2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · Effective Date: 01/01/2020 THIS...
Transcript of 2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · Effective Date: 01/01/2020 THIS...
CONVOY VILLAGEOH8100112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159421EP001
Facility Name: CONVOY VILLAGE STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CONVOY VILLAGEOH8100112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8160620EP002
Facility Name: CONVOY VILLAGE STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CONVOY VILLAGEOH8100112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8162394EP003
Facility Name: CONVOY VILLAGE STU 3
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP003
EP003
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
CONVOY VILLAGEOH8100112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CONVOY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CONVOY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
CONVOY VILLAGEOH8100112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CONVOY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: CONVOY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
MIDDLE POINT VILLAGEOH8100312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8162463EP002
Facility Name: MIDDLE POINT NEW WTP 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020
MIDDLE POINT VILLAGEOH8100312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MIDDLE POINT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MIDDLE POINT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 507 EASTVIEW ST
Dual Sample Required between 3/7/2020at: DS201DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2016/1/2020 andDual Sample Required between 9/7/2020at: DS2019/1/2020 andDual Sample Required between 12/7/2020at: DS20112/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MIDDLE POINT VILLAGEOH8100312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MIDDLE POINT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 103 N ADAMS ST
Dual Sample Required between 3/7/2020at: DS202DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2026/1/2020 andDual Sample Required between 9/7/2020at: DS2029/1/2020 andDual Sample Required between 12/7/2020at: DS20212/1/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MIDDLE POINT, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
OHIO CITY VILLAGEOH8100412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8161766EP003
Facility Name: OHIO CITY WTP -WATER PLANT 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP003
EP003
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OHIO CITY VILLAGEOH8100412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OHIO CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OHIO CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
OHIO CITY VILLAGEOH8100412
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OHIO CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OHIO CITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
VAN WERT CITYOH8100611
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159424EP001
Facility Name: VAN WERT CITY
Effective Date: 01/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
EP001
Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020
A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.
VAN WERT CITYOH8100611
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159424EP001/LT2001
Facility Name: VAN WERT CITY
Effective Date: 01/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
EP001
LT2001
Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1
Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.
*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.
VAN WERT CITYOH8100611
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159424LT2001
Facility Name: VAN WERT CITY
Effective Date: 01/17/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 3Facility Source: Surface Water
LT200
LT2001
Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020
Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.
VAN WERT CITYOH8100611
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1DS201 WASTEWATER PLANT GATE HYDRANT 2115
Dual Sample Required between 2/14/2020at: DS201DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2015/8/2020 andDual Sample Required between 8/14/2020at: DS2018/8/2020 andDual Sample Required between 11/14/2020at: DS20111/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
VAN WERT CITYOH8100611
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1DS202 SOUTH WATER TOWER DRAIN
Dual Sample Required between 2/14/2020at: DS202DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2025/8/2020 andDual Sample Required between 8/14/2020at: DS2028/8/2020 andDual Sample Required between 11/14/2020at: DS20211/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1DS203 800 N. WASHINGTON ST.
Dual Sample Required between 2/14/2020at: DS203DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2035/8/2020 andDual Sample Required between 8/14/2020at: DS2038/8/2020 andDual Sample Required between 11/14/2020at: DS20311/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1DS204 BURT/CABLE HYDRANT 2089
Dual Sample Required between 2/14/2020at: DS204DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2045/8/2020 andDual Sample Required between 8/14/2020at: DS2048/8/2020 andDual Sample Required between 11/14/2020at: DS20411/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: VAN WERT CITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
RIDGEVIEW BEHAVIORAL HOSPITALOH8100712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159425EP001
Facility Name: RIDGEVIEW BEHAVIORAL HOSPITAL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
RIDGEVIEW BEHAVIORAL HOSPITALOH8100712
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RIDGEVIEW HOSPITAL DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RIDGEVIEW HOSPITAL DISTRIBUTIONDS201 17872 LINCOLN HWY, MIDDLE POINT
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RIDGEVIEW HOSPITAL DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WILLSHIRE VILLAGEOH8100911
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159426EP001
Facility Name: WILLSHIRE VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WILLSHIRE VILLAGEOH8100911
