Website: -marine.com Oct 2013 M Prostar Indonesia Profile.pdfA. Partnership Shipyard: PT. Kumala...

Post on 27-Apr-2018

231 views 10 download

Transcript of Website: -marine.com Oct 2013 M Prostar Indonesia Profile.pdfA. Partnership Shipyard: PT. Kumala...

M Website: www.prostar-marine.com Oct 2013

Group Companies PT Prostar Indonesia PT Pinang Jaya Sentosa

Our key management and production staff are Singaporean and Malaysian with rich experience both in Singapore and in Indonesia. Our maximum work force in Batam is 850.

We have completed high quality and precision projects such as fabrication, assembly and erection of Jack Cases, Spud Cans & Leg Well Blocks for a few of Jack-up Rigs in Batam.

Our Clients Worldwide Existing Clients Seaways International (www.seawaysintl.com)

Gryphon Energy Asia Pacific Sdn Bhd (www.gryphonenergycorp.com)

PT. Graha Trisaka Industri (Drydocks World Group) PT. Nanindah Mutiara Shipyard (Drydocks World

Group) PT. Drydocks World Pertama (Drydocks World Group) PT. Batamec Shipyard (Otto Marine Group) PT. Bintan Offshore (Keppel Fels Group)

Some Completed Projects in Batam Deck Cargo and Ballast Tank Barge (Seaways) Rig Boss 1 and Cesano (Gryphon Energy) MSC CJ46 Jack up Rig : Project L204, 205, L206 in Drydock World Graha Jack Cases / Spud Cans /Leg Well Blocks Wing tank Blocks / Upper Hull Blocks Living Quarters / Helideck B329, B330, B883 in Bintan Offshore (Keppel Fels) Block 6D, Block 6W, Column Block (Please refer to attached completed project list)

Deck Cargo and Ballast Tank Offshore Barge for Seaways

Project of Leg Upgrading for Gryphon Energy

Project: L205, L206 Fabrication of Jackcase 1 Client: Drydocks World - Graha

Project: L205, L206 Fab & Erect Jackcase Client: Drydocks World - Graha

Project: L206 Fab & Erect Spudcan Client: Drydocks World - Graha

Project: L206 Fab & Erect Leg Well Blk Client: Drydocks World - Graha

Project: L206 Fab & Erect Living Quarter Client: Drydocks World - Graha

Project: L206 Fab & Erect Wing Tk Blk Client: Drydocks World - Graha

Project: L205, L206 Installation of Outfitting Client: Drydocks World - Graha

Project :B329 Assembly of BLK 6D Client: Bintan Offshore (Keppel Fels Group)

Our Vision

Safety is our priority. Quality is our commitment. Schedule is our Value.

Annex List

A. Partnership Shipyard: PT. Kumala Indonesia Shipyard B. Project List C. Contract Photocopies (Partial)