01-LV system

94
Presented By Kidsada Santisak 084-700-7802 LV Electrical Distribution System

Transcript of 01-LV system

Page 1: 01-LV system

Presented By Kidsada Santisak084-700-7802

LV Electrical Distribution

System

Page 2: 01-LV system

Schneider Electric 2- Marketing - Pakon – 22 July 2008

Topic

1.Basic Concept2.LV Components (Design and

Select)3.Schneider Offer in LV

Page 3: 01-LV system

Schneider Electric 3- Marketing - Pakon – 22 July 2008

Topic

1.Basic Concept2.LV Components (Design and

Select)3.Schneider Offer in LV

Page 4: 01-LV system

Schneider Electric 4- Marketing - Pakon – 22 July 2008

CB1 Isc 85 kA

415 V

In 600 A

Isc 40 kA50 m cable

Workshop

Desktop

In 800 A Isc 70 kA

CB2CB3

In 2500 A

Ics 100% Icu

Service continuity needed

CB5

CB4Isc 50 kA

Isc 36 kA

Service continuity neededIn 250 A

Component in LV system

Availability

Safety&

+

Energy Efficiency

Page 5: 01-LV system

Schneider Electric 5- Marketing - Pakon – 22 July 2008

CB1 Isc 85 kA

415 V

In 600 A

Isc 40 kA50 m cable

Workshop

Desktop

In 800 A Isc 70 kA

CB2CB3

In 2500 A

Ics 100% Icu

Service continuity needed

CB5

CB4Isc 50 kA

Isc 36 kA

Service continuity neededIn 250 A

Major Components in LV system

LV Circuit Braker

LV Distribution panel

Energy Management

System

Page 6: 01-LV system

Schneider Electric 6- Marketing - Pakon – 22 July 2008

Fault พนฐานทอาจเกดขนในระบบไฟฟาได

1.Overload2.Short Circuit3.Ground/Earth fault4.Earth Leakage

Page 7: 01-LV system

Schneider Electric 7- Marketing - Pakon – 22 July 2008

ภาวะปรกตNormal

Zแหลงจายไฟฟา

โหลด

Page 8: 01-LV system

Schneider Electric 8- Marketing - Pakon – 22 July 2008

Overload

ZZ

ภาวะโอเวอรโหลด

Z

โหลด

แหลงจายไฟฟา

Page 9: 01-LV system

Schneider Electric 9- Marketing - Pakon – 22 July 2008

Normal

ZZ

ภาวะปรกต

แหลงจายไฟฟา

โหลด

Page 10: 01-LV system

Schneider Electric 10- Marketing - Pakon – 22 July 2008

Short Circuit

Z

ภาวะกระแสลดวงจร

Zแหลงจายไฟฟา

โหลด

Page 11: 01-LV system

Schneider Electric 11- Marketing - Pakon – 22 July 2008

(c)L3L2L1

L2L1

L3L2L1

L3

(d) L2L1

L3

Short Circuit Current Branch Short - circuit Currents

I"k3 k2I"

I"k1k2EI"

a) Balance Three Phase Short Circuit.b) Line to Line Short Circuit Without Earth Connection.c) Line to Line Short Circuit With Earth Connection.d) Line to Earth Short Circuit.

in Conductors and Earth

(a) (b)

ชนดของการลดวงจรประเภทตางๆ

Page 12: 01-LV system

Schneider Electric 12- Marketing - Pakon – 22 July 2008

●ตวอกษรแสดงความหมายของการตอลงดน●อกษรตวแรก ตำาแหนงการตอลงดน ณ ตำาแหนง star ของ

หมอแปลงแหลงจาย ●อกษรตวหลง: ตำาแหนงการตอลงดนของสวนนำากระแสทเปดโลง เชน

โครงของอปกรณไฟฟา●TT: เปนระบบทหมอแปลง และโครงอปกรณมหลกดนทแยกจากกน●TN: เปนระบบทหมอแปลง และโครงอปกรณมหลกดนรวมกน

– TN-S: แยกสาย N (Neutral) และ PE (Earth) ออกจากกน

– TN-C: รวมสาย N (Neutral) และ PE (Earth) ดวยกน– TN-C-S: เรมตนดวยการรวมสาย N (Neutral) และ PE

(Earth) ดวยกน จากนนจงแยกออกจากกน●IT: โครงอปกรณตอหลกดน

2nd letter1st

letter

T(earth)

N(neutral)

T(earth)

I(isolated)

