Our balanceForbo Flooring B.V.
creating better environments
Health Safety and the Environment
2012 annual report
2
This is the 2012 annual HSE report of Forbo Flooring B.V. We evaluate the company’s performance of the past year with regard to its health, safety and environmental (HSE) policy, and present our HSE objectives for 2013. This report succeeds the 2011 annual HSE report which was published in June 2012.
Each year, as part of our HSE policy, we publish an HSE report to inform our internal and external stakeholders. As such, this report forms an important part of our communication plan, the ISO 14001 environmental management system and the OHSAS 18001 occupational health and safety system.
Our balance
Background images
Photo cover & photo page 8
Project: Waikato HospitalLocation: Hamilton, New Zealand
Floor covering installed: 1700 m2 of Marmoleum Real
Photo page 4:
Project: Modez Mode & Design HotelLocation: Arnhem, the Netherlands
Floor covering installed: 450 m2 of Unexpected Nature
of linoleum, Cork linoleum and Bulletin Board
Photo page 14:
Project: Maria-Lenssen-BerufskollegLocation: Mönchengladbach, Germany
Floor covering installed: 2200 m2 of Marmoleum Vivace,
Walton Cirrus and Walton Uni
Photo page 20:
Project: Dutch railways intercity trainsLocation: the Netherlands
Floor covering installed: 25000 m2 of Marmoleum Striato
Photo page 24:
Project: Artevelde HogeschoolLocation: Ghent, Belgium
Floor covering installed: 1200 m2 of Marmoleum Decibel and
500 m2 of Bulletin Board for the wall
Photo page 28:
Project: Waterford Regional HospitalLocation: Waterford, Ireland
Floor covering installed: 1800 m2 of Marmoleum Vivace,
Marmoleum Real and Marmoleum Dutch Design.
Aquajet technology used.
HSE annual report 2012 3
Contents5 Preface 6 Our company 6 Bestbrand•Greenfloors•Newcross-dockwarehouse
7 Inspiringworkingenvironment•ForboinHetKlokhuis
9 HSEpolicystatement
10 HSE objectives 10Evaluationof2012objectivesandnewobjectivesfor2013
12 Our products 12TheNextGenerationofMarmoleum•Lifecycleanalysis•Sustainableproducts 15Locationsandproducts
16 Our People 16Safety
18Healthandsustainabledeployability
21Development-orientedstaffpolicy
23Staffinglevels•WorksCouncil
25Suggestionsandrelaxation
26 Our Planet Earth 26Efficientinenergy
27 Air
29Residualwaste
30Environmentalincidents
Joost Dirkx director Human Resources
‘Keepingthebalance bymakingwell-considered choices’
4
HSE annual report 2012 5
Thisannualreportfocusesonthesustainablebusinesspracticeof
ForboFlooring.Ourlinoleumfloorcoveringsarethemostsustaina-
blefloorcoveringsintheworld.Sustainableinthesenseof
ecologicallysound,butalsointhesenseofexcellentperformances
thateasilystandthetestoftime.Intermsofdurability,ourlinoleum
isbyfarthebestchoice.
This2012sustainabilityreportservestolookbackonthepastyear
andtolookforwardto2013.Thechoiceswemakeandtheactivities
weundertakehelpustocontinuouslykeepabalanceintermsofour
obligationstowardsourcustomers,employees,localresidents,
shareholdersandotherstakeholders.Short-termresultswillalso
havetocontributetolong-terminvestmentsandeffects.
ForForbo,2012wasayearinwhichwewerefacedwiththeharsh
realityoftheeconomiccrisis.Nevertheless,Idonotthinkweshould
beunhappyaboutthewayinwhichweconcludedtheyear.Afterall,
financialperformancescannotbeseparatedfromperformancesin
thefieldsofsafety,quality,sustainabilityandcustomersatisfaction.
Sometimes,onecarriesjustthatlittlebitmoreweightandwehave
totakecompensatingmeasurestorestorethebalance.However,
allouremployeesworkhardtokeepourcustomerssatisfiedandto
continuouslyimproveourperformances.Weparticularlyfocuson
safety.Thankstotheunabatedattentionwepaidtoworkingsafely
lastyearandtheimprovementofsafetyawareness,2012hasseen
alotfewerincidents.
Intermsofthestaffplanning,2012wasquiteachallenge.Dueto
fallingmarketdemand,weneededless(new)personnel.Becauseof
theimportanceofproductdevelopmentinthesechallengingtimes,
wedidinvestinexpandingourresearchanddevelopmentcapacity,
despitetheeconomichardship.
Withthe‘ForboinBalans’project,weaimforsustainableemployability
ofourstaff.Theobjectoftheprojectisajointfocusonemployability,
healthandahealthylifestyle,asafeandinspiringworkingenviron-
mentandatasksetgearedtotheworkloadcapacityofstaff.Many
employeesliterallystoodonthescales,withthebalancegoingthe
wrongwayattimes.Bytakingjointresponsibility,thebalanceis
restored.Theemployerfacilitatesandencouragesahealthylifestyle
andassuchhopesemployeeswillconsciouslyoptforabalancedand
healthierlifestyle.In2012,alotofstepsweretakenintermsof
sustainableemployabilityandthiswillbefollowedupin2013and
subsequentyears.
Youmayhavealreadynoticed,but‘balance’isthethemeofthisannual
report.Attimes,doingbusinessin2012feltliketryingtofindour
balanceonatightropeinaheadwind.However,asamajoremployer
intheDutchZaanstreekregion,wehaveanobligationtowardsour
customers,membersofstaffandlocalresidentstoacceptoursocial
responsibility,alsointimesofeconomichardship.Thisannualreport
servestoaccountforourperformancesof2012.Andmayitbean
inspirationtofurtherimprovethesustainabilitybalancein2013.
Onbehalfofthemanagementteam,
Joost DirkxDirectorHumanResources
Ourbalance
6
OUR COMPANY
A new vision, mission and strategy. In today’s difficult times, we constantly have to make choices that bring balance in terms of our performances and obligations towards our customers, employees, local residents, shareholders and other parties involved. Where are we heading, how do we respond to social trends and economic developments?
Best brandManagementoftheForboFlooringdivisiondevelopedanewvision,
missionandstrategyin2012.Thestartingpointisthecurrent
positionandwhatForboaimstoachieveinthenextfiveyears.We
operateonadifficultmarketthatwillnotrecoverjustlikethat.Still,
themaingoalofForboistorealiseastrong,sustainablegrowthofat
least5%peryear.Inordertoachievethis,ournewstrategyis
subdividedintoanumberofkeyaspectswhichForbowillfocuson
inthenextfewyears.Oneofthemistobecomeinnovativeleaderin
thefieldofflat,compactflooring.Anothergoalistoensureour
customerserviceandsalesandmarketingprocessesbecome‘the
standard’inthefloorcoveringindustry.ForboFlooringisknownasa
flooringcompanywithhigh-qualityproducts,highlyskilled
employeesandanexcellentlevelofservice.Forboaimstoreinforce
thislevel,sothattheForbobrandisultimatelyknownasthebestfloor
coveringbrand.Theoverallvisionthereforeis:ExcellenceinFlooring.
Green floorsSustainabilityhasbeenoneofthekeyaspectsinForbo’spolicyfor
yearsnow.Initsnewstrategytoo,sustainabilityisanimportant
subject.Oneofthegoalsistorealiseenvironmentallyaware
leadershipbyplacingsustainabilityinthecoreofourorganisation
andbusiness.TheForbosloganstillis:CreatingBetterEnvironments.
Theenvironmentremainsaveryimportantthemeinourindustry.
Theconstructionindustryisoneofthebiggestsourcesofincreased
CO2concentrationsintheatmosphereandForbodoesformpartof
thatindustry.Eventhoughthefloorinabuildingonlyhasasmall
partinthis,itisstillvitaltolookforgreenalternatives.Linoleumis
Forbo’sgreenestfloor,butwealsocontinuetodevelopmore
environmentallyfriendlyversionsofourotherfloorcoverings.
New cross-dock warehouseForyearsnow,Assendelfthasbeenthesitewherefloorcovering
productsfromvariousForbobranchesareunitedfortransportto
ourcustomers.Theadvantagesofthisarethatcustomersonlyhave
onedeliveryperdayandweneedfewertrucks-whichresultsin
fewercostsanditislessharmfultotheenvironment.Theprocessof
combiningproductsinasingletruckiscalledcross-docking.
Cross-dockingactivitieshaveexpandedenormouslyduringthepast
fewyears.Theexistingwarehouseisnolongerbigenough,whichis
whyin2012,theBoardofDirectorsinSwitzerlandapprovedan
ExcellenceinFlooring
6
HSE annual report 2012 7
Forbo Flooring Systems, the division we form part of, has twelve production locations and sales offices in more than thirty countries. These production locations manufacture floor coverings for both the project and private markets. Forbo Flooring’s product range comprises linoleum, vinyl, carpet tiles, needle felt, Flotex flocked floors and entrance floor covering. In addition to the floor product itself, installation and maintenance service products are of course an important addition. Our site in Assendelft is where we design, develop and manufacture an extensive international linoleum range. The Forbo Flooring Systems division forms part of the Swiss Forbo Group, which is listed on the Zurich stock exchange and has its registered office in Baar.
investmentproposaltobuildanewcross-dockwarehouse.The
ProvinceofNoord-HollandhasgrantedplanningpermissionandDe
GeusconstructorsofBroekopLangedijkhavestartedtheconstruc-
tionprocess.Ifallgoestoplan,thewarehousewillbeoperationalin
theautumnof2013.
Inspiring working environment‘Workingwithrespectforeachother’and‘jobsatisfaction’are
importantconceptsinourcompany.Afterall,aninspiringworking
environmentkeepsstaffbalanced.Anenvironmentthatprovidesour
approximately650employeeswiththespaceandopportunityto
developthemselvestobecomethemostskilledandthemost
committedintheindustry.Wedoourbesttoachievethat.Forbo
FlooringB.V.hasdevelopedintooneofthelargestemployersinthe
DutchZaanstreekregion.Asweaspireinnovationandinspirationfor
allouremployees,wehavebeencarryingtheinternationalquality
markforstrategicstaffpolicy,InvestorinPeople,since2004.
FOrBO IN ‘HET KlOKHuIS’Het Klokhuis filmed at the Assendelft plant in February. Het Klokhuis is an educational television programme for children that explains various, often technical subjects in a way that is easy to understand. Twelve years ago, the programme already had an item about the production of linoleum. Apparently people are still very interested in Forbo’s linoleum, so they sent a film crew to record everything one more time. The script was written by the editors of Het Klokhuis and Forbo’s Dutch marketing department. The show shows everything: from the design and production of linoleum to the logistics process and installation. The film crew was highly impressed, which has led to some enjoyable images. The show was broadcasted on one of the Dutch TV channels on 10 October. The video will be repeated on Het Klokhuis several times in the next three years.
