2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES...

31
2011 RESULTS PRESENTATION PETER WADE, EXECUTIVE CHAIRMAN PETER WADE, EXECUTIVE CHAIRMAN PETER WADE, EXECUTIVE CHAIRMAN PETER WADE, EXECUTIVE CHAIRMAN BRUCE GOULDS, CHIEF FINANCIAL OFFICER BRUCE GOULDS, CHIEF FINANCIAL OFFICER BRUCE GOULDS, CHIEF FINANCIAL OFFICER BRUCE GOULDS, CHIEF FINANCIAL OFFICER AUGUST 2011 AUGUST 2011 AUGUST 2011 AUGUST 2011

Transcript of 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES...

Page 1: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

2011 RESULTS

PRESENTATION

P E T ER WADE , E X E CU T I V E C H A I RMANP E T ER WADE , E X E CU T I V E C H A I RMANP E T ER WADE , E X E CU T I V E C H A I RMANP E T ER WADE , E X E CU T I V E C H A I RMAN

BRUC E G OU L DS , C H I E F F I N ANC I A L O F F I C E RBRUC E G OU L DS , C H I E F F I N ANC I A L O F F I C E RBRUC E G OU L DS , C H I E F F I N ANC I A L O F F I C E RBRUC E G OU L DS , C H I E F F I N ANC I A L O F F I C E R

AUGUS T 2 011AUGUS T 2 011AUGUS T 2 011AUGUS T 2 011

Page 2: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

�About Mineral Resources

�Finance

�Operations

�Development Projects

�Strategy, market and outlook

�Appendices

AGENDA

2

Page 3: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� This presentation has been prepared by Mineral Resources Limited (“MRL” or“the Company”) . I t should not be considered as an of fer or invi tat ion tosubscribe for or purchase any securi t ies in the Company or as an inducementto make an of fer or invi tat ion with respect to those securi t ies. No agreementto subscribe for securi t ies in the Company wil l be entered into on the basis ofth is presentat ion.

� This presentation contains forecasts and forward looking information. Suchforecasts , projections and information are not a guarantee of futureper formance, involve unknown risks and uncer tainties. Actual resul ts anddevelopments wi l l a lmost cer tainly di f fer material ly from those expressed orimpl ied.

� You should not act or refrain from acting in rel iance on this presentationmaterial . This overview of MRL does not purpor t to be al l inclusive or tocontain al l information which i ts recipients may require in order to make aninformed assessment of the Company’s prospects . You should conduct yourown investigation and per form your own analysis in order to satisfy yoursel fas to the accuracy and completeness of the information, statements andopinions contained in this presentation before making any investmentdecision.

DISCLAIMER

3

Page 4: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

Process Process Process Process MineralsMineralsMineralsMinerals

Minerals and base

metals processing,

logistics, ship loading &

marketing

Crushing Crushing Crushing Crushing ServicesServicesServicesServices

Australia’s largest

specialist BOO crushing,

screening and processing

contractor

PIHAPIHAPIHAPIHA

Pipeline, services, site

infrastructure, contractor

and polyethylene fittings

manufacturer

Polaris Polaris Polaris Polaris MetalsMetalsMetalsMetals

Specialist Iron Ore

resources company

Mesa Mesa Mesa Mesa Minerals Minerals Minerals Minerals (64% owned)

AuvexAuvexAuvexAuvex Resources Resources Resources Resources

Specialist manganese and

technology company

Minerals ProducerMinerals ProducerMinerals ProducerMinerals ProducerService ProviderService ProviderService ProviderService Provider

MINERAL RESOURCES

4

Page 5: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Record net profit $150.5 million, up 141% on normalised 2010

� Fully franked final dividend of 27.0 cent, brings full year dividend to 42.0 cents (110% increase)

� DRP effective for final dividend

� Cash balance - ~$300 million(at 18/8/11)

� Balance sheet enhanced and continues to strengthen

� NTA per share increased to $3.45 from $2.75

� 2011 CAPEX programme $272 million in line with expectations

� 802% growth in EPS since listing in 2006

FINANCIAL HIGHLIGHTS

5

Page 6: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

FINANCIAL HISTORY

6

0

20

40

60

80

100

2006 2007 2008 2009 2010 2011

cents per share

cents per share

cents per share

cents per share

Earnings Earnings Earnings Earnings per shareper shareper shareper share

-

50

100

150

200

250

2004 2005 2006 2007 2008 2009 2010 2011

$ m

illions

$ m

illions

$ m

illions

$ m

illions

EBITDAEBITDAEBITDAEBITDA

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

2006 2007 2008 2009 2010 2011

$$$$

Value of an investment of $1,000 in Value of an investment of $1,000 in Value of an investment of $1,000 in Value of an investment of $1,000 in MIN on float in 2006 MIN on float in 2006 MIN on float in 2006 MIN on float in 2006

