CONFIDENTIAL | 1 Featured Project: Seattle Tunnel, U.S.A | US $1.4B Value Trusted by the world’s largest projects World-Class Delivery of Mega Infrastructure Projects Observations and Global Trends September 16, 2014 Andrew Killander, VP Major Projects

description

Information Management in Construction

Transcript of 14.15 andrew killander, aconex for distribution

Page 1: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 1

Featured Project:

Seattle Tunnel, U.S.A | US $1.4B Value

Trusted by the world’s largest projects

World-Class Delivery

of Mega Infrastructure Projects

Observations and Global Trends

September 16, 2014

Andrew Killander, VP Major Projects

Page 2: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 2

Frequently Asked QuestionsAgenda

1. Observations, statistics and challenges for mega projects

2. Trends in Mega project delivery

3. Case study

Page 3: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 3

Big projects mean more challenges

Many projects

overrun on

cost and time

But mega

projects

overrun more

Page 4: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 4

Survey - Project delivery challenges

Source: Global Infrastructure Survey, 2013

42%:

Communication

among team

members is the

most

challenging on

projects

69%:

Collaboration

has the

greatest

impact on

Infrastructure

Projects,

followed by

BIM

69%: Highest

cost on

completion is

time required

to prepare

information

Page 5: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 5

Frequently Asked QuestionsWhat we will cover today

1. Observations, statistics and challenges for mega projects

2. Trends in Mega project delivery

3. Case study

Page 6: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 6

Frequently Asked QuestionsTrends: What do industry executives tell us?

• Uneasy hosting third party data

on internal systems: compliance,

legal & discovery implications

• Internal use is OK, but managing

processes and collaboration

outside the firewall is challenging

• High cost of maintaining,

customizing and deploying

installed systems

• Installed systems can have

performance issues, especially

on Mega projects with >1 m files

and > 10 Tb of data

• As projects grow, so does the

number of interface points

between organisations

• Managers need to focus on

delivering projects, not managing

and supporting IT systems

Page 7: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 7

Technology Trends 1

Mobile devices mean a mobile workforce

Mobile: Anywhere, Anytime

All Devices: iOS, Android, Win 8. Smartphones & Pads

Collaborative Processes: Not only ease of access to

content and drawings, but also processes like: Review,

Inspections, Snagging, assigning to others and reporting

Page 8: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 8

Technology Trends 2

BIM for Engineers and Architects only

is becoming BIM for everyone

BIM has worked well

as a modelling tool

for the Design &

Engineering teams

Until now, it has not

allowed all project

participants to

access and enrich

the model

Page 9: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 9

Technology Trends 3

Digital Workflows bring control and productivity

Source: Infrastructure Project

Major Mining Company

4 11 20 57 78

131 99 85

162134

344

149

152

250

410

338301

50.3

44.5

8.3

20.8

12.7

23.9

15.9

22.6

6.2 7.1

4.3 4.0 3.3 2.6 3.2 4.1 3.8

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11

2009 2010

Av

era

ge D

ocu

men

t R

ev

iew

Cycle

Tim

e

0

50

100

150

200

250

300

Document Review Cycle Time

350

400

450

Co

un

t o

f D

ocu

men

ts

Count of Drawings Average of Review Cycle Time

GO LIVE ON

Digital Workflows

TARGET

Normal document

control processes

Page 10: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 10

Technology Trends 4

Close-out & Handover have been revolutionised

Field Inspections, Commissioning and Safety Check

Full records or all testing/commissioning reports and protocols

All Manual, Spare parts lists, Certificates, Permits

Texts, files, logs, videos

Model visualization in the cloud

With comparison & mark-up, part-model streaming, clash detection

All drawings available on-line (both PDF and CAD source files)

Easy mobile access. No lost documents. Always latest version

Handover of Models

Handover in IFC conforming to LOD 400 , Compliant with COBie

605

Page 11: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 11

Technology Trends 5

The cloud now offers unmatched security

Secure data centers in the Kingdom

ISO 27001: Third party validation

Controlled access

Authentication

Encryption

Page 12: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 12

Technology Trends 6

Neutrality and Audits

The Client doesn’t want to use multiple contractors’ systems:

I have my own internal system. I don’t want to

change I need handover to be easy and in

my system I need the history: what was built, but also why & how it was built this way

Page 13: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 13

Technology Trends 6 (cont)

Neutrality and Audits

The contractors, EPCs, PM’s or Lead Engineers do not wantto use the Client’s internal system:

I have my internal system and want client

to use my system

I need a system for my internal processes

I need to interact with consultants,

subcontractors and vendors

Page 14: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 14

Technology Trends 6 (cont)

Neutrality and Audits

Observation from +100 Mega projects last 4 yearsWhen the Client owns or installs a project-wide system:

• Benefits to Contractors and Engineers are limited• Mistrust and uncertainty: can the Client edit data?• Contractors are reluctant to use the system• Data will not be captured and indexed

Mega Projects using neutral Collaboration Platforms see faster workflow processes, reviews, approvals and more complete records

Result: slower processing & incomplete

records

When the Contractor owns or installs a project-wide system:• Benefits to Client and Engineers are limited• Mistrust and uncertainty: can the Contractor edit data?• Client, PM and Engineers are reluctant to use the system• Data will not be captured and indexed

Result: slower processing & incomplete

records

Page 15: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 15

Frequently Asked QuestionsWhat we will cover today

1. Observations, statistics and challenges for mega projects

2. Trends in major project delivery

3. Case studies

Page 16: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 16

Featured Project:

Indira Gandhi International Airport, Terminal 3, New Delhi, India | US $2B Value

Trusted by the world’s largest projects

Dubai Metro

Page 17: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 17

Dubai MetroChallenges

Strategic, complex, high-visibility project. Large project team dispersed across

Dubai, Japan, Italy, Thailand, Australia, and Hong Kong.

Requirement for immediate transmission of documents and communications

Need for scalability to high volumes of project data.

.

Solutions

Secure collaboration platform for project information and process management.

Efficient communications between participants with a permanent audit trail.

Management of drawings and documents, with version control.

Results

Close coordination between multiple teams – civil, structural and rail systems.

4,500 participants collaborating globally during the design and build phases.

7 million letters/doc/drawings/models managed and stored securely. >9 Tb

Less rework and changes. Disputes resolved quickly due to transparency

“Aconex provides an efficient process for communicating between teams.”Jonathan Skittrall, Utilities and Highways Interface Leader

Page 18: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 18Denver Regional Transportation District (RTD), U.S.A. | US $5B Value

Regional Transit DistrictDenver Colorado

Page 19: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 19

Program background

Across eight Denver-area counties, a system of trains, buses and

transit facilities with more than 40 projects in the program

RTD FasTracks, +$5 Billion program

− 122 miles of new commuter rail and light rail

− 18 miles of bus rapid transit service

− New commuter rail maintenance depot

− 31 new Park-n-Ride stations with 21,000 new parking spaces

Historic Union Station renovation to become a multimodal hub serving

commuter rail, light rail, buses, and taxis

Page 20: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 20

Challenges

File Retention – For the life of each project, plus 7 years. Maintaining paper

copies for RTD for each project is very costly and paper copies are lost

Complex Funding – From of public and private sources. Contracts decision

records must be kept current and made available for 7 years after completion

Different Contract Types – Some are PPP others design-build, which require

different data ownership, responsibilities and workflow guidelines

Bottlenecks and Duplicate Efforts – RTD was planning to collect data from

an internal DMS and from all contractors, then re-transmit to appropriate

parties. This created heavy workloads for DCs and affected project schedules.

Different Practices/Repositories : Each contractor on every project shared

data with RTD differently, forcing RTD to adopt separate processes

Page 21: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 21

The technology selected by RTD Neutral Collaboration Platform– for all internal and external data and

exchange of information across all projects and participants

– A Neutral and Secure Online Platform for each Project Team

– Complete Project Record that cant be deleted or altered

– Unlimited Users, Document Storage and Distribution Capacity

– Google-like Document Search Functionality

Other complementary systems used

− Primavera P6

− Revit and Microstation (Bentley) for modelling

− Various cost/budget tools

Page 22: 14.15 andrew killander, aconex   for distribution

CONFIDENTIAL | 22