11B 1.5L Overhaul

download 11B 1.5L Overhaul

of 51

Transcript of 11B 1.5L Overhaul

  • 8/10/2019 11B 1.5L Overhaul

    1/51

    ENGIN

    OVERHA

  • 8/10/2019 11B 1.5L Overhaul

    2/51

    11 B-2

    ENGINE OVERHAUL

    -

    Gen

    Description

    TYPe

    Number of cylinders

    Combustion chamber

    Total displacement dm3 (cu, in)

    Cylinder bore mm (in.)

    Piston stroke mm (in.)

    GENERAL INFORMATION

    Spe

    In-li

    4

    Hem

    1,46

    75.5

    82.0

    GENERAL SPECIFICATION

  • 8/10/2019 11B 1.5L Overhaul

    3/51

    ENGINE OVERHAUL

    - S

    SPECIFICATIONS

    S E RV C E S

    P

    EC IF CAT I NS

    Standartem

    qocker arms, rocker shafts, and camshaft

    ~ _

    Camshaft cam height

    rnrn

    (in.) Intake-primary

    I 38.78 (1

    Intake-secondary 38.78 (1

    Exhaust

    39.10 (1

    2ylinder head and valves

    Cylinder head gasket surface flatness

    mm

    (in.)

    I

    Less th

    l

    ylinder head gasket surface grinding limit

    (including grindingof cylinder block gasket surface) mm (in.)

  • 8/10/2019 11B 1.5L Overhaul

    4/51

    Item Standard

    Crankshaft iournal diameter mm (in.) 48.0 (1.89

    Piston pin press-in load (at room temperature) N (Ibs.)

    4900

    -

    14

    Crankshaft pin oil clearance mm (in.)

    Connecting rod big end side clearance mm (in.)

    0.01

    -

    0.0

    0.10

    -

    0.2

    0.02

    -

    0.0

    rankshaft ournal oil clearance mm (in.)

    Cylinder block gasket surface flatness mm (in.)

    ~ _ _ _ _ _ _ _ _ _

    _

    ~

    ~

    0.05 (.020

    ~

  • 8/10/2019 11B 1.5L Overhaul

    5/51

    ENGINE OVERHAUL c1.5L>

    -

    Generator brace bolt (generator side)

    Generator brace bolt (tightened with water pump)

    Generator pivot bolt nut

    Oil dipstick guide bolt

    _ _ _ _ . _ _ _ _ ~ _ _ _ _

    TORQUE SPECIFICATIONS

    Generator and ignition system

    Water pump pulley bolt

    Crankshaft pulley bolt

    Spark plug

  • 8/10/2019 11B 1.5L Overhaul

    6/51

    11B-6

    ENGINE OVERHAUL c1S L i

    -

    Item

    Exhaust manifold nut

    Rocker cover bolt

    Rocker shaft bolt

    ~~

    Cylinder head bolt r ighten to

    49

    Nm

    (35

    ft.lbs.), then completely loos

    retightenas described.]

    Oil pan bolt

  • 8/10/2019 11B 1.5L Overhaul

    7/51

    ENGINE OVERHAUL c1 .5L>

    -

    Specified sealant

    Mitsubishi Genuine Part No.

    SEAL ANT S

    Item

    Water pump

    Engine coolant temperature sensor 3M Nut Locking Part No.417

    +--

    ngine coolant temperature gauge unit 3M ATD Part No.8660 or equ

    ~~~~~

    t

    I Front case

    Mitsubishi Genuine Part No.

    I oil

    pan

    Mitsubishi Genuine Part No.

    I

    Oil pressure switch

    I

    3M ATD Part No.8660 or eq

  • 8/10/2019 11B 1.5L Overhaul

    8/51

    11B-8

    ENGINE OVERHAUL c1.5L>

    -

    SPECIAL TOOLS

    Tool

    number and name Supersession

    Tool

    MB990767

    End yoke holder

    Use with MD998715

    MB990767-01

    Use with

    MIT30

    MD998011

    Crankshaft rear oil seal

    installer

    MD998011-01

    Use with

    MB990938-01

  • 8/10/2019 11B 1.5L Overhaul

    9/51

    ENGINE

    OVERHAUL c1.5L>

    -

    Tool

    Tool number and name

    MD998772

    Valve spring

    compressor

    MD998780

    Piston pin setting tool

    MD998781

    Flywheel stopper

    Supersession

    General service

    MIT216941

    General service

  • 8/10/2019 11B 1.5L Overhaul

    10/51

  • 8/10/2019 11B 1.5L Overhaul

    11/51

    ENGINE OVERHAUL c1.5L>

    -

    Generato

    9EN0268

    REMOVAL SER

    +A F CRANKSHA

    (1)

    Lockthe lywhe

    tool shown in t

    bolt.

