.00 0.003 0.6 2.5 0.39 0.23 2250.00 0.00 19.54 111.95 0.004 1.5 4 1.20 0.82 2850.00 0.00 29.31 223.90 169.195 6.3 10.3 6.23 5.02 3625.00 0.00 37.13 335.85 338.376 4 14.3 9.88 3.65 3400.00 0.00 47.23 425.41 507.567 0 14.3 9.88 0.00 3150.00 0.00 44.30 541.09 642.918 1.6 15.9 11.38 1.50 2725.00 0.00 41.04 507.50 817.749 0.4 16.3 11.76 0.38 2500.00 0.00 35.50 470.19 766.9810 0.2 16.5 11.95 0.19 2250.00 0.00 32.57 406.75 710.5911 0.6 17.1 12.51 0.57 1925.00 0.00 29.31 373.16 614.7112 0.1 17.2 12.61 0.09 1675.00 0.00 25.08 335.85 563.9613 0 17.2 12.61 0.00 1450.00 0.00 21.82 287.34 507.5614 0 17.2 12.61 0.00 1225.00 0.00 18.89 250.02 434.2515 0 17.2 12.61 0.00 1000.00 0.00 15.96 216.43 377.8516 0 17.2 12.61 0.00 775.00 0.00 13.03 182.85 327.1017 0 17.2 12.61 0.00 550.00 0.00 10.10 149.27 276.3418 0 17.2 12.61 0.00 325.00 0.00 7.17 115.68 225.5819 0 17.2 12.61 0.00 100.00 0.00 4.23 82.10 174.8320 0 17.2 12.61 0.00 0.00 0.00 1.30 48.51 124.0721 0 17.2 12.61 0.00 0.00 0.00 0.00 14.93 73.3122 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 22.5623 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0024 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0025 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0026 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0027 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0028 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0029 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0030 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0031 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0032 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.0033 0 17.2 12.61 0.00 0.00 0.00 0.00 0.00 0.00

Page 63: 6 Uhg Theory

Individual ResponsesIndividual Responses

Individual Responses

-5000.00

0.00

5000.00

10000.00

15000.00

20000.00

0 5 10 15 20 25 30 35 40 45

Time (hrs)

Flo

w (

cfs)

Page 64: 6 Uhg Theory

Overall ResponseOverall Response

Overall Response

-5000.00

0.00

5000.00

10000.00

15000.00

20000.00

25000.00

30000.00

35000.00

40000.00

0 5 10 15 20 25 30 35 40 45

Time (hrs)

Flo

w (

cfs)

Page 65: 6 Uhg Theory

UHG Application

UHG’s in the NWSRFS – a few issues

Page 66: 6 Uhg Theory

The SAC-SMA UHG

The SAC-SMA model computes the following components:Surface runoff which occurs when the storage capacity of the upper zone free water is exceeded.Impervious runoff from impermeable surfaces (if the percent impervious is set to a value greater than zero.Direct runoff from additional impervious surfaces (if applicable).Interflow and baseflow contributions.

Page 67: 6 Uhg Theory

More on SAC-SMA UHG

When developing a unit hydrograph for the SAC-SMA model, the user should attempt to separate out both baseflow and interflow.

Page 68: 6 Uhg Theory

SAC-SMA – more…

The very nature of the unit hydrograph is that is time distributes the runoff or excess precipitation. Therefore, it accounts for lagging or delays. The SAC-SMA model also accounts for delays in the interflow and baseflow components; therefore, they should not be accounted for in the unit hydrograph that is to be used with the SAC-SMA.

Page 69: 6 Uhg Theory

Issues w/ UHG in Forecasting

Storm Size Moving Storms