    InputsTotal Energy Consumption, GJ 3,000,611 2,233,706 142,803 6% $2,809,876 $773,045

    Electricity consumption 1,334,868 1,109,399 88,732 8% $2,496,138 $767,695Natural Gas consumption 1,447,611 925,046 54,071 6% $313,638 $5,000Other fuel consumption 218,132 199,261 0 $100 $350

    Total Water Consumption, m3 6,907,027 5,659,249 243,571 4% $81,310 $48,000Municipal 0 0

    Well 0 4,460,746

    OutputsGreen House Gaes, metric tones CO2 equivalents 283,673 221,870 13,891 6%

    Indirect Emissions 194,285 160,009 11,317 7%Direct NG emisions 72,196 47,256 2,575 5%

    Other direct emissions 17,192 14,605 0Total Effluent Discharged, m3 5,748,446 4,813,324 144,189 3%

    To WWTP 0 0To municipal 0 0

    Total Waste Generated, metric tones 35,144 26,988 489 2% $50,000Waste Disposed 21,704 16,427 489Waste Recycled 13,440 10,561 0

    Total $2,941,187 $821,045

    2008 P2E2 projectdescription

    EstimatedEnergy, Water,

    GHGs, or WasteReductions

    Percentreductionfrom 2007

    Cost Savings,USD

    EstimatedCapital costs,

    USD

    Seeindividualfactory tabsfor project

    descriptions

    This coinformaincomprespon

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    2/150

    Americas Region EMEAI East Region

    InputsTotal Energy Consumption, GJ 50,102 6% $680,430 $253,500 41,522 13% $461,349 $0 23,487

    Electricity consumption 17,705 4% $422,644 $248,500 19,848 15% $405,497 $0 23,487

    Natural Gas consumption 32,397 8% $257,786 $5,000 21,674 14% $55,852 $0 0

    Other fuel consumption 0 $0 $0 0 $0 $0 0

    Total Water Consumption, m3 46,477 12% $61,350 $0 33,310 19% $7,880 $0 133,822

    Municipal

    Well

    Outputs

    Green House Gaes, metric tones CO2 equivalent 5,483 6% 2,782 11% 3,336

    Indirect Emissions 4,015 6% 1,675 11% 3,336Direct NG emisions 1,468 7% 1,107 14% 0

    Other direct emissions 0 0 0

    Total Effluent Discharged, m3 0 0% 10,328 13% 128,462

    To WWTP

    To municipal

    Total Waste Generated, metric tones 0 0% $50,000 0 0% 113

    Waste Disposed 0 0 113

    Waste Recycled 0 0 0

    Total $791,779 $253,500 $469,228 $0

    EstimatedEnergy,Water,

    GHGs, orWaste

    Reductions

    Percentreductionfrom 2007

    CostSavings,

    USD

    EstimatedCapital

    costs, USD

    EstimatedEnergy,Water,

    GHGs, orWaste

    Reductions

    Percentreductionfrom 2007

    CostSavings,

    USD

    EstimatedCapital

    costs, USD

    EstimatedEnergy,Water,

    GHGs, orWaste

    Reductions

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    3/150

    EMEAI West Region Asia / Pac Region

    3% $993,421 $33,000 27,692 8% $673,577 $486,195

    8% $993,421 $33,000 27,692 15% $673,577 $486,195

    0% $0 $0 0 0% $0 $0

    $0 $0 0 $0 $0

    3% $0 $0 29,962 7% $10,581 $48,000

    6% 2,291 5%

    9% 2,291 6%0% 0 0%

    0

    3% 5,399 2%

    1% 376 6%

    376

    0

    $993,421 $33,000 $684,158 $534,195

    Percentreductionfrom 2007

    CostSavings,

    USD

    EstimatedCapital

    costs, USD

    EstimatedEnergy,Water,

    GHGs, orWaste

    Reductions

    Percentreductionfrom 2007

    CostSavings,

    USD

    EstimatedCapital

    costs, USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    4/150

    Americas Region

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 1,336,492 881,681 50,102 6% $680,430

    Electricity consumption 553,973 479,149 17,705 4% $422,644Natural Gas consumption 782,519 402,532 32,397 8% $257,786

    Other fuel consumption 0 0 0 $0Total Water Consumption, m3 812,410 385,252 46,477 12% $61,350

    Municipal 0 0Well 0 0

    OutputsGreen House Gaes, metric tones CO2 equivalents 120,470 88,950 5,483 6%

    Indirect Emissions 80,437 68,384 4,015 6%Direct NG emisions 40,033 20,566 1,468 7%

    Other direct emissions 0 0 0Total Effluent Discharged, m3 387,766 128,408 0 0%

    To WWTP 0 0To municipal 0 0

    Total Waste Generated, metric tones 16,496 10,920 0 0% $50,000Waste Disposed 9,922 7,087 0Waste Recycled 6,574 3,833 0

    Total $791,779

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Cost Savings,USD

    Seeindividualfactory tabsfor projectdescriptions

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    5/150

    $253,500$248,500

    $5,000$0$0

    $253,500

    EstimatedCapital costs,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    6/150

    EMEAI EAST Sites

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 321,254 329,715 41,522 13% $462,449

    Electricity consumption 134,866 131,103 19,848 15% $406,497Natural Gas consumption 141,493 154,812 21,674 14% $55,852

    Other fuel consumption 44,895 43,800 0 $100Total Water Consumption, m3 223,593 177,437 33,310 19% $9,380

    Municipal 0 0Well 0 0

    OutputsGreen House Gaes, metric tones CO2 equivalents 26,065 26,190 2,782 11%

    Indirect Emissions 15,710 15,231 1,675 11%Direct NG emisions 7,227 7,907 1,107 14%

    Other direct emissions 3,128 3,052 0Total Effluent Discharged, m3 62,227 76,923 10,328 13%

    To WWTP 0 0To municipal 0 0

    Total Waste Generated, metric tones 1,467 1,071 0 0%Waste Disposed 945 697 0Waste Recycled 523 374 0

    Total $471,828

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Cost Savings,USD

    Seeindividualfactory tabsfor projectdescriptions

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    7/150

    $350$0

    $0$350$0

    $350

    EstimatedCapital costs,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    8/150

    Asia/Pac Region

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 403,797 344,110 27,692 8% $673,577

    Electricity consumption 239,534 190,726 27,692 15% $673,577Natural Gas consumption 17,902 11,530 0 0% $0

    Other fuel consumption 146,361 141,854 0 $0Total Water Consumption, m3 489,676 442,679 29,962 7% $10,581

    Municipal 0 0Well 0 0

    OutputsGreen House Gaes, metric tones CO2 equivalents 62,828 50,687 2,291 5%

    Indirect Emissions 49,692 39,493 2,291 6%Direct NG emisions 914 589 0 0%

    Other direct emissions 12,222 10,605 0Total Effluent Discharged, m3 277,320 261,600 5,399 2%

    To WWTP 0 0To municipal 0 0Total Waste Generated, metric tones 6,706 6,335 376 6%

    Waste Disposed 4,011 3,409 376Waste Recycled 2,695 2,926 0

    Total $684,158

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Cost Savings,USD

    Seeindividualfactory tabsfor projectdescriptions

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    9/150

    $486,195$486,195

    $0$0$48,000

    $534,195

    EstimatedCapital costs,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    10/150

    EMEAI WEST Sites

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 939,068 682,366 23,487 3% $993,421

    Electricity consumption 406,495 312,587 23,487 8% $993,421Natural Gas consumption 505,697 356,172 0 0% $0

    Other fuel consumption 26,876 13,607 0 $0Total Water Consumption, m3 5,381,348 4,653,881 133,822 3% $0

    Municipal 0 0Well 0 4,460,746

    OutputsGreen House Gaes, metric tones CO2 equivalents 74,310 56,043 3,336 6%

    Indirect Emissions 48,446 36,901 3,336 9%Direct NG emisions 24,022 18,194 0 0%

    Other direct emissions 1,842 948 0Total Effluent Discharged, m3 5,021,133 4,346,393 128,462 3%

    To WWTP 0 0To municipal 0 0Total Waste Generated, metric tones 10,474 8,662 113 1%

    Waste Disposed 6,826 5,233 113Waste Recycled 3,648 3,428 0

    Total $993,421

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Cost Savings,USD

    Seeindividualfactory tabsfor projectdescriptions

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    11/150

    $33,000$33,000

    $0$0$0

    $33,000

    EstimatedCapital costs,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    12/150