TT

IT

TN

ระบบตอลงดน

Page 13: 01-LV system

Schneider Electric 13- Marketing - Pakon – 22 July 2008

TT system

RB RA

PEN

Id

RdUd

123

TN system

Ud

RB

Id

1

2

3

N

PE

TN-C TN-S

RB

123

C3 C2 C1

R3 R2 R1

IT system

Page 14: 01-LV system

Schneider Electric 14- Marketing - Pakon – 22 July 2008

Topic

1.Basic Concept2.LV Components (Design and

Select)3.Schneider Offer in LV

Page 15: 01-LV system

Schneider Electric 15- Marketing - Pakon – 22 July 2008

LV Circuit Breaker

What are function of LV Circuit Breaker? Mechanical switching device, capable of making,

carrying and breaking currents under normal

circuit conditions and also making, carrying for a

specified time and breaking currents under

specified abnormal circuit conditions such as

those of short circuit. (IEC60947-1)

Page 16: 01-LV system

Schneider Electric 16- Marketing - Pakon – 22 July 2008

Type of LV Circuit Breakers

1. MCB - Miniature Circuit Breaker0.5-125A

2. MCCB - Molded Case Circuit Breaker15-3200A

3. ACB - Air Circuit Breaker800-6300A

Page 17: 01-LV system

Schneider Electric 17- Marketing - Pakon – 22 July 2008

หลกการท Circuit Breaker ใชใน การตรวจจบ และตดกระแสเกน

แบงไดเปน 2 หลกการคอ….

• Thermal-Magnetic trip unit

• Electronic trip unit

Page 18: 01-LV system

Schneider Electric 18- Marketing - Pakon – 22 July 2008

Thermal-Magnetic trip unitการตดวงจรโดยอาศยผลทางความรอน และสนามแมเหลก

ประกอบดวยอปกรณปลดวงจร 2 สวน 1. Thermal Unit. (ทำาหนาทปองกน

) 2. Magnetic Unit. (ทำาหนาทปองกน

C CCCCCCC)

Page 19: 01-LV system

Schneider Electric 19- Marketing - Pakon – 22 July 2008

หลกการทำางานของกลไกทใชผลทางความรอน (Thermal unit)

Thermal-Magnetic trip unit

ภาวะปรกต

ภาวะเกดกระแสเกน (Overload)

Page 20: 01-LV system

Schneider Electric 20- Marketing - Pakon – 22 July 2008

หลกการทำางานของกลไกทใชผลของสนามแมเหลกไฟฟา (Magnetic unit)

Thermal-Magnetic trip unit

ภาวะปรกต ภาวะเกดกระแสลดวงจร Short circuit

Page 21: 01-LV system

Schneider Electric 21- Marketing - Pakon – 22 July 2008

สวนปองกนโอเวอรโหลด

สวนปองกนกระแสลดวงจร

ของจรง...

เบรกเกอร MCB รน multi 9

Page 22: 01-LV system

Schneider Electric 22- Marketing - Pakon – 22 July 2008

How LV Circuit Breakers work

1- The current is measured by current sensors installed in the breaking unit or in the trip unit.

2- The current is analysed by an electronic circuit board in the trip unit. The electronic trip unit sends an electrical tripping command to the MITOP.

3- The MITOP (electromagnet) converts the electrical command into a mechanical command and activates the half wheel of the mechanism. The mechanism opens.sensorssensors

MITOPMITOP

trip unittrip unit

Page 23: 01-LV system

Schneider Electric 23- Marketing - Pakon – 22 July 2008

ของจรง...

Page 24: 01-LV system

Schneider Electric 24- Marketing - Pakon – 22 July 2008

สามารถปรบระดบกระแสทรปไดละเอยดกวา รวมทงสามารถปรบคาหนวงเวลาได (time delay)

ม Fault indicator แสดงสาเหตการปลดวงจร

ใชprotect fault ไดหลายประเภท รวมไปถง อาท Earth fault, Earth League

ม Pre-trip alarm เตอน เมอเบรคเกอรใกลจะเกดการทรป เนองจากปรมาณกระแสใชงาน ใกลเคยงกบพกดกระแสโอเวอรโหลด

มฟงกชนของแอมมเตอร เพาเวอรมเตอร บางรนสามารถวดฮารโมนคได สามารถเชอมตอเขาระบบ Energy Management or SCADA เพอบรหารจดการการใชพลงงานได

ขอดของ Electronic trip unit

Other Technology for LV CBElectronic trip unit

Page 25: 01-LV system

Schneider Electric 25- Marketing - Pakon – 22 July 2008

Tripping Curves

●เวลา ในการตดวงจรของเบรกเกอร (Tripping time) แสดงเวลาในการตดวงจร มหนวยเปนวนาท อยในแนวแกนตงของกราฟ

ปรมาณ กระแส ทไหลผานเบรกเกอร แสดงปรมาณกระแสทไหลผานเบรกเกอร โดยกราฟจะ แสดงเปนจำานวนเทาของคาแอมปทรปของเบรกเกอร มหนวยเปนแอมป อยในแนวแกนนอนของกราฟ