Visit www.hetklokhuis.nl/tv-uitzendingen/ to watch the video about the production of linoleum.
ExcellenceinFlooring
8
Jelle van der Zwaan Operations director Linoleum and Site manager
‘In terms of linoleum, the market is very challenging at the moment’, says Jelle van der Zwaan, Operati-ons director linoleum. ‘Our customers come from sectors that are financed with public money, such as schools and hospitals. They have to look after the pennies. We are not unaffected by the crisis either. At the same time we want to build on the future. Creating beautiful new products, investing in more sustainability, further develop our cross-docking activities, which means fewer transport movements and fewer CO2 emissions. We need innovation on all fronts. Where lies the balance between our ambiti-ons and falling turnovers? By seizing opportunities, despite the fact that volumes are under pressure.’
Unlockthepotential ofLinoleum
‘Sothecruxissustainablegrowthversushealthybusinessoperations.Inordertofacethatchallengeweneedtoreallyfocusonourobjectives.Wehavetosetpriorities.Thatsoundsbasic,butifwesellless,Opera-tionscancompensatethatbyreducinglosses:lessrawmaterialwaste,fewerrejectedproducts,lessstandstill.Thatiswhyit’ssoimportanttoworkonimprovements.Butwhatdoesallthismeantotheemployees?Ourstrategyaimstohaveeveryoneinthecompanyactuallycontributetothosegoals.Ontheprincipleof‘UnlockthepotentialofLinoleum’,weaskallouremployeestomakeacontributionfromwithintheirsphereofinfluence.TheOperationsdepartmenthas
formulatedtenstrategicobjectives,focusingongrowth,improvementanddevelopment.Everyemployeecontributestoanumberofinitiatives,bigorsmall, thatdoesn’tmatter.Everythingissubjecttoagreementandtheresultsareevaluatedduringperformanceinterviews.Thisway,allobjectivesareimplementedthroughouttheorganisationtransparentlyandspecifi-cally.Theresponsehasbeenverypositive.Weemployveryloyalpeoplewhohavealotofknowledgeandexperience.Theyseeopportunitiestorealisetheirownideas,givingthemmorecontroltoo.Thatgeneratespositiveenergy.Andwhenthatleadstovisibleresults,it’sveryinspiring.’
Seizing opportunities in challenging times
HSE annual report 2012 9
HSEpolicystatementForboFlooringB.V.makeseveryefforttoensurethattheworkis
carriedoutinsuchawaythatanydamagetothehealthand
well-beingofemployeesandthirdpartiesisprevented.Wefeelitis
necessaryforouremployeestoexperiencetheirworkingenviron-
mentassafeandhealthy.Theemphasisisonthecontinued
embeddingofsafetyawarenessandassumingpersonalresponsibi-
lityintheaimforasafeandhealthyworkingmethodandlifestyle.
Wewishtostructurallyreducethenumberofinjuriesbyatleast10%
peryear.
ForboFlooringB.V.stimulatesdialogueamongitsemployees,
customersandotherinterestedparties,theWorksCouncilandthe
authorities.Activeandeffectivecommunicationwiththeseparties
helpsustocriticallyreviewourHSEperformanceandtomake
improvements.
WithregardtoenforcingandimprovingaspectsinthefieldofHSE,
ForboFlooringB.V.stipulatesitspolicyandobjectivesonanannual
basisinaccordancewiththeISO14001andOHSAS18001systems.
TheresultisdisclosedtoallemployeesofForboFlooringB.V.andto
thepublicbymeansoftheHSEannualreport.Ourobjectiveisto
publishtheannualHSEreportsasasustainabilityreportinaccor-
dancewiththeinternationalGlobalReportingInitiativeguidelines
withinthenextfouryears.
Jelle van der ZwaanSitemanagerofForboFlooringB.V.
ForboFlooringB.V.develops,manufacturesandsellslinoleum
products.Wealsosellvinylfloorcoverings,Flotex,needlefelt,carpet
tiles,entrancefloorcoverings,installationequipment,maintenance
productsandserviceproducts.
ForboFlooringB.V.assumesitsentrepreneurialresponsibility
regardingemployeehealth&safetyandtheenvironment(HSE).
SinceHSEmanagementisconsideredanessentialpartofourpolicy,
ithasbeenmadeanintegralpartofallouractivities.Allaspectswith
regardtoproductsandproductionprocessesaresubjectto
continuousimprovementandarealwayscarriedoutinaccordance
withtherelevantrulesandlegislationwithoutcompromisingour
ambitions.
ForboFlooringB.V.seessustainabledevelopmentasthecoreofits
operationsandasthebasisforthenewstrategyfortheperioduntil
2017.Theemployerandemployeesshareresponsibilityinthat
respect.Thisprincipleissafeguardedbyinvestinginthedevelop-
ment,involvement,motivationandhealthoftheemployeesandby
gettingeveryoneinvolvedinourpursuitforExcellence.
TheobjectiveoftheFlooringdivisionistoreducetheenvironmental
impactofitsproductionprocessesandproductsintheentire
lifecycleby25%betweennowand2016.ForboFlooringB.V.wants
tomakeasubstantialcontributiontothis.Weaimtocontinuously
improveourproductionmethodsandtomakethemmore
sustainableinordertoofferallourstakeholdersbetterperspectives.
Inthecourseofthat:
-wemakeoptimumandefficientuseofallrelevantnaturalraw
materials,additivesandwater
-wemakeminimumandefficientuseofenergy,whilepursuingthe
bestpossibleuseofrenewableenergy
-wereduceresidualwasteandcuttingsduringinstallationofour
product,andreuseandrecyclethemtothegreatestpossibleextent
-weapplysustainableprinciplestothedesignandconstructionof
newproductanddevelopmentprogrammes.
10
Solidperformances,powerfulambitions
Health & Well-being
Sickness absenceAmaximumcorporatesick-leaveaverageof3.75%.Thefocuswithregardtosicknessabsencewillbemoreonprevention.
Health and lifestyle In2013,thefocuswillbeonsustainabledeployability,healthandvitality.Wewillencourageemployeestoacceptpersonalresponsibi-lityfortheirhealthandvitalityandwecanhelpthemwithcoachingprogrammesinthatrespect.Wearealsoaimingtorealiseasmoke-freesiteby2015,thefirstmeasuresforwhicharetobetakenin2013.
Preventive Health Survey (PHS)The2013PHSwillbeconductedattheLogistics,MaintenanceandR&Ddepartments.Theresultsofthe2012PHSwerereasontocontinuetheorganisation’shealthpolicy,evenduringeconomichardship.
ExposureWewillingeneralcontinueourstudiesintoandtheimprovementoftheworkingenvironment,withtheMACvalueservingaslimitvalue.
Wewillcontinueourstudyintoalternativemethodsforcleaningthegranulestoragewithoutusingtalc,thuspreventingexposuretoparticulatematter.
Health & Well-being
Sickness absenceWithacorporatesick-leaveaverageof4.23%wefailedtoachieveour3.75%objective.Theresultiscomparabletothatof2011.Comparedtothenationalaverage,itisagoodresult.
Health and lifestyle ‘ForboinBalans’wasasuccessin2011.Thiscampaignwasevaluatedin2012andnewactivitieswillbeundertakenin2013.Ataskforceofsmokersandnon-smokershasbeensetupinordertopursueasmoke-freesiteinthefuture.
Preventive Health Survey (PHS)The2012PHSwasconductedamongtheproductiondepartments.Onespecificpointforattentionwasshiftwork.Findingswillbeimplementedasimprovementmeasures.
ExposureExposuretofumesanddustintheMixingdepartmenthasbeendrasticallyreducedfollowingthecommissioningofanimprovedextractionsystemandplacingcoversoverpartsofthemixingline.Trialstopreventexposuretotalcdustatthegranulestoragehaveprovedsuccessful.Experimentswithothercleaningmethodsarebeingcarriedout,sothefloornolongerhastobecoveredintalc.
Evaluation 2012 Objective 2013
Safety
Minimising the number of injuriesWewanttoholdontothedecreasingtrendandaimtostructurallyreducethenumberofinjuriesuntil2017by10%peryearcomparedtothepreviousyear.
Thatisa100%scoreintermsofrealisingthemeasureswithintheagreeddeadline.
Increase safety awarenessWewillcontinuethesafetyawarenessprogramandencouragepeopletosubmitreports:thetargetremainsaminimumof10timesmorepreventivereportsthaninjuries.Wewillcontinuetofocusonleadershipandholdingeachothertoaccount.
In2013,wewillprepareaprogrammetofurtherstructureleadershipinthefieldofsafety.
Objective 2013Safety
Minimising the number of injuries/incidentsIn2012,werealisedareductionof32%intermsofinjuries/incidents!Thatismorethanourtargetof-20%andwehavealsomanagedtoholdontoadropsince2010.Outofthe32accidents,4ledtosicknessabsence.Thatis5lessthanin2011andsignificantlylessthanthepastfewyears.Anexcellentresult.
Weaimtorealise100%ofthemeasuresbasedoninjuryreportsandhazardidentifica-tion&riskassessmentactionitemswithinthesetterm.In2012,82%ofmeasureswasrealisedbeforethedeadline(62%in2011).
Increase safety awarenessThetargetfortheminimumnumberofreportsis10timesthenumberofinjuries. In2012therewere408reportsofhazardoussituations.Thetargetminimumnumberofreportswas320,sothatobjectivetoowasachieved.Thenumberofreportshasremainedvirtuallythesameasin2011(425).
In2012wecompletedthesafetyawarenesstrainingprogrammeforallemployees. Atotalof95%oftheintendedemployeestookpart.Inaddition,theOperationsdepartmenthasstartedatrainingprogrammeaboutsafetyleadership.
Evaluation 2012
OBJECTIVESSAFETY, HEALTH AND WELL-BEING, THE ENVIRONMENT
HSE annual report 2012 11
Evaluation 2012 Objective 2013
Evaluation objectives 2012 and new objectives 2013
Solidperformances,powerfulambitionsThe environment
Environmental awarenessIn2013wewillagainpayattentiontosustainability.Successfulideaswillbecontinuedandtheresultswillbecommunicated.TheSustainabilitye-learningmodulethatformspartoftheForboWaytoWinSustainabilityprogrammehasnotbeenrolledoutyetduetotechnicalissues.Weexpectittoberolledoutduringthefirstsixmonthsof2013.