    Antipolo City

    2005 2006 2007 2008 P2E2 project description

    Inputs

    Total Energy Consumption, GJ 28,562 27,830 8346 30Electricity consumption 22,162 21,011 t otal electrical reduction 8346 40

    3941 19

    Lighting: install an automatic light flux regulator 18 0

    Improve monitoring of chillers efficiency 23 0

    551 3

    233 1

    21 0

    89 0

    Close cooling tunnels ducts (open on top). 89 0

    Increase mainteinance of motors

    1141 5

    Solar water heating of hot water 1744 8

    496 2

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percent reductiofrom 2007

    New boiler installation - site reports this asproject for 2008

    Install VSD drives for boiler air blower controlled

    by flue monitorControl Dissolved Oxygen content in WWTPand close loop blowers

    MCC improvement (autamatic stop of motion ifnot required)

    Reduction of Air Compressed usage inproduction (empty bags)

    Energy monitoring and targeting on steam

    consumption install meters for key users

    Monitor steam production and efficiency of theboilers

    Pre-heat of combustion air through effluent fluegas economizer a)

    Pre-heat of make-up water through effluent fluegas economizer b)

    Condensate collection completion to 100% (nowis 80%)

    Coating pan water after washing: flush through aheat exchanger to pre heat cleaning water itselfor domestic water

    Improve efficiency of Boilers through correctpressure dimensioning

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    13/150

    Blow down of Boiler to pre-heat make-up water

    Natural Gas consumption 0 0Other fuel consumption 6,400 6,819

    Total Water Consumption, m3 14,343 17,512

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 3,272 3,154 1238 46

    Indirect Emissions 2,826 2,679 New boiler installation - as est by site 1238 46Direct NG emisions 0 0

    Other direct emissions 446 475Total Effluent Discharged, m3 8,709 7,431

    To WWTPTo municipal

    Total Waste Generated, metric tones 1,002 850Waste Disposed 738 592Waste Recycled 264 258

    Total cost savings

    electricity 7.3 PHP/KWH

    1 PHG =$0.025

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    14/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    15/150

    $213,370$213,370

    $0

    $63,870

    $28,000

    $500

    $35,000

    $70,000

    $16,000

    EstimatedCapitalcosts,

    USD

    Budgetedfor in 2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative welldefined? Yes/No

    Does your location have themeans of measuring the

    metric? Yes/No

    Date Started or EstimetedStaring Date

    Date Finished orEstimated Finish date

    Name of the personresponsible for this

    initiative

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    16/150

    $213,370 Total Capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    17/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    18/150

    Major Issues or challengesIs this "on going" or"one time" effort?

    Percent completed: NotStarted, 25%, 50%, 75%,

    Finished

    Overall Status for thiGreen, Yellow,

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    19/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    20/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    21/150

    Asquith

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 47159 34,064 2048 6%

    Electricity consumption 29,257 22,534 2048

    Natural Gas consumption 17,902 11,530Other fuel consumption 0 0

    Total Water Consumption, m3 22,814 19,055 1140 6%Municipal 1140

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 7777 5,875 440 7%

    Indirect Emissions 6,863 5,286 440

    Direct NG emisions 914 589

    Other direct emissions 0 0Total Effluent Discharged, m3 16,373 11,036

    To WWTPTo municipal

    Total Waste Generated, metric tones 871 547 41.42 8%Waste Disposed 575 290 41.42

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percent reductionfrom 2007

    factory commitment to 5%reduction in energy use.Calc value by factory is2048 GJ

    factory commitment to 5%reduction in water use.

    Calc value by factory is1140 m3

    factory commitment to 5%reduction in emissions.Calc value by factory is440 CO2 equiv.

    factory commitment to 5%reduction in waste. Calcvalue by factory is 41.42tonnes

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    22/150

    Waste Recycled 296 257

    total cost savings

    electricity cost 0.1 AUD/KWHwater cost 0.01 AUD/gallon1 AUD = 0.9 USD

    factory commitment toincrease recycling by 10%

    2007 values for inputs and outputs are based on

    Jan- Sept data

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    23/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    24/150

    $54,134 0

    $51,425

    $2,709

    $2,709

    Cost savings,USD

    EstimatedCapitalcosts,USD

    Budgetedfor in 2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative welldefined? Yes/No

    Does your location have themeans of measuring the

    metric? Yes/No

    Date Started or EstimetedStaring Date

    Date Finished orEstimated Finish date

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    25/150

    $56,843 0 Total Capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    26/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    27/150

    Name of the personresponsible for this

    initiative

    Is this "on going" or"one time" effort?

    Percent completed: NotStarted, 25%, 50%, 75%,

    Finished

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    28/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    29/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    30/150

    Major Issues or challenges Overall Status for this Initiative:Green, Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    31/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    32/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    33/150

    Baddi

    2005 2006 2007 2008 P2E2 project description

    Inputs

    Total Energy Consumption, GJ 49,499 46,553 4652 10% $116,812

    Electricity consumption 15,746 15,421 Total Electrical reduction 4652 30% $116,812

    171 1% $4,294

    342 2% $8,588

    427 3% $10,722

    72 0% $1,808

    179 1% $4,495

    VSD in air compressors 628 4% $15,769

    Better insulation of all building 424 3% $10,647

    Better insulation of curing rooms 21 0% $527

    Shading HVAC condensers 215 1% $5,399

    53 0% $1,331

    1897 12% $47,634

    15 0% $377

    1 0% $25

    Install electronic ballasts on 2x40 W tubes 202 1% $5,072

    Complete condensate return - part B 5 0% $126

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    1. Install overhead water storage tanks toeliminate cotinuous pumping in toilets andcanteen

    2. Recycle vacuum pump water back tocooling tower

    3. Replace AC plant with high efficiencyunits and close loop control

    Rectify distribution lines of Compressed

    AirReduce leakages by installing segm.valves and monitoring

    Better mainteinance of cooling tunnel 2JOT

    Substitute decentralized units with a new

    centralized chilled water unitImprove efficiency of water pumpingsystem

    Install automatic "too full" control fortreated water tanks

    Substitute boiler with smaller moreefficient boiler

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    34/150

    Insulate thermically the condensate tank

    Solar heating of boiler make-up waterWaste heat recovery from DGs

    Waste heat recovery from Incinerator

    Solar water heating of process raw water

    Natural Gas consumption 0 0Other fuel consumption 33,753 31,132

    Total Water Consumption, m3 71,709 52,857 18750 35%Municipal

    Well 18750

    OutputsGreen House Gaes, metric tones CO2 equivalents 6,488 6,220 123 2%

    Indirect Emissions 4,136 4,051 assume 2% reductionDirect NG emisions 0 0

    Other direct emissions 2,352 2,169Total Effluent Discharged, m3 0 0 0

    To WWTP

    To municipalTotal Waste Generated, metric tones 61 186Waste Disposed 61 186Waste Recycled 0 0

    total savings $116,812

    electricity cost: 3.6 INR/KWH

    I INR = 0.025 USD

    Eliminate leakages by continuousmonitoring and maint.

    Complete condensate return - part A + B(only in $ sav)

    1. Install overhead water storage tanks toeliminate continuous pumping in toilets &canteen thereby reducing the flow ofwater waste. 2. Vacuum pump water tobe recycled back to spare cooling tower.

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    35/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    36/150

    0

    EstimatedCapitalcosts,USD

    Budgeted forin 2008?Yes/No

    PAR approved?Yes/No

    Is the metric for thisinitiative well defined?Yes/No

    Does your location have themeans of measuring the

    metric? Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    37/150

    0 total capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    38/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    39/150

    Major Issues or challengesIs this "on going" or"one time" effort?

    Percent completed: NotStarted, 25%, 50%,

    75%, Finished

    Overall Status for thisInitiative: Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    40/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    41/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    42/150

    Bangalore

    2005 2006 2007

    Inputs

    Total Energy Consumption, GJ 18,167 19,834 1920 10% $66,960

    Electricity consumption 7,025 7,166 1920 27% $66,960

    Natural Gas consumption 0 0Other fuel consumption 11,142 12,668 .