    INSTALLATION

    F A + DISTRIBUT

    (1) Turn the crank

  • 8/10/2019 11B 1.5L Overhaul

    12/51

    11B-12 ENGINE OVERHAUL

    -

    TIMING

    BELT

    REMOVAL AND INSTALLATION

    8

    88 Nm

    64 ft.lbs. \

  • 8/10/2019 11B 1.5L Overhaul

    13/51

    ENGINE OVERHAUL

    -

    REMOVAL SER

    +A F TIMING BEL

    TENSIONER

    (1)

    Using pliers, g

    in the illustratio

    lug. Then, rem

    (2) Remove the tim

    timing belt.

    (3) If the timing be

    belt to indicate

    it. This will ens

    reused.

  • 8/10/2019 11B 1.5L Overhaul

    14/51

    11B-14 ENGINE OVERHAUL

    -

    (2)

    Install the tens

    case, and then

    (3) Grip the other e

    then hook it on

    illustration.

    (4) Move the timin

  • 8/10/2019 11B 1.5L Overhaul

    15/51

    ENGINE OVERHAUL

    -

    (3) Keeping the te

    timing belt on

    sprocket, and

    4) Loosen the tim

    by 1/4 to 1/2 o

    to apply tensio

    (5)

    Turn the crank

    all timing mark

    Caution

    This procedur

    to apply tensi

    to turn the cra

    turn the crank

    (6) Tighten the tim

    specified torqu

  • 8/10/2019 11B 1.5L Overhaul

    16/51

    11

    B-16 ENGINE OVERHAUL c1.5L> -

    Canvas

    worn

    exposing

    rubb

    Z8EN0068

    I

    (7) Abnormal wea

    Initial stage:Ca

    texture gone, wh

    Final stageCan

    reduced)

    (8) Missing teeth.

    TENSIONER

    PUL

    (1) Check the pull

    are not noisy.

  • 8/10/2019 11B 1.5L Overhaul

    17/51

    ENGINE OVERHAUL - Fuel and E

    FUEL

    AND EMISSION CONTROL SYSTE

    REMOVAL AND INSTALLATION

    11

    Nrn

  • 8/10/2019 11B 1.5L Overhaul

    18/51

    11 B-18

    ENGINE OVERHAUL c1.5L> - Fuel and E

    INSTALLATION

    .A+ INJECTOR I

    (1) Fit a new O-rin

    (2) Apply clean eng

    (3) Fit the injector

    right as it goes

    (4) Check that the

    Caution

    If the injector

    may be bindin

    from the fuel r

    injector.

    .B+ FUEL PRES

  • 8/10/2019 11B 1.5L Overhaul

    19/51

    ENGINE OVERHAUL c1.5L> - Water

    P

    WATER PUMP AND WATER HOSE

  • 8/10/2019 11B 1.5L Overhaul

    20/51

    11B-20

    ENGINE OVERHAUL - Water

    P

    INSTALLATION

    ,A+ WATER PUM

    (1)

    Clean the sea

    case and cylin

    2) Apply a 3

    mm

    area shown in

    pump within 1

    (3) After installatio

    engine or let co

    that time.

    Specified sea

    Mitsubishi

    equivalent

    b B + O-RINGWA

  • 8/10/2019 11B 1.5L Overhaul

    21/51

    ENGINE OVERHAUL

    =

    In take a

    INTAKE AND EXHAUST MANIFOLDS

    REMOVAL AND INSTALLATION

  • 8/10/2019 11B 1.5L Overhaul

    22/51

    11

    B-22

    ENGINE OVERHAUL

    -

    Rocker

    ROCKER

    ARMS AND

    CAMSHAFT

    REMOVAL AND INSTALLATION

  • 8/10/2019 11B 1.5L Overhaul

    23/51

    ENGINE OVERHAUL

    -

    Rocker

    REMOVAL SER

    +A,ROCKER A

    REMOVAL

    Caution

    If the lash adjust

    Refer to

    118-24.)

    Set special ool MD

    free and falling to

    INSTALLATION

    F A + LASH ADJU

    Caution

  • 8/10/2019 11B 1.5L Overhaul

    24/51

    11B-24

    ENGINE OVERHAUL

    c1.5L> -

    Rocker

    Outside Inside Filling

    cleaning cleaning diesel fuel

    INSPECTION

    CAMSHAFT

    (1)

    Measure the ca

    height exceed

    Standard valu

    Intake:

    38

    Exhaust:

    Intake: 38

    Exhaust:

    Limit:

    LASH

    ADJUSTER

    Caution

    1. The lash

  • 8/10/2019 11B 1.5L Overhaul

    25/51

    ENGINE

    OVERHAUL

    -

    Rocker

    , iesel fuel 6 E N 1 7 0 1

    (5)

    Remove he las

    down he steel b

    diesel fuel from

    (6)

    Fit special tool

    (7)

    Place the lash a

    down the intern

  • 8/10/2019 11B 1.5L Overhaul

    26/51

    11B-26

    ENGINE OVERHAUL - Rocker

    6 E N 1 7 0 4

    I

    Division

    =

    1

    rnrn

    (.04n.)