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLSHIRE VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLSHIRE VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS201 18182 STATE ROUTE 49
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WILLSHIRE VILLAGEOH8100911
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLSHIRE VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS202 103 HOGAN ST
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLSHIRE VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 6/30/202010LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202010 7/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
BROOKSIDE DAIRY & CONVENIENCE STORE
2020 MONITORING SCHEDULE
OH8130612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BROOKSIDE DAIRY DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BROOKSIDE DAIRY & CONVENIENCE STORE
2020 MONITORING SCHEDULE
OH8130612 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BROOKSIDE DAIRYGround Water Facility Class: CLASS A
8159428
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VAN WERT CINEMAS
2020 MONITORING SCHEDULE
OH8131112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VAN WERT CINEMAS DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VAN WERT CINEMAS
2020 MONITORING SCHEDULE
OH8131112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VAN WERT CINEMASGround Water
8159432
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE BEARS DEN
2020 MONITORING SCHEDULE
OH8131212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: THE BEARS DEN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
THE BEARS DEN
2020 MONITORING SCHEDULE
OH8131212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: THE BEARS DEN WTPGround Water
8159433
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRYSIDE CHAPEL UM CHURCH
2020 MONITORING SCHEDULE
OH8131312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COUNTRYSIDE CHAPEL UM DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COUNTRYSIDE CHAPEL UM CHURCH
2020 MONITORING SCHEDULE
OH8131312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COUNTRYSIDE CHAPEL UMGround Water
8159434
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
E & R TRAILER SALES
2020 MONITORING SCHEDULE
OH8131712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: E AND R TRAILER SALES DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
E & R TRAILER SALES
2020 MONITORING SCHEDULE
OH8131712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: E AND R TRAILER SALESGround Water
8159436
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
YMCA OF VAN WERT COUNTY
2020 MONITORING SCHEDULE
OH8131812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
YMCA OF VAN WERT COUNTY
2020 MONITORING SCHEDULE
OH8131812 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: YMCA OF VAN WERT COUNTYGround Water
8159437
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
FIRST BAPTIST CHURCH - VAN WERT
2020 MONITORING SCHEDULE
OH8132312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FIRST BAPTIST CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
FIRST BAPTIST CHURCH - VAN WERT
2020 MONITORING SCHEDULE
OH8132312 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FIRST BAPTIST CHURCHGround Water
8159440
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE I
2020 MONITORING SCHEDULE
OH8133012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE I
2020 MONITORING SCHEDULE
OH8133012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE I
2020 MONITORING SCHEDULE
OH8133012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUNDGround Water
8159443
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TIMBERWOODS CAMPING RESORT
2020 MONITORING SCHEDULE
OH8133912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: TIMBERWOODS CAMPING RESORT DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TIMBERWOODS CAMPING RESORT
2020 MONITORING SCHEDULE
OH8133912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TIMBERWOODS CAMPING RESORT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TIMBERWOODS CAMPING RESORT
2020 MONITORING SCHEDULE
OH8133912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TIMBERWOODS CAMPING RESORTGround Water
8159447
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
COOPER FARMS COOKED MEATSOH8134212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8159449EP001
Facility Name: COOPER FARMS COOKED MEATS VAN WERT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
COOPER FARMS COOKED MEATSOH8134212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COOPER FOODS PROCESSED M DISTRIBUTIO Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COOPER FOODS PROCESSED M DISTRIBUTIO Facility Class: CLASS 1DS201 TEST KITCHEN SINK
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COOPER FOODS PROCESSED M DISTRIBUTIO Facility Class: CLASS 1DS202 CRS KITCHEN SINK
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: COOPER FOODS PROCESSED M DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
REDEEMER LUTHERAN CHURCH-CONVOY
2020 MONITORING SCHEDULE
OH8134312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: REDEEMER LUTHERAN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
REDEEMER LUTHERAN CHURCH-CONVOY
2020 MONITORING SCHEDULE
OH8134312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: REDEEMER LUTHERAN CHURCHGround Water
8159450
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST PAULS REFORMED CHURCH IN AMERICA
2020 MONITORING SCHEDULE
OH8134712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST PAULS REFORMD CH AMERICA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST PAULS REFORMED CHURCH IN AMERICA
2020 MONITORING SCHEDULE
OH8134712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT PAULS REFORMED CHURCH AMERICAGround Water
8159451
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST THOMAS LUTHERAN CHURCH-VAN WERT
2020 MONITORING SCHEDULE
OH8134812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST THOMAS LUTHERAN CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ST THOMAS LUTHERAN CHURCH-VAN WERT
2020 MONITORING SCHEDULE
OH8134812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT THOMAS LUTHERAN CHURCHGround Water