    Total Water Consumption, m3 22,396 20,543Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 2,622 2,765 471 25%

    Indirect Emissions 1,846 1,882 assume 25% reduction 471 25%Direct NG emisions 0 0

    Other direct emissions 776 883Total Effluent Discharged, m3 4,616 3,152

    To WWTPTo municipal

    Total Waste Generated, metric tones 97 70Waste Disposed 15 29Waste Recycled 82 41

    total savings $66,960

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Costsavings,

    USD

    Installation of Power factorController panel to improvethe existing power factorfrom 0.89 to 0.99. Theproject includes design apower factor controller,manufacture at supplierend and install at our site.

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    43/150

    electricity cost: 5 INR/KWH

    I INR = 0.025 USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    44/150

    0

    0 total capital

    EstimatedCapitalcosts,USD

    Budgeted forin 2008?Yes/No

    PARapproved? Yes/No

    Is the metric for thisinitiative well defined?Yes/No

    Does your location have themeans of measuring the metric?

    Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of theperson responsible

    for this initiative

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    45/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    46/150

    Is this "on going" or"one time" effort?

    Percent completed:Not Started, 25%,

    50%, 75%, Finished

    Major Issuesor challenges

    Overall Status for thisInitiative: Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    47/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    48/150

    Biesheim

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 278,703 199,201

    Electricity consumption 119,850 92,525Natural Gas consumption 158,385 106,676

    Other fuel consumption 468 0Total Water Consumption, m3 5,134,607 4,460,746 133,822 3%

    MunicipalWell 4,460,746 133,822

    OutputsGreen House Gaes, metric tones CO2 equivalents 11,035 7,692

    Indirect Emissions 2,905 2,243Direct NG emisions 8,127 5,449

    Other direct emissions 3 0Total Effluent Discharged, m3 4,929,222 4,282,056 128,462 3%

    To WWTPTo municipal 128,462

    Total Waste Generated, metric tones 3,537 4,538 27 1%Waste Disposed 2,640 2,977 27

    Waste Recycled 897 1,561total savings 0

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Cost savings,USD

    Factory reports a 3%reduction goal for 2008

    water cost isfree

    assume 3% reduction inwastewater too

    Factory reports 0.9%goal of waste reductionfor 2008

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    49/150

    0 total capital

    EstimatedCapitalcosts,USD

    Budgeted for in2008? Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiativewell defined?Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of theperson responsible

    for this initiative

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    50/150

    Major Issues or challengesIs this "on going" or"one time" effort?

    Percentcompleted: NotStarted, 25%,

    50%, 75%,Finished

    Overall Status for thisInitiative: Green,

    Yellow, Red

    Ch tt

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    51/150

    Chattanooga

    2005 2006 2007 2008 P2E2 project description

    Inputs

    Total Energy Consumption, GJ 268,493 195,775 36434 19%Electricity consumption 75,549 81,351 total electric reduction 6944 9%

    1792 2%

    672 1%

    4480 6%

    Natural Gas consumption 192,944 114,424 Total Gas reduction 29490 26%14557 13%

    3586 3%

    2769 2%

    8578 7%

    Other fuel consumption 0 0Total Water Consumption, m3 138,450 113,835

    MunicipalWell

    Outputs

    Green House Gaes, metric tones CO2 equivalents 22,049 19,521 2556 13%

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    1. Leakage control for compressedair

    2. Upgrade air compressor controlsystem

    3. Heat recovery from aircompressors

    4. Optimisation of compressed airdistribution system

    5. Optimisation of chilled watersystem operation

    6. Implement an energymanagement system

    1. Install feedwater economiserson steam boilers

    2. Control excess air in steamlines by managing oxygen;

    3. Insulate steam valves &

    fittings4. Inspect and repair steamtraps on a regular basis

    5. Implement an energymanagement system

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    52/150

    Indirect Emissions 12,137 13,676 1504 11%

    Direct NG emisions 9,912 5,845 1052 18%

    Other direct emissions 0 0Total Effluent Discharged, m3 101,841 59,364

    To WWTPTo municipal

    Total Waste Generated, metric tones 2,132 2,223Waste Disposed 1,443 369Waste Recycled 689 1,854

    total savings

    electricity cost: USD/KWHP2E2 study info gas cost =

    Facility Area Opportunity GJ Therms kWh

    Chattanooga Steam 138,000

    Chattanooga Steam 34,000 5,000

    Chattanooga Steam 26,250

    Chattanooga Steam 81,320

    Chattanooga Air 500,000

    Chattanooga Air 30,000

    Assume equivalent to electricalreduction percent reduction in GHG -11%

    Assume equivalent to natural gasreduction percent reduction in GHG -18%

    Estimated

    Investment

    Install feedwatereconomisers onsteam boilers

    Control excess airby managingoxygen

    Insulate steamvalves & fittings

    Inspect andrepair steamtraps on a regularbasisLeakage controlfor compressedair

    Upgrade aircompressorcontrol system

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    53/150

    Chattanooga Air 2

    Chattanooga Air 187,500 2

    Chattanooga CWS 1,250,000 5

    Chattanooga Man 10

    Chattanooga Supply

    Heat recoveryfrom aircompressor

    Optimisation ofcompressed airdistributionsystem

    Optimisation ofchilled watersystem operation

    Implement anenergymanagementsystemImprove powerfactor to elimatekVArh penalty

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    54/150

    $381,690 $145,000$155,243 $140,000$29,998 $0

    $17,000 $30,000

    $12,000 $25,000

    $11,249 $25,000

    $74,995 $50,000

    $10,000 $10,000

    $226,448 $5,000

    $111,780

    $27,536$5,000

    $21,263$0

    $65,869 $0

    Cost savings,USD

    EstimatedCapital costs,

    USD

    Budgetedfor in 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started or EstimetedStaring Date

    Date Finished orEstimated Finish date

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    55/150

    $381,690 $145,000 total capital

    USD 100,000 ###

    USD 15,000 $15,000

    USD 11,025 $11,025

    USD 35,000 $35,000

    USD 28,000 $28,000

    USD 17,000 $17,000

    Localcurrency

    ProjectedSaving (localcurrency)

    ProjectedSaving(USD)

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    56/150

    USD 12,000 $12,000

    USD 10,500 $10,500

    USD 70,000 $70,000

    USD 100,000 ###

    USD 16,800 $16,800

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    57/150

    Major Issues or challengesName of theperson

    responsible forthis initiative

    Is this "on going" or"one time" effort?

    Percentcompleted: NotStarted, 25%,

    50%, 75%,Finished

    Overall Status forthis Initiative: Green,

    Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    58/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    59/150

    Gainesville

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    60/150

    Gainesville

    2005 2006 2007 2008 P2E2 project description

    InputsTotal Energy Consumption, GJ 315,964 358,786 0 0% $61,350

    Electricity consumption 162,692 209,198

    Natural Gas consumption 153,272 149,588Other fuel consumption 0 0

    Total Water Consumption, m3 126,792 144,786 46,477 32% $61,350

    something that accidentally got erased 2273 $3,000

    Water effluent re-use 37879 $50,000

    Written water conervation plan 947 $1,250

    Cooling tower replace 1894 $2,500

    Dishwater replacement 227 $300

    Reuse base pellet cooling H20 1894 $2,500

    Install driam washout controls 1136 $1,500

    Upgrade washing machine 227 $300

    OutputsGreen House Gaes, metric tones CO2 equivalents 33,966 41,250 1031 6%

    Indirect Emissions 26,137 33,608 840 3%

    Direct NG emisions 7,829 7,642 191 2%

    Other direct emissions 0 0Total Effluent Discharged, m3 26,285 51,294To WWTP

    To municipalTotal Waste Generated, metric tones 5,892 6,221

    Waste Disposed 3,541 5,068

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Costsavings,

    USD

    Enthalpy Control System project for eachMunters unit to provide conditionedprocess air to 6 Driams. This control willprovide 25% fresh make up outside air tothe Munters and 75% re-circulated returnconditioned air. Current system provides100% outside air which needs to beconditioned. Result of the enthalpycontrol is that the chill water load will bereduced by 50 tons refrigeration per

    Driam which totals out to 300 tonsreduced chill water load. Thusly, one277 ton Trane Chiller Yard Unit will beidled through out the year.

    KWHreductionneed toquantified

    Per P2E2 assessment, assume 5% totalE savings split between electricity andnatural gas

    Waste Recycled 2,351 1,152

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    61/150

    y , ,total savings $122,699

    electricity cost: 0.06 USD/KWHwater cost 0.01 USD/gallon

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    62/150

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your location havethe means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish date

    Name of the personresponsible for this

    initiative

    Is this "on going" or"one time" effort?

    Percent completedNot Started, 25%,

    50%, 75%, Finishe

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    63/150

    total Capital

    O S f

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    64/150

    Major Issues or challenges Overall Status for this Initiative:

    Green, Yellow,Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    65/150

    Guangzhou

    2005 2006 2007 2008 P2E2 projectdescription

    Estimated Energy,Water GHGs or

    Percentreduction

    Costsavings

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    66/150

    InputsTotal Energy Consumption, GJ 168,144 111,271 1925 3.0% $46,005

    Electricity consumption 98,305 65,225 1925 3.0% $44,046

    Natural Gas consumption 0 0Other fuel consumption 69,839 46,046

    Total Water Consumption, m3 129,852 115,366 5999 5.2%$1,959

    Municipal 5999 5.2% $1,959

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 30,238 20,033

    Indirect Emissions 23,346 15,490Direct NG emisions 0 0Other direct emissions 6,892 4,543

    Total Effluent Discharged, m3 112,035 103,829 5399 5%To WWTP

    To municipalTotal Waste Generated, metric tones 2,514 2,282

    description Water, GHGs, orWaste Reductions

    reductionfrom 2007

    savings,USD

    1. improve efficiencyon chiller systemcondenser; 2. Coolfresh air munter/chillersysteml. Factoryestimates 2.5% energyreduction

    Reuse steamcondensate and installlow flow faucets.Factory estimates5.2% reduction

    Based on waterconservation, expect5.2% reduction ineffluent

    Waste Disposed 1,035 721Waste Recycled 1,479 1,561

    total savings $47 964

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    67/150

    total savings $47,964

    electricity cost: 0.59 CNY/KWH

    1 CNY= 0.139 USDwater cost0.0089 CNY/gallon

    EstimatedCapital

    Budgetedfor in

    PARapproved?

    Is the metric for thisinitiative well defined?

    Does your locationhave the means of

    Date Started orEstimeted Staring

    Date Finished orEstimated

    Name of theperson responsible

    Is this "ongoing" or "one

    Percentcompleted: Not

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    68/150

    $140,000$140,000

    $28,000$28,000

    Capitalcosts,USD

    for in2008?Yes/No

    approved?Yes/No

    initiative well defined?Yes/No

    have the means ofmeasuring themetric? Yes/No

    Estimeted StaringDate

    EstimatedFinish date

    person responsiblefor this initiative

    going or onetime" effort?

    completed: NotStarted, 25%,

    50%, 75%,Finished

    $168 000 total capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    69/150

    $168,000 total capital

    Major Issues or challenges Overall Status for thisInitiative: Green,

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    70/150

    ,Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    71/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    72/150

    Nairobi

    2005 2006 2007 2008 P2E2 project description Percent re

    Inputs

    Total Energy Consumption, GJ 24,793 9,520Electricity consumption 24,793 9,520 Shut offf all non needed equipment to be determined 5% of 200

    Isolate compressed air to departments during weekend tbd 5% of 200

    tbd 5% of 200

    tbd 5% of 200

    tbd 5% of 200

    Natural Gas consumption 0 0Other fuel consumption 0 0

    Re use munters condensate as boiler feed watertbd 2% of 200

    tbd 2% of 200

    Install exhaust gas economiser to the boiler tbd 2% of 200

    2,007 Insulation of all steam and hot water pipes tbd 1% of 200

    Total Water Consumption, m3 13,519 40

    Municipal Seal all leak points and accurate metering tbd 2% of 200Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 1,813 696

    Indirect Emissions 1,813 696 Assume reduction by 5% tbd 5% of 200

    Direct NG emisions 0 0

    Other direct emissions 0 0Total Effluent Discharged, m3 0 0

    To WWTP tbd 5% of 200

    EstimatedEnergy, Water,

    GHGs, or WasteReductions

    Replace static air losses in the network by repairingleaks

    Isolate production areas(air conditioned) fromwarehouse

    Introduce Day lighting for warehouse by changing rooftype

    Improve oil consumption of main boilers throughefficient burner management

    No project conceptualised this year , but intend to keep

    NFI

    2005 2006 2007 2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    W t R d ti

    Percentreduction from

    2007

    Costsavings,

    USD

    EstimatedCapital

    t

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    73/150

    Inputs

    Total Energy Consumption, GJ 22,073 17,893 447 5% $5,381 0

    Electricity consumption 5,310 4,166 104 3% $2,615

    Natural Gas consumption 16,763 13,727 343 3% $2,765

    Other fuel consumption 0 0Total Water Consumption, m3 3,957 4,804

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 1,709 1,370 34 5%

    Indirect Emissions 853 669 17 3%

    Direct NG emisions 856 701 18 3%Other direct emissions 0 0

    Total Effluent Discharged, m3 2,440 2,340

    To WWTPTo municipalTotal Waste Generated, metric tones 271 256

    Waste Disposed 58 50Waste Recycled 213 206

    total savings $5,381 0

    electricity cost: 0.09 USD/KWH

    Waste Reductions 2007 USD costs,USD

    Per P2E2 assessment,assume 5% total Esavings split betweenelectricity and naturalgas

    Per P2E2 assessment,assume 5% total Esavings split betweenelectricity and naturalgas

    gas cost 0.85 USD/therm

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    74/150

    Budgetedfor in 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your location havethe means of

    measuring the metric?

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

    Is this "on going" or"one time" effort?

    Percent completed:Not Started, 25%,

    50% 75% Finished

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    75/150

    total capital

    Yes/No Yes/No defined? Yes/No measuring the metric?Yes/No

    Date date initiative 50%, 75%, Finished

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    76/150

    Major Issues or challenges Overall Status for this Initiative: Green,

    Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    77/150

    ,

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    78/150

    Panyu

    2005 2006 2007 2008 P2E2 project description Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    79/150

    Inputs

    Total Energy Consumption, GJ 68,341 70,164 3508 5%Electricity consumption 36,324 35,094 3508

    Natural Gas consumption 0 0

    Other fuel consumption 32,017 35,070Total Water Consumption, m3 181,100 161,135 16114 10%

    Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 10,857 7,808 390 5%

    Indirect Emissions 8,627 5,978 390

    Direct NG emisions 0 0Other direct emissions 2,230 1,830

    Total Effluent Discharged, m3 63,305 53,921To WWTP

    To municipal

    Site reports 5% energy reduction targetby: 1. Leakage reduction of compressedair; 2.Steam leakage reduction;3.Optimize environmental temp andhumidity in working area; 4.Convertorcontrol in air-compressor; 5.Upgradelights to lower engergy consumptiontype; 6. Air conditioner replacement

    Site reports 10% water consumptiondecrease by: 1.Reuse of vacuum pumpwater 150T/Day; 2.Reuse of waste waterfrom purity-water station to water theplant; 3.Install sub-meter for main wateroutlet to measure consumption;

    related to energy reduction above,assume same percent reduction inindirect emissions - 5%

    Total Waste Generated, metric tones 424 994 50 5%Waste Disposed 165 598 Site reports 5% target in waste reduction 50Waste Recycled 259 396

    total savings

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    80/150

    electricity cost: 0.7 CNY/KWH

    1 CNY= 0.139 USDwater cost 0.01 CNY/gallon

    Costsavings,

    USD

    EstimatedCapitalcosts,USD

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative welldefined? Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring Date

    Date Finished orEstimated Finish

    date

    Name of theperson

    responsible forthis initiative

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    81/150

    $101,144 $30,000$95,231 $30,000

    $5,913 $20,000$20,000

    USD Yes/No this initiative

    $107,057 $50,000 total capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    82/150

    Major Issues or challengesIs this "on going"or "one time"

    effort?

    Percentcompleted: NotStarted, 25%,

    50% 75%

    Overall Status for thisInitiative: Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    83/150

    50%, 75%,Finished

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    84/150

    Plymouth

    2005 2006 2007 2008 P2E2 project description Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    85/150

    Inputs

    Total Energy Consumption, GJ 180,291 170,233 20,265 12%Electricity consumption 88,186 90,029 Total electrical reduction 20265 23%

    Fix Compressed air leaks 81637156

    4946

    Natural Gas consumption 92,105 80,204Other fuel consumption 0 0

    Total Water Consumption, m3 62,876 53,725

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 16,214 15,825 2697 17%

    Indirect Emissions 11,488 11,728 assume 23% reduction 2697Direct NG emisions 4,726 4,097

    Other direct emissions 0 0Total Effluent Discharged, m3 18,002 6,176

    To WWTPTo municipal

    Total Waste Generated, metric tones 2,086 2,402Waste Disposed 1,448 1,830Waste Recycled 638 572

    total savings

    electricity cost: 0.08 GBP/KWH

    1 GBP 1.96 USD

    Switch off all nonessential equipment when notneeded and during weekends

    Adjust site voltage - turn down tapings on11,000 volt transformer from 432volt 3 phaseto 420v, 3 phase

    Costsavings,USD

    EstimatedCapitalcosts,USD

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finishedor EstimatedFinish date

    Name of the personresponsible for this

    initiative

    Is this "ongoing" or "onetime" effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    86/150

    0

    $886,537

    $886,537 0 total capital

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status forthis Initiative: Green,

    Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    87/150

    Poznan

    2005 2006 2007

    I t

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Costsavings,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    88/150

    Inputs

    Total Energy Consumption, GJ 376,822 284,117 3222 3% $106,884

    Electricity consumption 163,601 114,825 3222 3% $106,884

    Natural Gas consumption 213,221 169,292Other fuel consumption 0 0

    Total Water Consumption, m3 126,191 101,159Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 41,296 29,953 639 3%

    Indirect Emissions 30,355 21,305 639 3%Direct NG emisions 10,941 8,648

    Other direct emissions 0 0Total Effluent Discharged, m3 73,909 58,161

    To WWTPTo municipal

    Total Waste Generated, metric tones 2,263 1,722 86 5%Waste Disposed 522 426 86

    Waste Recycled 1,741 1,295

    installation of PowerPurge dessicantdehumidification unit

    Waste generationreduction by 5% for2008. Process willconsist of a

    combination ofemployee training andsupervision,process/equipmentmodification, betterhousekeeping, andincreased wastesegregation.

    total savings $106,884

    electricity cost: 0.29 PLN/KWH

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    89/150

    1 PLN 0.41 USD

    EstimatedCapitalcosts,USD

    Budgetedfor in2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your location havethe means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of theperson responsible

    for this initiative

    Is this "on going"or "one time"

    effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    90/150

    $33,000

    $33,000

    $33,000 total capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    91/150

    Major Issues or challengesPercent completed: NotStarted, 25%, 50%, 75%,

    Finished

    Overall Status forthis Initiative:

    Green, Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    92/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    93/150

    Santiaga

    2005 2006 2007

    Inputs

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    EstimatedCapitalcosts,USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    94/150

    Total Energy Consumption, GJ 56,733 0

    Electricity consumption 14,625 0Natural Gas consumption 41,986 0

    Other fuel consumption 122 0Total Water Consumption, m3 7,093 0

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 1,798

    Indirect Emissions 1,562 0Direct NG emisions 228 0

    Other direct emissions 8 0Total Effluent Discharged, m3 0 0

    To WWTPTo municipal

    Total Waste Generated, metric tones 1,136 0Waste Disposed 878 0Waste Recycled 258 0

    total savings 0 0

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiativewell defined?Yes/No

    Does your location havethe means of measuring

    the metric? Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

    Is this "on going"or "one time"

    effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    95/150

    total capital

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status for thisInitiative: Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    96/150

    Shanghai

    2005 2006 2007 2008 P2E2 project description

    Inputs

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Costsavings,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    97/150

    p

    Total Energy Consumption, GJ 41,293 55,466 10,594 $148,140Electricity consumption 28,066 29,706 Total electrical reduction 10,594 $148,140

    358 $9,739

    752 $20,289

    Heat recovery from air compressors 2,862 $28,405Use high efficiency blow guns 16 $460

    470 $2,001

    Reduce steam generation pressure 1,923 $19,072Split driam area into two sections 2,067 $47,209

    1,466 $14,202

    680 $6,763

    Natural Gas consumption 0 0Other fuel consumption 13,227 25,760

    Total Water Consumption, m3 74,478 98,972Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 4,499 8,850

    Indirect Emissions 3,578 7,055Direct NG emisions 0 0

    1. Install submeters on electricity andsteam pipe

    2. Reduce electric consumption fromMontes Chiller operation

    3. Reduce steam consumption onjacket water system

    4. Check compressed to eliminateleaks

    Reduce pressure of compressed air

    lines

    Minimize starting and stopping ofproduction lines

    Install feedwater economizers onsteam boilers

    Improve insulation of steam pipes,valves and fittings

    Other direct emissions 921 1,795Total Effluent Discharged, m3 67,030 81,872

    To WWTPTo municipal

    Total Waste Generated, metric tones 599 857W t Di d 403 573

    Run WWTP, reduce BODdischarge into environment

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    98/150

    Waste Disposed 403 573

    Waste Recycled 196 284total savings $148,140

    $102 825

    EstimatedCapitalcosts,USD

    Budgetedfor in2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiativewell defined?Yes/No

    Does your location havethe means of measuring

    the metric? Yes/No

    Date Started orEstimeted

    Staring Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

    Is this "on going"or "one time"

    effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    99/150

    $102,825

    $102,825

    $1,082

    $0

    $27,052$974

    $0

    $0$16,231$40,578

    $16,908

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    100/150

    $102,825 total capital

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status for thisInitiative: Green, Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    101/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    102/150

    Silao

    2005 2006 2007

    Inputs$99 948

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    103/150

    Total Energy Consumption, GJ 66,104 63,749 4543 7%$99,948

    Electricity consumption 33,326 32,552 Total electrical reduction 1979 6% $71,375268 1% $9,666

    14 0% $505

    62 0% $2,236

    1635 5% $58,968

    Natural Gas consumption 32,778 31,197 Total gas reduction 2564 8% $28,573

    1669 5% $18,599

    265 1% $2,953

    630 2% $7,021

    Other fuel consumption 0 0Total Water Consumption, m3 40,292 44,159

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 6,531 6,338 681 11%

    Indirect Emissions 4,857 4,744 474 10%

    1. Inspect and repaircompressed air leaks

    2. Use high efficiency airblow guns

    3. Install additionalreceiver tank capacity

    4. Implement an energymanagement system

    1. Install (feedwater)economizers on steamand hot water boilers

    2. Improve insulation inboiler house

    3. Install an automaticblowdown system

    Assume equivalentreduction in electricalGHG as in comsuption -10%

    Direct NG emisions 1,674 1,594 207 13%

    Other direct emissions 0 0Total Effluent Discharged, m3 10,407 15,236

    To WWTPTo municipal

    Assume equivalentreduction in gas GHG asin comsuption - 13%

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    104/150

    To municipalTotal Waste Generated, metric tones 1,536 912

    Waste Disposed 1,099 702Waste Recycled 437 211

    total savings $99,9

    electricity cost: 1.39 MXN/KWH

    1 MXN 0.093 USD

    gas cost 12.64 MXN/ThermP2E2 Study info

    Facility Area Opportunity GJ Therms kWh

    Silao Steam 1669 463,611 MXN

    Silao Steam 265 73,611 MXN

    Silao Steam 630 175,000 MXN

    Silao Air 75,000 MXN

    Silao Air 3,900 MXN

    Silao Air 18,750 MXN

    EstimatedInvestment

    Localcurren

    Install (feedwater)economizers onsteam and hot waterboilers

    Improve insulation inboiler house

    Install an automaticblowdown system

    Inspect and repaircompressed air leaks

    Use high efficiency airblow guns

    Install additionalreceiver tank capacity

    Silao Man 1863 456,260 100,000Implement an energymanagement system

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    105/150

    $9 300

    EstimatedCapital

    costs, USD

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative well defined?Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

    Is this "ongoing" or "onetime" effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    106/150

    $9,300$9,300

    $0

    $0

    $0

    $9,300

    $0

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    107/150

    $9,300 total capital

    155,232 $14,258

    24,621 $2,261

    58,550 $5,378

    86,250 $7,922

    4,485 $412

    21,563 $1,981

    Projected

    Saving(localcurrency)

    ProjectedSaving(USD)

    697,953 $64,108

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    108/150

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Statusfor this Initiative:Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    109/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    110/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    111/150

    St. Petersburg

    2005 2006 2007 2008 P2E2 project description

    Inputs

    Total Energy Consumption, GJ 228,795 249,642 34,950 14% $285,457

    El t i it ti 87 302 94 830 13 276 14% $221 725

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    Sit h t t d j t

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    112/150

    Electricity consumption 87,302 94,830 13,276 14% $221,725

    Natural Gas consumption 141,493 154,812 21,674 14% $55,852

    Other fuel consumption 0 0Total Water Consumption, m3 115,969 103,997 14,560 14% $7,880

    Municipal 14,560 14% $7,880

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 15,142 16,509 2311 14%

    Indirect Emissions 7,915 8,602 assume 14% 1204

    Site has not reported any projectsbut has reported that their goal for2008 is to keep electricityconsumption/MSSU equal to 2007levels. Production FOB for 2008 is14% greater than 2007 so assumeelectricity use will be reduced by14% as well.

    Site has not reported any projectsbut has reported that their goal for2008 is to keep gas

    consumption/MSSU equal to 2007levels. Production FOB for 2008 is14% greater than 2007 so assumegas use will be reduced by 14% aswell.

    Site has not reported any projectsbut has reported that their goal for2008 is to keep waterconsumption/MSSU equal to 2007

    levels. Production FOB for 2008 is14% greater than 2007 so assumewater use will be reduced by 14%as well.

    Direct NG emisions 7,227 7,907 assume 14% 1107Other direct emissions 0 0

    Total Effluent Discharged, m3 57,611 73,771 assume 14% 10328 14%To WWTP

    To municipalTotal Waste Generated, metric tones 1,295 995

    Waste Disposed 854 662Waste Recycled 441 333

    total savings $293 336

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    113/150

    total savings $293,336

    electricity cost: 1.46 RUB/KWH

    1 RUB 0.041 USD

    gas cost 6.63 RUB/thermwater cost 0.05 RUB/gallon

    Per site, projects include:

    Other comments:

    Use high-efficiency utilities equipment,

    Install manufacturing line of the new generation

    Continue with various energy saving initiatives (e.g. dry coolers, timers for lighting in office etc).

    Keep current positive trend in Energy consumption despite extensive growth of the production volume in 2008 due to 3 rd stage of the Factory Expans

    0

    EstimatedCapitalcosts,USD

    Budgetedfor in2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative well defined?Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted

    Staring Date

    Date Finishedor EstimatedFinish date

    Name of the personresponsible for this

    initiative

    Is this "on going" or"one time" effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    114/150

    0 total capital

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    115/150

    0 total capital

    ion

    Major Issues or challengesPercentcompleted: NotStarted, 25%,

    50%, 75%,Finished

    Overall Status for thisInitiative: Green,

    Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    116/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    117/150

    Taipei

    2005 2006 2007

    Inputs

    Total Energy Consumption, GJ 50,298 45,315 1271 3% $23,716 0

    Electricity consumption 25,420 17,156 1271 7% $23,716

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    EstimatedCapitalcosts,USD

    Isolation of area to keep

    cool air

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    118/150

    Natural Gas consumption 0 0Other fuel consumption 24,878 28,159

    Total Water Consumption, m3 67,089 30,639 Leakage prevention 6709 22%Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 6,185 4,967 223 4%

    Indirect Emissions 4,452 3,005 223 7%

    Direct NG emisions 0 0Other direct emissions 1,733 1,962

    Total Effluent Discharged, m3 9,868 3,511To WWTP

    To municipalTotal Waste Generated, metric tones 1,296 805 285 35%

    Waste Disposed 1,095 635 Wrapping materials reus 285 35%Waste Recycled 201 170

    total savings $23,716 0

    electricity cost: 2.09 TWD/KWH

    1TWD 0.0321 USDwater cost ??? Free maybe

    related to reducedelectrical consumption,assum 5%

    Budgetedfor in 2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiativewell defined?Yes/No

    Does your location have themeans of measuring the

    metric? Yes/No

    Date Started orEstimeted

    Staring Date

    Date Finished orEstimated Finish

    date

    Name of the personresponsible for this

    initiative

    Is this "on going"or "one time"

    effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    119/150

    total capital

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status for thisInitiative: Green, Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    120/150

    Tarazona

    2005 2006 2007

    Inputs

    Total Energy Consumption, GJ 46,519 28,815Electricity consumption 20,233 15,208

    Natural Gas consumption 0 0Oth f l ti 26 286 13 607

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreduction from

    2007

    Costsavings,

    USD

    EstimatedCapitalcosts,USD

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    121/150

    Other fuel consumption 26,286 13,607Total Water Consumption, m3 50,581 38,251

    MunicipalWell

    OutputsGreen House Gaes, metric tones CO2 equivalents 3,967 2,573

    Indirect Emissions 2,136 1,625Direct NG emisions 0 0

    Other direct emissions 1,831 948Total Effluent Discharged, m3 0 0

    To WWTPTo municipal

    Total Waste Generated, metric tones 1,452.01 0Waste Disposed 1,338.01 0Waste Recycled 114 0

    total savings 0 0

    Budgetedfor in2008?Yes/No

    PARapproved?Yes/No

    Is the metric forthis initiative welldefined? Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted Staring

    Date

    Date Finished orEstimated Finish

    date

    Name of theperson responsible

    for this initiative

    Is this "on going" or"one time" effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    122/150

    total capital

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status for thisInitiative: Green, Yellow,

    Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    123/150

    Toronto

    2005 2006 2007

    Inputs

    Total Energy Consumption, GJ 120,142 127,791 1582 1% $35,028

    Electricity consumption 78,777 85,128 Total Electrical reduction 1582 2% $35,028

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    1. Implement an energymanagement system

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    124/150

    1201 1% $26,592

    3. Install HF ballasts 298 0% $6,598

    83 0% $1,838

    tbd

    tbd

    tbd

    tbd

    tbd

    tbd

    Natural Gas consumption 41,365 42,663 0%Other fuel consumption 0 0

    Total Water Consumption, m3 57,925 49,057Municipal

    Well

    Outputs

    management system

    2. Implement compressedair leakage controlprogramme

    4. Switch off LEVs duringnon-production times

    Turn off lights in officeswhen not in use

    Shut down equipmentduring down hours

    Shut down chiller duringwinter

    Install submeters toidentify high energy useareas and developreduction plans

    Optimize capacity of chillerwater

    Install auto light switchesand programmablethermostats

    Green House Gaes, metric tones CO2 equivalents 6,705 7,142 0 0%Indirect Emissions 4,592 4,963 0%

    Direct NG emisions 2,113 2,179 0%Other direct emissions 0 0

    Total Effluent Discharged, m3 43,480To WWTP

    To municipalTotal Waste Generated, metric tones 3,109 829

    Waste Disposed 1,972 421 Eliminate styrofoam, cansand bottles

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    125/150

    Reduce paper to landfill

    Waste Recycled 1,137 408

    total savings $35,028

    electricity cost: 0.08 CAD/KWH

    1 CAD 0.992 USD

    P2E2 Study info

    Facility Area Opportunity GJ Therms kWh

    Toronto Man 100,000 CND

    and bottles

    Eliminate use of plastics insmall ingredient prep

    study ways to minimizegum waste to landfill

    Study recycling program toid improvementopportunities

    Improve segregation ofwastes to optimizerecycling

    Investigage recycling ofdust collector powder

    EstimatedInvestment

    Localcurrency

    Implement anenergymanagementsystem

    Toronto Air 335,028 -

    Toronto Lighting Install HF ballasts 83,080 -

    Toronto Process 23,166 -

    Implementcompressed airleakage controlprogramme

    Switch off LEVsduring non-production times

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    126/150

    $99,200

    $99,200

    $99,200

    EstimatedCapital

    costs, USD

    Budgeted forin 2008?Yes/No

    PARapproved?Yes/No

    Is the metric for thisinitiative welldefined? Yes/No

    Does your locationhave the means of

    measuring the metric?Yes/No

    Date Started orEstimeted

    Staring Date

    Date Finished orEstimated Finish

    date

    Name of theperson

    responsible forthis initiative

    Is this "on going"or "one time"

    effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    127/150

    $0

    $0

    $0

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    128/150

    $99,200 total capital

    100,000 $98,789

    ProjectedSaving(localcurrency)

    ProjectedSaving(USD)

    27,081 $26,753

    6,715 $6,634

    1,873 $1,850

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    129/150

    Major Issues or challengesPercent completed: NotStarted, 25%, 50%,

    75%, Finished

    Overall Status forthis Initiative:

    Green, Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    130/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    131/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    132/150

    Yorkville

    2005 2006 2007

    Inputs

    Total Energy Consumption, GJ 75,898 117,687 7096 11% $158,383 0

    Electricity consumption 46,976 66,754 7096 11% $158,383

    2008 P2E2 projectdescription

    Estimated Energy,Water, GHGs, or

    Waste Reductions

    Percentreductionfrom 2007

    Costsavings,

    USD

    EstimatedCapitalcosts,USD

    Budgetedfor in 2008?Yes/No

    Site reports 2008 project to

    replace air compressorwhich will save anestimated 1.98 million kWh

    l i 096 GJ f

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    133/150

    Natural Gas consumption 28,922 50,933 0%Other fuel consumption 0 0

    Total Water Consumption, m3 25,389 28,611Municipal

    Well

    OutputsGreen House Gaes, metric tones CO2 equivalents 9,024 1180 11%

    Indirect Emissions 7,547 10,724 1180 11%

    Direct NG emisions 1,477 2,605 0%Other direct emissions 0 0

    Total Effluent Discharged, m3 540 174To WWTP

    To municipalTotal Waste Generated, metric tones 577 479

    Waste Disposed 268 477Waste Recycled 309 2 $50,000

    total savings $208,383 0 total capital

    - translates into 7096 GJ ofelectricity saved

    Based on electricalsavings, assume 11%reduction in indirectemissions

    sell dust collectorreclaimed dusts to PullmanSugar rather than giving itto FWS

    revenuegenerated

    electricity cost: 0.08 USD/KWH

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    134/150

    PARapproved?Yes/No

    Is the metric for thisinitiative well defined?Yes/No

    Does your locationhave the means of

    measuring themetric? Yes/No

    Date Started orEstimeted Staring Date

    Date Finished orEstimated Finish

    date

    Name of theperson

    responsible forthis initiative

    Is this "on going" or "onetime" effort?

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    135/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    136/150

    Major Issues or challengesPercent completed:Not Started, 25%,

    50%, 75%, Finished

    Overall Status for thisInitiative: Green,

    Yellow, Red

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    137/150

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    138/150

    Chicago

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 385,107

    Electricity consumption 100,422Natural Gas consumption 284,685

    Other fuel consumption 0Total Water Cons mption m3 212 417

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    139/150

    Total Water Consumption, m3 212,417Municipal

    Well

    Outputs

    Green House Gaes, metric tones CO2 equivalents 30,674

    Indirect Emissions 16,133Direct NG emisions 14,541Other direct emissions 0

    Total Effluent Discharged, m3 183,888To WWTP

    To municipalTotal Waste Generated, metric tones 2,979

    Waste Disposed 1,541Waste Recycled 1,438

    Percent reduction

    factory closure 100100

    100

    2008 P2E2 projectdescription

    EstimatedReduction/savings

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    140/150

    100

    100100

    100

    100100

    Dreyfus

    2005 2006 2007

    InputsTotal Energy Consumption, GJ 82,711

    Electricity consumption 50,921Natural Gas consumption 31,790

    Other fuel consumption 0Total Water Consumption m3 207 188

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    141/150

    Total Water Consumption, m3 207,188Municipal

    Well

    Outputs

    Green House Gaes, metric tones CO2 equivalents 9,812

    Indirect Emissions 8,181Direct NG emisions 1,631Other direct emissions 0

    Total Effluent Discharged, m3 18,885To WWTP

    To municipalTotal Waste Generated, metric tones 0

    Waste Disposed 0Waste Recycled 0

    Percent reduction

    factory closure 100100

    100

    2008 P2E2 projectdescription

    EstimatedReduction/savings

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    142/150

    100

    100100

    100

    00

    Cost savings - all values are in USD

    Other Totals

    AP

    Asquith $51,425 $2,709 $54,134Guangzhou $44,046 $1,959 $46,005Panyu $95,231 $5,913 $101,144Philippines $311,019 $311,019Shanghai $148,140 $148,140

    Taipei $23,716 $23,716total AP $684,158Baddi $116,812 $116,812Bangalore $66,960 $66,960

    Electrical CostSavings

    Natural GasSavings

    Other EnergySavings

    Water costSavings

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    143/150

    EMEAI

    Biesheim $0Nairobi $4,700 $2,900 $1,500 $4,000 $13,100Poznan $106,884 $106,884Plymouth $886,537 $886,537Tarazona $0St. Petersburg $221,725 $55,852 $7,880 $285,457Santiga

    total EMEAI $1,475,749

    Americas

    Chattanooga $155,243 $226,448 $381,690Gainesville $61,350 $61,350NFI $2,615 $2,765 $5,381Silao $71,375 $28,573 $99,948Toronto $35,028 $35,028Yorkville $158,383 $50,000 $208,383

    Total Americas $791,779Grand Total $2,499,838 $316,538 $0 $81,310 $54,000 $2,951,687

    2006 Environmental Footprint SummaryAP

    Metric Guangzhou Panyu Shanghai Taipei Antipolo City Asquith Summary

    MSSU 180,433 45,070 2,605 19,421 35,220 22,423 305,172

    98,305 36,324 28,066 25,420 22,162 29,257 239,534

    0 0 0 0 0 17,902 17,902

    69,839 32,017 13,227 24,878 6,400 0 146,361

    Total Energy, GJ 168,144 68,341 41,293 50,298 28,562 47,159 403,797

    0.93 1.52 15.85 2.59 0.81 2.10 1.32

    23,346 8,627 3,578 4,452 2,826 6,863 49,692

    Electricitypurchased, GJ

    Natural Gaspurchased, GJ

    Other Fuelpurchased, GJ

    total Energy

    GJ/MSSUIndirect GHGEmissions, metricTonnes CO2 equiv

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    144/150

    0 0 0 0 0 914 914

    6,892 2,230 921 1,733 446 0 12,222

    30,238 10,857 4,499 6,185 3,272 7,777 62,828

    0.17 0.24 1.73 0.32 0.09 0.35 0.21

    129,852 181,100 74,478 67,089 14,343 22,814 489,676

    0.72 4.02 28.59 3.45 0.41 1.02 1.60

    112,035 63,305 67,030 9,868 8,709 16,373 277,320

    15 37 1 0 6 0 59

    66 4 0 5 0 37 112

    1,020 128 402 1,095 732 575 3,952

    1,413 255 196 196 264 259 2,583

    Direct Natural GasGHG emissions,metric tonnes CO2equiv

    Direct (other fuel)GHG emissions,

    metric tonnes CO2equiv

    total GHGEmissions, metrictonnes CO2 equiv.

    Total GHGemissions/MSSU

    WaterConsumption, m3

    Water con-

    sumption/MSSUEffluentDischarged, m3

    Haz wastedisposed, metrictonnes

    Haz wasterecyled, metrictonnes

    Non haz wastedisposed, metric

    tonnesNon haz wasterecycled, metrictonnes

    2006 Environmental Footprint summaryEMEAI

    Cafosa St. Petersburg Nairobi Plymouth Tarazona Biesheim Poznan Bangalore Baddi Summary

    154,288 15,979 80,931 17,945 128,845 176,894 6,703 30,236 611,821

    14,625 87,302 24,793 88,186 20,233 119,850 163,601 7,025 15,746 541,361

    41,986 141,493 0 92,105 0 158,385 213,221 0 0 647,190

    122 0 0 0 26,286 468 0 11,142 33,753 71,771

    56,733 228,795 24,793 180,291 46,519 278,703 376,822 18,167 49,499 1,260,322

    #DIV/0! 1.48 1.55 2.23 2.59 2.16 2.13 2.71 1.64 2.06

    1,562 7,915 1,813 11,488 2,136 2,905 30,355 1,846 4,136 64,156

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    145/150

    228 7,227 0 4,726 0 8,127 10,941 0 0 31,249

    8 0 0 0 1,831 3 0 776 2,352 4,970

    1,798 15,142 1,813 16,214 3,967 11,035 41,296 2,622 6,488 100,375

    #DIV/0! 0.10 0.11 0.20 0.22 0.09 0.23 0.39 0.21 0.16

    7,093 115,969 13,519 62,876 50,581 5,134,607 126,191 22,396 71,709 5,604,941

    #DIV/0! 0.75 0.85 0.78 2.82 39.85 0.71 3.34 2.37 9.16

    0 57,611 0 18,002 0 4,929,222 73,909 4,616 0 5,083,360

    0.4 854 0 6 0.01 12 0 0 20 892

    0 441 0 2 0 0 18 1 0 462

    878 0 15 1,442 1,338 2,628 522 15 41 6,879

    258 0 0 636 114 897 1,723 81 0 3,709

    2006 Environmental Footprint SummaryAmericas Total

    Dreyfus NFI Chicago Toronto Chattanooga Gainesville Yorkville Silao Summary Summary68,556 119,312 68,298 171,684 53,756 23,461 505,067 1,422,060

    50,921 5,310 100,422 78,777 75,549 162,692 46,976 33,326 553,973 1,334,868

    31,790 16,763 284,685 41,365 192,944 153,272 28,922 32,778 782,519 1,447,611

    0 0 0 0 0 0 0 0 0 218,132

    82,711 22,073 385,107 120,142 268,493 315,964 75,898 66,104 1,336,492 3,000,611

    #DIV/0! #DIV/0! 5.62 1.01 3.93 1.84 1.41 2.82 2.11

    8,181 853 16,133 4,592 12,137 26,137 7,547 4,857 80,437 194,285

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    146/150

    1,631 856 14,541 2,113 9,912 7,829 1,477 1,674 40,033 72,196

    0 0 0 0 0 0 0 0 0 17,192

    9,812 1,709 30,674 6,705 22,049 33,966 9,024 6,531 120,470 283,673

    #DIV/0! #DIV/0! 0.45 0.06 0.32 0.20 0.17 0.28 0.20

    207,188 3,957 212,417 57,925 138,450 126,792 25,389 40,292 812,410 6,907,027

    #DIV/0! #DIV/0! 3.10 0.49 2.03 0.74 0.47 1.72 4.86

    18,885 2,440 183,888 43,480 101,841 26,285 540 10,407 387,766 5,748,446

    0 0 4 22 2 1 1 2 32 983

    0 36 8 0.4 1.57 0 0.40 0 46 620

    0 58 1,537 1,950 1,441 3,540 267 1,097 9,890 20,721

    0 177 1,430 1,137 687 2,351 309 437 6,528 12,820

    2007 Environmental Footprint SummaryAP

    Metric Guangzhou Panyu Shanghai Taipei Antipolo City Asquith SummaryMSSU 0

    65,225 35,094 29,706 17,156 21,011 22,534 190,726

    0 0 0 0 0 11,530 11,530

    46,046 35,070 25,760 28,159 6,819 0 141,854

    Total Energy, GJ 111,271 70,164 55,466 45,315 27,830 34,064 344,110

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    15,490 5,978 7,055 3,005 2,679 5,286 39,493

    Electricitypurchased, GJ

    Natural Gaspurchased, GJ

    Other Fuelpurchased, GJ

    total Energy

    GJ/MSSUIndirect GHGEmissions, metricTonnes CO2 equiv

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    147/150

    0 0 0 0 0 589 589

    4,543 1,830 1,795 1,962 475 0 10,605

    20,033 7,808 8,850 4,967 3,154 5,875 50,687

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    115,366 161,135 98,972 30,639 17,512 19,055 442,679

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    103,829 53,921 81,872 3,511 7,431 11,036 261,600

    19.26 25.00 0.71 0.00 0.24 0.00 45.21

    128.00 0.36 0.00 0.22 0.00 25.00 153.58

    701.74 573.00 572.08 635.00 592.00 290.00 3,363.82

    1,432.58 396.00 284.00 170.00 258.00 232.00 2,772.58

    Direct Natural GasGHG emissions,metric tonnes CO2equiv

    Direct (other fuel)GHG emissions,metric tonnes CO2equiv

    total GHGEmissions, metrictonnes CO2 equiv.

    Total GHGemissions/MSSU

    WaterConsumption, m3

    Water con-

    sumption/MSSUEffluentDischarged, m3

    Haz wastedisposed, metrictonnes

    Haz wasterecyled, metrictonnes

    Non haz wastedisposed, metric

    tonnesNon haz wasterecycled, metrictonnes

    2007 Environmental Footprint summaryEMEAI

    Cafosa St. Petersburg Nairobi Plymouth Tarazona Biesheim Poznan Bangalore Baddi Summary0

    94,830 9,520 90,029 15,208 92,525 114,825 7,166 15,421 439,524

    154,812 0 80,204 0 106,676 169,292 0 0 510,984

    13,607 0 0 12,668 31,132 57,407

    0 249,642 9,520 170,233 28,815 199,201 284,117 19,834 46,553 1,007,915

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    8,602 696 11,728 1,625 2,243 21,305 1,882 4,051 52,132

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    148/150

    7,907 0 4,097 0 5,449 8,648 0 0 26,101

    948 883 2,169 4,000

    0 16,509 696 15,825 2,573 7,692 29,953 2,765 6,220 82,233

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    103,997 40 53,725 38,251 4,460,746 101,159 20,543 52,857 4,831,318

    #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

    73,771 6,176 4,282,056 58,161 3,152 0 4,423,316

    662.00 0.00 6.23 1.77 0.00 0.00 16.58 686.58

    333.00 0.00 0.00 0.00 13.35 0.96 0.00 347.31

    0.00 6.24 1,824.00 2,975.00 426.28 29.00 169.65 5,430.17

    0.00 0.00 572.00 1,561.00 1,282.00 40.00 0.00 3,455.00

    2007 Environmental Footprint SummaryAmericas Total

    Dreyfus NFI Chicago Toronto Chattanooga Gainesville Yorkville Silao Summary Summary114,295 198,084 72,524 27,190 412,093 412,093

    0 4,166 0 85,128 81,351 209,198 66,754 32,552 479,149 1,109,399

    0 13,727 0 42,663 114,424 149,588 50,933 31,197 402,532 925,046

    0 0 0 0 0 0 0 0 0 199,261

    0 17,893 0 127,791 195,775 358,786 117,687 63,749 881,681 2,233,706

    #DIV/0! #DIV/0! #DIV/0! 1.12 #DIV/0! 1.81 1.62 2.34 5.42

    0 669 0 4,963 13,676 33,608 10,724 4,744 68,384 160,009

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    149/150

    0 701 0 2,179 5,845 7,642 2,605 1,594 20,566 47,256

    0 0 0 0 0 0 0 0 0 14,605

    0 1,370 0 7,142 19,521 41,250 13,329 6,338 88,950 221,870

    #DIV/0! #DIV/0! #DIV/0! 0.06 #DIV/0! 0.21 0.18 0.23 0.54

    0 4,804 0 49,057 113,835 144,786 28,611 44,159 385,252 5,659,249

    #DIV/0! #DIV/0! #DIV/0! 0.43 #DIV/0! 0.73 0.39 1.62 13.73

    0 2,340 0 ? 59,364 51,294 174 15,236 128,408 4,813,324

    0.00 0.00 0.00 8.07 1.53 3.25 0.00 2.50 15.35 747.14

    0.00 41.00 0.00 0.13 1.04 0.34 1.84 0.00 44.35 545.24

    0.00 50.03 0.00 413.00 367.74 5,065.00 477.00 699.00 7,071.77 15,865.76

    0.00 165.17 0.00 408.00 1,852.68 1,151.96 0.00 210.70 3,788.51 10,016.09

    6% Energy reduction achieved through:

    Compressed air management and leak detection programs -fixing leaks, reducing loads on compressors, installing more energy efficient compressors, etc.

    ChattanoogaPanyuPlymouth 30% of our factories will implement compressed air management programsShanghaiSilao

    TorontoYorkville

    Steam Management - insulating valves and fitting, repairing leaks, optimizing boiler efficiencies through replacement or other meansinstalling meters for monitoring, etc.

    PhilippinesBaddiCh tt 29% f f i ill i l b il d ffi i

  • 8/14/2019 2008 E footprint accouting 3-14-08 (2)

    150/150

    Chattanooga 29% of our factories will implement boiler and steam efficiency programsPanyuShanghaiSilao

    Water Conservation via boiler condensate re-usePhilippinesBaddiGuangzhou

    Water conservation via other meansBaddi - water recycling, toilet volume reduction 30% of our factories will reduce water consumptionBiesheim - method not givenGainesville - effluent reuse, water urinals, cooling water reuse, cooling tower replacementGuangzhou - installation of low flow faucetsPanyu - reuse vacuum pump water, installation of meters, reuse of water for irrigationTaipei - institute a water pipe leakage program

    Waste Reduction -Asquith - method not given 25% of our factories will reduce wasteBiesheim - increasing recycling ratesPoznan - process/equipment modification, employee training and awareness, better housekeeping, better waste segregationTaipei - better re-use of wrapping materialsYorkville - reducing rolling compound usage and better segreation of waste materials to facilitate greater recycling