กราฟแสดงการทำางานของเบรกเกอร

Page 26: 01-LV system

Schneider Electric 26- Marketing - Pakon – 22 July 2008

●เสนกราฟจะอยชวงบนซายของกราฟ

Tim

e in

Sec

onds

Multiples of Amp Trip

Thermalunit

●ระดบกระแสทเบรกเกอรทำางานจะอยระหวาง 1-10 เทาของคาแอมปทรป

●แผน bimetal จะทำางาน (โกงงอ) เมอกระแสเกนไหลผาน แลวทำาใหเกดความรอน

●กระแสยงไหลผานมากเทาไร เบรกเกอรยงตดวงจรเรวมากขนเทานน

การตดวงจรโดยอาศยผลทางความรอน

(Thermal Tripping)

Page 27: 01-LV system

Schneider Electric 27- Marketing - Pakon – 22 July 2008

การตดวงจรโดยอาศยผลทางความรอน (Thermal Tripping)

1วนาท

5วนาท

Page 28: 01-LV system

Schneider Electric 28- Marketing - Pakon – 22 July 2008

การตดวงจรโดยอาศยผลทางความรอน (Thermal Tripping)

10วนาท

35วนาท

Page 29: 01-LV system

Schneider Electric 29- Marketing - Pakon – 22 July 2008

●เสนกราฟแสดงอยบรเวณทางขวาดานลาง

Tim

e in

Sec

onds

Multiples of Amp Trip

Magneticunit

●ระดบกระแสทเบรกเกอรตดวงจรจะอยตงแต10 เทาของคาแอมปทรปขนไป

●สนามแมเหลกไฟฟาจะทำางาน เมอมกระแสไหลผานตวเบรกเกอร

●การตดวงจรของเบรกเกอร จะทำางานทนท ไมมการหนวงเวลา

การตดวงจรโดยอาศยผลของสนามแมเหลกไฟฟา (Magnetic tripping)

Page 30: 01-LV system

Schneider Electric 30- Marketing - Pakon – 22 July 2008

0.02วนาท

การตดวงจรโดยอาศยผลของสนามแมเหลกไฟฟา (Magnetic tripping)

Page 31: 01-LV system

Schneider Electric 31- Marketing - Pakon – 22 July 2008

กราฟแสดงการทำางานของเบรกเกอรแบบ Electronic trip unit

Page 32: 01-LV system

Schneider Electric 32- Marketing - Pakon – 22 July 2008

● - Long time setting●เปนการจำาลองการทำางานของแผน Bimetal ในเบรกเกอรแบบ Thermal-Magnetic

●เบรกเกอรจะทำางานเมอเกด Overload●เปนตวกำาหนดขนาดแอมปทรปของเบรกเกอร

●ปองกนความเสยหายของฉนวนสายไฟฟา● - Long time delay

●ปรบตงเวลาในการตดวงจรของเบรกเกอร หลงจากตรวจจบกระแสโอเวอรโหลดแลว

Electronic trip unit

Page 33: 01-LV system

Schneider Electric 33- Marketing - Pakon – 22 July 2008

● - Short time pickup●ใชปรบตงปรมาณกระแสลดวงจร เพอประโยชนในการทำา Coordination

●ปองกนอนตรายทจะเกดขนในระบบ :●ปองกนกระแสสงๆ ทำาลายความเปนฉนวนของสายไฟฟา●ปองกนการหลอมละลายของสายไฟฟา

● - Short time delay●ปรบตงเวลาในการตดวงจรของเบรกเกอร หลงจากตรวจจบกระแสลดวงจรแลว เพอประโยชนในการทำา Coordination

Electronic trip unit

Page 34: 01-LV system

Schneider Electric 34- Marketing - Pakon – 22 July 2008

● Instantaneouspickup●เปนการจำาลองการทำางานของสนาม

แมเหลกไฟฟาในเบรกเกอรแบบ Thermal-Magnetic

●เบรกเกอรตดวงจรทนท ไมมการหนวงเวลา

●ปองกนอนตรายอนจะเกดจากการบดตว ของตวนำา (Electrodynamic) หลงจากเกดลดวงจรในระบบไฟฟา

