2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY:...

4
2nd Series of: Association of Electronic Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY: Singapore Industrial Automation Association(SIAA) Prakarsa Jaringan Cerdas Indonesia (PJCI) Ronco Expo Shanghai Myexpo Kreasi Indonesia CO-ORGANIZED BY:

Transcript of 2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY:...

Page 1: 2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY: Singapore Industrial Automation Association(SIAA) Prakarsa Jaringan Cerdas Indonesia

Shell Scheme Package Includes:- Rear and Dividing Wall Partition of 2,44M of Height in White Laminated Panel- 1 x 220V – 2 Amp Power Point- Needle Punch Carpet Flooring- 2 x Fluorescent Tube - 2 x Chairs - 1 x Information Desk - Fascia Board with Company Name - 1 x Waste Paper Basket

Raw Space:- Build Your Booth as Your Liking

(Custom Build)- 1 x 220V – 6 Amp Power Point

We are keen to : Exhibit Indoor Raw Space Area ____sqm (Min. 18sqm)Exhibit Indoor Shell Scheme Area_____sqm (Min. 9sqm)For provisional bookings please email us at : [email protected] Call us at : (+6221) 22457802/ Mobile : (+62) 812 8638 3647

2nd Series of:

Association of ElectronicIndustries in Singapore (AEIS)

SUPPORTED BY: ORGANIZED BY:

Singapore Industrial AutomationAssociation(SIAA) Prakarsa Jaringan Cerdas

Indonesia (PJCI)

Ronco Expo Shanghai Myexpo Kreasi Indonesia

CO-ORGANIZED BY:

Page 2: 2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY: Singapore Industrial Automation Association(SIAA) Prakarsa Jaringan Cerdas Indonesia

About the EventContinuing the successful story of POWERMAX 2017, the 2nd edition POWERMAX 2018 coming up to be the international platform to present the prospect of power-energy outlook and the latest project, providing market and industrial player, showcase the update new development technology and information to spur the industry sector globally. POWERMAX 2018 is pointed to take the leading and connecting industry in the sector energy and Power Plant covering from upstream, mid and downstream. The 2nd edition of POWERMAX 2018 is provide new look incorporating with The Indonesia Primary Energy Summit 2018 for Conference Program (IPEC 2018) will held by top key note speakers to industrial outlook update for Power Plant and Renewable energy sector, POWERMAX 2018 perform new concept featuring Renewable Energy, Bioenergy, Oil & Gas and Mining.

POWERMAX event is dedicated to answering the challenge and opportunity of Power Plant and Manufacturing-Automation industry and it’s prospective in Indonesia 2018 ahead. POWERMAX event held to encourage the Indonesia Government program to actualize electricity supply to reach capacity 35000 MW and supply the energy national throughout blue print National Energy supply Agency (Badan Pengelola Energi Nasional 2015-2025). Keeping eye on develop market to accelerate national economic growth by inviting the investor through POWERMAX event

Some of Interesting Facts: INDONESIA STUMBLES ON MEGA POWER PROJECT

The government’s plan to develop an additional 35,000 megawatts (MW) of electricity capacity by 2019 has hit a couple of speed bumps since it was announced last year, prompting President Joko “Jokowi” Widodo to order a review of the feasibility of the ambitious project. In mid-2015, President Jokowi announced a target of installing 35,000 MW of capacity before 2019, as electricity demand is predicted to increase by 7,000 MW per year. (thejakartapost.com May 16 2016)

Minister of Energy and Mineral Resources Ignatius Jonan and President Director of Perusahaan Listrik Negara (PLN) Sofyan Basir have witnessed the signing of 11 power purchase agreements (PPA) for new renewable energy between state-owned PLN and independent power producers (IPP) on Friday (9/8/2017). The total capacity of the 11 PPAs reaches 291.4 megawatts (MW).

The signing of PPA today is a continuation of new renewable energy PPA signing on August 2, 2017, with a capacity of 257.17 MW. With the addition of today’s PPA, the total capacity from the PPAs touches 548.57 MW

The potential for new renewable energy power plant development will continue to be improved, given its wider affordability and reaching Indonesia’s remote areas.