    MD998440

    /

    (12)Remove he la

    the lash adjus

    plunger firmly

    check that the

    new lash adjus

    NOTE

    If lash adjuste

    through (12) a

    Replace he las

    these steps.

    (13)Set the lash ad

    down tester).

    (14)After the plung

  • 8/10/2019 11B 1.5L Overhaul

    27/51

    ENGINE OVERHAUL c1.5L> - Cylind

    CYLINDER HEAD AND VALVES

    REMOVAL AND INSTALLATION

  • 8/10/2019 11B 1.5L Overhaul

    28/51

    11

    B-28

    ENGINE OVERHAUL

    -

    Cylinde

    1EN0486

    REMOVAL SER

    + A b CYLINDER H

    + B b RETAINER L

    (1)

    Tag removed v

    noting their cyl

  • 8/10/2019 11B 1.5L Overhaul

    29/51

    ENGINE OVERHAUL - Cylinde

    Painted

    end

    I SDrina re-

    taine;

    Stem seal

    .

    Spring

    seat

    b B + VALVE SPRI

    (1)

    Install the valve

    the rocker arm

    Paint colors:

    Intake: Ora

    Exhaust: Y

    I

    6EN0437

    b C + RETAINER L

    (1)

    The valve spring

    bottom end of th

  • 8/10/2019 11B 1.5L Overhaul

    30/51

    11B-30

    ENGINE OVERHAUL c1.5L> - Cylind

    (7) Make paint ma

    cylinder head

    (8) In accordance w

    bolt by 90(1/4

    (9) Tighten each b

    that the paint m

    are aligned.

    Caution

    If the bolts ar

    90(1/4 turn),

    with sufficien

    If the bolts are

    completely rem

    procedure ag

  • 8/10/2019 11B 1.5L Overhaul

    31/51

    ENGINE

    OVERHAUL

    -

    Cylind

    I

    Contact

    (must be in

    center of face)

    Margin

    6EN0542

    VALVES

    1) Check the valv

    uneven or inco

    (2) If the margin i

    Standard valu

    Intake: 1.0

    Exhaust:

    1

    Intake: 0.5

    Exhaust: 1

    Limit:

    (3) Measure the v

    than specified,

    Standard valu

  • 8/10/2019 11B 1.5L Overhaul

    32/51

    11B-32

    ENGINE OVERHAUL - Cylind

    Valve stem end

    D E N 0 2 1 2

    I

    0.9

    -

    1.3 mm

    0.9

    -

    1.3 mm

    (.035 - .051 in.) (.035

    -

    ,051 in.)

    \ /

    VALVE SEATS

    (1)

    Assemble the

    projection betw

    spring seating

    specified limit,

    Standard valu

    Intake: 43

    Exhaust: 4

    Intake: 44

    Exhaust: 4

    Limit:

    VALVE SEAT R

    (1) Before correct

    between the va

  • 8/10/2019 11B 1.5L Overhaul

    33/51

    ENGINE OVERHAUL

    -

    Cvlind

    VALVE GUIDE

    (1)

    Using a press, p

    (2) Rebore he valv

    block side.

    the oversize va

    Caution

    Do

    not install

    Valve guide h

    0.05

    O.S.:

    0.25 O.S.:

    0.50 O.S.:

  • 8/10/2019 11B 1.5L Overhaul

    34/51

    11B-34

    ENGINE

    OVERHAUL

    - Oil P

    ENGINE OVERHAUL Oil

    P

  • 8/10/2019 11B 1.5L Overhaul

    35/51

    -

    \

    REMOVAL SER

    MD998727

    4 A F O I L PAN RE

    (1) Remove the oi

    2 ) Knock the spec

    block as show

    (3)

    Tapping the sid

    the oil pan/cylin

    pan.

    INSTALLATION

    .A+ FRONT CAS

    (1)

    Clean the seal

  • 8/10/2019 11B 1.5L Overhaul

    36/51

    11 B-36

    ENGINE OVERHAUL

    -

    Oil

    P

    1EN050

    b C d OIL PAN IN

    (1)

    Clean the mati

    block.