8159452
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SALEM UNITED PRESBYTERIAN CH-VENEDOCIA
2020 MONITORING SCHEDULE
OH8134912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SALEM PRESBYTERIAN CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SALEM UNITED PRESBYTERIAN CH-VENEDOCIA
2020 MONITORING SCHEDULE
OH8134912 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SALEM PRESBYTERIAN CHURCHGround Water
8159453
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VAN-DEL DRIVE-IN
2020 MONITORING SCHEDULE
OH8135312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: VAN-DEL DRIVE-IN DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VAN-DEL DRIVE-IN
2020 MONITORING SCHEDULE
OH8135312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VAN-DEL DRIVE-IN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/14/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VAN-DEL DRIVE-IN
2020 MONITORING SCHEDULE
OH8135312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VAN-DEL DRIVE-INGround Water
8159455
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WREN RESTAURANT
2020 MONITORING SCHEDULE
OH8136512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WREN RESTAURANT DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WREN RESTAURANT
2020 MONITORING SCHEDULE
OH8136512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WREN RESTAURANTGround Water
8159458
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODOT REST AREA 1-27 EB
2020 MONITORING SCHEDULE
OH8136612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODOT-REST AREA 1-27 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODOT REST AREA 1-27 EB
2020 MONITORING SCHEDULE
OH8136612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODOT REST AREA 1-27Ground Water Facility Class: CLASS A
8159459
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODOT REST AREA 1-28 WB
2020 MONITORING SCHEDULE
OH8136712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODOT REST AREA 1-28 DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ODOT REST AREA 1-28 WB
2020 MONITORING SCHEDULE
OH8136712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODOT REST AREA 1-28Ground Water Facility Class: CLASS A
8159460
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE II
2020 MONITORING SCHEDULE
OH8136912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PH DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE II
2020 MONITORING SCHEDULE
OH8136912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE II
2020 MONITORING SCHEDULE
OH8136912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PHASE IIGround Water
8159462
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP CLAY - YMCA
2020 MONITORING SCHEDULE
OH8137012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP CLAY YMCA DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP CLAY - YMCA
2020 MONITORING SCHEDULE
OH8137012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP CLAY-YMCAGround Water
8160968
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH UNION UNITED METH CH - VAN WERT
2020 MONITORING SCHEDULE
OH8137112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
09/18/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NORTH UNION UNITED METHODIST CHURCH DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NORTH UNION UNITED METH CH - VAN WERT
2020 MONITORING SCHEDULE
OH8137112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NORTH UNION UNITED METHODIST CHURCHGround Water
8160969
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LINCOLNVIEW K-12 SCHOOLOH8137212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8162231EP002
Facility Name: LINCOLNVIEW K-12 SCHOOL
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
LINCOLNVIEW K-12 SCHOOLOH8137212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLNVIEW K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLNVIEW K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLNVIEW K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
LINCOLNVIEW K-12 SCHOOLOH8137212
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: LINCOLNVIEW K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
CAMP CLAY YMCA- NATURE CENTER
2020 MONITORING SCHEDULE
OH8137312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP CLAY NATURE CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP CLAY YMCA- NATURE CENTER
2020 MONITORING SCHEDULE
OH8137312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP CLAY NATURE CENTERGround Water
8161496
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KINGSLEY UNITED METHODIST CHURCH
2020 MONITORING SCHEDULE
OH8137412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KINGSLEY UNITED METHODIST CHURCH DISTRIBGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
KINGSLEY UNITED METHODIST CHURCH
2020 MONITORING SCHEDULE
OH8137412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KINGLSEY UNITED METHODIST CHURCHGround Water
8161533
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE III
2020 MONITORING SCHEDULE
OH8137512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PHASE III DISTGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE III
2020 MONITORING SCHEDULE
OH8137512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PHASE III DISTGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020
Sample(s) Required between1 2/1/2020 and 2/29/2020
Sample(s) Required between1 3/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Sample(s) Required between1 11/1/2020 and 11/30/2020
Sample(s) Required between1 12/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HUGGY BEAR CAMPGROUND PHASE III
2020 MONITORING SCHEDULE
OH8137512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HUGGY BEAR CAMPGROUND PHASE IIIGround Water
8162083
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LINCOLNVIEW BIBLE BOARD
2020 MONITORING SCHEDULE
OH8138012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LINCOLNVIEW BIBLE BOARD DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LINCOLNVIEW BIBLE BOARD
2020 MONITORING SCHEDULE
OH8138012 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LINCOLNVIEW BIBLE BOARDGround Water
8162462
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or