This is in line with RUPTL 2017 - 2026, where new renewable energy power plant reaches 23 percent by 2025 with a capacity of 45 GW. (www.en.netralnews.com)

Indonesia to Auction off Geothermal Power Projects Worth $1b

The government will auction off six geothermal projects worth $1.02 billion in September to expand Indonesia’s renewable energy capacity as part of its plan to become the world’s largest geothermal producer. Local companies and foreign investors from the United States, Italy, Japan, South Korea, Turkey and China have expressed interest in the projects, which will have a combined capacity of 255 megawatts.The government aims for Indonesia, which is now the world’s third-largest geothermal producer, to become the world’s largest by 2021, overtaking current number one, the United States. Indonesia expects to have a total geothermal capacity of 3,559.5 MW within the next four years. The country’s total geothermal capacity amounted to 1,643.5 MW last year.(electricindonesia.com)

The government is planning to increase the use of new renewable energy for electricity by 2025. The Electricity Provision Business Plan (RUPTL) 2017-2026 signed in March says that the uptake of new renewable energy will be increased from 19.6 percent to 22.6 percent by 2025.

highlight events: - Business Trade Network And Consultation- Conference Program- Demonstration Product On Board- Technical Presentation On Site

- Interactive Display Machineries, Technology & Equipments- International Pavilion- More Than 8000 Target Visitor- More Than 150 International Exhibitor

Page 3: 2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY: Singapore Industrial Automation Association(SIAA) Prakarsa Jaringan Cerdas Indonesia

The government also plans to operate power stations with a total capacity of 125 gigawatts (GW), or 125,000 megawatts (MW). Seventy GW of electricity is expected to be installed by 2019.(en.tempo.co)

Investment in Indonesia’s Electricity Sector; Sparks of Life

Indonesia aims to achieve nearly complete electrification of the country by 2020. During the APEC CEO Summit in Beijing, President Widodo therefore announced his crucial goal: to boost Indonesia’s electricity production and distribution to facilitate economic growth. He laid out his ambitious infrastructure project plans and pledged to allocate most of his resources in the immediate term to facilitate infrastructure development. Currently, the government has a nationwide target of 53 MW installed power capacity, and annual electricity sales of 220 TWH. For the electricity ratio, the Indonesian government plans to increase the ratio to 97.2% by 2019 from the current 87.5%. (gbgindonesia.com)

Whatever Happened to Indonesia’s Mighty Oil and Gas Industry?

Indonesia’s Energy and Mineral Resources Minister Ignasius Jonanwas planning for expansion and aimed to lure as much as $200 billion in investment over the next decade, offering incentives such as tax-free import of drilling equipment and simpler cost recovery. It is also revising the tax structure. He said state-owned oil giant PT Pertamina is spending billions of dollars to boost production and refining capacity and Indonesia’s crude output is expected to top 1 million barrels a day by 2019, from about 800,000 barrels now. (bloomberg.com)

ABOUT ORGANIZER :

MyExpo Kreasi Indonesia is a professional event organizer of exhibition that specialized on combining various industry sector by line of business (LOB) concept and committed to enhance and avail support international exhibition industry in Indonesia.

WHY EXHIBIT ?

POWERMAX provides international Power Plant, Manufacturing - Automation, Renewable Energy, Oil & Gas and Mining supply chain sector across upstream, mid and downstream energy companies with a B2B platform to meet and influence highly focused international decision-makers and buyers.Connect market globally through 4800 Square Meters Exhibition Space (upgraded to more than 75% from last year) with more than 8,000 attendees International showcasing over 350 Regional and International brands and product from Regional and International Exhibitors.Conference Program by international top level speakers by PJCI

MAJOR PARTICIPATING IN 2017 :

KEMETERIAN ESDM, KEMENTERIAN PERINDUSTRIAN RI, PLN, INDONESIA POWER, BKPM, EXTRANA CABLE, SCHNEIDER, SIEMENS, PILLAR HANDAL, TORISHIMA GUNA ENGINEERING, BINDER INDONESIA, AUTOGAS, SOUTHERN TRISTAR, KREASI SUKSES INDONESIA, NTP, POWERLINK,TRAFOINDO

WHO WILL YOU MEET ?

