Brussels, 06/12/2011 – Hubert Lemmens, Chief Innovation Officer
Implementing Agreement Day
206/12/2011
Unique situation in the EUOwnership
Elia
• 100% of 380-150kV network
• 94% of high voltage network (70-30kV)
50Hertz
• 100% of 380-220kV network
- 34% of the German 380kV network
- 19% owner of the German 220kV network
Age of networks
Elia
• Less than 10 years for 50% of underground cables
• Less than 20 years for 50% of lines & substations
50Hertz
• Around 10 years for 90% of the network (refurbished
after German reunification in 1989)
306/12/2011
Elia with 50Hertz = TOP 5 TSO in Europe
Critical mass to play a leading role in future developments
110 to 380 kV lines & cables 13,431km
30 to 70 kV lines & cables 4,800km
Number of substations 872
Area covered (km2) c.143,000
Direct customers c.130
Residents covered >29 million
Employees (FTE) c.1,800
Regulated Asset Base (RAB) €5,097m
406/12/2011
Drivers for Innovation
• Elia grid in the center of Western Europe
• Strongly meshed between large power systems of France andGermany
• Subject to loopflows between French nuclear plants and Germanwind
• Management driven positioning in Europe
• Strong Elia involvement in TSO cooperation
• Phase Shifting Transformers on Belgian borders
• Lead in European Wind Integration Study
506/12/2011
TSOs have to boost R&D
2010 2020
Business
needs due to
integration of renewables
EWIS,
etc.
20302000
European Electricity Grid Initiative (EEGI)
606/12/2011
European Strategic Energy Technology Plan
EEGI
European Electricity
Grid InitiativeBIO
EWI
FCH
SOLAR
NUCLEAR
Smart Cities
ccs
6
706/12/2011
EEGI
• One of the pillars of the SET plan
• Leading role by Elia
• Includes T and D topics
• 2 b€ to be invested in R&D during 2010 - 2018
• T-topics embedded in Entso-e R&D plan
• Accepted by EC and member states during SET plan conference in June 2010
• Reference program for R&D in grid related matters.
806/12/2011
Some achievements and ongoing
actions: a few examples
906/12/2011
European Wind Integration Study (EWIS)
• Duration June 2007- April 2010 (34 months)
• An EC SmartGrids project (FP6)
• Competent Market Model Partner SUPWISci
consortium
• Close cooperation with external stakeholders:
• Network operators (TSOs and DSOs)
• Wind power producers and turbine
developers
• Market participants
• Relevant studies and working groups on
Wind integration
- TradeWind, IEA-Task 25, Greenpeace
study, EC Working group for Offshore/
onshore grid development, EWEA WG
Grid Codes, PLEF, Wind on the grid …
• Consumers
• Regulatory representatives
• National Governments and authorities…
UK & IrelandUK & Ireland
NorthernNorthern
BALTICBALTIC
CENTRAL EASTCENTRAL EAST
SOUTH WESTSOUTH WEST
SOUTH EASTSOUTH EAST
CENTRAL WESTCENTRAL WEST
CENTRAL SOUTHCENTRAL SOUTH
UK & IrelandUK & Ireland
NorthernNorthern
BALTICBALTIC
CENTRAL EASTCENTRAL EAST
SOUTH WESTSOUTH WEST
SOUTH EASTSOUTH EAST
CENTRAL WESTCENTRAL WEST
CENTRAL SOUTHCENTRAL SOUTH
1006/12/2011
Flexibility
• 3 phase shifters in the Van Eyck & Zandvliet HV station
� Improved control of neighbouring energy flows on the Elia grid for an improved reliability
� Optimisation of transmission capacity with interconnected networks
� The next step is to coordinate the operation of power flow devices taking into new regulatory issues
1106/12/2011
Cross border Coordination
CORESO : Regional Coordination Service Center (RTE, ELIA, National
Grid, 50 HzT, Terna)
www.coreso.eu
• Re-optimizing power grid
(max SoS & transm cap)
• operational safety of the system,
• massive integration of renewable
(wind energy)
• development of the electricity market
in the Central-Western Europe (CWE)
1206/12/2011
Enhanced overhead lines using the same right of way
150kV line (approx 600 MVA) versus “insulated arms” 380kV line ( up to 5000 MVA)
1306/12/2011
TWENTIES - Flexgrid
GOAL: Better integration of renewables
More stable and flexible grid
KUL: Optimal
Power flow
Control devices
ULB: WAMS
StabilityMargins
Help establish Good
Operating Practices
Ampacimon
PMU
ULg: Dynamic
Line Rating
1406/12/2011
On-going R&D projects with EC support
• 7MW-WEC-by-11 Estinnes (WindVision, Enercon, Sarens, ELIA, ENECO, 3E, K.U. Leuven, TSO Cyprus, EAC
- Ancillary Services delivery (Voltage control and SecundaryControl)
• OPTIMATE (Elia, ENBW TNG, REE, RTE, 50 HzT)
- A simulation platform to analyze electricity market design options involving transmission constraints, results by end 2012
• Ecogrid (SINTEF, Energinet.dk, Ostkraft, DTU-CET, Elia, Eandis, Siemens, IBM Research, Labein, AIT, ECN, UoT, EnCT)
- A Smart Grid prototype for the Future
1506/12/2011
Conclusions
• Fight against climat change pose important challenges on Electricity System
• Transmission System Operators play a central role in the change
• Elia Group is willing to contribute
• Availability of human resources is crucial
• We welcome international cooperation.
1606/12/2011