New integrated environmental permitVariousstudieswereconductedwithintheframeworkoftheapplicationforanewenvironmentalpermit.Thishasprovidedabetterandrevisedoverviewoftheenvironmentalaspectsofthebusiness.
Saving energyEnergyconsumptionperm2oflinoleumissettorisecomparedto2012.Thiswas82.5%in2012.Thefigureroseto88%in2013,whereasthetargetwasamaximumof85%.Assuchwefailedtoachievetheobjective.Electricityconsumptionintheoffices,whichwewantedtofurtherimprove,hasbeenreducedby12%,agoodresult.
reducing residual wasteTheobjectiveforgranulateresidualwastewassetat0.012tons/tonofproduct.In2012,wedisposedofatotalof0.016tons/ton.Thetargetseemstobeachallengingone,asweagainfailedtomeetit.
In2012weaimedfor50customerstoactivelytakepartincollectingexternallinoleumcuttingresiduesforourrecyclingprogramme.Atotalof40customerstookpart,resultingin20fullcontainersbeingreturnedtoForbo.
Wehavecontinuedtoencouragethereductionofpaperin2012.Unfortuna-tely,weused4.5%morepaperthanwedidin2011.Onepositiveaspectisthatprintingpaperhasbecomemoresustainablesincetheendof2012:fromFSCpaperto100%recycledfibre.
The environment
Environmental awarenessIn2013wewillstartaprojecttofurtherincreaseenvironmentalawarenessamongallemployees.Wewillalsostartacampaigntofurtherexplainthesustainablequalitiesoflinoleumtoallourcustomersandemployees.
New integrated environmental permitAnupdatedoverviewofourenvironmentalaspectsprovidesuswithanewbasistocontinuetoimproveourenvironmentalperformances.
Saving energyAnumberofspecificenergyprojectshavebeenscheduledfor2013:-switchingofftheincineratorsoftheEsterificationdepartmentduringweekends
-insulatinganumberoftanksfollowingapositivefeasibilitystudy-findingoutiftheextractionoutputfromthestovesoftheTrimmingdepartmentcanbereduced
-continuingthestudyintosavingenergyinthedryingrooms
reducing residual wasteThe2013objectiveforgranulateresidualwastewasagain0.012tons/tonofproduct.AsCalender1makesaconsiderablecontributiontoresidualgranulate,aseparateimprovementprogrammehasbeenformulated,withtheobjectiveofreducingthissubstanceby20%comparedto2012.
12
Forbofloors,greenproductsThe Next Generation of MarmoleumIn2012weworkedhardonanewlinoleumcollection.Beforethe
collectionwasdesigned,wevisitedmorethantwohundred
architectsaroundtheworldinordertoevaluatetheprevious
collection.Thewishesofthearchitectshavebeentranslatedintoa
newcollection:TheNextGenerationofMarmoleum.Thecollection
offersnofewerthan76newcolours,andalotoftraditionalcolours
havebeenrevamped.Thearchitectsmadeitclearthattheyfeltthe
previoussamplebookwasnotexactlyuser-friendly.Inorderto
betterservecustomers,thenewcollectionhasbeensubdividedinto
fourgroups,eachwiththeirownidentity.Thishasresultedinfour
samplebooksthateachtelltheirownstory.Thecollectioncompri-
sesbookswithmarble,striped,plainandplayfulcolours.The
communicationpillarsforthiscollectionarethatMarmoleumisthe
mostsustainablefloorofitskind,hasthelowestmaintenancecosts
andoffersthebiggestchoiceintermsofdesign.Thenewcollection
enjoyeditsworldwidelaunchearly2013.
Marmoleumismadeof97%naturalrawmaterials.Theseare
materialsthatareeasilyrecyclablelikelinseedoil,pineresin,juteand
woodflour,orwhichareabundant,likelimestone.Marmoleum
carriestheCradle-to-CradleSilvercertificateandhasthelowestLife
CycleAssessmentscoreinthesegmentofflat,resilientfloors.
life Cycle Assessment (lCA)Weliketoknowthefootprint,theenvironmentalimpact,ofour
products.ALifeCycleAssessment(LCA)helpsusinthatrespect.An
LCAisameasurementthatmeasurestheenergyconsumption,the
circulationofmaterialsandtheenvironmentalimpactofthe
products.Themeasurementhelpsustoassesswhereorforwhich
productsimprovementscanbemade.Weaimtoimprovethe
environmentalperformanceofourproductsbycontinuously
findingwaysofreducingthepotentialharmfulimpactofour
productsontheenvironment.
Sustainable productsIn2012,ForboFlooringintroducedanumberofsustainable
products,thatareinlinewithourstrategytorelievetheenviron-
mentandtheyhonourthesloganCreatingBetterEnvironments.
Coral WelcomeTheCoralWelcomecollectionismanufacturedatForboFlooring
CoralinKrommenie.Itistheonlytextileentrancefloorcoveringin
Europemadeofrecycledmaterialthatisnonethelesssuitablefor
heavy-dutyprojectuse.Thepolyamideyarnofthefloorcoveringis
madeofEconyl®:recycledindustrialanddomesticwaste.The
supplierclaimsthatfishingnetsareamongtheproductstobe
recycled.Thetuffscreentowhichtheyarnissecuredismadeof
recycledPETbottles.Onlythebackisa‘new’product,butForbois
lookingintothepossibilitiesofmanufacturingabackmadeof
recycledmaterial.
OUR PRODUCTS
12
HSE annual report 2012 13
Sarlon AbsoluSarlonAbsoluisanewrangeofacousticvinyl.Incontrastwithother
PVCfloors,theproductsinthiscollectionhavevegetablesofteners
insteadofpetrochemicalsofteners.ThenewsoftenerusedbyForbo
toproducethiscollectionoriginatesfromtheoiloftheRicinusplant.
Withagrowthcycleofonlyayear,thisnaturalmaterialcanbe
recycledfast.Onlygreenenergyandenvironmentallyfriendlyinkis
usedfortheproductionofSarlonAbsoluattheReimsplant.The
rangeisfullyrecyclableandreusable.
Protective finish: Topshield2Maintenancerequirementsinthehealthcareandeducational
sectorshavebecomeincreasinglystricterduringthepastfewyears.
Attimes,themaintenancecostsduringaproduct’slifemeantaPVC
floorwaslessexpensivethanalinoleumfloor.Forbohastherefore
beenworkingonthedevelopmentofanewfinishforlinoleum.In
2012,ourlinoleumwasgivenanewfinish:Topshield2.Itisatough,
water-basedacrylicsolutionthatisappliedintwolayers.Topshield2
isresistantagainststainsfrom,forinstance,chemicalsandalcoholic
disinfectants,butalsoagainstscratchesandmarksleftbyrubber
soles.Thefinishistougherandassuchmoredurable.Another
advantageisthatthetoplayeriseasytorepair.Assuch,linoleum
floorswithTopshield2equalorevenoutperformanyotherflatfloor.
Forboisproudofthefactthatthecleaningindustrynetwork
supportsTopshield2.
BAlANCE BETWEEN PrOduCTION ANd MINIMuM ENVIrONMENTAl IMPACTThe production of linoleum is a complex process that hardly differs from the process of a hundred years ago. A mixture of linseed oil, resin, wood flour, limestone and pigments produces coloured granulate. A calendering process turns this into sheets two metres in width. The linoleum then dries for a period of fourteen days, after which it is cut into rolls.
As mentioned before, we try to minimise the environmental impact caused by our production process. We are always looking for a balance between production and environment. That is why a local waste processor has been collecting cuttings from our customers since 2011, returning them to our plant in Assendelft. Here, the returned material is recycled and reused for new rolls of linoleum. Using residual waste has proved to be a resounding success which we are proud of. We will therefore continue that process in the next few years, also on an international basis.
13
Forbofloors,greenproducts
14
Peak production and quieter times balanced
Fok Klompmaker Forces team leader
The Next Generation of Marmoleum, Forbo’s new linoleum collection, offers a wide range of colours and designs. In order to offer retailers, architects and other customers a good overview of the versatility and unique designs, we make sample charts and four different sample books, among other things. The Forces department prepares the Marmoleum to compose these items.
TheNext GenerationForces
‘Theproductionofsamplesstartsinthebleachingcabinet’,saysFokKlompmaker,theForcesteamleader.‘TheproductionofMarmoleumgeneratesayellowlayeronthematerial,whichdisappearswhenitisbleachedindaylight.Itbringsupthereal,sparklingcolour.In2012,webleached2,400rollsforsamplematerial.Thisisthenturnedintosheetsthathavetoevenoutintheheatroom.Oncethey’vecooleddownagain,theyarecuttosizeandstackedonapalletbyarobot.Designnumbersusedtobeprintedontothesamplesininkandathinningagent.Wenowusealabellingmachine:betterfortheenvironmentandfortheemployees.’
Sheetsformorethan350,000samplebooks,107,000loosesamples,34,000largerloosesamples,42,000samplecharts…it’senormous.Thesemi-finishedproductsforthenewswatchesneedtobereadybeforethestartoftheyear.Fok:‘Peaksareunavoidable.Weuseagencyworkers,buttheworkloadcontinuestobehigh.Nomatterwhathappens,wehavetogetitalldoneintime.Andthatmeansovertime.It’snotsomethingweenjoy,butatleastweknowit’sgoingtohappen.Afterthat,wecanrelaxabitandthere’stimetoalternatebetweenbleaching,cutting,collecting,assemblinganddrilling.Thatvarietyisnice,thingsdon’tgetboringandeveryonecanlearnhowtooperateallthedifferentmachines.Thisway,wekeepabalancebetweenahighworkloadandquietertimes.’
HSE annual report 2012 15
Assendelft, the NetherlandsThecompletelinoleumcollection,withtheexceptionof
linoleumtiles,isproducedinAssendelft.RangessuchasVivace,
Walton,TouchandStriatoarepopularamongbotharchitects
andconsumers.
Kirkcaldy, ScotlandInadditiontolinoleumonrolls,tiledlinoleumisanextremely
importantproductforForboFlooring.Theentirelinoleumtile
rangeismanufacturedinKirkcaldy,Scotland.
Krommenie, the NetherlandsCoralentrancefloorcoveringistuftedintheplantinKromme-
nie.CollectionssuchasClassic,Duo,GripandWelcomeeach
offertheirowncharacteristicsolutiontodifferentproblems
wheredirtandmoistureabsorptioninclean-walkzonesare
concerned.
Telford, EnglandThissmallplantinEnglandalsomanufacturesentranceflooring
systems,butinaluminiumprofiles.Theprofilesarefittedwith
brushes,rubberortextileandarethefirstlineofdefencein
stoppingthedirtbeforeevenenteringthebuilding.
Coevorden, the NetherlandsThisplantmanufacturesforboththeconsumerandprojects
markets.OurNovilonrangeisverywell-knownamong
consumers.TheAlluravinylstrips,EternalvinylrollsandFlex
vinyltilesaremoregearedtowardstheprofessionalmarket.
reims, FranceNeedlefeltandvinylarethespearheadsinReims.Inthecaseof
vinyl,theemphasisisonspecificproperties,suchasacoustic
vinyl,butalsoonlocalFrenchranges,asthefocusinFranceis
verymuchonvinyl.
ripley, EnglandThespeciallyflockedfloorsareproducedunderthenameofFlotex
inRipley,England.TheFlotexClassicandtheFlotexHDbaseare
manufacturedhere.InadditiontoFlotexonrolls,thisplantalso
manufacturesFlotextiles.
Château renault, FranceAfterthewhiteFlotexfloorhasbeenmanufacturedinRipley,
England,itistransportedtoFrancefordigitalprinting.Twoenor-
mousdigitalprintersprintthestandardFlotexHDdesignsaswellas
anyotherrandomdesigninaccordancewiththecustomer’s
preference.
Giubiasco, SwitzerlandAhighlyspecificproductismanufacturedinSwitzerlandwhichis
appliedpurelyonthebasisofitsfunctionalproperties.Colorexis
appliedine.g.operatingtheatresorantistaticrooms.
Bamber Bridge, EnglandCarpettilesfortheofficemarket,forexample,isaproducttheForbo
Flooringcollectioncannotdowithout.InadditiontoaTessera
collectionfortheinternationalmarket,alargepartoftheproduction
inBamberBridgeisintendedforthedomesticEnglishmarket.
Cortonwood, EnglandLuxuriouscarpettiles,apersonalisedcolourdesignoraspecific
colourcombinationforthecustomerandfullywoollencarpetsare
allproducedbytheWestbondplant.Thesecarpettilesaremanufac-
turedinaccordancewithaspecialmanufacturingtechnologythat
wasdevelopedin-houseandsubsequentlyappliedinluxurious
high-prestigeprojects.
Kaluga, russiaThismodernplantproducesprojectvinylcollectionsforthelocal
Russianmarket.Theplantwasentirelyrefurbishedin2009and
broughtintolinewiththerequiredRussianandEuropeanstandards,
plustheForboFlooringqualityrequirements.
Our products are manufactured in Europe. Each day, thousands of employees make their way to twelve plants distributed across the Netherlands, the United Kingdom, France, Switzerland and Russia in order to manufacture our products.
Locationsandproducts
15
16
Ambitionandsafety balancedA clear focus and specific goals for every employee should safeguard the balance between decisiveness and tho-roughness, between speed and safety. Getting employees involved in our strategic objectives serves to increase interest and motivation. After all, interested and commit-ted employees remain healthier and deployable for longer and perform better. Forbo asks its employees to actively serve as an inspiring motor of our dynamic organisation.
SAFETy‘I work safely because I want to’ SafetyawarenessisheldinhighregardatForbo,becausepeople
beingunawareofdangerplaysamajorroleinunsafesituationsand
incidents.Thelarge-scalesafetyawarenessprogramme,whichhas
beenurgingemployeestochangethecorporateculturesince2009,
coststimeandenergy.Howdoesthisrelatetodailyactivities?The
newcorporatecultureshouldleadtoahealthybalancebetweenthe
ambitiontogrowontheonehandandprecisionandpermanent
improvementontheother.Thechallengeistotakespecificstepsin
ordertofurtherembedsafetyawarenessintheorganisation.With
ournew2013-2017strategy,wewanttoreducethenumberof
injuriesbyatleast10%eachyear.Theultimategoalistoachievea
maturesafetyculture:‘IworksafelybecauseIwantto’.
OUR PEOPLE
New record without lost-time injuries Theyear2012wasconcludedwithatotalof32injuries.With32%,the
objectiveofa20%reductionfor2012wasamplyachieved.The
numberoflost-timeinjurieswasreducedbymorethanhalf:fourin
2012comparedtoninein2011.Wealsorecordedanewrecordin
2012forthenumberofdayswithoutlost-timeinjuries:182days.The
oldrecordstoodat150daysin2006.Intwoyears’time,allthe
attentionwehavepaidtosafetyandsafetyawarenesshasledto
considerablyfewerinjuriesin2012.
Thefourlost-timeinjuriesledto58lost-timedays(2011:69lost-time
days).Theinjuriesdidnotresultinpermanentinjury.44%ofinjuries
fallinthelightestcategory:injurywassustained,butthiswassominor
thatnofirstaidtreatmentwasneeded.Buteventhesetypesof
injuriesarefollowedup.Afterall,theytellusacertainactivitywasnot
completedinfullcontrol.Falls,trips,sprains,bumpsandcutsarethe
mostcommonincidents.Thenumberofentrapments(oneofthe
highestriskcategories)felltothreeduringthepastyear(2011:eleven).
Thisistheresultofalotofimprovementsimplementedinthefieldof
machinesafety.
16
HSE annual report 2012 17
Continuous focusIn2012,thenumberofreportsofunsafesituations(unsafeactions,
unsafesituationsandnear-injuries)remainedvirtuallyunchanged:
408comparedto425in2011.Weamplyachievedourobjectiveof
atleasttenreportsforeachlost-timeinjury(408reports,whereasit
shouldhavebeen320).Allreportsleadtoimprovementmeasures.
Ourobjectiveistocompleteimprovementswithinthesetterm.So
farwehavenotquitesucceeded,butduringthepastyear,82%of
improvementshadbeenimplementedwithinthesetterm.Atotal
of830improvementswerecompleted.
In2012wepaidampleattentiontothefollow-upofthemachine
riskassessmentfortheCalander4andCalander1departments.In
thesameyear,weintroducedanewmachineriskassessmentforthe
DryingRooms.Thiswasthefirsttimeforustochangethegeneric
partoftheriskassessmentforCalander1andtheDryingRooms.We
havebeenabletocollectgenericinputfortheriskassessmentfrom
alllayersofthedepartmentsthroughinterviewswithemployees
whiletheywereworking,combinedwithexternalexpertise.And
duringthoseinterviews,weonceagainraisedsafetyawareness
levelsamongthoseemployees.Thiswaswell-receivedandthis
approachwillbecontinuedatotherdepartmentsin2013.
Incident at the Oxidation departmentUnfortunately,weexperiencedanexplosioninthefluegassystem
oftheOxidationdepartment.Abuild-upofcondensateandhigh
temperaturesinthefluegassystemledtoanincipientfire.This
resultedinsystembreakdownsandanumberofresetsofthe
system’saerationventilators.Whentheaerationventilationswere
switchedonagain,theoxygensupplycausedfumestodilute.This
createdanexplosivemixturethatledtoanexplosionthataffected
theentiresystem.Fortunately,noonewasinjured,butthedepart-
mentcouldnotoperateforthreeweeks.Theenvironmentaldamage
wasreducedtoblacksmokecomingfromthechimneyforabout
twominutes(combustionproductsNOx,CO,CO
2,sootanddust).
Thatsameevening,theentiresystemunderwentacontrolled
switch-off,plusacontrolledcoolingandsafeguardingprocess.
OdourscouldbedetectedintheimmediatevicinityoftheOxida-
tiondepartment,butnocomplaintswerereceivedfromlocal
residents.TheentirefluegassystemoftheOxidationdepartment
hasbeencleaned.Condensateandotherresidualsubstancesfrom
thesystemwereremovedfromthesiteaswaste.Anactivestudy
intothesafetyofthesystemandtheincidentledtoalargenumber
ofimprovementmeasures.Themonitoringprocesshasimproved,
forinstance.Furthermore,theaerationventilatorsandtheboilercan
nolongerbeswitchedonjustlikethat,ithastobedoneinstages.
Theevacuationprotocolhasbeentightenedandtheprocessin
emergencysituationscannowbecontrolledfromadistance.
2008 2009 2010 2011 2012
Injuries and reports of unsafe situations
ReportsInjuries
050
100150200250300350400450
Other injuriesLost-time injuries
0
10
20
30
40
50
60
Lost-time and other injuries
2008 2009 2010 2011 2012
1 Falls/sprains 10 32%
2 Bumps 8 25%
3 Cutting 7 22%
4 Burning 3 9%
5 Entrapment 3 9%
6 Electrocution 1 3%
Total 32 100%
Type of injury 2012 (in %)
1
2
3
4
56
1 Losttimeinjurieswith-outfurthertreatment
14 44%
2 InjurieswithFirstAid 9 28%
3 InjuriesrequiringFirstAidinahospital
5 16%
4 Injuriesrequiringalternativeactivities
0 0%
5 Lost-timeinjuries 4 12%
Total 32 100%
Severeness of injury 2012 (in %)
1
2
3
45
Ambitionandsafety balanced
18
Time out for safety Bytakingspecificstepswewishtofurtherembedsafetyawareness
intheorganisation.Safety-relatedinterviewsbetweenmanagers
andemployeesisonesuchstep.In2012,100%ofthescheduled
safetyobservationroundswerecarriedout.Weevenconducted
anotherseven.Theobjectiveofthesafetyobservationroundsisto
raisethelevelofsafetyawarenessandtoremoveanydoubtsin
respectofsafety.Thisalsoshowstheinvolvementofmanagement
whenitcomestothesafetyofemployees.Visitingotherdepart-
mentstotalkaboutsafetyleadstointerestingandvaluablecollateral
benefits,particularlythankstotheparticipationofteamleaders.Half
ofthesevisitshadtoberescheduled(54%comparedto35%in
2011).Wemustcontinuetokeeptimefreeforsafetyobservation
roundsandtokeepagoodbalancebetweensafetyandother
priorities.
In2012wecompletedourgeneralsafetyawarenesstraining
programme(LastMinuteRiskAnalysis).Thisformedpartofthe
collectivelabouragreement.Atotalof517employeestookpart
(2012:194),whichis95%oftheintendedemployees.Thetraining
programmefocusedontakingamomenttothinkaboutsafety
beforestartingajob,amomentthatappliestoeveryone,everyw-
here.ThedepartmentalmanagersandteamleadersoftheOperati-
onsdepartmentfollowedatrainingprogrammeaboutleadership.
Bothtrainingcoursesreceivedapositiveresponse.
Fire brigade and first aidThefirebrigadewascalledoutfourteentimesin2012forfireor
overheatingandonceforanexplosion,theoneintheOxidation
department.In2011,thatfigurewasten.Withtheexceptionofthe
explosion,itconcernedoverheatingand(incipient)fireswhichwere
undercontrolfast.Twomembersofthecompanyfirebrigadeleftin
2012.Wenowhavethreenewmembers,bringingthetotalto
seventeen.Sixteenistheminimum,eighteenthepreferredtotal.In
2012,threeofthefourscheduledevacuationexerciseswereheld.
Thefourthonewillbeheldearly2013.Newmusterpointswere
usedduringtheevacuationexercisesandtheremoteoperationof
theOxidationdepartmentwasalsotested.
Therewereeighteeninjuriesin2012thatrequiredonsitefirstaid
treatment.Effectivefirstaidreducestheconsequencesofaninjury.
Currently,wehave95firstaidersand144employeeswhocan
operateanAED(AutomaticExternalDefibrillator).Ourpolicyalways
assumedtwofirstaiderspershift.In2013wewillstructurethefirst
aidassistanceacrossfourareas:WarehouseFinishedProducts,
Oxidation,MixingandTrim.Agooddistributionofasufficient
amountoffirstaiders,takingillnessandholidaysintoaccount,has
thereforebecomeevenmoreimportant.ThenumberofonsiteAEDs
hasbeenincreasedtoeight:twowereadded,oneattheOxidation
departmentandoneonthetenniscourt.Everymemberofthe
companyfirebrigadeholdsanAEDcertificate.WhentheFront
OfficecontactstheAmbulanceControlRoomwitharequestfor
resuscitation,theexternalambulancesandcompanyfirebrigadeare
notifiedatthesametimetoprovideimmediateassistanceand
support.
HEAlTH ANd SuSTAINABlE EMPlOyABIlITyA healthy policy Ifthere’sonesubjectwherebalanceistopical,it’shealth.Good
healthisimportanttoeveryone.Healthyemployeesformthebasis
ofthesuccessofourorganisationandareanincentiveforeffective
andpleasantcollaboration.
18
HSE annual report 2012 19
Buthowtokeepyouremployeeshealthyandmotivateduntilthey
leavethecompany?Forbomakessustainableinvestmentsinits
employees:intheirdevelopment,involvement,motivationand
health.
AgingGiventheagestructureatForboandtheanticipatedinfluxand
outflow,halfofouremployeeswillhavereachedtheageof50in
abouttenyears.Bythen,athirdofthemwillbeolderthan56.There
willbemorebottlenecksintheworkloadandemployability,and
sicknessabsencelevelswillrise.Thiswillleadtopersonalissues,
extracosts,organisationalproblemsandfrictionintermsof
teamwork.Wedoofcoursewanttopreventthisasmuchas
possible,whichiswhywedevelopedapolicyaimedatimproving
thehealthandvitalityofallemployees.
Smoking policy Inadditiontothemanycurrentactivities,weintroducedanumber
ofnewsubjectsin2012.OneofthemistheForboSmoke-Free
projectgroup,startedinNovemberin2012withtheaimofhaving
thecompanysmoke-freebyJanuary2015.Thetaskforcewillstarta
campaigntoconvinceemployeestostopsmokingandtooffer
support.
Collaboration with the Occupational Health ServiceAttheendof2012anewcontractwasconcludedwith365/
ArboNed,ouroccupationalhealthservice.Thecollaborationwith
365nowoffersmoreroomforapreventivepolicy.Thatmeansmore
attentionforhealthandhealthrisks.Inthenewformat,avitality&
healthexpertandjobcoachwillholdconsultationsatthecompany,
inadditiontothecompanydoctor.Whenrequired,employeesare
offeredassistancewhentherearehealthandemployabilityissues.
TheWorksCouncilunanimouslyvotedinfavourofthisnewcon-
tract.
Age-related staff policyInFebruary2012,thereportofconclusionsandrecommenda-
tionsfromthetaskforcewaspresentedtothemanagement
team.Theserecommendationsrelatetofourcategories,namely:
•collectivebargaining
•staffpolicy,termsofemploymentandleadership
•research,studyorexploration
•managementandtheorganisation.
Therecommendationsaregraduallyincorporatedinthe
organisation’sobjectives.Employerandtradeunionswilldiscuss
howtoachieveintegrationofanage-relatedstaffpolicyinour
benefitspackage.
Preventive Health Survey (PHS)In2012,thePHSfocusedonemployeesintheproduction
department.Atotalof223employeeswereinvited,ofwhich
176(79%)tookuptheinvitationandparticipatedinthesurvey.
Thesurveydoesofcoursefocusonworkingconditionsand
work-relatedsymptomsofstaff.However,thereisalsomuch
attentiontolifestylefactors,theso-calledBRAVOthemesthat
relatetoexercise,smoking,alcohol,nourishmentandrelaxation,
workability(thedegreetowhichanindividualismentallyand
physicallycapabletoperformhisworkwell)andthe‘mental
temperature’(thelevelofwellnessatwork).
Theconclusionsandrecommendationsfollowingthe2012PHS
particularlyrelatetolifestylefactorsandworkingconditions.
19
20
Aart van Dijk Operations vocational training manager
Forbo encourages all its employees to keep learning. Within the Investor in People framework and the development-oriented staff policy, a lot is invested in training. Colleagues follow courses to further develop themselves, to stay up-to-date in their discipline or because they need to for a particular job they’re after. However, Safety training is mandatory. That means it is more of a challenge to make those training courses interesting for everyone.
DeLeiderDraaitDoor
‘Usingcherrypickerssafely,safehoisting,thesafeuseofhazardoussubstances.Allsafety-relatedtraininghastobeperiodicallyrepeated,asacertificateisonlyvalidforsolongandlegislationcanchange’,saysAartvanDijk,Operationsvocationaltrainingmanager.‘Also,refreshercoursesaregood.Safetyawarenessdeservescontinu-ousattention,alsoatmanageriallevel.Theyhavetoemanatetheimportanceofsafetyawareness.Thatrequiresfeltleadership.Thatmeansamanagerhastofeelhisrolefromtheinside.Heneedstodevelopaninnerdrivetoencouragehisstafftoworksafely.That’snothingnew,really.Soinorderforstafftonotforget
thecourse,Iwantedtomakeitmoreexciting.Thesamecontent,butamorestrikingformat.That’showIcameupwiththeideaofDeLeiderDraaitDoor,similartoDeWereldDraaitDoorTVshow.Weusedapartnersystem,weshowedvideosanddiscussedvariousbriefsubjects.Andweappliedalotofhumour.Wewerelookingforahealthybalancebetweencontentandformat.Welaughed,wegotemotionalattimes,butultimatelyit’saboutsafetyawarenesssinkingin.Ourmessage:useyourcommonsense.Beawareofpotentialdangersandactaccordingly.Yourbrainsprotectyou,youprotectyourbrains.’
Same content, striking format
HSE annual report 2012 21
Recommendationswillalsobemadetoincreasethementalability
tocopeandtoreducetheriskofstress-relatedcomplaints.Thiscan
bedonethroughtrainingandcoaching,forinstance.Thereportand
allconclusionsandrecommendationshavebeendiscussedbythe
HumanResourcesdepartmentwithdepartmentalmanagementand
theHSEdepartment.Therecommendationshavebeenconverted
intoactionplans.
Sickness absence 2012In2012,thesicknessleaverateof4.16%wasagainslightlyhigher
thanthetargetof3.75%.Thisisvirtuallythesameresultas2011,
whentheyearwasconcludedat4.1%.Thereportingfrequency
remained0.99,whichmeansthatthenumberofreportsison
averageslightlylowerthanonereportperpersonperyear.
Social mediaTheuseofsocialmediaisembeddedinoursociety.Inorderto
anticipatethemanydevelopmentsinthisfield,ForboFlooring
conductedastudyintodevelopmentsinthatrespectthatmaybeof
interesttothecompany.Thishasresultedintheactiveuseof
LinkedIn.ForboFlooringsetupacareerpageonLinkedIn,inline
withthecentralwebsitewww.forbo-flooring.nl.Weusethecareer
pagetotellpeoplewhatitisliketobeworkingforForboFlooring.It
willalsoshowvacanciesthatpeoplecanapplyforstraightaway.In
thefuturewewillfindouthowtouseothersocialmediasuchas
TwitterinourHRpolicy.
Major step regarding exposure to talcTalcisusedasananti-adheringagentinthegranulestorage.Astudy
conductedbytheexternaloccupationalhygienistshowedthatthe
overallexposuretotalcdustinthegranulestoragewastoohighif
nodustmaskswereworn.In2011,employeesstartedatrialduring
whichnotalcwasused.Instead,thefloorwaskeptcleanbyusinga
scrubbingmachine.Thesetrialswereextendedinto2012,inthe
courseofwhichdifferentcleaningagentsandfloorcoatingswere
tested.Thetrialshaveprovedsuccessfulandasaresultwehave
comesofarthatwewillnotbeneedingtalcatallinthegranule
storage.Thisisamajorstepfollowinglongtermexposuretotalcin
themixingdepartment.
Safe site accessIn2012,theMunicipalityofZaanstadstartedtheredevelopmentof
theAssendelftNoordindustrialarea.Theaccessroadfromtherail
tracksnolongerrunsviaDorpstraat,butstraighttoIndustrieweg.
Themunicipalitywill,incollaborationwithForbo,constructa
separatecyclelanethatleadsdirectlytoForbo.Thisnewcyclelane
willensurecyclistswillalsobeabletoreachForbosafely.
dEVElOPMENT-OrIENTEd STAFF POlICy A balance in work, development and careerEachyear,duringtheperformanceinterviews,newagreementsare
enteredintowithallemployeesontraininganddevelopment.These
arrangementsareincorporatedinourannualtraining&education
programme.Thebasicprinciplesarefutureopportunitiesin
combinationwiththeemployee’swishes.
Sick leave in 2012 according to age group (%)
21-2
5
26-3
0
31-3
6
36-4
0
41-4
6
46-5
0
51-5
5
56-6
0
61-6
5
Age group
0
1
2
3
4
5
6
2008 2009 2010 2011 2012
Sick leave (%)
0
1
2
3
4
5
6
2008 2009 2010 2011 2012
Sick leave (%)
0
1
2
3
4
5
6
210 220 230 240 250 260 270 280200
Bonus sick leave
Employees not sick
2010
2011
2012
100
Penalty sick leave
Fifth sick noticeThird sick notice
20 30 40 50 60 70
2010
2011
2012
Short, medium and long-term sick leave in 2012
(2011)
1-7 days 0.73% (0.75%)
8-42 days 0.96% (1.01%)
43-365 days 1.78% (1.45%)
Outstandingcasesofillness 0.41% (0.89%)
Total 4.16% (4.10%)
Causes of sick leave 2012In2012,atotalof616peoplereportedsick.Thesesicknessreportsaredividedintofivecategories.