POWERMAX targeted to international power and energy companies Tittle Owner, EPC, Directors, Managers, Purchasers, Maintenance, Engineers, End User, User and Supplier who operate across the up, mid and downstream sectors of the Power Plant featuring Renewable Energy and Unrenewable Energy, Manufacturing - Automation supply chain with a B2B platform to meet and influence highly focused international decision-makers and buyers.

EXHIBITOR PROFILE :

Consultant, Inspection, Boiler, Turbine, Pipe, Coal fire Industry, Gas Related, Engineering, IT and Software, Bearing, Conveyor , Belt, Steel, Batteries, Solar Energy & Lighting, Panel Control, Instrumentation, Generator, Hydro power, Electricity equipment, IPP, Machineries, Automation system, Power Plant equipment and technology, Pumps, Policy makers and Governments related agencies, Geothermal Developers, Resources Companies, Power Plant EPC, Contractors and Services Companies, Drilling Contractors & Survey Companies, Mining Technology and Services, Heavy Equipment, Equipment Manufacturers and Suppliers, Supporting Consultancies, Financial and Investment Institutions, Civil Society Organization, Cables & Cabling Equipment, Wire, Welding & Metal Fabrication, Safety Equipment & System, Heat Exchanger, Generator, Trafo, Hand Tools & Power Tool, Meters & Metering Devices, Parts, Components & Accessories, Compressors, Gas & Fuel, Clean Energy, Oil & Gas, Exploration, production, Refinery, Energy Efficiency & Conservation, Steel, Container, Transmission, Logistics, Combustion System, Cooling System, etc..

Page 4: 2nd Series of - Welcome to Myexpo...Industries in Singapore (AEIS) SUPPORTED BY: ORGANIZED BY: Singapore Industrial Automation Association(SIAA) Prakarsa Jaringan Cerdas Indonesia

VENUE

COST OF PARTICIPATION

JIEXPO Kemayoran Jakarta

POWERMAX 2018 will be held at Jakarta International Expo (JIEXPO) Kemayoran, Jakarta, Indonesia. JIEXPO is known as perfect destination for the MICE industry stakeholder in Indonesia, with Excellent reputation, JIEXPO proven with the success of many events, projects. Located in the center of Jakarta, it is strategic location and easy accessible both to the airport and to the harbor with accessible 4 & 5 star hotel. Shuttle bus will be provided for your convenience transport from hotel to venue - venue to hotel on exhibition days.

DKI Jakarta

Jakarta is the capital city of the Republic of Indonesia, it also has a greater population than other city in Southeast Asia with a current population around 9 million people. Covering of 637.44 square km area, Jakarta is the center of government, commerce and industry and has an extensive communication network with outside world. Strategically positioned in the archipelago, the city also become the gateway of Indonesia. The accessibility to rest of Jakarta spur the development of business in any sectors.

Raw Space Only (Min 18sqm)

360 USD PER SQM“Ideal For Companies With LargeExhibits Or Simply For Those WithMore Flair...”

Shell Scheme Package Includes:- Rear and Dividing Wall Partition of 2,44M of Height in White Laminated Panel- 1 x 220V – 2 Amp Power Point- Needle Punch Carpet Flooring- 2 x Fluorescent Tube - 2 x Chairs - 1 x Information Desk - Fascia Board with Company Name - 1 x Waste Paper Basket

Raw Space:- Build Your Booth as Your Liking

(Custom Build)- 1 x 220V – 6 Amp Power Point

We are keen to : Exhibit Indoor Raw Space Area ____sqm (Min. 18sqm)Exhibit Indoor Shell Scheme Area_____sqm (Min. 9sqm)For provisional bookings please email us at : [email protected] Call us at : (+6221) 22457802/ Mobile : (+62) 812 8638 3647

Standard Shell Scheme (9sqm)

380 USD PER SQM“Leave The Work To Us AndWalk Onto A Furnished StandWith Chairs & Tables.”

HAVE IT RAW!

SHELL ME UP!

Association of Electronic

Industries in Singapore (AEIS)

SUPPORTED BY: ORGANIZED

Singapore Industrial Automation

Association(SIAA)

Prakarsa Jaringan Cerdas

Indonesia (PJCI)Ronco Expo Shanghai Myexpo Kreasi Indonesia

CO-ORGANIZED BY: