REFERENCES RWE is planning to build a lignite-fired power plant with optimized efficiency parameters – the most modern of it’s kind in the world. This new power plant with 2 Blocks will be equipped with a flue gas desulfurization system. The company LAB offers to RWE the Twin-Tower DCFS from Mitsubishi. Part of the offer is a 3D design model of the system based on the tender data and bill of Quantities for steelwork and piping. As a subcontractor for LAB we developed the preliminary design and 3D model for integration of the desulfurization system into the new power plant and we extracted BoQs for price calculation purposes. FLUE GAS DESULFURIZATION SYSTEM OUR SERVICES IN THIS PROJECT > Preliminary design > 3D arrangement with AVEVA PDMS > Bill of Quantities – Steelwork and piping Absorber type Twin Tower DCFS FGD process Wet Limestone-Gypsum Design gas condition (full load) 550 MW Abs. Inlet gas condition (SO 2 ) 1900 ppm-d Abs.Outlet gas condition (SO 2 ) SO 2 - 52 ppm-d RAP Systems Bulgaria OOD Tel: +359 2 8199303 www.rap-systems.com Blvd. Cherni Vruh 51 B, 1407 Sofia, Bulgaria Fax: +359 2 8199313 [email protected]

description

FGD

Transcript of 07-Flue-Gas-EN

Page 1: 07-Flue-Gas-EN

 

REFERENCES

RWE is planning to build a lignite-fired power plant with optimized efficiency parameters – the most modern of it’s kind in the world.

This new power plant with 2 Blocks will be equipped with a flue gas desulfurization system.

The company LAB offers to RWE the Twin-Tower DCFS from Mitsubishi.

Part of the offer is a 3D design model of the system based on the tender data and bill of Quantities for steelwork and piping.

As a subcontractor for LAB we developed the preliminary design and 3D model for integration of the desulfurization system into the new power plant and we extracted BoQs for price calculation purposes.

FLUE GAS DESULFURIZATION SYSTEM

OUR SERVICES IN THIS PROJECT 

> Preliminary design

> 3D arrangement with AVEVA PDMS

> Bill of Quantities – Steelwork and piping

Absorber type Twin Tower DCFS

FGD process Wet Limestone-Gypsum

Design gas condition (full load) 550 MW

Abs. Inlet gas condition (SO2) 1900 ppm-d

Abs.Outlet gas condition (SO2) SO2 - 52 ppm-d

RAP Systems Bulgaria OOD Tel: +359 2 8199303 www.rap-systems.com Blvd. Cherni Vruh 51 B, 1407 Sofia, Bulgaria Fax: +359 2 8199313 [email protected]