•Flu/shortillness 450
•Locomotorapparatus 104
•Psychological 14
•Other 48
Total 616
Sickleavewascausedbyanaccident26times:
•Industrialaccident 4
•Sportsinjury 10
•Trafficaccident 5
•Othertypeofaccident 7
Total 26
22
In2012,1.9%ofthetotalwagebillwasinvestedinexternaltraining.
Thisisexclusiveofthecostsofcounsellingandtimeoffdueto
attendingthecourses.Alltrainingeffortscombinedrepresentan
investmentof22,314workinghours,whichisequalto12.8working
years.
Professionalization and safetyIn2012,ampleattentionwaspaidtoprofessionalizationandsafety.
Inordertofurtherprofessionalise,stafffollowedprofessionalstudy
programmesandmanagementskillcourses.Toimprovesafety
awareness,194membersofstafftookpartintheLMRAcourse(Last
MinuteRiskAnalysis).TheLMRAcourseincreasessafetyawareness
ontheworkfloorbyteachingstaffastrategythatenablesthemto
recogniserisksandpreventinjuries.In2012,thedevelopment-orien-
tedstaffpolicywascontinuedunchanged.Thenumberofinternal
appointmentsandpromotionsisareliablemeasureofemployee
development.In2012,atotalof71colleagueswereappointednew
jobroles.
development assessmentsIn2012,nearlyallemployeesofSales&MarketingNederlandtook
partinanonlineassessment.Thegoalistogainmoreinsightinto
behaviouralpreferences,competenciesandmotivationsandto
makeemployeesmoreawareoftheirpointsfordevelopment.The
resultsoftheassessmentserveasatooltomapoutdepartmental
andindividualtrainingneeds.
Team leader CourseTheTeamLeaderCoursestartedin2011.Followingonfromthat,
meetingswereheldinFebruaryandMarch2012withallteam
leadersoftheOperationsdepartments.Thethemeswerecommuni-
cationandworkconsultations.InSeptemberandOctober,the
formatandcontentofacourseonleadershipandsafetywas
determinedwiththemembersoftheprogrammecouncilunderthe
nameofDeLeiderDraaitDoor(DLDD).
de leider draait doorForthedemonstratedleadershipincombinationwithsafetytraining
coursewedeliberatelyoptedforatitlethatwouldraiseinterestand
thatwouldenableustocomeupwithexcitingcontent.The
messageofthiscoursewasnotonlytoletparticipantsmakeuseof
hierarchicleadership,buttoalsoteachthemtodemonstratemore
of‘felt’leadership.Theformatwasanaloguetothewell-known
DutchTVshow,DeWereldDraaitDoor:videos,photosandpresenta-
tionstogetthediscussiongoing,togiveexamples,tomakematters
negotiableandtosurprisetheaudience.Withahealthybalance
betweencheerfulandseriousmoments.Foursessionswereheld,
eachofthemwithawiderangeofdisciplinesandhierarchiclevels.
Thetrainingcoursewasattendedby90employeesfromthe
Production,ProductionSupport,LogisticsandR&Ddepartments.The
evaluationsfromtheparticipantshavebeenverypositive,andthey
wereabletoapplythetrainingsubjectstotheirjobsstraightaway.
16-2
0
21-2
5
26-3
0
31-3
5
36-4
0
41-4
5
46-5
0
51-5
5
56-6
0
61-6
5
Age group
Age structure 2012 (%)
0
5
10
15
20
25
Men Women
580
600
620
640
660
680
700
Number of employees
2008 2009 2010 2011 2012
Training programmes and courses 2012IT/applications 10
Chemistry 1
Commerce 19
Communication/personaleffectiveness
77
Firstaid 128
Financial/economic/managerial 7
Forklifttruck 56
Logistics 80
Management/supervision 100
Retirement 5
Personnel/organisation/training 5
Processtechnology 40
Projectmanagement 9
Secretarial 2
Languages 8
Technologygeneral/other 141
Electrical/electronics 17
Health&Safety 335
Total 1,040
Influx 2012Corporate IT 5
Financial&ICS 1
FlooringControlling 2
FlooringHR 1
Innovation&ProductManagement 6
Operations 11
Sales&Marketing 2
StrategicMarketing&Communication 3
Total 31
Outflow 2012 Corporate IT 3
Financial&ICS 2
FlooringHR 1
Innovation&ProductManagement 1
Operations 24
HumanResources 1
Sales&Marketing 6
StrategicMarketing&Communication
1
SupplyChain 1
Total 40
HSE annual report 2012 23
STAFFING lEVElSProduction capacities TheeffectsofthecrisisalsohitForboin2012.Duetocutsinthe
collectivesector,investmentsinhospitalsandschools(traditionally
thebiggestmarketforMarmoleum)fell.However,othersectorstoo
sawfewerconstructionsorrefurbishments.Asaresultofthisfalling
demandforourfloorcoverings,productionlevelsoflinoleumfell
too.Ontheotherhand,wehadtoproduceourlatestcollection,The
NextGenerationofMarmoleum,becauseallnewcolourshadtobe
instockatthestartof2013.Theseapparentcontradictionsde-
mandedthenecessaryflexibilityandcreativityfromourstaff.Once
stockshadbeenbuiltup,oneofthesixshiftswasremovedfromthe
calanderssoastomovealongwithfallingproductionlevels.We
havebeenabletoabsorbthisfromtheflexibleshell,withagency
workersandsecondees.
Despitethepainfulmeasurestoletproductioncapacitiesmovein
proportiontodemand,wemadeconsiderableinvestmentsinthe
organisationin2012.Theresearchanddevelopmentcapacityfor
linoleumandtheinnovationcapacityoftheFlooringdivisiongrew
significantlyin2012.Theseinvestmentsintheproductdevelopment
capacityshouldintimehaveaneffectondemandforlinoleumand
assuchontheproductioncapacitiesrequired.
FTE developmentThenumberofagencyworkersfellsharply,buttheFTEdevelop-
mentofForboemployeesonlyshowedaslightlydownwardtrend.
Asat31December2012,therewere609fulltimeequivalentjobs,
comparedto613asat1January2012.Twenty-sevenpeoplejoined
thecompanyin2012,tenresigned,threeretired(earlyorotherwise),
terminationagreementswereconcludedwitheightandten
employeesleftthecompanyduringtheirtrialperiod,followinga
long-termillnessorbecausetheirfixed-termcontractsexpired.
Pension and collective labour agreementThecollectivelabouragreementbetweenForboandtradeunions
FNVBondgenoten,DeUnieandCNVBedrijvenbondterminatedin
April2012.Anewpensionagreementformedpartofthecollective
bargaining.Thepremiumspaidbytheemployerandemployeesfor
theoldfinalsalaryschemehadnotbeencost-effectivesince2009.
Duetothechangedintereststructureandincreasinglifeexpec-
tancy,thecommitmentsofthepensionfundhadrisentosuchan
extentthatthefinancialsituationofthepensionfundcameundera
lotofpressure.Therewasarealisticthreatofhavingtocutaccrued
pensionrights.However,theemployerandemployeeshaveagreed
onanew,conditionallyindexedaveragesalarypensionschemethat
doesbetterjusticetothepensionambitionsofbothparties.This
schemewascombinedwitha15millionEuroslump-sumpayment
byForbointothepensionfund.Thislump-sumpaymenthelpedto
preventtheintendedcutofmorethan4%onaccruedpension
rights.
WOrKS COuNCIlWorks Council activities In2012,membersoftheWorksCouncilservedintheCodeofCon-
duct,theAge-RelatedStaffPolicyandBalancedForbotaskforces
(HSEcommitteemember).TheForboSmoke-Freeby2015taskforce
isnew.TheWorksCouncildealtwithanumberofrequestsforadvice
andconsent.
23
24
Roland Prantl senior functional consultant SAP Competence Center
Working out six days a week. That demands a lot of time and energy. However, roland Prantl is also the fulltime senior functional consultant SAP Competence Center. As such, he has to make trips abroad every now and then. So how does he combine his demanding job with his workouts and does he have any time left for his family and other private matters?
“OnceIgivein,Ican’tstop’
‘‘Allingoodtime’,saysRoland.‘Yes,Idoworkoutat“DeClub”forhalfanhoureverylunchbreak.I’vebeendoingsosinceForbostartedtocontributetomembership,aboutthreeyearsago.Ienjoyit,becauseIsitdowntherestofthedayanditmakesmefeelfitterduringtheafter-noons.Itgetsmybloodflowing,Ithinkclearer.Ispendtheeveningswithmyfamily,Saturdaystoo.Sundaymorningisme-time,that’swhenIgolong-distancerunning.It’snotachoretome,butpartofmydailyroutine.WhenI’mabroadIoftenusethehotelfacilities,butIdon’tmindnotworkingoutsomuchforaweek.Ioftenbumpintocolleaguesat“DeClub”.Somepeople
aretoofanaticwhentheystart,butyou’llneverlastthatway.Youhavetograduallybuilditup.Ifyouwanttofeelgood,youneedtodoabitmorethantakingregularexercise.Iwatchmydiet,forinstance.Ieattwopiecesoffruiteveryday.NowIsoundlikeagoodytwo-shoes,butI’malsoaddictedtochocolate.ButonceIgiveintothat,that’sit,soIhavetomusterthedisciplinenottooverdoit.Youaretheonlyonewhocandosomethingaboutit.Themostimportantthingistochoose.Tobeawareofwhat’sgoodforyouandtomaketimeforthat.Balancedoesn’thappenovernight.’
Balance doesn’t happen overnight
HSE annual report 2012 25
Recommendationshavebeenmadeaboutthedigitalsalaryslipand
requestsforconsentwereprocessedinconnectionwiththeCodeof
Conduct,changestothecorporaterestaurantrotaandtheinstalla-
tionoftwocameras.The2011requestforadviceaboutthelossof
theCompensation&BenefitsManagerin2012waswithdrawn
followinganagreementwiththeExecutiveBoardaboutthetime
spentbytheDivisionalCompensation&Benefitsmanagerin
Assendelft.TheWorksCouncilhasproposedtochangethecompany
regulationsintermsofthepowerstoconsultinformationinthe
accesscontrolsystem.