Electronic trip unit

Page 35: 01-LV system

Schneider Electric 35- Marketing - Pakon – 22 July 2008

●Ground-fault pickup● จดทเบรกเกอร เรมตรวจจบปรมาณกระแสลดวงจรลงดน

●Ground-fault delay●ปรบตงเวลาในการตดวงจรของ

เบรกเกอร หลงจากตรวจจบกระแสลดวงจรลงดนแลว

Electronic trip unit

Page 36: 01-LV system

Schneider Electric 36- Marketing - Pakon – 22 July 2008

Application of Electronic Trip UnitThermal image

Page 37: 01-LV system

Schneider Electric 37- Marketing - Pakon – 22 July 2008

Application of Electronic Trip UnitI2t ON/OFF

Page 38: 01-LV system

Schneider Electric 38- Marketing - Pakon – 22 July 2008

Application of Electronic Trip Unit

Principles of the ZSI function

Page 39: 01-LV system

Schneider Electric 39- Marketing - Pakon – 22 July 2008

- Ground fault Protection Equipmentระบบตรวจจบกระแสลดวงจรลงดน (Ground Fault Sensing)

แบบ Residual• สายแตละเสนจะถกตรวจวดกระแสดวยหมอแปลงกระแส (CT) โดยเฟส A, B, C จะตดตงใน ตวเบรกเกอร สวนในสายนวทรล จะตดตงแยกตางหาก แลวเดนสายกลบมาทตวเบรกเกอร

Concept3 เฟส 4 สาย: I1+I2+I3+IN = 0

3 เฟส 3 สาย: I1+I2+I3 = 0

เฟสเดยว: I1+IN = 0

Page 40: 01-LV system

Schneider Electric 40- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breakerparameter display definition selection

Rating

Breaking capacity

In (A)Must be indicated on the front of the circuit breaker

Maximum current that the device can withstand under specific operating conditions

The rated current determines the rating (In)

In = rated current: to withstand the current absorbed by the loadsIn > rated current: if derating is required, according to the ambient T° and installation and operating conditions (connector cross-section, temperature, environment, etc.)

Icu in kAMust be indicated on the front of the circuit breakerN.B. magnifying glass effect on the front of a device

Maximum short-circuit current that the circuit breaker can interrupt

The assumed short-circuit current (Isc) determines the breaking capacity

Page 41: 01-LV system

Schneider Electric 41- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker

In = 400A

Icu = 70kA at 380/415 V

Page 42: 01-LV system

Schneider Electric 42- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit BreakerHow to select suitable Icu?

1. Must know what is the level of 3 phase short circuit fault at that location. (By

calculation or from drawing)

2. LV CB at that location must have Icu ≥ 3 phase fault level at that location.

DC component AC component

Iproot2 Ik

2 root2 Ik

Page 43: 01-LV system

Schneider Electric 43- Marketing - Pakon – 22 July 2008

High power test lab

"O" opening test

"CO” closing/opening test

enclosureA B

is closed

ON Opening, breaking OFF

is closed

OFF ON Opening, breaking OFFclosing

to t1

BA

to t1

BA

making switch

ground fuse

t

t

การทดสอบคา Icu“O” - รอ3 นาท - “CO”

Page 44: 01-LV system

Schneider Electric 44- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

Ics

Discrimination: Icw

parameter selectiondefinitiondisplay

Icw (kA RMS)Category B

On the front of the device

Permissible short-time current.

Icw covers the TED and I²t performances of a circuit breaker

A selective circuit breaker has an Icw.To be selective, according to IEC 60947-2, a circuit breaker must have an Icw > 12 In (Category B). To be completely selective, it must have an Icw equivalent to the max Icu of the downstream circuit breaker(s).

It is expressed as a % of Icu.It is defined by IEC 947-1/-2. The higher the Ics the more effective the circuit breaker

Ics is the rated service breaking capacity given by the manufacturer. Ics indicates the ability of a circuit-breaker to provide normal operation after three short-circuit breaking operations.

Ics (kA RMS)

Page 45: 01-LV system

Schneider Electric 45- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

Ics = 100%Icw = 6kA/ 0.25 s

Page 46: 01-LV system

Schneider Electric 46- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

Breaker ทมคา Ics สงๆ ชวยเพมความตอเนองของระบบไฟฟาอยางไร ?

- Breaker ภายในตเมน (MDB) ซงอยใกลหมอแปลง มโอกาสทจะพบกบกระแสลดวงจรทมขนาดสงใกลเคยงกบคา Icu หรอ กระแสลดวงจร 3 เฟส มากกวา breaker ทอยภายในตยอย

Breaker ทตดในตเมน (MBD) หรออยใกลหมอแปลงควรจะเลอกใช แบบทมคา Ics = 100 % Icu

Page 47: 01-LV system

Schneider Electric 47- Marketing - Pakon – 22 July 2008

เทคโนโลย Current limiting ชวยใหคา Ics = 100 % Icu

DC component

AC component

Ip

Page 48: 01-LV system

Schneider Electric 48- Marketing - Pakon – 22 July 2008

ตดกระแสลดวงจรดวยเวลาเพยง 0.002 วนาท !Compact NS

Page 49: 01-LV system

Schneider Electric 49- Marketing - Pakon – 22 July 2008

aa

10 0005 000

2 0001 000

500

20010050

20105

21.5

.2

.1.05

.02

.01.005

.002

.001.5 .7 1 2 3 4 5 7 10 20 30 50 70100 200 300

t(s)

