100 kg/day Rapid Ramp NH System Development

16
1 Ammonia Energy Association Conference 2021 100 kg/day Rapid Ramp NH 3 System Development Rachel Gregg M.S. , Ammonia Production Engineer AEA 2021

Transcript of 100 kg/day Rapid Ramp NH System Development

Page 1: 100 kg/day Rapid Ramp NH System Development

1Ammonia Energy Association Conference 2021

100 kg/day Rapid Ramp NH3 System Development

Rachel Gregg M.S. , Ammonia Production EngineerAEA 2021

Page 2: 100 kg/day Rapid Ramp NH System Development

2Ammonia Energy Association Conference 2021

Starfire Energy is a clean energy company

● Research, development, deployment- Ammonia Synthesis and Cracking● Modular Ammonia Production following variable power

– Approach since 2016

– Ramp production based on power

– N2 and H2 used as they are made

NitrogenUnit

HydrogenUnit

Rapid RampNH3

AmmoniaStorage

Air

Water

CleanElectricity

H2

N2

NH3

Variable Renewable Power

Page 3: 100 kg/day Rapid Ramp NH System Development

3Ammonia Energy Association Conference 2021

Starfire Energy’s journey to 100 kg/day

● 100 kg/day system designed with modularization principals● Conex building block is first commercial NH3 synthesis product

– Each unit scaled to maximum capacity of standard shipping container– Faster, simpler, cheaper plant construction– Build any size plant from modules

ProofOf

Concept

LaboratoryScale

Reactor

10 kg/day Integrated

System

Scale Up & Modularization

EngineeringInvestigation

100 kg/day Modular System

2016-2017 2018 2019 2020 2021 2022

Conex Commercial

Design

Page 4: 100 kg/day Rapid Ramp NH System Development

4Ammonia Energy Association Conference 2021

Successful close of Series A investment in 2021

Funding transitioned from ARPA-E government funding to investment

Page 5: 100 kg/day Rapid Ramp NH System Development

5Ammonia Energy Association Conference 2021

The team and facility have expanded

Expansion of NH3 Synthesis team,

NH3 Cracking team, Fabrication

team, and Operations team

Facilities upgrade from4,000 to 23,000 ft2

2015 2016 2017 2018 2019 2020 20210

10

20

30

Starfire Energy Staffing

Year

# of

Em

ploy

ees

Page 6: 100 kg/day Rapid Ramp NH System Development

6Ammonia Energy Association Conference 2021

Process flow for NH3 synthesis

Page 7: 100 kg/day Rapid Ramp NH System Development

7Ammonia Energy Association Conference 2021

Next development step is the 100 kg/dayCirculation Pump

&Liquefaction

Reactor

Nitrogen Generation

Hydrogen Generation

Adsorption

Control and Power

Page 8: 100 kg/day Rapid Ramp NH System Development

8Ammonia Energy Association Conference 2021

100 kg/day system built in modules

● 6 main modules● Platforms

simulate 20 ft shipping containers

Page 9: 100 kg/day Rapid Ramp NH System Development

9Ammonia Energy Association Conference 2021

Nitrogen system fully installed and tested

Air Compressor

N2 Production System

Air DryerNitrogen

Generator

Nitrogen Booster

Air Storage● Several components

– Air compressor– Air dryer– Nitrogen generator– Boost compressor– Storage vessels

● 24 hour continuous test – 08:55 16-Aug to 08:55 17-Aug

Page 10: 100 kg/day Rapid Ramp NH System Development

10Ammonia Energy Association Conference 2021

N2 milestone complete in August 2021

Notes: 1. Step changes in N2 pressure are manual adjustments of pressure regulator.2. Spike in N2 flow rate resulted from rapid manual adjustment of regulator.

Not to exceed Milestone requirement

Actual System Performance

Actual System Performance

Must exceed Milestone requirement

Note 1

Note 2

Must exceed Milestone requirement

Actual System Performance

Test was successfulSKID achieved milestone requirements of pressure > 31 bar,

flow> 100 kg/day (4.17 kg/hr), and oxygen content < 10 ppm

Page 11: 100 kg/day Rapid Ramp NH System Development

11Ammonia Energy Association Conference 2021

Hydrogen system fully installed and tested

● 21 electrolysers, 5 dryers

● External water purification system

● Enapter supported commissioning

● 24+ hour continuous test – 07:00 24-Aug to 08:00 25-Aug

H2 Production System

Dryers(Top Unit on Each Rack)

Electrolyzers

Page 12: 100 kg/day Rapid Ramp NH System Development

12Ammonia Energy Association Conference 2021

H2 milestone complete in August 2021Test was successful

SKID achieved milestone requirements of pressure > 31 bar and flow> 20 kg/day (0.83 kg/hr)

Note 1. A power surge was experienced which shut down one electrolyser. Electrolyser was returned to operation after test completion.

Must exceed Milestone requirement

Must exceed Milestone requirement

Actual System Performance Actual System Performance

Note 1

Page 13: 100 kg/day Rapid Ramp NH System Development

13Ammonia Energy Association Conference 2021

Scaling the system resulted in design changes ● Reactor Vessel

– Was: 24” pipe 24” long– Now: 36” pipe 24” long

● Output increased by factor of 13.2

– Was:Thermal regeneration● Larger, Long Cycle Time

– Now: Novel regeneration technology

● Smaller Size = Faster regeneration, Lower cost

● More uniform flow

24” Reactor vessel 36” Reactor vessel

● Adsorber Vessel Regeneration

Previous adsorption bed

Page 14: 100 kg/day Rapid Ramp NH System Development

14Ammonia Energy Association Conference 2021

Experience curve drives cost reduction

● Ubiquitous in manufacturing● Break the normal cost reduction

approach to chemical synthesis– Traditionally reduce cost by increasing

unit size

● Mass produced modules reduces cost for both large and small plants

http://www.netmba.com/strategy/experience-curve/

Each doubling of cumulative production reduces cost 5 – 20%

Page 15: 100 kg/day Rapid Ramp NH System Development

15Ammonia Energy Association Conference 2021

Moving ahead

● Finish 100 kg design and fabrication

● Close Series B funding● Continue growing the team● Maximize capacity for conex

building block● Prepare for mass production

Page 16: 100 kg/day Rapid Ramp NH System Development

16Ammonia Energy Association Conference 2021

Questions?