TheWorksCouncilhasevaluatedspecificsubjectswithemployees,
suchasthedigitalsalaryslip,changestoCalanders2and4andthe
correspondingjobratingandtheimplementationofthereorganisa-
tionatSales&MarketingNL.Consultationsaboutthiswereheld
withtheFNVtradeunionexecutiveinMarch.Thenewcompany
doctorwasintroducedattheendofMay,withboththeWorks
CouncilandHSEcommitteemembersbeingpresent.Othersubjects
discussedatWorksCouncilmeetingsincludedpricesinthe
corporaterestaurant,anupdateonthepensionsituation,changes
toOxidation/Esterificationmanagement,thepresentationofThe
NextGenerationofMarmoleumcollection,changestotheDrying
Roommanagementreports,anexplanationtonewcontract
agreementswiththeoccupationalhealthandsafetyservicesandan
explanationabouttheuseofonlineassessmentsatSales&
MarketingNL.
HSE CommitteeIn2012,theHSECommitteecontinuedinvitingdepartmental
managerstoitsmeetings.Twodepartmentalmanagerswereasked
abouttheirvisiononsafetyandtheenvironment.Asagreed,two
consultationstookplacewiththeHSEmanager.Furthermore,the
committeecloselyfollowedtheClassbasesystemforreporting
unsafesituations,anditforwardedissuestothepersonsresponsible.
Thecommitteealsoconductedanumberofsafetyobservation
rounds.In2013,thenewHSEcommitteewillseeiftheseobserva-
tionroundsstillserveapurposeandactuallyaddvaluetotheother
observationrounds.
ForamorecomprehensivereportfromtheWorksCouncilandHSE
committee,werefertotheWorksCouncil’s2012annualreport.
SuGGESTIONS ANd rElAXATIONSuggestion BoxEightysuggestionsweresubmittedin2012,73ofwhichwere
processedbythecommittee.Atotalof25ofthosewererewarded,
while45wererejectedandthreewereawardedwithanincentive.
Theentriesincludedthirteenrequestsforrevaluation.Thenumber
ofsuggestionssubmittedfellby35%.Operationssubmittedmost
ofthesuggestions,namely64(includingthosethirteenrequests
forrevaluation),butotherdepartmentschippedintoo.Atotalof
€22,740inrewardswaspaidout,thehighestindividualpayment
being€6,000.Thenumberofpendingsuggestionsroseto122as
at31December2012.
Classification of suggestions received 2012Operations(Production/Logistics) 64
HumanResources 7
Sales&MarketingNL 5
Finance&ICS 4
Total 80
Successful sporting event EachyearForboFlooring’sSportsandLeisureCouncilorganisesa
rangeofactivities.Thisyear,thecouncildecidedtomaketheForbo
FamilyCyclingDayevenmoreattractive.Inconsultationwiththe
sportsclubsthisledtotheForboSportingEvent:apartfromthe
customarycyclingandwalkingevents,peopletookpartinafitness
walk,atennisclinic,afitnessclinicandalong-distancecyclingtrip.
Variousexcitingactivitieshadalsobeenorganisedforthechildren.
Thankstothecooperationfromtheclubs,thisfirstSportingEvent
wasabigsuccess.Thereactionsfromthenearly550participants
havebeenverypositive.ThankstotheSportingEvent,thenumber
ofmembersofthetrimclubhasrisen.
Plus…Thisyearsawthebi-annualtripforretireesandthattoohadbeen
revamped.Onlyformeremployeesandtheirpartnerswereinvited,
makingitpossibletohosttheeventonasingleday,atasingle
location,motelAkersloot.Itwasaverysuccessfulday.
Sinterklaaswascelebratedon1December.Duetoabreakdownhe
nearlydidn’tmakeit,butatruckbroughthimrightuptothedoorof
thecorporaterestaurant.Veryexcitingforthechildren,who
unwrappedtheirpresentswithbigsmilesontheirfaces.
ThebingonightsledbyPeterDennemantookplaceasnormal.Peter
isaworthysuccessorofJanGravesteijn,whohadbeenabingo
masterfornearly45years.
ThephotoclubandotherclubsatForboalsoremainactive.Weare
ofcoursepleasedtoknowtherearealwaysvolunteersatForbo
willingtohelpoutwiththevariousevents.
26
Responsibleproduction,nowandinthefutureWe are proud of our beautiful green products. And we are proud of our production processes which aim to leave the smallest footprint possible. Still, the process does affect the environment; it consumes energy. It generates residual substances and odours, CO2 is emitted. We are aware of that and we want to keep those effects to a minimum as best as we can. Production, turnover and healthy working conditi-ons are important in order to facilitate a healthy business. However, we also spend a lot of time and energy on coming up with improvements that contribute to environmentally friendlier products and processes. We encourage our employees to think about responsible production in order to keep our planet earth habitable for future generations.
EFFICIENT IN ENErGy Theproductionoflinoleumrequiresenergy.Forbousesnaturalgas
andgreenelectricityasprimarysourcesofenergy.Thehigherthe
productionlevels,themoreefficientenergyconsumptiongets.Soa
fallinproductionisachallengewhenitcomestotheefficientuseof
energy.BurningnaturalgasproducesCO2.Since2008,Forbo
Flooringhasbeenbuyinggreenenergy,andassuchcontributesto
lessconsumptionoffossilfuels.
Weconvertsomeofthesourcesofenergyintosecondarysourcesof
energysuchassteam,hotwaterandcompressedair.
Energy consumption 2012
1
23
4
5
67
810, 119
Energy consumption 2012
1
23
4
5
67
810, 119
%
1 Oxidation 23.8
2 Dryingrooms 21.7
3 Calanders 16.3
4 Mixingdepartment 14.8
5 Trimming 6.2
6 Storage&Distribution 5.0
7 Esterification 3.6
8 Offices 2.8
9 Notidentified 2.7
10 Samples/rawmaterials 2.4
11 Recycling 0.7
Natural gas consumption 2012
1
3
2
4
56
Natural gas consumption 2012
1
3
2
4
56
Areas Nm3 %1 Steamgeneration 4,155,115 51
2 Small-scaleconsumption 1,238,741 15
3 Incineratorsdryingrooms 1,017,985 13
4 Steamboiler 908,340 11
5 Esterification 537,411 7
6 Incineratorsoxidation 230,235 3
Total 8,087,827 100
Electricity consumption 2012
1
2
4
5
3
9 - 14
67 8
Electricity consumption 2012
1
2
4
5
3
9 - 14
67 8
Areas kWh %1 Oxidation 13,417 33
2 Mixingdepartment 8,130 20
3 Dryingrooms 6,266 15
4 Calender4 4,512 11
5 Calender 2 3,696 9
6 Storage&Distribution 1,324 3
7 Trimming 1,149 3
8 FandHbuildings 769 2
9 Other 440 1
10 Headoffice 300 0.5
10 Laboratory/pilotfactory 244 0.5
12 Calender 1 241 0.5
13 Recycling 219 0.5
14 Esterification 133 0.5
Total 40,840 100
OUR PLANET EARTH
Thefourprocessphasesthatconsumemostenergyare:
Oxidation 24% heatinguptheboilersandheavy
mixingwork
Dryingrooms 22% steamhumidification,compressedair
drive,incinerator
Calenders 16% electricandcompressedairdrive
Mixingdepartment 15% electricandcompressedairdrive
reduced energy consumptionTheconsumptionofenergydependsontheamountoflinoleum
produced.In2011weused8,283thousandNm3ofnaturalgasand
41.9thousandMWhofelectricityfortheproductionof22.8millionm2
oflinoleum.In2012thosefigureswere8,088thousandNm3of
naturalgasand40.8thousandMWhofelectricityforthegross
productionof20.9millionm2oflinoleum.Sodespitethefactthatwe
producedapproximately8%lesslinoleum,energyconsumptionfell
byapproximately2.5%,not8%.Unfortunately,afallinproduction
resultsinalessefficientuseofoursystems.Thereasonisthatwe
cannotswitchoffallmachineswhennoproductionisinprogress.
Therelativeenergyconsumptionperm2ofproductof2012
iscomparabletothatof2009,whenweproducedagross
20.8millionm2oflinoleum.Assuch,energyefficiencydidnot
deteriorateduringthepastthreeyears,butitdidnotsignificantly
improveeither.
HSE annual report 2012 27
However,wecanstillreportsomeenergyimprovementsfor2012.
Electricityconsumptionatheadofficefellby11%,whichisagood
result.
In2012,magnetswerefittednearthegassupplyforthesteam
boilers.Thesemagnetsprovideamaximumflowofgasatmolecular
level,facilitatingamoreefficientincinerationprocess.Accordingto
thespecifications,thiscanleadtoa5%gassavingforthesteam
boilers.Wewillbemeasuringthesesavingsin2013.Astudyintothe
reductionoftheventilationcapacityforaircirculationwasconduc-
tedintheDryingRooms.Althoughthisstudyhasnotyetbeenfully
completed,theresultsappeartobepositive.
CO2 emissionsTheemissionofCO
2isdirectlylinkedtotheburningofnaturalgasat
ourlocation.Duetoafallof3%inournaturalgasconsumptionin
2012,CO2emissionsfellaccordingly.Thetotalquantityis14.4
kilotons,12.2kilotonsfallswithintheCO2emissionstrade.Thisisthe
CO2emittedbythesteamboilers,thewaterboilerandlow-volume
consumption.Ourannualemissionrightsarefixedat10.1kilotonsof
CO2.Thatmeanswehadtopurchase1.1kilotonsofCO
2emission
rightsfor2012.Anewtradingperiodstartsin2013.Thatmeans
someoftheincineratorswillalsofallundertheCO2emissiontrade
witheffectfrom1January2013.
AIrNOxNitrogenoxides(NO
x),likeCO
2,areformedduringcombustion
processes.However,thequantitythatisformeddependsnotonly
onthenaturalgasconsumptionbutalsoonthequalityofthe
burner.NOxcontributestoacidificationandcanbeaburdenon
NOx-sensitiveplantsandanimalsinnearbywildlifeareas.In2012we
emittedslightlymoreNOxfromtheBEESsystems(steamboilersand
hotwaterboiler)thanin2011(2,813kilosin2012comparedto2,523
kilosin2011),whiletheoverallnaturalgasconsumptionofthese
systemsfellby2%.Thisistheresultofthefactthatboiler6wasused
relativelymorethanin2011.Boiler6hasaslightlyhigherNOxemis-
sionthanboiler7.Thehotwaterboilerwasalsousedslightlymore
often.
Odours studied againTheemissionofvolatileorganiccompounds(VOCs)happens
especiallyduringtheesterificationandoxidationoflinoleum
cementandduringthelinoleumdryingprocessintheDrying
Rooms.TheemissionofVOCscontributestotheacidificationofthe
environmentandcausesthatodourthatissoparticulartoour
company.Inordertoreducetheseemissions,incineratorshave
beeninstalledinthedepartments,whichremovevirtuallyallVOCs
influegasesandodour.Theseveryextensivemeasurements
conductedin2011and2012havegivenusabetterandmore
completeinsightintoourVOC/odouremissions.