I / Ir

Im = 5 … 10 x In

déclenchement réflexe :t < 10 ms

t(ms)

5

20

10

87

6

4

3

2 3 4 6 10 20 30 40 60 100 200

STR22SE160

NS250

NS100-NS160

TM160D

TM16D...TM100D

kA eff

Trip curve ของเบรคเกอรทไมใช current limit •Isc < 25 In

Thermal magnetic ทำางาน

•Isc > 25 In“Reflex tripping” ทำางาน

Compact NS

Page 50: 01-LV system

Schneider Electric 50- Marketing - Pakon – 22 July 2008

a

Compact NS“roto-active”

Page 51: 01-LV system

Schneider Electric 51- Marketing - Pakon – 22 July 2008

fixedcontact

housingchamber

gasgenerating parts

arc chute

arcchute

gasgenerating parts

rotarycontact

magnetique U

fixedcontact

a

i

Fm

i

Fr

Compact NS“roto-active”

Page 52: 01-LV system

Schneider Electric 52- Marketing - Pakon – 22 July 2008

MCCB (molded case CB) ทวๆไป

a

i

Fm

i

Fr

Page 53: 01-LV system

Schneider Electric 53- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)ICE 947-2แบงอปกรณปองกนเซอรกตเบรคเกอรออกเปน 2 ประเภท

• Category A• Category B

เบรกเกอร category B :• เปนเบรคเกอรทม time delay ทำาใหสามารถทำา time discrimination กบเบรคเกอรตวลางได• คา Icw บอกระดบกระแส (kA)ทสามารถทนไดในชวง time delay (0.05 ,0.1 ,0.25 ,0.5 ,1 sec)• พกดกระแส 800-6300 A

เบรกเกอร category A :• ไมมการกำาหนดคา Icw• สามารถทำา discrimination แบบ current discrimination ได• พกดกระแส 1-630 A

Im

tm

mt

Page 54: 01-LV system

Schneider Electric 54- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

Icu(D2)

CB1CB2

CB1

CB2

CB2 CB1

CB1

CB2

Icu(CB2)

Current discrimination Time discrimination

Page 55: 01-LV system

Schneider Electric 55- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

ยงใชเบรคเกอร category B ทมคาIcw สงเทาใด discrimination กยงดเทานน …

(ใกลเคยง total discrimination)

Icw = Icu

ถา Icw = Icu จะได total discrimination !

Instantaneous OFFbreaking power:Icu= Ics = Icw

Category B

Icu

If Icw = Icu?

Page 56: 01-LV system

Schneider Electric 56- Marketing - Pakon – 22 July 2008

Key Parameter to Select LV Circuit Breaker (2)

Easy way to check Discrimination!

upstreamCompact circuit breaker NS100N/H/L NS160N/H/L NS250N/H/L NS400N/H/L NS630N/H/LTM-Dn trip unit 80 100 125 160 200 250 400 630

downstreamcircuit breaker TM-Dmulti 9 C60N 10 to 25

32 to 4063

Compact NS80H-MA 2.5 to 80NS100N 16 to 100NS160N 16 to 160NS250N 16 to 250

Discrimination table

Page 57: 01-LV system

Schneider Electric 57- Marketing - Pakon – 22 July 2008

…ความตอเนองของระบบไฟฟา ใครๆกตองการ

• ลดตนทนการผลต• เพมปรมาณการผลต• คณภาพของสนคา

Page 58: 01-LV system

Schneider Electric 58- Marketing - Pakon – 22 July 2008

LV co-ordination techniques● Optimising LV electrical distribution through 3 actions at the Protection

Plan Level

1) discrimination to guarantee continuity of supply 2) limitation to reduce constraints 3) cascading to optimise performances

Page 59: 01-LV system

Schneider Electric 59- Marketing - Pakon – 22 July 2008

Co-ordination of protection devices1) discrimination● Whatever the fault: overload short-circuit insulation fault

only the circuit-breaker located just upstream from the fault trips

● 4 types of discrimination current time energy logic

E41139

a

A

CB

Page 60: 01-LV system

Schneider Electric 60- Marketing - Pakon – 22 July 2008

Co-ordination of protection devices2) limitation● Technique that allow for the harmful effects of short-circuit currents

to be diminished

● Limitation reduces effects of the following type: electromagnetic: reduction in EMC disturbances mechanical: reduction of deformation and/or breaks thermal: rise in the life span of trunkings

