Post on 08-Oct-2020
1. An opening hole of 35mm diameter is required on sink top or work top for installation of tap.2. Slide the rubber O-ring ⑨, base ⑧, rubber ⑦ up to the base of tap;3. Install the plastic cover ⑥ to the A hole under the base of the tap; the connecting pipe ⑩ to the B hole and 2 flexible hoses ⒀ to C and D;4. Place the tap through the tap hole;5. Place the skid proof rubber ⑤ and the fixing sheet ④ through the connecting pipe and close to the sink or worktop;6. Tight the nut ③, make sure the tap is stable;7. Connect the pull-out pipe to the connecting pipe ⑩;8. Place the weighting ball 10cm up the lowest point of the pull-out hose.
●Before installation, please ensure that the following work
conditions are adhered to:
-Water temperature between 0˚C - 90˚C
-Water pressure between 0.05MPa – 1.0MPa. Pressure reducing
valve is necessary if pressure exceeds 1.2MPa
-Avoid major pressure differences between hot and cold water
supply
●Flush pipes thoroughly before and after installation to ensure
water supply is free of any debris.
●Inspect tap fitting and debugged to its best. Do not attempt to
disassemble fitting on your own.
●Use thread sealant tape (PTFE) on any screw joining
connections and ensure all joints are securely tightened.
ETM-E3680P
9
8
10
A
BC D
Φ35mm
2 6~10cm
This . FIAMMA SDN. BHD. will not be held responsible for the use of superseded or voided specifications.Fabricatoe must check for cut-out accuracy.
specification is subject to change without notice
Stainless Steel Mixer Tap