Page 7: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

CASH FLOW

$AUD millions$AUD millions$AUD millions$AUD millions 2011201120112011 2010201020102010 2009200920092009

EBITDA 216.0216.0216.0216.0 103.7 74.4

Net Interest Payments (0.5)(0.5)(0.5)(0.5) (2.7) (1.8)

Income Taxes Paid (1.6)(1.6)(1.6)(1.6) (17.3) (24.1)

Working Capital and Other 9.59.59.59.5 76.6 4.3

CAPEX (including funded items) (272.1)(272.1)(272.1)(272.1) (88.0) (56.6)

Sale of assets 82.382.382.382.3 17.4 1.6

Net Operating and Investing cash flow 33.633.633.633.6 89.7 (2.2)

7

Page 8: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� World class safety record maintained

� Substantial year on year increase in commodity tonnes exported

� Christmas Creek 1 plant operating at nameplate

� Christmas Creek 2 awarded

� Atlas Iron / GAM crushing facility agreed

� Carina iron ore project on track for first tonnes Q2 FY2012

� 100% of Mesa Joint venture secured

� Progressive development of Mt Marion lithium project

� Pipeline order book strong

OPERATIONAL HIGHLIGHTS

8

Page 9: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

SAFETY

Industry Average Source: Worksafe Mining Services category

0

2

4

6

8

10

12

14

16

LTIFR Industry Average

9

Page 10: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

EXPORT VOLUMES

‘000 tonnes‘000 tonnes‘000 tonnes‘000 tonnes 2009/10 2009/10 2009/10 2009/10

ActualActualActualActual

2010/11 2010/11 2010/11 2010/11

ActualActualActualActual

% increase% increase% increase% increase

Iron Ore 875 2,259 158%

Manganese 428 449 0%

TOTAL 1,303 2,708 107%

10

Page 11: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

�Demand and pricing of iron ore continues to be strong

�China steel production

�Prices historical high in USD

�Manganese pricing & volumes expected to improve in 2012

� AUD / USD continuing volatility

COMMODITY MARKET

World Steel Production History

Source: Alan Kohler, 2011

11

Page 12: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Iron ore volumes limited by allocated export

capacity

�Remaining iron ore stockpile tonnes to be fully

utilised in 2012

� Poondano operation

to provide Fe lump

and fines product

in Q3 2012

NORTH WEST IRON ORE

12

Page 13: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Construction completed on time, within budget

� Plant fully operational at 19 mtpa

� Expansion to 25 mtpa concurrent with

Christmas Creek 2 project

CHRISTMAS CREEK 1

13

Page 14: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� 10 year, $1 billion+ BOO contract awarded 4 July

� Construction programme 15 month duration

� 25 mtpa plant configuration:

�Remote primary crushing station

�7 km overland conveyor

�Scrubbing & wet screening circuit

�25mtpa crushing & screening circuit

� Jigging beneficiation circuit

�Upgrade of existing 19mtpa crushing & screening plant by installation of additional screen to achieve CC1 25mtpa capacity

CHRISTMAS CREEK 2

14

Page 15: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Construction programme to install new 3mtpa

tantalum plant in Q4 2012

� Existing 7mtpa plant upgraded and dedicated

to Atlas iron ore production in Q4 2012

WODGINA OPERATION

15

Page 16: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

�Mining commenced on site

� Temporary crusher in place

� 258 rooms complete / permanent

site facilities in construction

� Permanent processing plant

progressing to plan

� Train load-out facility being

automated, civils 95% complete

� Rail loop installed

� Haul road sealing work in August

CARINA IRON ORE PROJECT

16

Page 17: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Construction activity in line with project plan

� Programme to coincide with first trains of ore

� Major equipment items secured and being installed

KWINANA BERTH 2 UPGRADE

17

Page 18: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

MESA MINERALS

� Mesa Manganese Joint Venture� Partners - Mesa Minerals 50%, Auvex Resources 50%

� Resource – Ant Hill & Sunday Hill manganese tenements

� MRL holds 64% of Mesa Minerals

� MRL purchased 100% of Auvex Resources via scheme of arrangement finalised August 2011.

