1001 GREENFIELD NORTH - Foundry Commercial · 2018. 1. 2. · 1001 GREENFIELD NORTH LOCATION &...
Transcript of 1001 GREENFIELD NORTH - Foundry Commercial · 2018. 1. 2. · 1001 GREENFIELD NORTH LOCATION &...
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
DELIVERED1001 GREENFIELD PARKWAY
Garner, North Carolina
CONTACT:
Jackson Rives 919.576.2692 [email protected]
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
NORTH GREENFIELD PARKWAY
OPTIONAL DOOR PAIR
ELECFIREPUMP
ROOF ACCESSLADDER N
D EPOLS
SLO
PE D
N
50'-0"
200'-
0"
750’-0”
SITE PLAN 151,642 SF
50’50’
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
OPTIONAL DOOR PAIR
ELECFIREPUMP
ROOF ACCESSLADDER
ND EP
OLS
ND EP
OLS
987654321 1101 12 13
A
B
C
D
E
50'-0" 50'-0" 50'-0"
750'-0"14 15 16
50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0"
"0-'05"0-'05
"0-'05
"0-' 0
02
50'50'
FLOOR PLAN
AVAILABLE 90,769 SF
151,642 SF
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
BUILDING SIZE ±151,642 SF
AVAILABLE SF ±90,769 SF
COLUMN SPACING 50' x 50'
DIMENSIONS 200' x 750'
BAY SIZES Approximately 10,000 SF bays
PAVEMENT Heavy duty asphalt at truck court and drive aisle
TRUCK COURT 120' deep
CAR PARKING 1/1,000 square feet
SLAB ON GRADE 7" thick, 4,000 psi, un-reinforced over 4" compacted granular fill; vapor barrier at office area
EXTERIOR WALLS Concrete tilt wall
STRUCTURAL STEEL Tube steel columns, joists/girders primed grey, white roof deck
FLOOR SEALER 1 coat of floor hardener
ROOFING Mechanically attached .60 mil TPO with rigid insulation
CLEAR HEIGHT 32' to bottom of structure (inside 1st bay)
DOCK DOORS for entire building
• Thirty-six (36) 9' x 10' manual overhead doors
• Four (4) knock-out openings for future dock positions
• Two 12' x 14' motor operated overhead doors with drive-in ramps
• Two knock-out openings for future drive-in positions
FIRE PROTECTION ESFR with pump
HVAC 3 air changes per hour; heat provided for freeze protection only
ELECTRICAL SERVICE 1,200 amp service
INTERIOR LIGHTING T5 lighting for 25 foot-candles at 36" above finish floor based on an open floor plan
BUILDING FEATURES
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
MASTER SITE PLAN
GREENFIELD NORTHRaleigh,NC
1201 GREENFIELD220' X 750'
±165,000 SF165 SPACES
1001 GREENFIELD200' X 753'151,642 SF151 SPACES
800122,006 SF
900127,228 SF
1000 133,347 SF
1100 GREENFIELD220' X 640'
+140,800 SF113 SPACES
1300 GREENFIELD220' X 565'+124,300 SF111 SPACES
North Greenfield Parkway
55 Trailer Spaces
45 Tr
ailer
Spa
ces
ProposedPond
Existing Pond
StreamWetland
Norfolk Southern Railroad
KEYDuke Realty Building
Proposed Building
Non-Duke Realty Building
dukerealty.com
Strategically located at the I-40 and Highway 70 interchange in Garner, North Carolina, Greenfield North is the only rail-serviced industrial park in the region. Just a few miles southeast of Raleigh’s amenity-rich down-town, the park is minutes from
the I-440 Beltline, the proposed extension of the Outer Loop (I-540), and the RDU airport.
Greenfield North is a beautifully landscaped ±228-acre develop-ment park comprised of office, industrial, flex, and retail space.
Accessible by a four-lane, divided median entrance into the park, Greenfield North is currently home to tenants including Golden State Foods and Butterball.
NORTH GREENFIELD PARKWAY
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
LOCATION & AMENITIESPetSmart, Dick’s Sporting Goods, Pier 1 Imports, Rack Room Shoes, Target, and Best Buy.
THE OUTER LOOP The Triangle Expressway (I-540) Southeast Extension project began in 1997 and has over 30 miles of completed freeway in a radius around Raleigh.
The next phase of the loop will extend from Highway 55 in Apex to I-40 near Greenfield North. There are currently five different routes being considered by the North Carolina Turnpike Authority. Two of the routes being considered would have the Triangle Expressway intersecting with I-40 within one mile to the south
of Greenfield North. The remaining proposed routes would bring an interchange to Garner located no further than five miles from Greenfield North.
