Questions? Contact us: 24/7 phone: 403-212-0565 [email protected] SWCRRproject.com Southwest Calgary Ring Road 2018 Construction Update Segment 2: Glenmore Trail from 69 th Street to 37 th Street SW N Road Construction • Construct Tsuut’ina Parkway and roundabout to access 37 th Street • New eastbound lanes along Discovery Ridge • Additional road construction where available Bridge Construction • Start bridge at 37 th Street • Continue nine bridges in Sarcee Trail interchange Traffic Impacts • Detour intersection at Sarcee Trail to the north • Realign ramps at 37 th Street • Permanently close 45 th Street access to/from Glenmore Trail Truck traffic from haul road • Speed reduction on Highway 8 / Glenmore Trail Elbow River Crossing • Open river realignment • Continue three bridges and one tunnel • Start two stormwater ponds Realign traffic on Weaselhead Road Utilities • Richmond stormwater line near 37 th Street 69 st St SW Westhills Way SW Sarcee Trail SW 45 th St SW 37 th St SW Glenmore Trail SW 37 th St SW Weaselhead Rd Richard Way SW Tsuut’ina Nation 3 3 5 5 5 5 Transportation Utility Corridor 5 5 3 3 Future Transportation Corridor Pond Pond Pond Elbow River SWCRR Roads & Ramps Existing Roads Stormwater Ponds Right-of-Way Road Closure SWCRR Bridges Haul Road River Realignment Transportation Utility Corridor # Number of Stage 1 Lanes & Direction of Traffic Asphalt Plant Tsuut’ina Parkway Tsuut’ina Parkway New Traffic Signal (2018)

Transcript of Southwest Calgary Ring Road - swcrrproject.com€¦ · Questions? Contact us: 24/7 phone:...

Questions? Contact us:24/7 phone: 403-212-0565 [email protected] SWCRRproject.com

Southwest Calgary Ring Road 2018 Construction Update Segment 2: Glenmore Trail from 69th Street to 37th Street SW

N

Road Construction • Construct Tsuut’ina Parkway and roundabout to

access 37th Street • New eastbound lanes along Discovery Ridge• Additional road construction where available

Bridge Construction• Start bridge at 37th Street • Continue nine bridges in Sarcee Trail interchange

Traffic Impacts• Detour intersection at Sarcee Trail to the north• Realign ramps at 37th Street• Permanently close 45th Street access to/from

Glenmore Trail• Truck traffic from haul road• Speed reduction on Highway 8 / Glenmore Trail

Elbow River Crossing• Open river realignment• Continue three bridges and one tunnel• Start two stormwater ponds • Realign traffic on Weaselhead Road

Utilities• Richmond stormwater line near 37th Street

69st St

SW

Wes

thill

s Way

SW

Sarc

ee T

rail

SW

45th

St S

W

37th

St S

W

Glenmore Trail SW

37th

St S

W

Wea

selhea

d Rd

Ric

hard

Way

SW

Tsuut’ina Nation

33

5

5

55

Transportation Utility Corridor

5

5

3

3

Future Transportation

Corridor

Pond

Pond

Pond

Elbow River

SWCRR Roads & Ramps

Existing Roads

Stormwater Ponds

Right-of-Way

Road Closure

SWCRR Bridges

Haul Road

River Realignment

Transportation Utility Corridor

# Number of Stage 1 Lanes & Direction of Traffic

Asphalt Plant

Tsuut’ina Parkway

Tsuut’in

a Park

way

New Traffic Signal (2018)