� Manganese technology commercialisation of assets being pursued with local and overseas customers

18

Page 19: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Focus on plant construction

�Opportunity to vertically integrate

� Plant operation scheduled for first quarter 2012

�MRL key contribution as process plant operator

MT MARION LITHIUM

19

Page 20: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Contract lining projects at record levels

�Repeat business major local and international

companies

�Order book full for 2012

� Entry into coal seam

market

�Maintained reputation

as major infrastructure

contractor

PIPELINE OPERATIONS

20

Page 21: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

STRATEGY

� Major opportunities to grow in contracting – clients looking to accelerate production growth

� Key to success continues to be seamless execution of major projects for clients and MRL

� Infrastructure investment provides significant opportunities for client and shareholder value generation

� Ports

� Accommodation

� Logistics

� Further resource definition in Yilgarn Region for iron ore production increase

� Potential for international expansion of commodity business

21

Page 22: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� Port infrastructure is the oxygen of WA mining industry

� MRL has secured allocation at two WA public bulk materials common user berths

� MRL is the only southern producers of iron ore with the capacity to be in operation within the next 24 months (Carina operating within 3 months)

� Port infrastructure investment is a natural extension of the CSI BOO model

� MRL has the operational skill and balance sheet to play a significant role in the development of WA ports

PORTS

Kwinana Berth

Utah Point

Esperance Port

22

Page 23: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

� MRL implementing BOO accommodation

infrastructure at i ts operating sites at Carina

(258 beds) and Nicholas Downs (48 beds).

� Port Hedland accommodation at a premium

� MRL proposes to seek approval to develop

accommodation within Por t Hedland to meet

i ts anticipated personnel requirements for i ts

Por t Hedland based contracting and

commodity based requirements.

ACCOMMODATION INFRASTRUCTURE

23

Page 24: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

EXPLORATION PROGRAMME

24

Page 25: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

EXPLORATION - YILGARN DISTRICT

� 2011/12 program� Carina Extended – resource definition drilling of the northern extension

� Johnson Range – extension of previous resource definition programme

� Mayfield – metallurgical testing of diamond drill core samples

� Short term program� Carina Extended targeted program to extend geological strike range

� J4 – infill drilling of earlier positive results

� J4 – infill drilling of earlier positive results

25

Page 26: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

OUTLOOK

� Demand and pricing of iron ore to continue to be strong

�Manganese pricing & volumes to recover through second half 2012

� Infrastructure a key element in production growth

� Improved definition of commodity reserves and resources to be undertaken

� Award of piping contracts in growing CSM industry

� Contract crushing pipeline with blue chip mining companies expanding

26

Page 27: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

SUMMARY

27

� Record full year result for MRL

� All business segments performing above expectations

� Continued organic growth across all operations

� Executive team continues to be strengthened to facilitate growth strategy

� Outstanding balance sheet and cash position

� Commodity growth strategy on target with Carina iron ore mine being first of our Yilgarn tenements into production

� BOO contracting strategy continues to gain favour with blue chip miners / targeting expansion overseas

Page 28: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

APPENDICES

28

Page 29: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

FINANCIAL HISTORY

0

20

40

60

80

100

120

140

160

FY2007 FY2008 FY2009 FY2010 HY2011

$ m

illions

$ m

illions

$ m

illions

$ m

illions

NPAT (normalised)NPAT (normalised)NPAT (normalised)NPAT (normalised)

first half second half

0

100

200

300

400

500

600

700

FY2007 FY2008 FY2009 FY2010 HY2011

$ m

illions

$ m

illions

$ m

illions

$ m

illions

RevenueRevenueRevenueRevenue

first half second half

29

Page 30: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

FINANCIAL PERFORMANCE

$AUD millions$AUD millions$AUD millions$AUD millions 2011201120112011 2010201020102010 % change% change% change% change

Revenue 609.5609.5609.5609.5 322.4322.4322.4322.4 +95%

NPAT 150.5150.5150.5150.5 62.562.562.562.5 +141%

EPS 90.090.090.090.0 68.568.568.568.5 +31%

Net Assets 627.5627.5627.5627.5 485.7485.7485.7485.7 +29%

Net Cash 78.478.478.478.4 88.288.288.288.2

Funds Employed 549.1549.1549.1549.1 397.5397.5397.5397.5 +38%

30

Page 31: 2011 RESULTS PRESENTATION - Amazon S3...2 4 6 8 10 12 14 16 LTIFR Industry Average 9 EXPORT VOLUMES ‘000 tonnes 2009/10 Actual 2010/11 Actual % increase Iron Ore 875 2,259 158% Manganese

BALANCE SHEET

$AUD millions$AUD millions$AUD millions$AUD millions Jun 11Jun 11Jun 11Jun 11 Jun 10Jun 10Jun 10Jun 10 Jun 09Jun 09Jun 09Jun 09 Jun 08Jun 08Jun 08Jun 08

Total Assets 970.1970.1970.1970.1 844.8 288.9 223.6

Total Liabilities (342.6)(342.6)(342.6)(342.6) (359.1) (144.0) (107.6)

Net Assets 627.5627.5627.5627.5 485.7 144.8 116.0

Net Cash Position 78.478.478.478.4 88.2 (11.6) 21.5

Funds Employed 549.1549.1549.1549.1 397.5 156.4 94.5

0

100

200

300

400

500

600

2011 2010 2009 2008

Funds EmployedFunds EmployedFunds EmployedFunds Employed

31