E62650

E62651

Isc presumed transient peakIsc presumed steady peak

Isc limited peak

Isc

10 %

Â

tsc t

100 %

t

A2 I2sc

Presumedenergy 100 %

Limitedenergy< 1 %

1 %

100 %

Page 61: 01-LV system

Schneider Electric 61- Marketing - Pakon – 22 July 2008

Co-ordination of protection devices3) cascading● The limiting upstream circuit-breaker helps the downstream

circuit-breakers to open● Technique that allows for the cost of LV electrical distribution

to be optimisedE62667

Non priorityfeeder

Page 62: 01-LV system

Schneider Electric 62- Marketing - Pakon – 22 July 2008

a

1000 A

100 A

• โอเวอรโหลด : I < 10 In

• ลดวงจรแบบมความตานทาน :10 In > Icc 30 In

• ลดวงจร : In > 30 In

กระแสเกนในระบบไฟฟามหลายระดบเบรกเกอร CB1

เบรกเกอร CB2

Ic3 = 30 kA - ลดวงจร

breaking capacity

Ic2Ic1 Ic3 I(A)

t(s)

100A

เบรกเกอร CB2

เบรกเกอร CB1

Ic1 = 300 A - โอเวอรโหลด

Ic2 = 3000 A - ลดวงจรแบบมความตานทาน

Page 63: 01-LV system

Schneider Electric 63- Marketing - Pakon – 22 July 2008

หลกการ Current discrimination Discrimination limit Is = Im(CB1) หลกการ Current discrimination จะใชไดดมาก กบต Load center, Consumer unit (เพราะพกดกระแส CB1 กบ CB2 หางกนมาก และกระแสลดวงจรตำา)

Ir ของ CB1

Ir ของ CB2> 2

Ir(CB2) Ir(CB1)

Im(CB2)Im(CB1)

Im ของ CB1

Im ของ CB2> 2

Note : Merlin Gerin Im(CB1)/Im(CB2) >1.5

Icu(D2)

CB1CB2

CB1

CB2

Page 64: 01-LV system

Schneider Electric 64- Marketing - Pakon – 22 July 2008

การทำา Discrimination ในชวงกระแสลดวงจรตำาๆ

CB2 CB1

CB1

CB2

Icu(CB2)

•ใชหลกการ time discrimination

Page 65: 01-LV system

Schneider Electric 65- Marketing - Pakon – 22 July 2008

มาตรฐาน IEC947-2 แบงอปกรณปองกนเซอรกตเบรคเกอรออกเปน 2 ประเภท

• Category A• Category B

เบรกเกอร category B :• เปนเบรคเกอรทม time delay ทำาใหสามารถทำา time discrimination กบเบรคเกอรตวลางได• คา Icw บอกระดบกระแส (kA)ทสามารถทนไดในชวง time delay (0.05 ,0.1 ,0.25 ,0.5 ,1 sec)• พกดกระแส 800-6300 A

เบรกเกอร category A :• ไมมการกำาหนดคา Icw• สามารถทำา discrimination แบบ current discrimination ได• พกดกระแส 1-630 A

Im

tm

mt

Page 66: 01-LV system

Schneider Electric 66- Marketing - Pakon – 22 July 2008

ยงใชเบรคเกอร category B ทมคาIcw สงเทาใด discrimination กยงดเทานน …

(ใกลเคยง total discrimination)

การทำา Discrimination ในชวงกระแสลดวงจร

• ใชหลกการ time discrimination

Icw = Icu

ถา Icw = Icu จะได total discrimination !

Instantaneous OFFbreaking power:Icu= Ics = Icw

Category B

Icu

Page 67: 01-LV system

Schneider Electric 67- Marketing - Pakon – 22 July 2008

Other Technology for LV CB (2)Current Limiting and Cascading

A device is said to be limiting when the current passing through it during a short-circuit has an amplitude considerably lower than the prospective short-circuit current

t

Icc Prospective Isc peak

Limited Isc peak

What is Current Limiting?

Page 68: 01-LV system

Schneider Electric 68- Marketing - Pakon – 22 July 2008

Other Technology for LV CB (2)Current Limiting Technology

Limitation thermal, mechanical and electromagnetic stresses of cables, thanks to rapid opening preventing complete development of the short-circuit

Cost reduction:Smaller cables for high short-circuit currentsSmaller devicesSmaller switchboard enclosureUse of the cascading principle

Even our multi 9 circuit-breakers are equipped with limitation technology thanks to an extremely effective mechanism

Limitation curves are defined for each device.t

Icc Prospective Isc peak

Limited Isc peak

Page 69: 01-LV system

Schneider Electric 69- Marketing - Pakon – 22 July 2008

Other Technology for LV CB (2)What is Cascading?