0
20
40
60
80
100Energy E�ciency Index (%)
02008 2009 2010 2011 2012
Energy consumption (TJ)
0
100
200
300
400
500
600
700
800
Natural gas Electricity2009 2010 2011 20122008
27
Responsibleproduction,nowandinthefuture
28
Jan Ayal mechanical engineer and Herbert de Rooy general production operator
Forbo’s plant counts more than 130 conveyor belts. They transport the linoleum granulate. This coloured substance sticks to the belt, falls off one belt onto the other, it bounces up and down and forms clumps. And if you don’t keep the belts clean, the product will be contaminated with the colours of the previous run. So is there another way of doing this, employees were wondering.
Onestepforward thankstoinnovation
‘Forbo’sprincipleisthatallmaterialshavetobeasnaturalaspossible,sowealwaysoptedforcanvasbelts’,saysHerbertdeRooy,generalproductionoperator. ‘Asgranulateadherestoittoomuch,thebeltiscoveredinatoplayerofsilicon.Butthatlayerpeelsoff,causingtheproducttobecontaminated.Thisresultsinthelossofalotofrawmaterials,thecleaningprocessislabour-intensiveandcostsmuchtime.Timeduringwhichproductionstagnates.Andallofthatcoststime.Butthat’sthewaywedidit,linoleumhadthatnameofbeingandifficultsubstance.Eventually,wedidstartlookingatalternatives.Thingshadtoimproveonallfronts:fewerspills,lesssubstance,abetterworkingenvironment,lesstimeneededtoclean,higherproductionlevels.’
‘Togetherwithamulti-disciplineprojectgroupweconductedextensiveresearchandformulatedtherequirements’,JanAyal,mechanicalengineerchipsin.‘Weinvitedmanufacturerstohelpthinkaboutasolution,andtheyweremorethanhappytodoso. Theexchangeofknowledgeandideaswaspheno-menal.We’reayeardownthelinenowandwe’reinthetestphaseduringwhichwewilltryoutseveralbeltsandtrialsituations.Ittookalotoftimeandenergy,butwe’realreadyseeingexcellentresults:50%lesstimeneededtoclean,90%lesswaste,amoreefficientuse ofmaterialsandadust-freeenvironmentforstaff. Awin-win-winsituationfortheenvironment,produc-tionandstaff.ThethingIreallylikeisthatwetooksomeverybigandinnovativestepsthatnowgenerateavisibleresult.Weusedtohavestacksofdust,nowthere’shardlyanything.Wereallytookastepforwardandwecanalsoimplementthisinotherdepartments.’
Less dust, less waste, produce more
HSE annual report 2012 29
Onthebasisthereof,wecalculatedanewodourcontouraroundour
premises.Outsideacontourofapproximately1kmaroundour
premises,odournuisancelevelsarevirtuallyzero,butwithinthe
contoursomenuisancemaybeexperienced.TheMixingdepart-
mentcurrentlyisthebiggestcontributortoodouremissions.
Duringthepastfiveyears,VOCemissionswererecalculatedin
accordancewithprescribedcalculationmethods.Emissionsshould
onaveragenotincreaseoverseveralyears,butaredeterminedonly
onthebasisofthemostrecentemissionmeasurements.Asaresult
theannualemissionfiguresshowmoredifferences,asthemeasure-
mentvariessignificantly.
In2012,VOCemissionswere30.1tonsfrom31emissionpoints.In
2011,thefigurewas7.6tonsfrom27emissionpoints.The22.5-ton
differencecanbeexplainedasfollows:
-48%ofnewlychartedemissionsintheMixingdepartment
-31%increaseatknownemissionpointsattheMixingdepartment
followingimprovementstotheworkingenvironmentthere
(previouslydiffusedemission)
-8%riseofemissionsfromOxidationincinerators
-4%riseofemissionsfromTrim3stoves
-9%other.
Theimprovedoverviewofemissionsbymeasuringatmoreemission
pointsgivesusaninsightthatenablesustofocusmoreonoptions
toreduceemissions,whilealsostillconcentratingonoptimisingthe
indoorclimateoftheproductiondepartments.
dust filtersThemanufactureoflinoleumalsoproducesdust.Dustcontributes
tospreadingemissionsandcanleadtoahigherlevelofparticulate
matter.DustcanbereleasedduringmixingintheMixingdepart-
mentandwhenfillingwoodflour,limestoneandscrapsilos.Inorder
topreventtheemissionofdust,dustfiltershavebeeninstallednear
thesedepartmentsandsystems.Thefunctioningofthesefiltersis
regularlyinspectedasapreventivemeasure.Theemissionofdustis
measuredonceeverythreeyears.Nonewmeasurementstookplace
in2012.Thedifferenceinthecalculatedemissionsisthereforethe
resultofadifferenceinoperationalhours:1,163kgin2012compa-
redto1,294kgin2011.
rESIduAl WASTEresidual waste used as raw material Duringthemanufactureoflinoleum,typicalresidualwastesuchaslinoleumandgranulateisproduced.Thisresidualisproducedwhentrimmingtheedges,duringsampling,breakdownsorwhenmaterialthatfailstomeetourhighqualitystandardsisrejected,amongotherthings.Amagnificent86%ofourinternallinoleumresidualwastedoesnotleavethepremises,asitisreusedasrawmaterialinourproductionprocess.Theother14%cannotberecycledandisdisposedofaswasteproduct.
In2012,wedisposedof884tonsoflinoleum(2011:983tons)and
889tonsofgranulate(2011:947tons).Linoleumandgranulatethat
aredisposedofstillhaveahighcalorificvalueandareincinerated
externally.Theheatobtainedfromthisprocessisconvertedinto
energyandreturnedtopowerplants.Thisyearwewillbecon-
ductingatestinwhichgranulatewastewillnotbeincinerated
externally,butbeputtogooduseinthetarmacindustry.
CO2 emissions (kilotons)
2009 2010 2011 2012200814.0
14.4
14.8
15.2
15.6
16.0
VOC emissions (ton) (amount of emission points)
02468
1012
2426283032
1416182022
(13)
(16)
(16)(27)
(31)
2009 2011 201220102008
NOX emissions (kg)
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
2009 2011 20122010
20080
5
10
15
20
25
30
35
40
Coolant emissions (kg)(substances that a�ect the ozone layer)
45
2009 2011 201220102008
Water consumption (m3)
0
20,000
40,000
60,000
80,000
2009 2011 201220102008
Mains water Surface water
Less dust, less waste, produce more
30
Aslinoleumandgranulatewastedependontheproductionfigures,
aproduction-relatesHSEobjectivewasformulated:0.012tonsof
granulatewastepertonofproduct.In2012,wefailedtoachieveour
objectiveforgranulateresidualwaste(0.016ton/ton).Amongother
things,thiswascausedbytheexecutionoftestproductionsin
preparationofournewcollection,qualitydifferencesandanumber
ofincidents.
In2012,wereplacedsevenconveyorbeltswiththeaimofspilling
lessgranulatefromthebelts.Thisprojecthasbeenasuccess.The
reductiononthesebeltsis99%andtherearehardlyanyspills
anymore.Thenewconveyorbeltscanhelpprevent330tonsof
granulatewasteperyear.In2013wewillagainbereplacinga
numberofconveyorbelts.
less residual waste disposed ofApartfromlinoleumandgranulateresidualwaste,otherwaste
includespaper,wood,juteandtin.In2012,wedisposedofatotalof
3,289tonsofresidualwaste.Thisis8.5%lessthanin2011.A
significantamountofresidualwasteisusedexternallyasfuelto
generateenergy,aspackagingmaterial,jutebailsandpaperfor
instancearerecycled.Residualwastethatcannotbeprocessedis
disposedof.
ENVIrONMENTAl INCIdENTSThirty-three(potential)environment-relatedincidentstookplacein
2012.In2011,thatfigurewas42.Ofthese33incidents,24moreor
lesscausedanegativeimpactontheenvironment.Theyincluded:
-anexplosion
-ninebreakdownsintheincinerators(twelvein2011)
-twelvefireoroverheatingincidents
-twospills(methylatedspiritsandtalloil).
Theothernineincidentsdidnotaffectanythingoutsidethesite
boundaries,astheyweredealtwithinternallyor,inhindsight,did
notcauseanyemissions.Incidentsarereportedinternallytoa
centralpoint,afterwhichimprovementmeasuresareformulatedin
ordertopreventrepeats.Allreportshavebeenprocessed.
NocomplaintsweresubmittedtotheProvinceofNoord-Hollandin
2012.Inordertobeabletorespondwelltoanyodournuisance,
ForborecommendslocalresidentstocontactForbodirectly.This
enablesustofindoutifForboisindeedthesourceandwhatmaybe
causingtheproblem.Nocomplaintsfromlocalresidentswere
receivedbyForboin2012.
Recycling linoleum residues (ton)
0
2,000
4,000
6,000
8,000
10,000
2009 2010 2011 2012
Linoleum scrap recycled internallyLinoleum residual waste disposed of
2008
Disposal of linoleum residues (ton)
0
500
1,000
1,500
2,000
2,500
3,000
2009 2010 2011 2012
Linoleum Granulate
2008
Disposal of scrap (ton)
0
1,000
2,000
3,000
4,000
5,000
2008 2009 2010 2011 2012
Landfill Incineration Recycling
Water drained to sewer (m3)
0
6,000
9,000
12,000
15,000
2008 2009 2010 2011 2012
3,000
Colophon
This is a publication of Forbo Flooring B.V., Assendelft
Editors Lucia Fijlstra, Mia Harkamp, Laura Hellendoorn, Saskia Boot and Woord tekst en advies, AmsterdamInterviews Birgitta Langen, AmsterdamDesign Frissewind, profs in communicatie en design, AmsterdamPhotography Don Wijns, Frissewind, profs in communicatie en design, AmsterdamPrinted by Zalsman Groningen bv, Groningen
The production of this annual report has been CO2-neutral, and it was printed on FSC-certified paper.
We hope you have enjoyed reading our 2012 HSE annual report. In 2013 we will continue to work hard on the objectives set out in the report and on the further improvements in the fields of health, safety and the environment. If you have any questions or comments about the report, please send them to [email protected] more information about our company, visit www.forbo-flooring.nl.
Our balance
creating better environments
For more information, please contactForbo Flooring B.V.
PO Box 13, 1560 AA Krommenie
Industrieweg 12, 1566 JP Assendelft
The Netherlands
+31 (0)75 647 7477
www.forbo-flooring.nl