1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys”...

7
1 06/23/22 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    218
  • download

    4

Transcript of 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys”...

Page 1: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

104/18/23 Space Cowboys Team Project Final Report

SysEng 401 MBSE Team Project “Space Cowboys”

Final Report

04-May-2010

Page 2: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

204/18/23 Space Cowboys Team Project Final Report

Agenda

1. Team Project Overview – Jim Smith

2. System-Level Modeling – Jim Smith

3. Remote Control Subsystem – Jim Smith

4. Pneumatic Subsystem – Mark Foster

5. Defensive Weapon Subsystem – Mark Foster

6. Offensive Weapon Subsystem – Chris Hokans

7. Mobility Subsystem – Brett Padgett

8. Artisan – Lessons Learned – Brett Padgett

9. Summary/Conclusions – All

Page 3: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

304/18/23 Space Cowboys Team Project Final Report

Team Project Overview

Used the “BattleBots” Robot Wars as our team projectStraightforward, well-defined requirements with sufficient design latitude to make it interestingFocused on techniques to make MBSE & SysML work for a “typical” design projectGeographically dispersed team is typical of modern projectsLeveraged diversified team experience Intend to utilize project as a springboard for introducing MBSE to our respective companies

Jim SmithOrlando,

FL

Chris HokansEverett, WA

Mark FosterHuntington Beach,

CA

Brett PadgettHuntsville,

AL

Page 4: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

404/18/23 Space Cowboys Team Project Final Report

BattleBot Videos & Other Links

VideosBest of BattleBots

Top Ten BattleBot Moments

Remote Control Robot Tutorial

Other referenceshttp://www.battlebots.com

http://www.societyofrobots.com/

http://www.hobbytron.com/ http://www.superdroidrobots.com

See the Military/Law Enforcement Items

http://www.npcrobotics.com/showpic.asp?cat=bbiq2&pic=21

http://www.battlebots.com

Page 5: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

504/18/23 Space Cowboys Team Project Final Report

Team Project LogisticsWeekly Team WebEx (Thur, 9pm ET, 8pm CT, 6pm PT)

Google Site for team collaboration and model file sharing (configuration management)

http://sites.google.com/site/se401spacecowboys/

Page 6: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

604/18/23 Space Cowboys Team Project Final Report

DefensiveD3

DefensiveD3

DefensiveD2

DefensiveD2

BattleBot Trade Tree

Battle BotBattle Bot

VehicleVehicle

WeaponsWeapons

RemoteControlRemoteControl

RC 2RC 2RC 1RC 1

DefensiveD1

DefensiveD1

C 2C 2C1C1

ChassisChassis

ElectricElectricGasGas

PowertrainPowertrain

OffensiveO3

OffensiveO3

OffensiveO2

OffensiveO2

OffensiveO1

OffensiveO1

Page 7: 1 6/30/2015 Space Cowboys Team Project Final Report SysEng 401 MBSE Team Project “Space Cowboys” Final Report 04-May-2010.

704/18/23 Space Cowboys Team Project Final Report