Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

20
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013

Transcript of Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

Page 1: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

Review of Recent IDS120 Target Concepts

Van Graves

October 31, 2013

Page 2: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

2 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

NF Target Concept Evolution (Abridged Version)

• Historical (Study 2) baseline: 20T (15+5) field

• MERIT Experiment: 15T solenoid but was proof-of-concept for 20T system

• MAP: re-started concept development using Study 2 as baseline– Early mercury vessel concept had upstream jet

with downstream drain; later switched to upstream drain

• Subsequent efforts focused on realistic coil sizes, coil shielding, coil configurations

• Mercury vessel refinement revealed geometric complexities needed to integrate with resistive coils

Page 3: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

3 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Concept Evolution (cont’d)• Started considering utility & facility requirements

– He cooling, splash mitigation, double Hg containment, RH, etc.

• Coil sizes continued to increased due to shielding issues until IDS120– Field profile work continued, which led to several coil

configurations

– IDS-NF continued with 20T baseline, MAP began seriously considering 15T

• Early 2013– Latest concept models developed for 15T- and 20T-cases in

support of IPAC’13 papers

• Field tapers to 1.5T over 7m rather than 15m

• Cryostat breaks considered length of mercury module

• IDS120_15-1.5T7m3+4 (MAP)

• IDS120_20-1.5T7m2+5 (IDS-NF)

Page 4: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

4 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120 Coil Comparison - Sections

IDS120H

IDS120K

IDS12020-1.5T7m2+5

IDS12015-1.5T7m3+4

Page 5: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

5 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Latest 20T CAD Concept(IDS120_20-1.5T7m2+5)

Page 6: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

6 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120_20-1.5T7m2+5 Front Section

Page 7: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

7 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Superconducting coilsMercury Module: mercury jet, collection pool + resistive coils

Shielding Module:Tungsten beads,He-gas cooled

Cryostat

IDS120_20-1.5T7m2+5 Cryo 1 Iso

Page 8: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

8 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120_20-1.5T7m2+5 Cryo 1 CloseUp

Incorporates concept for double wall mercury containment

Page 9: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

9 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Latest 15T CAD Concept(IDS120_15-1.5T7m3+4)

Page 10: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

10 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120_15-1.5T7m3+4 Front Section

Page 11: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

11 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Superconducting coilsMercury Module: collection pool,mercury jet

Shielding Module:Tungsten beads,He-gas cooled

Cryostat

IDS120_15-1.5T7m3+4 Cryo1

Page 12: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

12 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120_15-1.5T7m3+4 Target Module Section

Page 13: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

13 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120_15-1.5T7m3+4 Utility Connections

ShieldingHelium

RemoteHandlingFeatures

NozzleSupply

BeamEntrance

Vent

MercuryDrains

MercuryVesselHelium

Page 14: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

14 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

20T-15T Comparisons

Page 15: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

15 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Field Taper Comparison

Page 16: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

16 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Vessel Comparison

IDS120K

IDS120_20-1.5T7m2+5

IDS120_15-1.5T7m3+4

Approx.Magnetic

Axes

Z=0

Page 17: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

17 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

System Comparison

Page 18: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

18 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Mercury Module

Page 19: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

19 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

IDS120J Mercury Module is Still Current

Magnetic Axis

View from downstream

Upstream beam port

Page 20: Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.

20 Managed by UT-Battellefor the U.S. Department of Energy IDS120 Concept Review 31 Oct 2013

Current Mercury Module Description• Modular design for remote

handling

• Provisions for beam entry, Hg entry/exit, Hg draining, He entry/exit, chamber venting

• Double wall Hg containment

• Double wall Be window

• Horizontal top, sloped bottom (for draining)

• Interstitial space radially sectioned for He down-and-back cooling path