Questions? Contact us:24/7 phone: 403-212-0565 info@SWCRRproject.com SWCRRproject.com

Southwest Calgary Ring Road 2018 Construction Update Segment 2: Glenmore Trail from 69th Street to 37th Street SW

N

Road Construction • Construct Tsuut’ina Parkway and roundabout to

access 37th Street • New eastbound lanes along Discovery Ridge• Additional road construction where available

Bridge Construction• Start bridge at 37th Street • Continue nine bridges in Sarcee Trail interchange

Traffic Impacts• Detour intersection at Sarcee Trail to the north• Realign ramps at 37th Street• Permanently close 45th Street access to/from

Glenmore Trail• Truck traffic from haul road• Speed reduction on Highway 8 / Glenmore Trail

Elbow River Crossing• Open river realignment• Continue three bridges and one tunnel• Start two stormwater ponds • Realign traffic on Weaselhead Road

Utilities• Richmond stormwater line near 37th Street

69st St

SW

Wes

thill

s Way

SW

Sarc

ee T

rail

SW

45th

St S

W

37th

St S

W

Glenmore Trail SW

37th

St S

W

Wea

selhea

d Rd

Ric

hard

Way

SW

Tsuut’ina Nation

33

5

5

55

Transportation Utility Corridor

5

5

3

3

Future Transportation

Corridor

Pond

Pond

Pond

Elbow River

SWCRR Roads & Ramps

Existing Roads

Stormwater Ponds

Right-of-Way

Road Closure

SWCRR Bridges

Haul Road

River Realignment

Transportation Utility Corridor

# Number of Stage 1 Lanes & Direction of Traffic

Asphalt Plant

Tsuut’ina Parkway

Tsuut’in

a Park

way

New Traffic Signal (2018)