Cascading is the use of the current limiting capability of circuit breakers at a given point to permit installation of lower- rated and therefore lower cost breakers downstream

1 1 3

Page 70: 01-LV system

Schneider Electric 70- Marketing - Pakon – 22 July 2008

Other Technology for LV CB (2)Cascading table

Upstream NS100N NS100H NS100LBreaking capacity kA eff 36 70 150Downstream (kA)C60a 15 20 20C60N 25 30 30C60H 25 40 40

Breaking capacity (kA eff)

Note : C60a 5kA @ 415VC60N 10kA @ 415VC60H 15kA @ 415VFault at 36kA

Page 71: 01-LV system

Schneider Electric 71- Marketing - Pakon – 22 July 2008

Other Technology for LV CB (2)Cascading with Enhanced Discrimination

Upstream NS160N/H/L 36kA trip unit TM-D

Downstream rating (A) 80 100/125/160

C60N <16 30/30 30/3020 30/30 30/3025 30/30 30/3032 15/30 30/3040 15/30 30/3050 15/30 30/3063 30/30

15/30Selectivity limit enhanced by cascading (in kA)

Downstream device breaking capacity enhanced by cascading (in kA)

Page 72: 01-LV system

Schneider Electric 72- Marketing - Pakon – 22 July 2008

Topic

1.Basic Concept2.LV Components (Design and

Select)3.Schneider Offer in LV

Page 73: 01-LV system

Schneider Electric 73- Marketing - Pakon – 22 July 2008

Ecodial Program for LV Electrical system design

B2

Tableau

D4

CEP

Q8

Circuit

C8

L8 L9

C9

Circuit

Q9

Q7

Circuit

C7

L7L6

C6

Circuit

Q6

Q5

Circuit

C5

L5

Q3

Circuit

C3

Q1

Circuit

C1

T1

Page 74: 01-LV system

Schneider Electric 74- Marketing - Pakon – 22 July 2008

Up to 125A MCB multi9

Up 10 100A MCB QOvs

Up to 400A MCCB Easypact

100 – 3200A MCCB Compact NS

800 – 1600A ACB Masterpact

NT

800 – 6300A ACB Masterpact

NW

Circuit breaker from 0.5 – 6300 A

Page 75: 01-LV system

Schneider Electric 75- Marketing - Pakon – 22 July 2008

Easypact: performances

25010015 60

7.5

10

36

30

25

18

15

EZD100B

EZD100FEZD100N

EZD100H

EZD250F

EZD250N

EZD250H

EasyPact 100 EasyPact 250

Breaking Capacity Icu kA at 415Vac

50

EZDV250N

EZDV250H EZD400N

EZD400H

Ratedcurrent In A

EasyPact 400

400

Page 76: 01-LV system

Schneider Electric 76- Marketing - Pakon – 22 July 2008

●Breaking capacities by standards

400/415V

100 AF 250 AF

IEC-JIS 550V

230/240V

240VNema 480V

B F N H

5 2.5 105

10 7.5 30 15

25 10 100 25

- - 18 10

-- 100 25

kA F N H

5 15 10

18 36 25

25 85 50

15 25 18

25 85 50

400 AF

N H

2015

5036

100 85

3525

8550

Easypact: performances

Page 77: 01-LV system

Schneider Electric 77- Marketing - Pakon – 22 July 2008

Compact NSX and Compact NS Range Overview●4 volumes only to cover...

●Ratings from 100 to 3200 A●Performances from 36 to 200 kA

Compact NSX 100 - 250 Compact NSX 400-630 Compact NS 630-1600 Compact NS 1600-3200

Page 78: 01-LV system

Schneider Electric 78- Marketing - Pakon – 22 July 2008

NPerformances (kA) H L LB

Types of poles NH unit L unit LB unit

Icu 220/240 V 50 70 150 200

380/415 V 50 70 150 200

440 V 50 65 130 200

500/535 V 40 50 100 100

660/690 V 30 42 - 75

Icw 0.5 s 25 25 10 7

1 s 19.2 19.2 7 5

Break. cap.NEMAAB1

240 V 50 65 125 200

480 V 35 50 100 200

600 V 25 50 - 100

Mechanical durability 10 000 10 000 10 000 10 000

Compact NS IEC60947-2 performances

Page 79: 01-LV system

Schneider Electric 79- Marketing - Pakon – 22 July 2008

Compact NS IEC60947-2 performances

630b

Performance N

Manual Compact NS

Ics 100% 75%

800 1000 1250 1600

Performance H Ics 75% 50%

Performance L Ics 100%

Performance LB Ics 100%

630b

Performance N

Electrical Compact NS

Ics 75% 75%

800 1000 1250 1600

Performance H Ics 50% 50%

Performance L Ics 100%

Page 80: 01-LV system

Schneider Electric 80- Marketing - Pakon – 22 July 2008

ACB ●2 families, 3 sizes

Masterpact NT

630 to 1600 A

Smallest circuit-breaker !