    (2) Apply a 4 mm

    oil pan flange.

    minutes after a

    Specified seal

    Mitsubishi

    equivalent.

    (3)

    Tighten the oil

    (4) After installatio

    engine or let eng

    that time.

    c1.5L>

  • 8/10/2019 11B 1.5L Overhaul

    37/51

    ENGINE OVERHAUL

    -

    Oil

    (3) Check the side

    gauge.

    Standard valu

    (4) Check the bod

    Standard valu

    Limit: 0.35

    m

  • 8/10/2019 11B 1.5L Overhaul

    38/51

    11B-38 ENGINE OVERHAUL

    -

    Pistons

    PISTONS AND CONNECTING RODS

    REMOVAL AND INSTALLATION

    &

    ~ p p ~ yngine oil to all

    moving parts before

    installation.

  • 8/10/2019 11B 1.5L Overhaul

    39/51

    ENGINE OVERHAUL

    -

    Pistons

    Item No. Pa

    Piston pin setting

    tool

    MIT216941

    REMOVAL SER

    +A F CONNECTIN

    (1)

    Mark the cylind

    rod big end for

    (2)

    Keep the remo

    in order accord

  • 8/10/2019 11B 1.5L Overhaul

    40/51

    11 B-40

    ENGINE OVERHAUL

    -

    Pistons a

    INSTALLATION

    F A + PISTON PIN

    (1)

    Thread the stop

    base. Fit the co

    Insert the press

    the piston supp

    screw.

    (2) Using the mark

    screw to the de

    Depth: Refer

    special tool.

  • 8/10/2019 11B 1.5L Overhaul

    41/51

    ENGINE

    OVERHAUL

    -

    Pistons

    ~~

    Size

    STD

    Upper side rail

    Spacer

    Lower side rail

    A6EN0585

    Side rail gap

    d

    ,B+ OIL RING IN

    (1) Fit the oil ring s

    fit the upper an

    NOTE

    1)

    The space

    direction.

    N

    bottom.

    (2) Spacer and

    0.50

    mm

    O.S.

  • 8/10/2019 11B 1.5L Overhaul

    42/51

    11 B-42

    ENGINE

    OVERHAUL

    -

    Pistons

    No.1

    ring

    Piston pin

    Side rail

    No.2

    ring and

    I spacer

    - .

    bEFl0549 I

    iming belt

    side

    b D + PISTON AN

    (1)

    Apply oil to the

    (2)

    Align the gaps

    and spacer) as

    (3) With the piston

    the timing belt s

    assembly into

    INSTALLATI

    (4)

    Compress the

    compression to

    rod fully into th

    ENGINE OVERHAUL

    Pistons

  • 8/10/2019 11B 1.5L Overhaul

    43/51

    -

    Connecting rod bearing

    dentification mark

    Identification color stamped Position

    painted position

    l E N 0 5 4 4

    WF+

    CONNECTIN

    (1)

    Aligning the m

    bearing cap on

  • 8/10/2019 11B 1.5L Overhaul

    44/51

    11

    B-44

    ENGINE OVERHAUL

    c1.5L> - Pistons

    I l l 6AE0298

    ~ ~

    90"

    to

    100" I

    I

    Pa'nt mark

    (5) Make a paint

    6) Make a paint m

    to 100" from the

    of tightening th

    (7) Give a

    90"

    to

    the paint mark

    alignment.

    Caution

    1.

    If the nut

    is

    performan

    tightening

    a sufficien

    2.

    If the nut

    is

    the nut c

    repeating

    ENGINE OVERHAUL

    Pistons

  • 8/10/2019 11B 1.5L Overhaul

    45/51

    -

    CRANKSHAFT PI

    GAUGING MATER

    (1)

    Remove oil fro

    bearing.

    (2)

    Cut the plastic

    the width

    of

    b

    in parallel with

    (3)

    Install the conn

    nuts to the spe

    nut tightening

    (4) Carefully remo

    11

    8-46

    ENGINE O VERHAUL Cranksh

  • 8/10/2019 11B 1.5L Overhaul

    46/51

    -

    CRANKSHAFT AND CYLINDER BLOCK

    REMOVAL AND INSPECTION

  • 8/10/2019 11B 1.5L Overhaul

    47/51

    11B-48 ENGINE

    OVERHAUL c1.5L>

    -

    Cranksh

  • 8/10/2019 11B 1.5L Overhaul

    48/51

    Cyl'nder block Timing belt side

    ~

    ~

    Cranks haft bearing

  • 8/10/2019 11B 1.5L Overhaul

    49/51

  • 8/10/2019 11B 1.5L Overhaul

    50/51

  • 8/10/2019 11B 1.5L Overhaul

    51/51