20to2T5m100cm Images Van Graves February 13, 2014.

16
20to2T5m100cm Images Van Graves February 13, 2014

Transcript of 20to2T5m100cm Images Van Graves February 13, 2014.

Page 1: 20to2T5m100cm Images Van Graves February 13, 2014.

20to2T5m100cm Images

Van Graves

February 13, 2014

Page 2: 20to2T5m100cm Images Van Graves February 13, 2014.

2 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Overall View with 5 Cryostats• Beam extends to Z=1-0m

• Target chamber extends to Z=-5m

• Placeholder focusing magnet shown near Z=-5m

Page 3: 20to2T5m100cm Images Van Graves February 13, 2014.

3 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 4: 20to2T5m100cm Images Van Graves February 13, 2014.

4 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Target Region• Chamber extension would require supports and helium channels

Page 5: 20to2T5m100cm Images Van Graves February 13, 2014.

5 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 6: 20to2T5m100cm Images Van Graves February 13, 2014.

6 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Target Extraction

• Beam path to focusing magnets is at slight angles to the magnetic axis

• Upstream end of main cryostat Z=-2.3m, target length 3.6m inside cryostat

• Target cannot be extracted without first removing focusing magnet(s)

Page 7: 20to2T5m100cm Images Van Graves February 13, 2014.

7 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Front Elevation Views

Page 8: 20to2T5m100cm Images Van Graves February 13, 2014.

8 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 9: 20to2T5m100cm Images Van Graves February 13, 2014.

9 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 10: 20to2T5m100cm Images Van Graves February 13, 2014.

10 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Target Chamber Views

Page 11: 20to2T5m100cm Images Van Graves February 13, 2014.

11 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 12: 20to2T5m100cm Images Van Graves February 13, 2014.

12 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Target Chamber Isometrics

Page 13: 20to2T5m100cm Images Van Graves February 13, 2014.

13 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Page 14: 20to2T5m100cm Images Van Graves February 13, 2014.

14 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Downstream Beam Windows• Double Be windows at both ends of each cryo module

• 23cm IR, 1mm thick, 1cm gap

• All these are replaceable maintenance items

Page 15: 20to2T5m100cm Images Van Graves February 13, 2014.

15 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Window Close-up

Page 16: 20to2T5m100cm Images Van Graves February 13, 2014.

16 Managed by UT-Battellefor the U.S. Department of Energy 20to2T5m100cm Images 13 Feb 2014

Window Attachment

Tungsten shield module

Gasket requires precise surface on shielding

Be windows

Interstitial gap requires monitoring(line not shown)

Space for fasteners (tapped hole in shielding not shown)