4000 to 6300 A

Masterpact NW

800 to 4000 A

Masterpact NW

Masterpact NT/NW Range Overview

Page 81: 01-LV system

Schneider Electric 81- Marketing - Pakon – 22 July 2008

Masterpact NT/NW IEC60947-2 performances

Page 82: 01-LV system

Schneider Electric 82- Marketing - Pakon – 22 July 2008

อปกรณประกอบสำาหรบเซอรกตเบรคเกอร●SHUNT TRIP●UNDERVOLT RELEASE (UVR)●UNDERVOLT RELEASE WITH TIME DELAY●AUXILIARY SWICH●ALARM SWITCH●HANDLE PADLOCK●KEY LOCKS●MOTER OPERATE

Page 83: 01-LV system

Schneider Electric 83- Marketing - Pakon – 22 July 2008

Shunt Trip

●จะปลดวงจรเซอรกตเบรคเกอร เมอ Coil shunt trip ไดรบVoltage

●สามารถนำาไปตอกบระบบอนเพอนำามาสงปลดวงจรได

For MCCB For ACB

Page 84: 01-LV system

Schneider Electric 84- Marketing - Pakon – 22 July 2008

Undervoltage Release (UVR)●ปลดวงจรเมอ voltage ตกตำากวาคาทกำาหนดไว●สวนใหญจะใชงานคกบ under/over voltage relay●มทงแบบทม และไมม Time delay

ไมม Time delay ม Time delay

การไฟฟาแนะนำาใหเลอกใชงานแบบทม Time delay

Page 85: 01-LV system

Schneider Electric 85- Marketing - Pakon – 22 July 2008

Under volt. แบบไมมtime delay

BAD !

Under volt. แบบมtime delay

Good !

Phase protection relay with under voltage release

L1L2L3N

Page 86: 01-LV system

Schneider Electric 86- Marketing - Pakon – 22 July 2008Under voltage release with time delay Control board ของตว Under voltage

Undervoltage Release With Time Delay

Page 87: 01-LV system

Schneider Electric 87- Marketing - Pakon – 22 July 2008

Undervoltage Release With Time Delay

แบบตดตงภายนอกตวเบรคเกอร

Page 88: 01-LV system

Schneider Electric 88- Marketing - Pakon – 22 July 2008

For MCCBFor ACB

Auxiliary Switch●เมอเซอรกตเบรคเกอรเปลยนสถานะ - (on off) จะทำาใหหนาสมผส

ชวยเปลยนสถานะดวย

Page 89: 01-LV system

Schneider Electric 89- Marketing - Pakon – 22 July 2008

Auxiliary Switch (ตอ)●เมอเซอรกตเบรคเกอรเปลยนสถานะ - (on off) จะทำาใหหนาสมผส

ชวยเปลยนสถานะดวย

Page 90: 01-LV system

Schneider Electric 90- Marketing - Pakon – 22 July 2008

Alarm Switch●หนาสมผสชวยจะเปลยนสถานะเมอเซอรกตเบรคเกอรทรป

เนองจากเกด Fault ขนในระบบ (Overload, Short circuit)

For MCCB

Page 91: 01-LV system

Schneider Electric 91- Marketing - Pakon – 22 July 2008

Motor Operate●ผใชสามารถสง ON-OFF เบรกเกอรไดจากหองคอนโทรล โดยไม

ตองไปทหนาตวเบรคเกอร

Page 92: 01-LV system

Schneider Electric 92- Marketing - Pakon – 22 July 2008

Handle Padlock●ตดตงเพอกนการ ON เซอรกตเบรคเกอร●ลอกไวในตำาแหนง OFF เทานน ไมสามารถลอกไวในตำาแหนง ON

For MCCB For ACB

Page 93: 01-LV system

Schneider Electric 93- Marketing - Pakon – 22 July 2008

Key Locks●ตดตงเพอกนการ ON เซอรกตเบรคเกอร●ลอกไวในตำาแหนง OFF เทานน ไมสามารถลอกไวในตำาแหนงON

Page 94: 01-LV system

Schneider Electric 94- Marketing - Pakon – 22 July 2008

●นยมใชกบเบรคเกอรทควบคมมอเตอร●สามารถลอคเบรคเกอรทตำาแหนง OFF ได โดยไมตองใช

อปกรณเพม

Rotary Handle

Extend Direct