WHITE OAK CROSSING Completed in 2003 and located just minutes from Greenfield North, White Oak Crossing is one of the largest retail centers in the Raleigh metropolitan area. Totaling over 710,000 square feet White Oak Crossing is anchored by prominent national retailers such as BJ’s Wholesale Club, Kohl’s,
40
40
70
70
600 700
800 900
WHITE OAK CROSSING
GOLDEN STATE FOODS
BUTTERBALL
CAPITAL CHRYSLER JEEP DODGE
PERGO HEADQUARTERS
GREENFIELD NORTH
NORFOLK SOUTHERN RAILROAD
1001
NORTH GREENFIELD PARKWAY
1000
NORTH GREENFIELD PARKWAY
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
LOCATION & AMENITIESPetSmart, Dick’s Sporting Goods, Pier 1 Imports, Rack Room Shoes, Target, and Best Buy.
THE OUTER LOOP The Triangle Expressway (I-540) Southeast Extension project began in 1997 and has over 30 miles of completed freeway in a radius around Raleigh.
The next phase of the loop will extend from Highway 55 in Apex to I-40 near Greenfield North. There are currently five different routes being considered by the North Carolina Turnpike Authority. Two of the routes being considered would have the Triangle Expressway intersecting with I-40 within one mile to the south
of Greenfield North. The remaining proposed routes would bring an interchange to Garner located no further than five miles from Greenfield North.
WHITE OAK CROSSING Completed in 2003 and located just minutes from Greenfield North, White Oak Crossing is one of the largest retail centers in the Raleigh metropolitan area. Totaling over 710,000 square feet White Oak Crossing is anchored by prominent national retailers such as BJ’s Wholesale Club, Kohl’s,
40
40
70
70
NORTH GREENFIELD PARKWAY
N GREENFIELD PARKWAY
S G
REEN
FIEL
D PARK
WA
Y
WHITE OAK ROAD
TIMBER DRIVE E
WHITE OAK CROSSING
60
0
700
800
90
0
100
0
GOLDEN STATE FOODS
SITE
1001
CONTACT:
Jackson Rives 919.576.2692 [email protected]
1001 GREENFIELD NORTH
LOCATION & ACCESS
540
540
495
495
540
540
440
440
540
40
40
40
40
40
85 85
86
86
54
55
55
98 98
98
98
96
96
96
50
54751
751147
751
70
6464
1
70
70
70
401
401
401
401
401
401
70
70
501
15
1
1
1
1
75 55
50
50
ORANGECOUNTY
CHATHAMCOUNTY
WAKECOUNTY
WAKECOUNTY
JOHNSTONCOUNTY
NASHCOUNTY
FRANKLINCOUNTY
GRANVILLECOUNTY
DURHAMCOUNTY
FallsLake
JordanLake
RDUAirport
Carrboro
Pittsboro
Holly Springs
Apex
Morrisville
Garner
Clayton
Knightdale
Wendell
Zebulon
Rolesville
WakeForest
Bunn
Youngsville
FranklintonCreedmoor
Hillsborough
CHAPELHILL
Cary
RALEIGH
DURHAM
ResearchTriangle Park
PORTS Wilmington, NC 130 miles Morehead City, NC 150 miles Norfolk, VA 190 miles Charleston, SC 275 miles
AIRPORTS Raleigh-Durham International 18 miles Piedmont Triad International 100 miles Charlotte Douglas International 180 miles
INTERSTATES Uninterrupted distribution to every major market in the United States
10
95
91
80
80
80
95
95
95
95
85
85
85
65
65
65
43
59
59
5530
45
35
10
10
5
5
37
20
27
25
25
29
90
94
94
44
35
35
55
40
40
77
40
15
1590
84
70
75
10
70
81
40
8775
CANADA
MEXICO
MAINE
ALASKA
HAWAII
RUSSIA
CANADA
VT
NH
MA
CT RI
NEWYORK
NJ
MDDE
PENNSYLVANIA
OHIOINDIANA
KENTUCKY
TENNESSEE
MISSISSIPPI
LOUISIANA
TEXAS
OKLAHOMA
KANSAS
NEW MEXICO
COLORADO
NEBRASKA
SOUTH DAKOTA
NORTH DAKOTAMONTANA
WYOMING
UTAH
ARIZONA
CALIFORNIA
NEVADA
IDAHO
OREGON
WASHINGTON
ARKANSAS
MISSOURI
ILLINOIS
IOWA
MINNESOTA
WISCONSIN
MICHIGAN
ALABAMA
WESTVIRGINIA
VIRGINIA
NORTHCAROLINA
SOUTHCAROLINA
GEORGIA
FLORIDA
MS
Boston
New York City
Portland
Washington D.C.
Raleigh
Richmond
Wilmington
Charleston
Miami
Jacksonville
Savannah
AtlanticOcean
Gulf ofMexico
PacificOcean
Bering Sea
Gulf ofAlaska CUBA
BAHAMAS
Lake Superior
LakeMichigan
LakeHuron
Lake Erie
Lake Ontario
150 MILES
300 MILES
500 MILES
70 40
95 85
<1 mile 1 mile
27 miles 38 miles
Greenfield North
NORTH GREENFIELD PARKWAY
Although the information contained herein was provided by sources believed to be reliable, Foundry Commercial makes no representation, expressed or implied, as to its accuracy and said information is subject to errors, omissions or changes.